Q/ZX 01181.18-2013
Number
Q/ZX 01181.18-2013
Owning
Engineering & Service/Engineering Delivery/ Engineering Project Management/Document
Process Management
Responsible Engineering Solution Department
Unit
Drafted by Liu Hongmei00007637
Approved Chen Fuqi10005964
by
Issued on 2013-05-17
Effective 2013-05-17
from
1 Purpose....................................................................3
2 Overview...................................................................3
3 Terms, Definitions, Symbols and Abbreviations..............................4
3.1 Terms and Definitions....................................................4
4 Responsibilities...........................................................4
4.1 Documentation manager....................................................5
4.2 Project Sub-Teams........................................................5
4.3 Outsourcing Team.........................................................5
5 Engineering Project Standard Document Category and Management Requirements..5
5.1 Purpose and Principal of Classification..................................5
5.2 Document Category Naming Conventions.....................................6
5.3 Top-level Categories.....................................................6
5.4 M-Project Management Documents...........................................7
5.5 B-Commercial Files.......................................................9
5.6 U-Product Manuals........................................................9
5.7 R-Wireless Site Engineering.............................................10
5.8 X-OSP Engineering.......................................................11
5.9 Other Product Engineering...............................................12
6 Document Management Basic Specifications..................................14
6.1 Writing.................................................................14
6.2 Naming..................................................................14
6.3 Review..................................................................14
6.4 Readability Audit.......................................................14
6.5 Version Control.........................................................14
6.6 Delivery Format.........................................................14
6.7 Keep Records............................................................15
6.8 Set up File Room and Document Sever.....................................15
7 Document Naming Conventions...............................................15
7.1 Naming Format...........................................................15
7.2 Description of Document Name Components.................................16
8 Basic Actions for Documentation manager...................................17
<>
All rights reserved. No distribution without prior permission of ZTE.
I
Restricted
Q/ZX 01181.18-2013
<>
All rights reserved. No distribution without prior permission of ZTE.
II
Restricted
Q/ZX 01181.18-2013
1 Purpose
This standard is formulated to facilitate the engineering project delivery with standardized
document management work.
2 Overview
This standard specifies the responsibilities and standards of project documentation
management.
This standard is applicable to document management of engineering projects.
This standard is not applicable to procurement documents.
This standard is divided into the following parts:
Part 1: Engineering Project Management Delivery Project Establishment Process
Part 2: Engineering Project Management Team Building Process
Part 3: Engineering Project Management Contract Handover Process
Part 4: Engineering Project Management Project Plan Development and
Integration Process
Part 5: Engineering Project Management Making Budget Process
Part 6: Engineering Project Management Appraisal Process of Project Plan and
Budget
Part 7: Engineering Project Management Project Kick-off Meeting Process
Part 8: Engineering Project Management Project Implementation Management
Standard
Part 9: Engineering Project Management Resource Release Process
Part 10: Engineering Project Management Project Handover Process
Part 11: Engineering Project Management Final Accounting Process of
Engineering Cost
Part 12: Engineering Project Management Post Mortem Process
Part 13: Engineering Project Management Appraisal Process of Project Closure
Part 14: Engineering Project Management Communication Management Process
Part 15: Engineering Project Management Risk Management Process
Part 16: Engineering Project Management Quality Management Process
Part 17: Engineering Project Management Problem Management Process
<>
All rights reserved. No distribution without prior permission of ZTE.
3
Restricted
Q/ZX 01181.18-2013
Restricted
Q/ZX 01181.18-2013
Project
Standard
Document
Category
and
Management
Restricted
Q/ZX 01181.18-2013
M-Project Management
B-Commercial Files
U-Product Manuals
R-Wireless Site Engineering
X-OSP Engineering
(Other Product Engineering)
OM-Operation & Maintenance
Category Name
Description
M-Project
Management
2
B-Commercial
Files
<>
All rights reserved. No distribution without prior permission of ZTE.
6
Restricted
Q/ZX 01181.18-2013
No.
Category Name
Description
U-Product Manuals
R-Wireless Site
Engineering
X-OSP
Engineering
(Other Product
Engineering)
any of the other products except radio site engineering and OSP
OM-Operation &
Maintenance
If there is only one product type in a project, subcategories of the R-Wireless Site
Engineering, X-OSP Engineering or Other Product Engineering can be integrated in toplevel categories, as shown in Table 3:
Table 3 Engineering Project Document Top-level Categories(2)
Engineering Project Document Library
M-Project Management
B-Commercial Files
U-Product Manuals
RP-Network Planning
RE-Engineering & Technical Solutions
RS-Survey and Design(optional)
RA-Site folders
RN-Network Optimization
Restricted
Q/ZX 01181.18-2013
The subcategories of M-Project Management and their descriptions are given in Table 4.
Table 4 The Subcategories of M-Project Management
No.
Category Name
Document Example
Document
Owner
M01-Regulations
PMM
Contract
and Procedures
2
M02-Contract
Management
Manager
M03-Project
Contract
review
and
clarification
records,
Initiation
PMM
M04-Planning
and
Controlling
Planning
Control
Manager
&
records
5
M05-Financial
Project
Management
Financial
Manager
M06-HR
Project
organizational
chart,
roles
&
Management
PMM
evaluation records
7
M07-Outsoucing
Management
Outsourcing
construction
Manager
site,
performance
& approval
evaluation
Project
records
8
M08-Logistics
Project
Management
Logistics
Manager
M09-Purchase
Project
Management
contracts
Purchase
Manager
10
M10-Quality
Project Quality
Management
subcontractor
Manager
training
materials,
factory
M11-Communication
Meeting
minutes,
project
weekly
reports,
Management
internal
reports,
reports
for
customers,
plans,
PMM
M12-Data
Document
management
document
Documentation
Management
manager, Data
Manager
usage records
<>
All rights reserved. No distribution without prior permission of ZTE.
8
No.
Category Name
Restricted
Q/ZX 01181.18-2013
Document Example
Document
Owner
13
M13-Administration
Mobile/Telephone
rate
management,
visa
canteen
accommodation
management
Administration
Manager
management,
and
car
management
14
M14-XX
Regional
Region/Team
Managers,
Sub-team
Managers
15
M15-Project Closure
PMM
B1-Customer Documents
B2-Revenue Recognition
B3-Qualifications
B4-User Reports
Category Name
Document Example
B1-Customer
Documents
B2- Revenue
Recognition
punch lists
B3-Qualifications
B4-User Reports
User Reports
Restricted
Q/ZX 01181.18-2013
Category Name
Description
Document Owner
RP-Wireless
Network Planning
Network Planning
Team, Microwave
Engineering Team
RE-Engineering &
Technical Solutions
3
Engineering Team,
Technical Team
RS-Survey &
Engineering Design
Design (optional)
Team
RA-Site Folders
Refer to 5.7.2
RN-Network
Optimization
Network
Optimization Team
Restricted
Q/ZX 01181.18-2013
handed-over to the documentation manager in a complete set after the acceptance, or, in
several batches e.g.: The 1st batch upon CW(civil work) completion, and the 2nd batch
upon TI(telecom installation) completion.
Site folders include but are not limited to Table 9:
Table 9 RA-Site Folders
No.
Category
Document Owner
Rollout Team
Documents
4
Rollout Team
Acceptance Documents
5
Technical Team
As-built Drawings
Equipment List
Rollout Team
Category Name
Description
Document
Owner
XE-Engineering &
Engineering procedures
Rollout Team
Engineering
Technical Solution
2
XS-Survey &
Design
Design Team
XA-OSP Rollout
Documents
Refer to 5.8.2
Restricted
Q/ZX 01181.18-2013
Category
Document Owner
Wayleave documents
Wayleave Team
Rollout Team
acceptance documents
3
Rollout Team
As-built drawings
T-Test Documents
E-Engineering & Technical Solutions
S-Survey & Design
A-Product Engineering Documents
<>
All rights reserved. No distribution without prior permission of ZTE.
12
Restricted
Q/ZX 01181.18-2013
Category Name
Description
Document
Owner
T-Test Documents
E-Engineering &
Technical
documents
Team
Technical
Technical Solutions
3
Team
Survey date, detailed design drawings and BOM...etc
Engineering
Design Team
A-Product
Engineering
Refer to
4.9.2
Documents
Category
Document Owner
Rollout Team
acceptance documents
2
Technical Team
acceptance documents
3
As-built drawings
Equipment list
Rollout Team
<>
All rights reserved. No distribution without prior permission of ZTE.
13
Restricted
Q/ZX 01181.18-2013
Restricted
Q/ZX 01181.18-2013
The Document Management Records should be created for document collection, quality
control, usage and archives of project documents. It not only helps manage
documentation in an orderly way, but also prevents document shortage and missing.
Engineering Project Documentation Management forms mainly include Project
Document Record Sheet (template see R 01181.18-01), Paper Document Archive
Record Sheet (template see R 01181.18-02 , and Innerfile Item List (template see R
01181.18-03).
6.8 Set up File Room and Document Sever
To archive document in different media, the project team should establish a file room
and a document server:
a) File room: The project team should set up a file room or file cabinet for
documents in paper or CDs.
b) Document server: The project team must establish a document server for itself or
share one with another project team. All electronic documents must be saved to the
document server. SharePoint, EPM system and ZTE support website (only used to
publish documents to customers) can serve as the electronic document platform.
7 Document Naming Conventions
7.1 Naming Format
7.1.1 Document name is comprising of the Following Elements (By Order):
a) Project Code Name (Required)
b) Product Name (Optional)
c) Site ID/Cluster ID/Region Name (Optional)
d) Document Theme (Required)
e) Version Number (Optional, either this or document released date)
f) Document Released Date (Optional, either this or Version Number)
7.1.2 Use Underscore _ to Separate between Various Parts.
7.1.3 Examples of Document Naming
a) Project Code Name_Document Theme _Version Number
b) Project Code Name_Document Theme_Document Released Date
c) Project Code Name_Document Theme_Version Number_Document Released
Date
d) Project Code Name_Product Name_Document Theme_Version Number
<>
All rights reserved. No distribution without prior permission of ZTE.
15
e) Project
Code
Name_Product
Number_Document Released Date
Restricted
Q/ZX 01181.18-2013
Name_Document
Theme_Version
Restricted
Q/ZX 01181.18-2013
Documentation manager should apply for a document server and network bandwidth
to EPM, to build electronic document platform for the project.
Documentation manager should lead each and every sub-team to determine the
directory structure of electronic document platform and create a document server
access permission list for all necessary project team members and/or third party
<>
All rights reserved. No distribution without prior permission of ZTE.
17
Restricted
Q/ZX 01181.18-2013
Restricted
Q/ZX 01181.18-2013
g) The title in cover page and title in page header are consistent
h) The directory is consistent with body text
i) The numbering of figure and table are the same as described in body text
j) The revision marks and comments are deleted
k) Word format document should be converted to PDF format.
After the normative check, documentation manager should deliver the documents to
customer and officially release the document to the project team.
If there is any update for the document, the document should be released again. The
documentation manager must ensure that all parties are using and sharing the same and
latest version.
8.9 Collect Acceptance Documents and Trigger the Invoicing
After the project acceptance is partly or completely finished, documentation manager
should collect acceptance documents from engineering team and handover to
commercial team for invoicing.
9 Electronic Document Library Management
9.1 Access Permission Control
In order to ensure information security, all the documents in the electronic document
library can only be opened to the related members of the project. Documentation
manager needs to establish a permission assignment table to define which members can
access which folders. Sub-team leaders should be the one who assign access
permissions for team members in this table and submit it to documentation manager.
Documentation manager completes folder authorization on server.
If anyone leaves or joins the project, sub-team leaders should inform documentation
manager to update the permission assignment table.
Documentation manager should release permission assignment table to sub-team
leaders in a regular basis and check with EPM in order to avoid confidential information
leakage caused by improper authorization.
9.2 Document Backup
In order to guarantee document storage security, the electronic document library should
be backed up by using disk array for disaster recovery. If the condition is not allowed, the
documentation manager should back up electronic document library at least once a
month.
10 Archives Management
<>
All rights reserved. No distribution without prior permission of ZTE.
19
Restricted
Q/ZX 01181.18-2013
Restricted
Q/ZX 01181.18-2013
The project technical managers are responsible for product manuals delivery. Technical
managers are responsible for communicating with customers and passing on the
requirements to related department when customized documents are needed.
The engineering directors from each product support department, who act as the aftersales representatives in HPPD projects, are responsible for providing support for
document issues related to engineering projects.
11.2 Document Update
Product hardware or software may be upgraded or updated during the project execution
due to changes of customer's requirements or other reasons. Documents including
product description, installation guide, product manuals, etc should always be consistent
with products. Technical managers should evaluate whether these changes should trigger
the documents update when developing product upgrade plan. If the answer is yes, the
technical manager should apply for the new documents to the document development
department as soon as possible.
11.3 Delivery Time
Product manuals should be delivered to customers at least one month before starting
field test.
12 Record
Table 16 Record List
Template Number
R 01181.18-01
Record
Name
Project
Archived by Location
of
Archive
Document manager
document
Record
library
Disposal Form of
upon
Record
Expiration
Long-term Delete
E-file
Printed
team
Sheet
R 01181.18-02
Project
2 years
Paper
manager
after
room
only
team
Document
project
Archive
completion
Destroy
out
Record
Sheet
R 01181.18-03
Innerfile
Same as
Iterm List
manager
the related
use only
team
Destroy
files
<>
All rights reserved. No distribution without prior permission of ZTE.
21
Printed
out
Template Number
Record
Name
Archived by Location
of
Archive
Restricted
Q/ZX 01181.18-2013
Project
document
Manager
Disposal Form of
upon
Record
Expiration
5 years
Delete
E-file
2 years
Delete
E-file
assignment manager
document
after
table
library
project
control
document
team
library
procedures
completion
13 Normative References
None.
<>
All rights reserved. No distribution without prior permission of ZTE.
22
Restricted
Q/ZX 01181.18-2013
Record List
For better understanding, the latest three revisions are as follows:
Number
of
Standard
Number
before
Revision
Q/ZX
Q/ZX
01181.18-
01027.12
2013
-2012
Major Modification
a)
b)
Q/ZX
00688.10
-2010
manuals
c)
Revising
Departm
ent
Revised
by
Reviewed
by
Engineeri
Liu Hong
Sun
ng
Mei
Fangping
Engineeri
Liu Hong
Chen
ng
Mei
Guanqing
Approved
by
Chen Fuqi
Issued
/Revised
Date
2013-0517
Solution
Dept.
d)
e)
f)
g)
h)
i)
Q/ZX
Q/ZX
01027.12-
01027.12
2012
-2010
a)
Detailing
the
document
classification
b)
Chen Fuqi
Solution
Dept.
Made
clear
specifications
for
the
basic
document
management
d)
Replaced
management
document
flowcharts
with
Added
management
<>
All rights reserved. No distribution without prior permission of ZTE.
23
March,
2012
Number
of
Standard
Number
before
Revision
Major Modification
Restricted
Q/ZX 01181.18-2013
Revising
Departm
ent
Revised
by
Reviewed
by
TK
Liu Hong
Chen
Service
mei, Bai
Guanqing
Dept.
Yang,
Approved
by
Issued
/Revised
Date
Q/ZX
Q/ZX
01027.12-
75.1973.
2010
12-2008
a)
Redefined
the
responsibilities of documentation
management
relevant
b)
team
December
, 2010
Chen Fuqi
Cao
organizational structure
Fangxing
b)
, Qin Yan
Redefined
Xu Huijun
documentation
management regulation.
Newly issued.
Engineeri
Qin
ng
Chong
Project
qian
Chen Fuqi
Xu Huijun
Dept.
<>
All rights reserved. No distribution without prior permission of ZTE.
24
December