Painting Inspection Practice


3-1. Inspection Practice
3.1.1 Checking points at each stage
1) Inspection for surface preparation (Blasting and power tooling)
NO

Check-point

Secondary surface
prepared condition

ISO Sa2.5 or ISO Sa2 ISO St3 or ISO St2

Oil, Grease

- Not to find any oil or grease when


hand/rag is polished it. - Not to show up
contaminated oily parts with naked eyes

Grit, Foreign matters

To remove grit and foreign matters

Welding
spatters
and steel lamination

Inspection basis

-To remove irregular angle/angle sharp


spatters
-To remove steel lamination

Re-rusted
and
Miss-surface
preparation spots

- Not to turn into reddish black an steel


surface preparation - Not to omit secondary surface preparation welding lines, inside of angle stiffener and the edge of
holes which are difficult surface preparation

Zinc salt treatment

-To remove same white sedimentation on


exposed shop primed surface. However,
the tracing is allowable after removed zinc
salt

Welding fume

-Not to find any fume when hand/rag is


polished it -To do treatment the spot with
sand papering

Stripe
coated
Welding lines with
zinc primer

-To remove zinc stripe coated welding lines


during secondary surface reparation

Marking with chalk

-Not to find any chalk when hand/rah is


polished it

10

Cleaning condition

- To make good condition before painting

11

Relative humidity

As per the drawing of pint specification


(DWG.NO:2P104001 HB)

12

Balance between
dew point and steel
temperature

As per the drawing of paint specification


(DWG.NO: 2P104001 HB)

- 11

Remark
As per Paint specification

2) Subsequent painting inspection


NO

Check-point

Inspection basis

Drying condition for


painted film

-Not to show push-up painted film when


thumb is fiercely twisted on painted film
-Not to find when feet is trodden on painted
film

Strip coat condition

- To cover under coat and stripe coat constantly without omission

Re-coat
interval
(Min/Max.)

As per Paint Maker's recommendation

Cleaning/Foreign
matters Condition

To remove foreign matters and spray dust

Low DFT
Holidays

Low DFT is based on the drawing of Paint


specification and is not found holidays

AND

Sagging and Exceeding DFT

- Severe sagging is repaired with sand papering in order to make it smooth surface.
However, sagging of various hole, collar
plate, scallop, etc. are not repaired with
Paint Maker's recommendation when
Builder is stripe coated for the edges.
- Exceeding DFT than Paint Maker's recommendation is repaired with sand papering

Checking for Relative Humidity

Below 85%

Balance between
Steel temperature
and dew point

Above-3

Remark

3) Dry film thickness and Final inspection


NO

Checkpoint

Inspection-basis

Drying condition for


paintedfilm

-Not to show push-up painted film

Damaged
areas
and touch up condition

- All of damaged areas must be repaired No specified DFT for touch up are must be
repaired as per Paint specification

Sagging, Pinhole,
and
Exceeding
DFT

- Not to find sagging, pinhole (however,


sagging of various hole, are not repaired
with paint Maker's recommendation when
Builder is stripe coated for the edge.
- Exceeding DFT than Paint Maker's recommendation is repaired with sand papering

Cleaning condition

- Not to find 'foot-mark' and foreign matters


of painted film -To be clean condition thoroughly

- 12

Remark

NO

Check-point

Inspection -basis

Remark

Stripe coat condition for the edge of


various hole, access hale, outfits,
etc.

-To make specified DFT for possible


measuring

Dry film thickness

As per toe drawing of Paint specification

3.1.2 Standard for surface preparation


1) Secondary preparation - Block stage
Item

Process

Grade

Welding
beads, Burnt
& Rusted areas

Blasting or Power tooling

Intact
Primer

Not to be treated

shop

Remark

ISO St3 ISO Sa2


or ISO Sa2.5

Zinc salt

Swept blast or power tool


(brush) Cleaning. However, the
trace may be visible

OIL/Grease

Thinner wipe cleaning, The


trace of thinner cleaning is
permitted

Dust or Grit

To be removed by rags, broom


or vacuum cleaner

Insufficiently
Blasted area

Power/Hand tool Cleaning

- Hull stage
Item

Process

Grade

Side shell

Power tool cleaning

ISO ST3

Bottom

Ditto

Ditto

Exposed area
WBT(incl.
APT&FPT)
E/R
(incl. Various room
in E/R, Accom.)

Ditto

Ditto

Ditto

ISO ST2

Ditto

Ditto

Accomodation(IN)

Ditto

Ditto

Bosun/Paint store

Ditto

ISO St3

Deck/Chemical
cleaning equip
store (out)

Ditto

Ditto

Deck/chemical
Cleaning equip
store (IN)

Ditto

Ditto

Accomodation(out)

Ditto

Ditto

- 13

Remark

Please refer to the DWG.


of Paint specification in
detail grade

Item

Process

Grade

Remark

Void, cofferdam

Ditto

Ditto

COT(incl. SLOP TK,


Residualoil thank)

Blasting

ISO Sa2.5

Repair of the outfits

Power tool

Dry space : ISO


St2 Wet space:
ISOS13

Fresh water Tank

Power tool

ISO St3

3.1.3 STANDARD FOR COATING


1) FILM THICKNESS MEASUREMENT
Item

Process standard

Remark

General

Dry film thickness to be measured after completion of specified coating

Outside shell

Dry film thickness to be measured after completion of specified coating dry film thickness of
ant-fouling paint which is not practicable to check
the D.F.T to be controlled by volume

Specified D.F.T

D.F.T to be specified as average. D.F.T of all


measuring point shall be attained at least 85% of
the specified D.F.T

150mm width from


edge of structural
members, welding
beads and surface
outfits, etc

No measurement to be made

Instruments

EIco-meter or equivalences.

Refer
to
Painting specification

3.1.4 STANDARD FOR INSPECTION


1)SCOPE
Kind of inspection

description

Surface Preparation
Inspection

To confirm the surface preparation of the substrate is suitable


for the application of first coat

Intermediate Coating condition Inspection

To confirm the previous coated


surface is suitable for application
of next coat

Intermediate Coating condition Inspection

To confirm the previous coated


surface is suitable for application
of next coat

- 14

Abbreviation

Remark

B/L & P/B

B/L:
Blasting
P/B:
Power
brush

1ST

1st
Coating
condition before application
of 2 coating

2ND

2 Coating condition
before
application of 3
coating

Kind of inspection

description

Abbreviation

Remark
RD

Intermediate coating
condition inspection

To confirm the previous coated


surface is suitable for application
of next coat

3RD

D.F.T Check

To confirm the film thickness


and general condition of painted
surface above stage area

D.F.T

Final inspection

To confirm the painted condition


is suitable coated and acceptable D.F.T

Final

Bottom survey

To confirm the final condition of


flat bottom is acceptable prior to
launching

Bottom
vey

- 15

3 Coating
condition before application
of 4 coating

sur-