Professional Documents
Culture Documents
Check-point
Secondary surface
prepared condition
Oil, Grease
Welding
spatters
and steel lamination
Inspection basis
Re-rusted
and
Miss-surface
preparation spots
Welding fume
Stripe
coated
Welding lines with
zinc primer
10
Cleaning condition
11
Relative humidity
12
Balance between
dew point and steel
temperature
- 11
Remark
As per Paint specification
Check-point
Inspection basis
Re-coat
interval
(Min/Max.)
Cleaning/Foreign
matters Condition
Low DFT
Holidays
AND
- Severe sagging is repaired with sand papering in order to make it smooth surface.
However, sagging of various hole, collar
plate, scallop, etc. are not repaired with
Paint Maker's recommendation when
Builder is stripe coated for the edges.
- Exceeding DFT than Paint Maker's recommendation is repaired with sand papering
Below 85%
Balance between
Steel temperature
and dew point
Above-3
Remark
Checkpoint
Inspection-basis
Damaged
areas
and touch up condition
- All of damaged areas must be repaired No specified DFT for touch up are must be
repaired as per Paint specification
Sagging, Pinhole,
and
Exceeding
DFT
Cleaning condition
- 12
Remark
NO
Check-point
Inspection -basis
Remark
Process
Grade
Welding
beads, Burnt
& Rusted areas
Intact
Primer
Not to be treated
shop
Remark
Zinc salt
OIL/Grease
Dust or Grit
Insufficiently
Blasted area
- Hull stage
Item
Process
Grade
Side shell
ISO ST3
Bottom
Ditto
Ditto
Exposed area
WBT(incl.
APT&FPT)
E/R
(incl. Various room
in E/R, Accom.)
Ditto
Ditto
Ditto
ISO ST2
Ditto
Ditto
Accomodation(IN)
Ditto
Ditto
Bosun/Paint store
Ditto
ISO St3
Deck/Chemical
cleaning equip
store (out)
Ditto
Ditto
Deck/chemical
Cleaning equip
store (IN)
Ditto
Ditto
Accomodation(out)
Ditto
Ditto
- 13
Remark
Item
Process
Grade
Remark
Void, cofferdam
Ditto
Ditto
Blasting
ISO Sa2.5
Power tool
Power tool
ISO St3
Process standard
Remark
General
Outside shell
Dry film thickness to be measured after completion of specified coating dry film thickness of
ant-fouling paint which is not practicable to check
the D.F.T to be controlled by volume
Specified D.F.T
No measurement to be made
Instruments
EIco-meter or equivalences.
Refer
to
Painting specification
description
Surface Preparation
Inspection
- 14
Abbreviation
Remark
B/L:
Blasting
P/B:
Power
brush
1ST
1st
Coating
condition before application
of 2 coating
2ND
2 Coating condition
before
application of 3
coating
Kind of inspection
description
Abbreviation
Remark
RD
Intermediate coating
condition inspection
3RD
D.F.T Check
D.F.T
Final inspection
Final
Bottom survey
Bottom
vey
- 15
3 Coating
condition before application
of 4 coating
sur-