You are on page 1of 2

Federal Register / Vol. 72, No.

184 / Monday, September 24, 2007 / Notices 54321

basic BRT alignment. A two-way construction-phase impacts. Impacts of alternatives. SFCTA intends to request
transitway either in the median of Van the Van Ness Avenue BRT Project will FTA approval to enter Project
Ness Avenue or along the outside curbs be evaluated for both the construction Development and secure funding under
(one northbound BRT lane along the period and for the long-term period of the Small Starts program prior to
east curb/parking lane; one southbound operation. Mitigation measures will be initiating further engineering (e.g.,
BRT lane along the west curb/parking identified and evaluated for avoiding preliminary engineering) and preparing
lane) and, correspondingly, stations in and reducing adverse effects. the Final EIS/EIR.
the median or as extensions of the To ensure all significant issues related Issued on September 19, 2007.
sidewalk were considered in the Van to the proposed project are identified
Leslie T. Rogers,
Ness Avenue BRT Feasibility Study and and addressed in the ESI/EIR and
alternatives analysis, comments and Regional Administrator.
warrant further evaluation as part of the
EIS/EIR and alternatives analysis. suggestions are invited from all [FR Doc. 07–4713 Filed 9–21–07; 8:45 am]
The SFCTA in association with Muni interested parties. Comments, BILLING CODE 4910–57–M
will evaluate the procurement of suggestions, and questions concerning
modern low-floor high-capacity vehicles the proposed action should be directed
that would be assigned to the BRT to the contacts listed above. DEPARTMENT OF TRANSPORTATION
service and have added features, such as
V. FTA Procedures Surface Transportation Board
two-sided multidoor access, passenger
station docking assist, and other In accordance with the FTA policy,
[STB Docket No. AB–43 (Sub-No. 180X)]
amenities. Streetscape improvements, all Federal laws, regulations and
such as enhanced landscaping and executive orders affecting project Illinois Central Railroad Company—
pedestrian access along Van Ness development, including but not limited Abandonment Exemption—in Adams
Avenue, are also included in the to the regulations of the Council on County, MS
proposed BRT project. Environmental Quality and FTA
implementing NEPA (40 CFR parts Illinois Central Railroad Company
IV. Probable Effects 1500–1508 and 23 CFR part 771); the (ICR) has filed a notice of exemption
FTA and SFCTA will evaluate the conformity requirements of the Clean under 49 CFR Part 1152 Subpart F—
transportation, environmental, social, Air Act; section 4040 of the Clean Water Exempt Abandonments to abandon
and economic impact of each Act; Executive Order 12898 regarding approximately 0.46 miles of rail line,
alternative. Effects of the Van Ness environmental justice; the National between milepost 148.67 and milepost
Avenue BRT Project will be compared Historic Preservation Act; the 148.21, in Natchez, Adams County, MS.
to the No Project/Baseline. The overall Endangered Species Act; and section The line traverses United States Postal
benefits of the Van Ness Avenue BRT 4(f) of the Department of Transportation Service Zip Code 39120.
Project, including on transit speeds and Act, will be addressed to the maximum ICR has certified that: (1) No local
reliability, new riders, and extent practicable during the NEPA traffic has moved over the line for at
transportation system user benefits, will process. Prior transportation planning least 2 years; (2) there is no overhead
be relative to the No Project/Baseline studies may be pertinent to establishing traffic on the line to be rerouted; (3) no
Alternative. The Van Ness Avenue BRT the purpose and need for the proposed formal complaint filed by a user of rail
Project Alternative is expected to action and the range of alternatives to be service on the line (or by a state or local
improve transit speeds and increase evaluated in detail in the EIS/EIR. The government entity acting on behalf of
transit reliability; increase bus transit Draft EIS/EIR will be prepared such user) regarding cessation of service
ridership; improve access and mobility simultaneously with conceptual over the line either is pending with the
for San Francisco residents, many of engineering for the alternatives, Surface Transportation Board or with
whom are highly dependent on transit; including bus stop and alignment any U.S. District Court or has been
and provide competitive transit access options. The Draft EIS/EIR process will decided in favor of complainant within
to major employment and activity address the potential use of Federal the 2-year period; and (4) the
centers relative to the No Project/ funds for the proposed action, as well as requirements at 49 CFR 1105.7
Baseline Alternative. assessing social, economic, and (environmental report), 49 CFR 1105.8
Increased congestion and worsening environmental impacts of the proposed (historic report), 49 CFR 1105.11
conditions for transit service along Van Van Ness Avenue BRT Project. The (transmittal letter), 49 CFR 1105.12
Ness Avenue are expected without a Project will be refined to minimize and (newspaper publication), and 49 CFR
significant improvement. The No mitigate any adverse impacts. 1152.50(d)(1) (notice to governmental
Project/Baseline Alternatives would not After publication, the Draft EIS/EIR agencies) have been met.
eliminate the main impediments to will be available for public and agency As a condition to this exemption, any
efficient and effective service in the review and comment, and a public employee adversely affected by the
corridor—auto/transit conflicts in hearing will be held. Based on the Draft abandonment shall be protected under
mixed-flow lanes. The Van Ness Avenue EIS/EIR and comments received, the Oregon Short Line R. Co.—
BRT Project may affect the following San Francisco County Transportation Abandonment—Goshen, 360 I.C.C. 91
areas: Traffic operations; parking; local Authority Board will select a locally (1979). To address whether this
access and circulation; visual and preferred alternative (LPA) for further condition adequately protects affected
aesthetic effects; historic and cultural assessment in the Final EIS/EIR, which employees, a petition for partial
resources; disturbance of pre-existing will be based on further engineering of revocation under 49 U.S.C. 10502(d)
hazardous wastes; and temporary the LPA and other remaining must be filed.
rfrederick on PROD1PC67 with NOTICES

VerDate Aug<31>2005 14:43 Sep 21, 2007 Jkt 211001 PO 00000 Frm 00089 Fmt 4703 Sfmt 4703 E:\FR\FM\24SEN1.SGM 24SEN1
54322 Federal Register / Vol. 72, No. 184 / Monday, September 24, 2007 / Notices

Provided no formal expression of Board, 395 E Street, SW., Washington, within 15 days after the EA becomes
intent to file an offer of financial DC 20423–0001. available to the public.
assistance (OFA) has been received, this A copy of any petition filed with the Environmental, historic preservation,
exemption will be effective on October Board should be sent to ICR’s public use, or trail use/rail banking
24, 2007, unless stayed pending representative: Thomas J. Healey, 17641 conditions will be imposed, where
reconsideration. Petitions to stay that do S. Ashland Avenue, Homewood, IL appropriate, in a subsequent decision.
not involve environmental issues,1 60430–1345. Pursuant to the provisions of 49 CFR
formal expressions of intent to file an 1152.29(e)(2), ICR shall file a notice of
If the verified notice contains false or
OFA under 49 CFR 1152.27(c)(2),2 and consummation with the Board to signify
misleading information, the exemption
trail use/rail banking requests under 49 that it has exercised the authority
is void ab initio.
CFR 1152.29 must be filed by October granted and fully abandoned the line. If
ICR has filed both an environmental consummation has not been effected by
4, 2007. Petitions to reopen or requests report and a historic report that address ICR’s filing of a notice of consummation
for public use conditions under 49 CFR the effects, if any, of the abandonment by September 24, 2008, and there are no
1152.28 must be filed by October 15, on the environment and historic legal or regulatory barriers to
2007, with the Surface Transportation resources. SEA will issue an consummation, the authority to
environmental assessment (EA) by abandon will automatically expire.
1 The Board will grant a stay if an informed
September 28, 2007. Interested persons Board decisions and notices are
decision on environmental issues (whether raised may obtain a copy of the EA by writing
by a party or by the Board’s Section of available on our Web site at
Environmental Analysis (SEA) in its independent
to SEA (Room 1100, Surface www.stb.dot.gov.
investigation) cannot be made before the Transportation Board, Washington, DC
Decided: September 14 , 2007.
exemption’s effective date. See Exemption of Out- 20423–0001) or by calling SEA, at (202)
of-Service Rail Lines, 5 I.C.C.2d 377 (1989). Any 245–0305. [Assistance for the hearing By the Board, David M. Konschnik,
request for a stay should be filed as soon as possible Director, Office of Proceedings.
impaired is available through the
so that the Board may take appropriate action before Vernon A. Williams,
the exemption’s effective date.
Federal Information Relay Service
2 Each OFA must be accompanied by the filing (FIRS) at 1–800–877–8339.] Comments Secretary.
fee, which currently is set at $1,300. See 49 CFR on environmental and historic [FR Doc. E7–18761 Filed 9–21–07; 8:45 am]
1002.2(f)(25). preservation matters must be filed BILLING CODE 4915–01–P
rfrederick on PROD1PC67 with NOTICES

VerDate Aug<31>2005 14:43 Sep 21, 2007 Jkt 211001 PO 00000 Frm 00090 Fmt 4703 Sfmt 4703 E:\FR\FM\24SEN1.SGM 24SEN1

You might also like