Professional Documents
Culture Documents
Warren,
Mayor
Figure 1: View of Parcel #2 East Broad to the south (left) /South Clinton to the west/Elm Street to the north
TABLE OF CONTENTS
Part 1:
Purpose
Part 2:
Schedule
Part 3:
Part 4:
Site Description
Part 5:
Part 6:
Evaluation Criteria
Part 7:
Developer Selection
Part 8:
Rights Reserved
Part 9:
Additional Resources
Attachments
A.
Proposal Checklist
B.
Resubdivision Map
C.
Site Map of Former Midtown Plaza
D.
Midtown Rising Illustrative Plan
E.
Midtown Redevelopment Project: List of Environmental, Utility, and Building
Reports and Environmental Reviews
Figure 2: View of Midtown Commons and Cortland Street Windstream to the west/Sibley to north
PART 2: SCHEDULE
A. Request For Proposal Informational Meeting:
City staff will be available to explain/clarify requirements and respond to
questions.
DATE: Friday, September 11, 2015
TIME:
10:30 AM
PLACE: City Hall, 30 Church Street
Room 223B
B. Proposal Submission:
Due Date: Ten (10) copies of the proposal must be received by 4:00 p.m. on
November 13, 2015 at the following address. Please submit a completed
Proposal Checklist (Attachment A) with your proposal:
ATTN: Mark Fitzstevens
Bureau of Business & Housing Development
City Hall, Room 005A
30 Church Street
Rochester, NY 14614
Questions regarding this opportunity should be directed to Mark Fitzstevens at
585-428-6153 or by email at fitzm@cityofrochester.gov.
In 2009, the City completed the State Environmental Quality Review Act process for
the redevelopment plan. The amended Midtown Urban Renewal Plan was adopted
by the Rochester City Council in November 2009.
New York State provided $55 million for the Midtown Rising project, $44 million of
which was used for the (now complete) asbestos remediation and demolition of the
seven (7) buildings that made up the Midtown site. Construction work was
completed in the spring of 2013 on the reconstruction of the underground service
tunnel and is nearing completion on the 1,800-vehicle underground garage. Above
ground, a new street grid, sidewalks and lighting are also nearing completion as is
the preparation of the remaining development parcels and the public space with the
remaining $11 million grant from New York State. The infrastructure costs to
construct streets, utilities and open space are fully funded with federal, New York
State, County of Monroe, and City of Rochester funding.
Windstream officially celebrated the opening of its new office facility at the former
Seneca Building on September 3, 2013. The Pike Company completed the project
at a total investment of $19 million. The project was the first private development to
take hold on the Midtown Rising site. Windstream has placed 265 full-time
employees on two of the buildings three floors, comprising 66,667 square feet.
The third floor of the Seneca Building, comprising 37,000 square feet, is available
for lease.
Buckingham Properties and Morgan Management are developing Tower280 the
adaptive re-use of the former Midtown Tower. Construction is currently underway;
the development program is comprised of approximately 179 residential rental units
and approximately 130,000 square feet of commercial space.
The Pike Development Co. started the construction of new Gannett offices on the
development parcel between the Windstream offices and East Main Street. The
total project cost is $12,000,000. Construction started in May 2015. The remaining
development parcels (Parcels #5 and #6) at Midtown Rising will be developed at a
later time as a function of supply and demand within the market.
The total investment in the Midtown Rising Project, including acquisition, relocation,
demolition, infrastructure, rehabilitation of the garage, the redevelopment of the
Windstream offices building, the new construction of the Gannett offices building,
and the development of Tower280 at Midtown is more than $188 million. Through
this exciting development, Rochester is transforming its downtown with a focused
and balanced approach to revitalization.
pedestrian corridor (266 East Broad Street), and 148.39 feet along the south side of
Elm Street (shown as 60 South Clinton Avenue on Attachment B).
The parcel is served by all public utilities, including gas, electric, water, and sanitary
sewers. The Holly water main also services the site. Attachment D contains the
Illustrative Plan for Midtown Rising.
The entirety of Parcel 2 is located atop a portion of the Midtown Parking Garage.
The sub-surface areas of Parcel 2 is held in interest by the City and others which
affects potential development of building structures relative to vertical support
infrastructure as well as requiring potential sub-surface improvement area typically
found below-grade to be placed above within above- grade areas of a potential
building.
All four sides of this site face public spaces. The development is expected to
adhere to the Citys zoning code with regard to active facades (active first floor
uses, windows, entrances) and contribute to the implementation of the 2014 Center
City Master Plan and its Vision: Lively Streets starting on page 14 of the Plan.
The Master Plan can be downloaded from the following City website:
http://www.cityofrochester.gov/CenterCity/ . The details of the buildings first floor
facades will be very important, particularly at the southwest corner where the first
floor level will likely be above the level of the adjacent public sidewalk.
The site is zoned CCD-Tower District. The design guidelines for this district can be
downloaded from the Municipal Code (http://ecode360.com/8680942). All uses are
permitted in fully enclosed buildings unless they are limited or prohibited. Limited
uses include residential care facilities, high-impact sales and service retail, and
personal wireless communications facilities. Prohibited uses include sexually
oriented businesses, waste centers, homeless shelters, and pawn brokers.
Subject to the rules and regulations for the disposition of Urban Renewal Agency
parcels of land, the City obtained an independent appraisal that established a
market value of Six Hundred and Fifty Thousand Dollars ($650,000.00) for Parcel 2.
A license agreement has been executed with MidtownTower LLC for the staging of
construction materials and trailers on Parcel 2 through May 31, 2016; the City has
reserved the right to terminate the license agreement in the event of the
development of Parcel 2 with 60 days notice to Midtown Tower LLC.
Environmental Reports
The Empire State Development Corporation (ESD) commissioned a Phase I
Environmental Site Assessment for the Midtown Plaza site; it is dated June 5, 2008
and can be downloaded from the following City website:
http://www.cityofrochester.gov/midtowndocuments/
The ESD undertook the environmental remediation of the entire former Midtown
Plaza site, including the former structure on Parcel #2. The pre-demolition
asbestos survey report and the subsequent clearance letters can be downloaded
from the website noted above. Attachment E contains the environmental reports for
the former Midtown site and the link to each report. There are no additional
environmental reports for Parcel 2 other than what is available on the Midtown
website.
While the City is providing the listed reports for the use by respondents to this RFP
(the Developer) of Parcel 2 (the Site) and its agents, the City will make no
representation or warranty regarding any aspect of any report or other document
regarding the Site available on the above website relating to the physical or
environmental condition of the Site, including but not limited to the environmental
reports. The City will not make any representation or warranty as to the accuracy
or completeness of any such report or document, its preparation, or any information
upon which it is based. Any reliance on any report or document or any information
contained therein shall be at the Developers risk. The City advises the Developer
to conduct its own investigation to determine the physical and/or environmental
condition of the Property.
(2) Please submit a detailed history of all projects that have been
completed in the last five (5) years with an emphasis on similar
projects, if applicable.
3. Marketing plan. Please include a marketing plan that includes, at a minimum,
the following items:
Rent/lease marketing plan for commercial/retail uses
Promotion schedule/phasing
Marketing team
4. Project Team
(1) Provide an organization chart for the development of the project,
including the Developer, project manager, architects/engineers and
marketing personnel.
(2) Provide resumes of the principal participants involved in the project.
(3) The proposals should include a summary of the experience of the
project team, similar projects that the development team has been
involved with and how that experience will be useful in undertaking
the proposed project.
5. Project proposal Development plan
(1) Design concept drawings minimum concept drawings to include:
Site plan (to scale and legible) showing building elements,
landscaping, parking (if applicable) and access (vehicular and
pedestrian)
Elevations (to scale and legible)
Please note: Detailed perspectives, renderings, 3D modeling and
electronic presentations are not required; however, they may enhance
understanding of the proposal. Digital presentation material on CD
may be submitted to supplement the proposal hard copies.
(2) Development program including square footage by proposed use(s),
number and, if applicable, size of housing units breakdown for each
floor.
(3) Access/Parking Demand
A preliminary analysis of the access/parking demand associated
with the proposed development and how the demand will be met.
Developers are encouraged to consider multiple solutions related
to access: walking, bicycling, transit, car share, and private
automobile (parking). See also Item #8, Sustainable Development
Preference. Please note there is no parking requirement in the
CCD-Tower District. Please note that the City of Rochester will
not provide discounted parking rates in the Midtown Garage
for this project.
9
(4) The Developer shall also identify a project schedule, taking it from
initial award of development rights through implementation. The
proposed project must be ready to commence construction within
twelve (12) months. The project schedule shall include:
Closing on property sale
Design
Anticipated zoning and permit approvals
Funding commitments or bank proposal term sheets based on the
proposed funding sources
Construction start/completion
Occupancy
6. Project Proposal Funding
The Developer shall identify intended funding sources for the project,
along with term sheets as may be appropriate. Final funding
commitments are not required however, if available, they would be
beneficial. The total purchase price for Parcel 2 is $650,000, which must
be reflected in the sources/uses.
(1) Cost estimates detailing acquisition, construction costs and soft costs.
Include all assumptions.
(2) Provide two (2) tables showing the sources and uses of all funds for
both the construction and permanent phases of the project (including
bank participation, owner equity, and any other sources that may be
pursued) there must be no projected funding gaps. The proposed
financing arrangements should be verified by a letter from the
financial source/institution indicating the project has been reviewed
and the source/institution is willing to favorably consider a loan
application to finance the project.
(3) Expected terms for the project financing by source, including loan
amounts, interest rates, term length and any special loan
covenants/requirements.
(4) Any financial assistance requested from the public sector must be
presented in detail (including, but not limited to, COMIDA assistance).
If a respondent proposes to apply for COMIDA assistance, the
City expects the respondent to apply for the JobsPlus Program
an existing COMIDA tax abatement program. If a residential use
is proposed (and subject to the approval of the PILOT Review
Committee), the City would consider supporting an application to
COMIDA with the same abatement schedule as JobsPlus since
the JobsPlus does not accommodate residential uses. For
information on COMIDAs incentives and programs, please refer
to COMIDAs website:
(http://www.growmonroe.org/comida/incentives#enhancedjobspl
us).
10
12
13
14
Upon initial review of the submitted proposals, the evaluation team may choose to
establish a short list for subsequent interviews and requirement to submit more
detailed information related to the financial condition of the development company
(company financial statements, personal financial statements, global real estate
report, etc.). Any additional financial information provided will be confidential and
not subject to the Freedom of Information Law. All RFP respondents will be notified
if and when a short list is established. The City reserves the right to accept or reject
any and all submissions.
If a proposal is selected by the evaluation team, a recommendation will be
submitted to City Council and the Rochester Urban Renewal Agency for final
selection authorization.
16
Please fill out and submit the following checklist with your proposal
Developer Name:
Item
Yes
N/A
18
Attachment C
Site Map Of Former Midtown Plaza
Attachment D
Midtown Rising Illustrative Plan
See next page
Attachment E
Midtown Redevelopment Project: List of Environmental, Utility, and Building Reports and
Environmental Reviews
Document
Notes
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
October 4, 2010.
Empire State Development Corporation at Midtown Plaza
Asbestos Abatement, McCurdys Building 3rd Floor A, Rochester,
New York, Prepared by Paradigm Environmental Services, June
2, 2010.
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1
http://www.cityofrochester.gov/
article.aspx?id=8589944377#Oth
er%20Documents1