Regulation Affected: 30 CFR 75.1002 Petitioner: Blue Diamond Coal speeds to use on different roadway
(Installation of electric equipment and Company, P.O. Box 47, Slemp, conditions; and (4) limit the maximum
conductors; permissibility). Kentucky 41763. speed to 10 miles per hour. The
Modification Request: The petitioner Mine: Mine # 77, MSHA I.D. No. 15– petitioner states that: (1) The
requests a modification of the existing 09636, located in Perry County, Roadbuilder has six wheels and a
standard to permit the use of 2, 400-volt Kentucky. braking system on the four rear wheels;
AC-powered continuous mining Regulation Affected: 30 CFR (2) the weight distribution over the four
equipment at the No. 2 Deep Mine. The 75.364(b)(2) (Weekly examination). back wheels and the machine’s braking
petitioner asserts that the proposed Modification Request: The petitioner system is adequate to stop the machine;
alternative method would provide at requests a modification of the existing and (3) the safety of the miners will not
least the same measure of protection as standard to permit check points be compromised. The petitioner asserts
the existing standard. (examination points) for air volume and that the design of the Getman
Docket Number: M–2007–046–C. quality to be established in two Roadbuilder guarantees no less than the
Petitioner: Twentymile Coal locations of the Alwest 2 Mains due to same measure of protection afforded by
Company, Three Gateway Center, Suite poor roof conditions that prevent foot the existing standard.
1340, 401 Liberty Avenue, Pittsburgh, travel through the affected area of the Docket Number: M–2007–007–M.
Pennsylvania 15222. mine. The petitioner proposes to Petitioner: Phelps Dodge Safford, Inc.,
Mine: Foidel Creek Mine, MSHA I.D. establish evaluation points at certain 1124 W. Thatcher Blvd., Suite 202,
No. 05–03836, located in Routt County, points to evaluate airflow entering the Safford, Arizona 85546.
Colorado. Alwest 2 Mains and exiting the Alwest Mine: Safford Mine, MSHA I.D. No.
Regulation Affected: 30 CFR 75.335(c) 2 Mains. The petitioner also proposes to
(Construction of seals). 02–00299, located in Graham County,
establish ventilation check points Arizona.
Modification Request: The petitioner between certain breaks of the Alwest 2
requests a modification of the existing Regulation Affected: 30 CFR
Main. The petitioner states that due to 56.6309(b) (Fuel oil requirements for
standard to permit an alternative the adverse roof conditions and the
method of compliance with the ANFO).
distance from active works, it is Modification Request: The petitioner
prohibition against welding, cutting, or impractical to expose personnel to
soldering on the longwall face requests a modification of the existing
traveling the affected area. The standard to permit the use of used
equipment within 150 feet of seals. The petitioner describes additional safety
petitioner states that: (1) Prior to petroleum-based, lubrication oil from
precautions, such as signage and diesel equipment (recycled oil) for
welding or cutting activity on the establishing and monitoring air
longwall face within 150 feet of seals, blending with diesel fuel and
measurement stations, at locations that conventional prills to create ammonium
the ventilation plan will be reviewed would allow a certified person to
with the person(s) involved in such nitrate-fuel oil (ANFO). The petitioner
effectively evaluate ventilation in the has listed specific additional procedures
welding or cutting; (2) welding, cutting, affected area of the mine. The petitioner
or soldering with arc or flame will be in this petition that will be used to
has listed specific additional procedures comply with the proposed alternative
done under the supervision of a in this petition that will be used to
qualified person who will make a method. Individuals may review a
comply with the proposed alternative complete description of the procedures
diligent search for fire during and after method. Individuals may review a
such operations and shall continuously at the MSHA address listed in this
complete description of the procedures notice. The petitioner asserts that the
test for methane with means approved at the MSHA address listed in this
by the Secretary immediately before and proposed alternative method would at
notice. The petitioner asserts that the all times guarantee no less than the
during such operations; (3) welding, proposed alternative method will at all
cutting, or soldering will not be same measure of protection as the
times guarantee no less than the same existing standard.
conducted in air that contains 1.0 measure of protection afforded by the
volume per centum or more of methane; existing standard. Dated: August 9, 2007.
(4) the area will be wet or rock dusted, Docket Number: M–2007–048–C. Jack Powasnik,
and additional rock dust or suitable fire Petitioner: Paramont Coal Company Acting Deputy Director, Office of Standards,
extinguishers will be immediately Virginia, LLC, 2333 Alumni Park Plaza, Regulations, and Variances.
available during such welding or Suite 310, Lexington, Kentucky. [FR Doc. E7–16022 Filed 8–14–07; 8:45 am]
cutting; (5) prior to welding and cutting, Mine: Deep Mine # 26, MSHA I.D. No. BILLING CODE 4510–43–P
a determination will be made 44–06929, located in Wise County,
concerning the presence of ventilation Virginia.
quantities and velocities specified in the Regulation Affected: 30 CFR
NUCLEAR REGULATORY
ventilation plan; (6) prior to welding 75.1909(b)(6) ( Nonpermissible diesel-
COMMISSION
and cutting, a qualified person will powered equipment; design and
examine the area for methane as well as performance requirements). [Docket No. 50–182; EA–07–197]
the area towards the closest seal to the Modification Request: The petitioner
area, for a distance that can be traveled requests a modification of the existing In the Matter of Purdue University
safely; and (7) if methane is detected standard to permit the use of a Getman (Purdue University Research Reactor);
above 1.0 percent at any location during Roadbuilder, Model RDG–1504, and Order Modifying Facility Operating
examination, cutting, welding, or Serial Number 6946. The petitioner License No. R–87
soldering on the longwall face or in the proposes to: (1) Operate one Getman
I
ebenthall on PROD1PC69 with NOTICES
VerDate Aug<31>2005 15:00 Aug 14, 2007 Jkt 211001 PO 00000 Frm 00108 Fmt 4703 Sfmt 4703 E:\FR\FM\15AUN1.SGM 15AUN1
Federal Register / Vol. 72, No. 157 / Wednesday, August 15, 2007 / Notices 45831
on August 8, 1988, by the U.S. Nuclear arrangements for available financial conditions and technical specifications
Regulatory Commission (the NRC or the support, and reactor usage. that are needed to amend the facility
Commission). The license authorizes Paragraph 50.64(c)(2)(iii) requires the license and contains an outline of a
operation of the Purdue University licensee to include in the proposal, to reactor startup report to be submitted to
Research Reactor (the facility) at a the extent required to effect conversion, NRC within six months following return
power level up to 1 kilowatt thermal. all necessary changes to the license, to of the converted reactor to normal
The facility is a research reactor located the facility, and to licensee procedures. operation.
on the campus of Purdue University, in This paragraph also requires the
licensee to submit supporting safety IV
the city of West Lafayette, Tippecanoe
County, Indiana. The mailing address is analyses in time to meet the conversion Accordingly, pursuant to Sections 51,
Radiation Laboratories, Purdue schedule. 53, 57, 101, 104, 161b, 161i, and 161o
University, Nuclear Engineering Paragraph 50.64(c)(2)(iii) also requires of the Atomic Energy Act of 1954, as
Building, 400 Central Drive, West the Director to review the licensee amended, and to Commission
Lafayette, IN 47907–2017. proposal, to confirm the status of regulations in 10 CFR 2.202 and 10 CFR
Federal Government funding, and to 50.64, It is hereby ordered that:
II determine a final schedule, if the Facility Operating License No. R–87 is
Title 10 of the Code of Federal licensee has submitted a schedule for modified by amending the license
Regulations (10 CFR) Section 50.64, conversion. conditions and technical specifications
limits the use of high-enriched uranium Section 50.64(c)(3) requires the as stated in the attachments to this
(HEU) fuel in domestic non-power Director to review the supporting safety Order (Attachment 1: MODIFICATIONS
reactors (research and test reactors) (see analyses and to issue an appropriate TO FACILITY OPERATING LICENSE
51 FR 6514). The regulation, which enforcement order directing both the NO. R–87; Attachment 2: OUTLINE OF
became effective on March 27, 1986, conversion and, to the extent consistent REACTOR STARTUP REPORT). The
requires that if Federal Government with protection of public health and Order becomes effective on the later
funding for conversion-related costs is safety, any necessary changes to the date of either (1) the day the licensee
available, each licensee of a non-power license, the facility, and licensee receives an adequate number and type
reactor authorized to use HEU fuel shall procedures. In the Federal Register of LEU fuel assemblies to operate the
replace it with low-enriched uranium notice of the final rule (51 FR 6514), the facility as specified in the licensee
(LEU) fuel acceptable to the Commission explained that in most, if proposal dated August 13, 2006
Commission unless the Commission has not all cases, the enforcement order (ADAMS Accession Nos. ML062400495
determined that the reactor has a unique would be an order to modify the license and ML070920272), as supplemented on
purpose. The Commission’s stated under 10 CFR 2.204 (now 10 CFR May 3 (ADAMS Accession No.
purpose for these requirements was to 2.202). ML071410299) and June 18, 2007
reduce, to the maximum extent possible, Section 2.309 states the requirements (ADAMS Accession No. ML071700633),
the use of HEU fuel in order to reduce for a person whose interest may be or (2) 23 days after the date of
the risk of theft and diversion of HEU affected by any proceeding to initiate a publication of this Order in the Federal
fuel used in non-power reactors. hearing and to participate as a party. Register.
Paragraphs 50.64(b)(2)(i) and (ii)
III V
require that a licensee of a non-power
reactor (1) not acquire more HEU fuel if On August 13, 2006 (Agencywide Any person adversely affected by this
LEU fuel that is acceptable to the Documents Access and Management Order may submit an answer to this
Commission for that reactor is available System (ADAMS) Accession Nos. Order, and may request a hearing on
when the licensee proposes to acquire ML062400495 and ML070920272), as this Order, within 20 days of the date of
HEU fuel, and (2) replace all HEU fuel supplemented on May 3 (ADAMS this Order. Any answer or request for a
in its possession with available LEU fuel Accession No. ML071410299) and June hearing shall set forth the matters of fact
acceptable to the Commission for that 18, 2007 (ADAMS Accession No. and law on which the person adversely
reactor in accordance with a schedule ML071700633), the NRC staff received affected relies and the reasons why the
determined pursuant to 10 CFR the licensee’s conversion proposal, Order should not have been issued. Any
50.64(c)(2). including its proposed modifications answer or request for a hearing shall be
Paragraph 50.64(c)(2)(i) requires, and supporting safety analyses. HEU filed (1) by first class mail addressed to
among other things, that each licensee fuel assemblies are to be replaced with the Office of the Secretary, U.S. Nuclear
of a non-power reactor authorized to LEU fuel assemblies. The fuel Regulatory Commission, Washington,
possess and to use HEU fuel develop assemblies contain fuel plates, typical of DC 20555–0001, Attention: Rulemaking
and submit to the Director of the Office the Materials Testing Reactor design, and Adjudications Staff; or (2) by
of Nuclear Reactor Regulation (Director) with the fuel consisting of uranium courier, express mail, and expedited
by March 27, 1987, and at 12-month silicide dispersed in an aluminum delivery services to the Office of the
intervals thereafter, a written proposal matrix. These plates contain the Secretary, Sixteenth Floor, One White
for meeting the requirements of the rule. uranium–235 isotope at an enrichment Flint North, 11555 Rockville Pike,
The licensee shall include in its of less than 20 percent. The NRC staff Rockville, Maryland 20852, Attention:
proposal a certification that Federal reviewed the licensee’s proposal and the Rulemaking and Adjudications Staff.
Government funding for conversion is requirements of 10 CFR 50.64 and has Because of possible delays in delivery of
available through the U.S. Department determined that public health and safety mail to the United States Government
of Energy or other appropriate Federal and common defense and security Offices, it is requested that answers and/
ebenthall on PROD1PC69 with NOTICES
agency and a schedule for conversion, require the licensee to convert the or requests for hearing be transmitted to
based upon availability of replacement facility from the use of HEU to LEU fuel the Secretary of the Commission either
fuel acceptable to the Commission for in accordance with the attachments to by e-mail addressed to the Office of the
that reactor and upon consideration of this Order and the schedule included Secretary, U.S. Nuclear Regulatory
other factors such as the availability of herein. The attachments to this Order Commission,
shipping casks, implementation of specify the changes to the license HEARINGDOCKET@NRC.GOV; or by
VerDate Aug<31>2005 15:00 Aug 14, 2007 Jkt 211001 PO 00000 Frm 00109 Fmt 4703 Sfmt 4703 E:\FR\FM\15AUN1.SGM 15AUN1
45832 Federal Register / Vol. 72, No. 157 / Wednesday, August 15, 2007 / Notices
facsimile transmission addressed to the the ADAMS Public Electronic Reading docketing and provisions for
Office of the Secretary, U.S. Nuclear Room on the Internet at the NRC Web participation of the public in the COL
Regulatory Commission, Washington, site, http://www.nrc.gov/reading-rm/ review process.
DC, Attention: Rulemakings and adams.html. Persons who do not have A copy of the application is available
Adjudications Staff at 301–415–1101 access to ADAMS or who have problems for public inspection at the
(the verification number is 301–415– in accessing the documents in ADAMS Commission’s Public Document Room
1966). Copies of the request for hearing should contact the NRC PDR reference (PDR), located at One White Flint North,
must also be sent to the Director, Office staff by telephone at 1–800–397–4209 or 11555 Rockville Pike (first floor),
of Nuclear Reactor Regulation and to the 301–415–4737 or by e-mail to Rockville, Maryland and via the
Assistant General Counsel for Materials pdr@nrc.gov. Agencywide Documents Access and
Litigation and Enforcement, Office of Dated this 9th day of August 2007. Management System (ADAMS) Public
the General Counsel, with both copies For the Nuclear Regulatory Commission Electronic Reading Room on the Internet
addressed to the U.S. Nuclear at the NRC Web site, http://
James T. Wiggins,
Regulatory Commission, Washington, www.nrc.gov/reading-rm/adams.html.
Deputy Director, Office of Nuclear Reactor
DC 20555–0001, and the NRC requests The accession number for the
Regulation.
that a copy also be transmitted either by application is ML071980294. Future
[FR Doc. E7–16070 Filed 8–14–07; 8:45 am]
facsimile transmission to 301–415–3725 publicly available documents related to
BILLING CODE 7590–01–P
or by e-mail to OGCMailCenter@nrc.gov. the application will also be posted in
If a person requests a hearing, he or ADAMS. Persons who do not have
she shall set forth in the request for a access to ADAMS or who encounter
hearing with particularity the manner in NUCLEAR REGULATORY
COMMISSION problems in accessing the documents
which his or her interest is adversely located in ADAMS should contact the
affected by this Order and shall address Unistar Nuclear LLC; Notice of Receipt NRC Public Document Room staff by
the criteria set forth in 10 CFR 2.309. and Availability of Part of an telephone at 1–800–397–4209 or 301–
If a hearing is requested by a person Application for a Combined License 415–4737, or by e-mail to pdr@nrc.gov.
whose interest is adversely affected, the The application is also available at
Commission shall issue an Order On July 13, 2007 (ML071980294), http://www.nrc.gov/reactors/new-
designating the time and place of any UniStar Nuclear LLC (UniStar) filed licensing/col.html.
hearing. If a hearing is held, the issue to with the Nuclear Regulatory
be considered at such hearing shall be Commission (NRC, the Commission) Dated at Rockville, Maryland, this 9th day
of August, 2007.
whether this Order should be sustained. pursuant to Section 103 of the Atomic
In accordance with 10 CFR 51.10(d), Energy Act and 10 CFR Part 52, a For the Nuclear Regulatory Commission.
this Order is not subject to Section portion of an application for a combined Thomas A. Bergman,
102(2) of the National Environmental license (COL) for a U.S. EPR nuclear Deputy Director, Licensing Operations
Policy Act, as amended. The NRC staff power plant at the Calvert Cliffs Nuclear Division of New Reactor Licensing, Office of
notes, however, that with respect to Power Plant facility in Lusby, Maryland New Reactors.
environmental impacts associated with identified as Calvert Cliffs Nuclear [FR Doc. E7–16068 Filed 8–14–07; 8:45 am]
the changes imposed by this Order as Power Plant Unit No. 3. UniStar BILLING CODE 7590–01–P
described in the safety evaluation, the supplemented its filing with a letter
changes would, if imposed by other dated July 16, 2007 (ML072000363).
than an Order, meet the definition of a An applicant may seek a COL in NUCLEAR REGULATORY
categorical exclusion in accordance accordance with Subpart C of 10 CFR COMMISSION
with 10 CFR 51.22(c)(9). Thus, pursuant Part 52 and may submit such an [Docket No. 030–05004]
to either 10 CFR 51.10(d) or 51.22(c)(9), application in two parts in accordance
no environmental assessment or with 10 CFR 2.101(a)(5). The part Notice of License Termination and
environmental impact statement is submitted by UniStar on July 13 Release of the Northern States Power
required. consists of the Environmental Report Company Pathfinder Site in Sioux
For further information see the required by 10 CFR 50.30(f) as well as Falls, SD, for Unrestricted Use
application from the licensee dated other information required under 10
August 13, 2006 (ADAMS Accession CFR 2.101(a)(5). This information AGENCY: U.S. Nuclear Regulatory
Nos. ML062400495 and ML070920272), includes certain administrative Commission.
as supplemented on May 3 (ADAMS information such as financial ACTION: Notice of license termination
Accession No. ML071410299) and June qualifications submitted pursuant to 10 and site release for unrestricted use.
18, 2007 (ADAMS Accession No. CFR 50.33, Chapter 2, ‘‘Site
ML071700633), the staff’s request for Characteristics,’’ of the safety analysis FOR FURTHER INFORMATION CONTACT:
additional information dated March 13, report (SAR), which is submitted Chad J. Glenn, Materials
2007 (ADAMS Accession No. pursuant to 10 CFR 50.34(a)(1), and an Decommissioning Section, Division of
ML070680273), and the cover letter to agreement to limit access to sensitive Waste Management and Environmental
the licensee, attachments to this Order information submitted pursuant to 10 Protection, NRC, Washington, DC
and the NRC staff’s safety evaluation CFR 50.37. To support its application, 20555; telephone: (301) 415–6722; fax:
dated August 9, 2007 (ADAMS UniStar also requested an exemption (301) 415–5369; or e-mail at:
Accession No. ML071920168), available from 10 CFR 2.101(a)(5), as documented cjg1@nrc.gov.
for public inspection at the in its July 13, 2007 letter. The NRC will SUPPLEMENTARY INFORMATION: