), Gandhinagar
Date: 04.08.2015
Sub:
The Superintending Engineer (S.E) is planning to visit New Delhi on 05.08.2015 for
EIA study of Damanganga Pinjal Interlinking project, hence he require the vehicle for
local visit in the New Delhi for official purpose.
May kindly approve.
(Rajneekant Patel)
Sr. Engineer
C.E/Regional Manager (W.R)
Date: 01.08.2015
Sub:
Minutes of Meeting regarding ICZM Project, GSDMA bid,
geological study of Sabarmati and Narmada River
Hydro-
I undersigned along with Mr. Rajneekant Patel (Sr. Engineer) met Mr. Ishwar Desai
regarding Our payment of Site visit (19 Villages in Jamnagar) on 01.08.2015. He told
us that our payment file has moved by them and we will get it in the next week.
It was discussed that as per the previous work order of ICZM Project (Dated 04-032014 Work order No. GEC/PJT/T-9/574/2013-2014), WAPCOS will cover site visit for
those villages where work has been completed and would charge @ Rs. 10625/- per
village plus service tax as per Govt. of India prevailing rate for carrying out site
Inspection of 160 villages of Gujarat. They had issued us the revised work order (Work
order No. GEC/PJT/T-9/1001/2013-2014) on 12-05-2014 it was agreed that they will
pay Additional sum Rs 3000/- per village for Technical Inspection as per our previous
scope of work on ongoing EPA activities in Morbi and Kutch district. So our total
consultancy value for this Project is (Rs 21,80,000/- + S.T.) So approx 4.5 Lakhs
rupees work is remaining. We will get it within our extended time limit period for this
project
(i.e. up to 31.12.2015).
Also, we met Sh. Santosh Kumar (Sector Manager, GSDMA) regarding our submitted
bid on 01.08.2015. He said that the technical evaluation is completed and they had
submitted bids to World Bank for finalize. They will intimate us as soon as they get
the response from World Bank.
We discussed with Mr. N.P. Mistri, Sr. Geologist, C.G.M for the Hydro-geological study
of River Narmada and Sabarmati regarding our submitted proposal on 01.08.2015. He
said the scrutiny of the proposal get delayed because of the new commissioner as he
require time to study the submitted proposals. Now the file is moved to Sh. Prajapati,
Joint secretary, Industry and Mines, Govt. of. Gujarat. He said that you will get the
work order very shortly.
For Your Kind Information Please.
(V.P.singh)
Engineer Trainee
Sr. Engineer
Minutes of Meeting
Purpose: Progress review meeting of Preparation of City Survey Records of 25 Town Planning Scheme
in Ahmedabad, Rajkot and Jamnagar districts of Gujarat.
Date and Time: July 27, 2015, (11.15 A.M. to 2.00 P.M.)
Location: Meeting Hall, City Survey office, Ahmedabad
Attendees:
Name
Designation
Mr. S.K.Srivastava
C.E. / Regional Manager (W.R.)
Sr. Engineer
Mr. Rajneekant Patel
Mr. R.K.Gurjar
Team Leader (City Survey Project)
Mr. Rajkumar
AOM
Staff (City Survey Project) including Third Parties
Organization
WAPCOS
WAPCOS
WAPCOS
WAPCOS
Sh. R.K.Gurjar was welcomed to Chief Engineer / Regional Manager (W.R.), and with the
permission of him the proceedings of the review meeting cum presentation was started. All
present members introduce themselves to the C.E. / R.M. Sh. Rajneekant Patel, Sr. Engineer begin
presentation on progress review meeting containing the project background, year wise financial
progress achieve till date, manpower details with role and responsibilities, list of third party
involve in this projects, approach methodology for property card preparation, work done so far,
month wise physical and financial action plan to meet the target, critical issues in this project,
etc. The following points were discussed & decisions were taken.
Item
1
ACTION TO BE TAKEN
Sh. Rajneekant Patel/
Sh. R.K.Gurjar.
Sh. Rajneekant Patel told that the consultancy value is reduced as per
the Minutes of Meeting dated July, 12 for 2,03,650 properties
covering Ahmadabad (19 TPs), Rajkot (5 TPs), Jamnagar ( 1 TP)
districts.
2
3
4
Sh. R.K.Gurjar
Sh. Rajneekant Patel
Sh. Rajneekant Patel,
Sh. R.K.Gurjar.
Item
5
ACTION TO BE TAKEN
Sh. R.K.Gurjar/
Sh. Rajneekant Patel
Sh. Rajkumar
AutoCAD operator
Sh. Rajkumar
Sh. R.K.Gurjar/
Sh. Rajneekant Patel
Supervisors
C.E/RM sir instructed to hired the retired officers from the revenue
department, city survey office or Talati, etc for document collection
and IEC activities in the apartment for public awareness on property
document collection.
7
C.E/RM sir has noticed that only 2% of work completed in the Data
Entry work.
Sh. R.K.Gurjar told that Jamnagar TP scheme data entry work
completed and submitted to client on 18.6.2015 for validation and
other 2no.s of TP schemes data entry work is in progress.
Sh. R.K.Gurjar/
Sh. Rajneekant Patel
Sh. Rajkumar
C.E/RM sir instructed to write letter to client for validate the Jamnagar
property data entry, hence property card to be prepared.
Sh. R.K.Gurjar explained the slow progress of work due to decisions is
not taken inquiry officers on collected documents for further data entry
in software.
C.E/RM sir instructed to involve the retired experience city survey
officers for write the decisions on collected documents and seat with
data entry operator.
8
C.E/RM sir instructed to arrange meeting with Settlement Sh. Rajneekant Patel
commissioner for release our outstanding payment and progress of
work.
The C.E/RM sir told that all the employee and third parties owner to expedite the work as per the extended
time limit. The appreciation letter and work completion certificate shall be given of best performers of
serve notice and document collections.
The C.E/RM sir has instructed to put up the penalty clause in third party work order for expedite work and
critical review of the manpower and third parties. The next review meeting is to be held in end of August,
2015.
The meeting is end with vote of thanks.
Rajneekant Patel
Sr. Engineer
(Rajneekant Patel)
Sr. Engineer
Sh.
Sh.
Sh.
Sh.
Sh.
1. Write letter to Panvel Municipal Council to arrange joint meeting with CIDCO,
CDO, Irrigation Department and WAPCOS regarding funding, water allocation,
water availability, new dam alignment, EIA study, Social Impact Assessment
(SIA) study, way forward in this project etc.
2. R.M sir instructed to whole work is divided in two parts i.e Part-I survey and
Investigation and Part-II Detailed Project Report. Also decided role and
responsibility of third party and WAPCOS in this project in following activities.
a. Survey and investigation
b. Collection of the various secondary and preliminary data
c. Preparation of the Conceptual and detailed Project Report including
alternative alignment of the propose new dam site, structural design of
earthen dam and concrete dam with stability analysis, hydraulic design
of dam, detailed drawings, cost-estimate, draft tender paper, etc.
d. Rapid EIA/comprehensive EIA study as per MoEF notification and
prepare EMP.
e. Social Impact Assessment study (SIA) and prepare R & R plan.
f. Prepare Land Acquisition plan of submerge villages upto FRL and MWL .
g. Approval from various state and central Government department .
h. PMC work during execution of the project at site.
3. Involve the local Irrigation expert to expedite the project and monitor project
day to day.
(Rajneekant Patel)
Sr. Engineer
C.E/Regional Manager (W.R)
Date: 08.07.2015
Sub: Minutes of Meeting regarding attend progress review meeting of
various Tourism projects in Gujarat.
The undersigned, Sh. Satish Patel and Sh. Jayesh Vaniya were attended Progress
review meeting at Block no. -1, 4th floor, New Sachivalaya, Gandhinagar on
21.07.2015. The meeting was chaired by Mr.S.J. Haider (IAS), Secretary (Tourism) and
Mr. N. Srivastava (IFS), M.D (Tourism). The meeting was attended by Architect, PMC
consultant and Contractors, who are working presently in Gujarat Tourism project. This
is first meeting of the Secretary (Tourism).
Following points were discussed during the meeting.
1. The secretary is taken the introduction of the all the contractor, PMC
consultant and Architect.
2. The secretary has instructed to all the meeting is attend by the company
CMD, Director, Partner, etc during when decision making meeting and the
project manage, Sr. Engineer and Field Engineer during progress review
meeting or project implementing meeting.
3. The secretary has taken overview from the PMC, Contractor and Architect of
delay projects of last 5 years i.e Year 2010 to till date, 4 years Year 2011 to
till date with reasons.
4. The secretary instructed to Department officials to bifurcate the project
priority wise and call to contractor, PMC and Architect for monthly progress
review meeting accordingly.
5. The secretary instructed to develop strategy for handover the completed
projects to concerned municipality office or collector office.
6. He is instructed to all the contractor and PMC consultant to work as per
scope work mentioned in the tender document.
7. He is instructed to PMC consultant, require experience manpower should be
deploy at site and maintain all the quality register at site.
For your kind information please.
(Rajneekant Patel)
Sr. Engineer
Date: 08.07.2015
Sub: Minutes of Meeting regarding submission of Technical Inspection Reports Monitoring of Physical activities (Entry Point Activities) Being Implemented under
World Bank Assisted ICZM Project.
I undersigned along with Mr. Rajneekant Patel (Sr. Engineer) has attended meeting
with Mr. Sh. Ishwar Desai, Asst. Manger, GEC regarding no. of village remaining for site
visit in Jamnagar and Kutch Districts on 08.07.2015. He hold us that there are 56
villages in Jamnagar and 104 villages in Kutch out of which we have visited and
submitted the Technical Inspection report of 49 villages (for Jamnagar district) out of
56 villages as per scope of work and there are around 7 villages remaining in
Jamnagar and approximately 25 villages in Kutch district for site visit.
In the meeting, he told us that in the remaining villages the work ongoing is too much
slow due to Monsoon season and lack of funds available with them, so it requires some
time for our site visit and also as per our scope in the Kutch district, we have two site
visit one on the completion of more than 50% of work and on 100% completion of
project. So, approximately around 57 site visits (32 villages) are remaining thats why
our time limit extension is up to 31.12.2015.
(V.P.singh)
Engineer
Trainee
Sr. Engineer
3.
Project Name
Start date
Completio
n date
May, 12
January,
12
Nov., 08
April 2014
60km pipeline
Rs. 877.65 Cr.
March,
2007
March,20
10
Rs. 1472 Cr.
July, 2007
Dec,2007
193 Km
5.
6.
Report,
tender
document
for
Augmentation of drinking water to
Hyderabad Urban Agglomeration (HUA)
from river Godavari.
Third Party Inspection Agencies for the
services of Construction, Supervision &
Inspection of Materials, Machinery and
equipments for lift irrigation pipeline
project from N.M.C. 375.10 km to
Dantiwada-Sipu Reservoir and pumping
Station at Changa, Rampura (Khimana)
and Bhadath.
Consultancy
services
for
Kerala
sustainable urban Development project
Design and Supervision Consultancy for
package
2
(Kochi,
Thrissur
and
Kozhikode) DSC 2 (Asia Development
Bank Funded) Project cost Rs. Rs.630
Crores
Feb, 2011
Ongoing
61.27 Km
Rs. 345.02 cr.
March, 2007
June,2010
52.68 km
Rs. 630 Crores
Looking to the above table, we can eligible for above said work .
For your kind information
Encl:
1. Pre-qualification of the bid document
(Rajneekant Patel)
Sr. Engineer
C.E/Regional Manager (W.R)
Observations
In PDS, where you have mentioned
your City Survey Area > 1.5 sq.km
Area
Compliances
We have mentioned the T.P
scheme wise area in the work
done in city survey project list
(copy enclosed).
We have mentioned the T.P
scheme wise area in the work
done in city survey project list
(copy enclosed).
We have put up your digital
signature as authorized signature
in PDS. We can take care in future
for the same and put up bid for
your signature.
We are enclosed all the PDS
related to similar work experience.
We have enclosed survey related
other PDS like CADS Project, CDP
project, block contour survey,
master mapping survey, etc.
Sir, as instructed, we have take care of prepare the quality bid and also meet the
eligibility criteria of marked bid.
For your kind information please.
(Rajneekant
Patel)
Sr. Engineer
C.E/Regional Manager (W.R)