You are on page 1of 2

FLARE DETAILS

CHECKLIST
CUSTOMER:
PLANT LOCATION:
PROJECT:
JOB NO.:

Subclause No.

BY:
DATE:
REVISION NO.:
DOCUMENT NO.:

Subclause Subject

Subclause Decision

Comment

Note: Subclause Numbers in "Bold" have been added to ISO 25457 by the DEP specification DEP 80.45.11.12-Gen.
Flare type and configuration

See Comment

Cold climate conditions

Yes

Steam muffler / drain winterization

Use DEP Default See Flare Datasheet

4.6.2 a)

Pressure design code

Use DEP Default See Comment

4.6.2 b)

Structural design code

Use DEP Default See Comment

4.6.2 c)

Local or national regulations

Use DEP Default See Comment

4.6.2 d)

Design pressure and temperature

See Comment

See Flare Datasheet

4.7.2 xvi

Pilot thin film ceramic coating

Yes

No

See Flare Datasheet

Cold climate conditions

Yes

No

Heat tracing / winterized pilot

See Flare Datasheet

4.7.2 xxii

Retractable pilots

Yes

4.8 v

Pilot ignition systems

Use DEP Default See Flare Datasheet

4.9 v

Pilot flame detection

Use DEP Default See Flare Datasheet

4.10.2 a)

Piping classes

See Comment

Pipe fabrication

Use DEP Default See Flare Datasheet

4.4.1

See Flare Datasheet

No

4.5.2 b)

4.7.2 xxi

No

See Flare Datasheet

See Flare Datasheet

5.1 a)

Wind pressure probability factor

Use DEP Default See Flare Datasheet

5.1 c)

Wind-induced vibration loads

Use DEP Default See Flare Datasheet

5.1 d)

Internal pressure

Use DEP Default See Flare Datasheet

5.1 f)

Flashback pressure > 5.1 d)

Yes

5.1 g)

Nozzle loads

Use DEP Default See Flare Datasheet

5.1 j) 6)

Offshore structure dynamic loading

See Comment

See Flare Datasheet

5.2 f)

Single piece lift

Yes

No

See Flare Datasheet

5.3

Sour service

Yes

No

See Flare Datasheet

5.3.1

Materials
- gas riser (pressure code)
- structural parts (structural code)

Use DEP Default See Flare Datasheet

Flare burner materials

Use DEP Default See Flare Data Sheet

5.3.7

DEP 80.45.11.12

No

ISO 15156

See Flare Datasheet

NACE MR0103

Use DEP Default See Flare Datasheet

Page 1 of 2

Subclause No.

Subclause Subject

Subclause Decision

5.4 a)

Welding - relief gas containing portions


of the support structure

5.4 c)

Welding - non-relief gas containing


portions of the support structure

5.5 a)

Inspection - relief gas conatining


portions of the support structure

Use DEP Default See Flare Data Sheet

5.8.1

Aircraft Warning Lighting

Use DEP Default See Flare Data Sheet

5.9.1 d)

Ladder and Platform Requirements

See Comment

Use DEP Default See Flare Data Sheet


Pressure Design Code
Use DEP Default See Flare Data Sheet
Structural Design Code

Pressure Design Code

Derrick Structure?

Yes

No

100% Availability?

Yes

No

7.0

Instrumentation

See Comment

8.0

Electrical

5.10

DEP 80.45.11.12

See Flare Data Sheet


See Project Specification

Principal to say "yes" or "no" for drawing


applicability?

Flare Structure - Erection Procedure

Yes

No
Principal to say "yes" or "no" for DEP
applicability?

List of referred DEPs


DEP 30.10.60.18Gen.
DEP 31.10.00.31Gen.
DEP 31.38.01.31Gen.
DEP 34.24.26.31Gen.
DEP 34.28.00.31Gen.
DEP 80.45.10.10Gen.

See Project Specification

See Comment See Project Specification


List of applicable drawings

S 28.028

Comment

Welding of metals (Amendments/


Supplements to API RP 582)
Noise limits
Shop and field fabrication of piping
Aircraft warning lights
Steel structures
Design of pressure relief, flare and vent
systems

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

revise accordingly

Page 2 of 2

You might also like