You are on page 1of 1

Federal Register / Vol. 71, No.

103 / Tuesday, May 30, 2006 / Notices 30701

purpose of the rule was to relieve For the Nuclear Regulatory Commission. The General Counsel of the
licensees of the burden of filing annual Catherine Haney, Commission, or his designee, has
FSAR revisions while assuring that such Director, Division of Operating Reactor certified that, in his opinion, one or
revisions are made at least every 24 Licensing, Office of Nuclear Reactor more of the exemptions set forth in 5
months. Regulation. U.S.C. 552(b)(c)(2), (6) and (7) and 17
The NRC staff examined the licensee’s [FR Doc. E6–8262 Filed 5–26–06; 8:45 am] CFR 200.402(a)(2), (6) and (7) permit
rationale to support the exemption BILLING CODE 7590–01–P consideration of the scheduled matter at
request and concluded that it would the Closed Meeting.
meet the underlying purpose of 10 CFR Commissioner Atkins, as duty officer,
50.71(e)(4). The licensee’s proposed POSTAL SERVICE
determined that Commission business
schedule for the PBNP FSAR and PINGP
Sunshine Act, Board of Governors; required the above change and that no
FSAR updates will ensure that the
Meeting earlier notice thereof was possible.
FSAR will be kept current for all units
within 24 months of the last revision. At times, changes in Commission
The proposed schedule satisfies the TIMES AND DATES: 8:30 a.m., Tuesday, priorities require alterations in the
maximum 24-month interval between June 6, 2006; and 9 a.m., Wednesday, scheduling of meeting items. For further
FSAR revisions specified by 10 CFR June 7, 2006. information and to ascertain what, if
50.71(e)(4). The requirement to revise PLACE: Indianapolis, Indiana, at the any, matters have been added, deleted
the FSAR annually or within 6 months Westin Hotel, 50 South Capitol Avenue. or postponed, please contact the Office
after refueling outages for each unit, STATUS: June 6—8:30 a.m. (Closed); June of the Secretary at (202) 551–5400.
therefore, is not necessary to achieve the 7—9 .a.m. (Closed).
Dated: May 24, 2006.
underlying purpose of the rule. MATTERS TO BE CONSIDERED:
Nancy M. Morris,
Based on a consideration of the Tuesday, June 6, at 8:30 a.m. (Closed)
licensee’s proposed exemption, the NRC Secretary.
staff concludes that literal application of 1. Labor Negotiations Planning. [FR Doc. 06–4955 Filed 5–25–06; 10:46 am]
10 CFR 50.71(e)(4) would require the 2. Rate Case Planning. BILLING CODE 8010–01–P
licensee to update the same document 3. Strategic Planning.
within 6 months after a refueling outage 4. Financial Update.
5. Personnel Matters and SECURITIES AND EXCHANGE
for either unit at each site, a more
Compensation Issues. COMMISSION
burdensome requirement than intended
by the regulation. Wednesday, June 7, at 9 a.m. (Closed—
Therefore, the NRC staff concludes if needed.) [Release No. 34–53852; File No. SR–FICC–
that, pursuant to 10 CFR 50.12(a)(2)(ii), 1. Continuation of Tuesday’s agenda. 2006–04]
special circumstances are present. FOR FURTHER INFORMATION CONTACT:
Self-Regulatory Organizations; Fixed
4.0 Conclusion Wendy A. Hocking, Secretary of the
Income Clearing Corporation; Notice of
Board, U.S. Postal Service, 475 L’Enfant
Accordingly, the Commission has Filing and Immediate Effectiveness of
Plaza, SW., Washington, DC 20260–
determined that, pursuant to 10 CFR 1000. Telephone (202) 268–4800. Proposed Rule Change To Clarify
50.12(a), the exemption is authorized by Provisions in the Rules of the
law, will not present an undue risk to Wendy A. Hocking, Government Securities Division
the public health and safety, and is Secretary. Relating to the GCF Forward Mark
consistent with the common defense [FR Doc. 06–4993 Filed 5–25–06; 3:21pm] Component of the Funds-Only
and security. Also, special BILLING CODE 7710–12–M Settlement Process
circumstances are present. Therefore,
the Commission hereby grants NMC an May 23, 2006.
exemption from the requirements of 10 SECURITIES AND EXCHANGE Pursuant to section 19(b)(1) of the
CFR 50.71(e)(4) to submit updates to the COMMISSION Securities Exchange Act of 1934
PBNP FSAR and PINGP FSAR annually (‘‘Act’’),1 notice is hereby given that on
or within 6 months of each unit’s Sunshine Act; Meeting March 24, 2006, the Fixed Income
refueling outage. The licensee will be Clearing Corporation (‘‘FICC’’) filed
required to submit updates of the PBNP Federal Register Citation of Previous
Announcement: [71 FR 28892, May 18, with the Securities and Exchange
and PINGP updated FSARs once per Commission (‘‘Commission’’) the
fuel cycle, within 6 months following 2006]
proposed rule change described in Items
completion of each PBNP, Unit 1, STATUS: Closed Meeting. I, II, and III below, which items have
refueling outage and within 6 months of PLACE: 100 F Street, NE., Washington, been prepared primarily by FICC. FICC
each PINGP, Unit 2, refueling outage, DC. filed the proposed rule change pursuant
respectively, not to exceed 24 months DATE AND TIME OF PREVIOUSLY ANNOUNCED to section 19(b)(3)(A)(iii) of the Act 2
from the last submittal for either site. MEETING: Thursday, May 25, 2006 at 2 and Rule 19b–4(f)(4) thereunder 3 so that
Pursuant to 10 CFR 51.32, the p.m. the proposal was effective upon filing
Commission has determined that the CHANGE IN THE MEETING: Additional Item with the Commission. The Commission
granting of this exemption will not have and Time Change. is publishing this notice to solicit
a significant effect on the quality of the The Closed Meeting scheduled for comments on the proposed rule change
jlentini on PROD1PC65 with NOTICES

human environment (71 FR 28889). Thursday, May 25, 2006 at 2 p.m. has from interested parties.
This exemption is effective upon been changed to Thursday, May 25,
issuance. 2006 at 1 p.m. with the following item 1 15 U.S.C. 78s(b)(1).
Dated at Rockville, Maryland, this 22nd being added: Congressional request for 2 15 U.S.C. 78s(b)(3)(A)(iii).
day of May 2006. non-public documents. 3 17 CFR 240.19b–4(f)(4).

VerDate Aug<31>2005 16:51 May 26, 2006 Jkt 208001 PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 E:\FR\FM\30MYN1.SGM 30MYN1

You might also like