DOCUMENT No.

A609-00-02-41-ODB-0001
Rev C

Basic Engineering Design Basis Part-B


of AISHWARYA Project
at Haldia Refinery, IOCL

Page 54 of 75

All SOVs will be control room manual reset except heater


related SOVs which will be field manual reset.
However, licensor recommendation if any, shall be incorporated.
9.6

Status indication lamps in control room: (HW console)


All continuously running rotating equipment:
Critical continuously running rotating equipment:
Alarm window in control room for all compressors.
Hardwired alarm annunciation in control room
for critical compressors..

yes

yes no
yes
no
yes
no
yes

It is desired that all rotating equipment should have running information on DCS. The
critical equipment should necessarily have running indication on DCS. Compressor alarms
should also be repeated in main control room. Compressor trip alarms should be hard wired.
9.7
9.7.1

Control valve manifold:


As a default, all control valves in steam service and control valves upto 8" size in other
services and shall be provided with a manifold of block and bypass valves. Bypass valves
shall be globe valves. Control valves not having block and bypass provision shall be
provided with hand wheel for manual operation. For control valve above 8" size other than
steam service, block and bypass requirement shall be decided on case to case basis.
If owner has any specific additional or different preferences, indicate:

9.7.2

All control valves shall be provided with 3/4" drain valves, which can be provided as:
and downstream of all control valves
upstream and downstream of fail close valves, upstream of fail open valves
upstream and downstream of fail close valves, downstream of fail open valves
upstream of all control valves
drain valve shall be capped (in non-hydrocarbon and non IBR LP steam service)
drain valve shall be blind-flanged (in all Hydrocarbon and IBR steam service)

9.7.3

In no event shall shutdown valves be provided with block / bypass valves.


No bypass valves, but case to case basis u/s & d/s block valves are required.

9.8
9.8.1

Pressure relief valves (PSV):


Owner to indicate preferences towards pressure relief valves:
PSV for operational failures shall have installed spare:
(25% spare to be provided for multiple PSVs.)
PSV exclusively for non-operational failures (external fire or
heat exchanger tube rupture) shall not have installed spare:
Spared PSV shall have upstream and downstream isolation:
Spared PSV shall have only upstream isolation:
Unspared PSV shall have upstream and downstream isolation:
Unspared PSV shall have only upstream isolation:
Unspared PSV shall have no isolation:
PSV in IBR steam service shall have no isolation:
PSV in air service shall have only upstream isolation:
PSV for thermal relief valve shall not have installed spare:
PSV on spare equipment shall have downstream isolation only

Template No. 5-0000-0001-T2 Rev. 1


Page 101 of 10496

yes

no

yes
yes
yes
yes
yes
yes
yes
yes
yes

no
no
no
no
no
no
no
no
no