You are on page 1of 2

22ND STREET

Pennsylvania
to Iowa
CONCEPTUAL
ESTIMATE
& DESIGN
22ND COST
STREET
$502,000
CONCEPTUAL COST ESTIMATE & DESIGN

22ND STREET
CONCEPTUAL COST ESTIMATE & DESIGN

ota

$104,000

$168,000

$104,000

$45,000

$502,000

Pennsylvania
to Iowa
3
$230,000 $502,000

$104,000

$230,000

$168,000

Iowa to Indiana
$506,000

09.08.2015

1 ESTIMATE & DESIGN


2
3 to Iowa
CONCEPTUAL COST
Pennsylvania

22ND STREET

5 Iowa to Indiana
09.08.2015

$45,000

$461,000

7
Indiana to Minnesota
$130,000
COST ESTIMATE
$593,000 & DESIGN

$463,000

CONCEPTUAL
Iowa to Indiana
6
$463,000
$506,000

$506,000

$461,000

$168,000

Indiana to Minnesota
$593,000

$230,000

$45,000

$130,000

Minnesota to Tennessee
$729,000
7

Tennessee to 3rd
$646,000

$130,000

$600,000
Minnesota to Tennessee
$729,000

8
Minnesota to Tennessee
$600,000
$729,000

$130,000

PUBLIC WORKS ALTERNATIVE


STREETSCAPE TOTAL: $3,500,000 *

$130,000

$129,000

$129,000

$600,000

$129,000

10

$127,000

10

$127,000

10

$127,000

11

$305,000
Tennessee

to 3rd
$646,000

11 Tennessee to 3rd

$305,000

$646,000

11

$305,000

Indiana to
Pennsylvania to$59
Io
6 $502,000

$461,000

$104,000

ota

ota

09.08.2015

$168,000

$463,000

$230,000

3rd to Illinois
$483,000
12

$112,000

12

$112,000

12

$112,000

14

16

$112,000

$295,000
3rd to Illinois
$483,000

14

16
3rd to Illinois
$295,000
$483,000

$112,000

14

$112,000

16

$295,000

LEGEND

WORKS
ALTERNATIVE
Project
Segment
Number
1 PUBLIC
1
STREETSCAPE
TOTAL: $3,500,000 * $500,000
Segment Cost
$500,000

LEGEND

Block Improvements

Project Segment Number


1
Segment
Cost
$500,000
*Funding
for paving
(~$500,000)
from Illinois

Project Segment Number


Segment Cost
Bulb Out

Project Segment Number


1
Cost for the
$500,000
to
PennsylvaniaSegment
Ave (except

Street
Caltrain bridge) will come from the Public Works Paving Program budget.

Block Improvements

Bulb Out

*Funding for paving (~$500,000) from Illinois Street to Pennsylvania Ave (except for the
Caltrain bridge) will come from the Public Works Paving Program budget.

PUBLIC WORKS ALTERNATIVE


STREETSCAPE TOTAL: $3,500,000 *

13

LEGEND

1
$500,000

Project Segment Number


Segment Cost
Block Improvements

1
$500,000

Project Segment Number


Segment Cost

13

Bulb Out

*Funding
for paving
from Illinois
Illinois Street
Street to
to Pennsylvania
PennsylvaniaAve
Ave (except
(exceptfor
for the
the Caltrain
*Funding for
paving (~$500,000)
(~$500,000) from
bridge)
come
the
Public
WorksWorks
PavingPaving
Program
budget.
Caltrain will
bridge)
willfrom
come
from
the Public
Program
budget.

PROJECT SUMMARY: The 22nd Street Green Connection Streetscape project area is from Illinois
Street to Pennsylvania Avenue. The project proposes to enhance the public realm of the 22nd
Street commercial corridor through tree and understory planting, new pedestrian lighting,
replacement of sidewalk concrete where needed and installation of turf block treatments, corner
sidewalk bulbouts, new painted crosswalks and bike route markings (sharrows). In addition
to the pedestrian and public realm improvements, the project will strengthen the connection
09.09.15

$102,000

$102,000

13

$102,000

15

$76,000

PUBLIC WORKS ALTERNATIVE


STREETSCAPE TOTAL: $3,500,000 *

15

$76,000

15

$76,000

LEGEND

1
$500,000

Project Segment Number


Segment Cost

1
$500,000

Project Seg
Segment Co

for people cycling from the Illinois St bikeway to the 22nd St Caltrain station at Iowa Street.
The 22nd Street Green Connection Streetscape project
coordinate with Public Works paving
Bulb Out
Block will
Improvements
programs repaving of 22nd Street.

*Funding for paving (~$500,000) from Illinois Street to Pennsylvania Ave (exce

For more information, please contact:


Caltrain bridge) will come from the Public Works Paving Program budget.
Kelli Rudnick (415)-558-4489 / kelli.rudnick@sfdpw.org
or visit: sf-planning.org/CentralWaterfrontPRP

22ND STREET
GREEN CONNECTION

CONCEPTUAL COST ESTIMATE SUMMARY

FEATURES
6 Blocks of Repaving (~$500,000 from Paving Program)
19,400 SF New Sidewalks w/ Integral Color
9 Bulb-outs
42 New Street Trees
3 Year Maintenance for New Trees
7,150 SF Permeable Paving
7,150 SF Low-maintenance, Drought Tolerant Planting
7,150 SF Irrigation
1,855 SF Special Treatment at Crosswalks @ 6 Intersections
18 New Pedestrian Light Fixtures (& Conduit) @ Intersections
24 Painted Sharrows
21 Bike Posts
4 Trash Receptacles (at Bus Stops)

STREETSCAPE GREENING &


MATERIALS PALETTE

PEDESTRIAN LIGHTING

SEGMENT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

HARD COST
$104,000
$168,000
$230,000
$45,000
$461,000
$463,000
$130,000
$600,000
$129,000
$127,000
$305,000
$112,000
$102,000
$112,000
$76,000
$295,000

SOFT COSTS
Construction Support
5%
Construction Management
10%
Design (SF Public Works
Disciplines) 12%
Project Management
3%
Survey $50,000
TOTAL=

$3,500,000*

*Funding for paving (~$500,000) from


Illinois Street to Pennsylvania Ave (except
for the Caltrain bridge) will come from the
Public Works Paving Program budget.

SCHEDULE
DOGPATCH & POTRERO COMMUNITY OUTREACH

Summer through Fall 2015

EASTERN NEIGHBORHOODS COMMUNITY ADVISORY COMMITTEE MEETINGS

September 21
October 19 final presentation and additional

funding request
22ND ST COMMUNITY WORKSHOP

November/December 2015
22ND ST CALTRAIN BRIDGE CONSTRUCTION

January 2016 through October 2016
SIDEWALK PLANTERS

TURF BLOCK/ GREEN FUZZ

SPECIAL PAVING AT CROSSWALKS


BICYCLE SHARROWS
09.08.15

PLANTED BULB-OUTS

22ND STREET
GREEN CONNECTION

BIKE RACKS