You are on page 1of 267

MONITORING PROGRESS MECHANIC

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE STAIRCASE
&E SERVICE ROOM

BASEMENT

PARKING &
DRIVEWAY

LIFT CORE

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

PODIUM

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTH

LOCATION

RISER / SHAFT
INSTALLATION

Actual
START

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

01-2/A

Hotel store 1,2

4a/C-D

Store 3

4a-5/C-D

Store (service apt.)

7/G

1-2/F-G

5/C

1-7/A-J

Car parking

1-7/A-J

Motor parking

4a-E

1/E

Ramp 1

10

1/C

Fan room

11

3a/B

Chiller plant room

12

4/B

13

4a/A-B

14

5/A

Domestic tank 1, 2 (retail)

15

5/A

Pump room 1 (retail)

16

5a/B

Pump room 2 (hotel)

17

6/B

18

6/C-D

Pump room 4 (service Apt. +


retail)

19

5a-6/D

Pump room 5 (hotel)

20

5b-5c/H

Pump room 6 (hotel)

21

5b-5c/J

Pump room 7 (retail/ carpark)

22

5a/A

AC make up tank 1, 2 (hotel)

Carpark store
Staircase lobby
Passage

Handicapped parking space

Flood retention tank (below)


Sump pit

Pump room 3 (service apt.)

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION

Actual
START

Progress
(%)

CABLING
INSTALLATION

Actual
START

Progress
(%)

LOOPING &
MERGERING

Actual
START

Progress
(%)

PANEL INSTALLATION
(SUB SWITCHBOARD)

Actual
START

LIFT CORE & ESCAPE STAIRCASE


RETAIL

LEVEL1

GRID LINE

NO.

M&E SERVICE
AREA
ROOM

PODIUM

M&E AND SERVICE


ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

BASEMENT

MONITORING PROGRESS MECHANIC

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTH

LOCATION

RISER / SHAFT
INSTALLATION

Actual
START

23

7/A

Domestic tank 3 (hotel)

24

7/B

Domestic tank 4 (service apt.)

25

5a-6/C

Wet riser tank 1, 2

26

6-7/C

Hose reel tank 1, 2

27

7/D

28

5b/H

Sprinkler pump stage 1

29

7/J-K

Sprinkler tank 1, 2

30

2/H

Grease interceptor system


(hotel&retail)

31

01/G

OSD, on-site detention tank

32

01/F

Rain water harvesting tank

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1a/A

Store

5a/D

Janitor

5a/D-E

Refuse

5a-D

4a-5B/D-F

1-H

2a-4a/D-L

1-6/C-G

3/M

10

1-7/A-M

11

4a-5b/C-F

12

4/F

Fresh air fanroom (car park)

Refuse bin
Store 1, 2,3,4,5
Ramp 1
Retail lobby
Passage 1, 2, 3, 4
Retail service lift lobby
Retail unit 1,2,3,4,5,6,7,8,9,10
Retail male & female toilet
Glass lift

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION

Actual
START

Progress
(%)

CABLING
INSTALLATION

Actual
START

Progress
(%)

LOOPING &
MERGERING

Actual
START

Progress
(%)

PANEL INSTALLATION
(SUB SWITCHBOARD)

Actual
START

LIFT CORE & ESCAPE


STAIRCASE
M&E & SERVICE ROOM (SERVICE APARTMENT & RETAIL)

LEVEL 2

GRID LINE

NO.

AREA
RETAIL

PODIUM

M&E & SERVICE ROOM (HOTEL)

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

LEVEL1

MONITORING PROGRESS MECHANIC

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTH

LOCATION

RISER / SHAFT
INSTALLATION

Actual
START

13

3a/F

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

2/C

Hotel lobby

3/B-C

1/C

Receiving area & purchasing

2/D

Luggage room

1a/B

LPG Farm 1 (hotel)

2/B

Loading & Unloading bay

2a/B

Receiving area & platform

1/C-D

Bin center 1

1/C-D

Store

10

5a/E

Retail service lift lobby

11

5/C

Letter box

12

5a/C

Fire control room (retail, apt.)

13

6/C

MDF room

14

6/C-D

Bin center 2

15

5a-6/D

AWCS cable room

16

5a-6/D-E

AWCS

17

5a/E

CWSP

18

5a/E

Full vacuumload station

19

6/E

Loading & Unloading

20

5a/F

Consumer HT room

21

5a/G

TNB room

22

6/G

23

5b/G-H

24

5c/H

Diesel fuel pump room

25

5b/H

Bomba vehicle turning circle

Reception

TNB meter room


M&E room

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION

Actual
START

Progress
(%)

CABLING
INSTALLATION

Actual
START

Progress
(%)

LOOPING &
MERGERING

Actual
START

Progress
(%)

PANEL INSTALLATION
(SUB SWITCHBOARD)

Actual
START

GRID LINE

NO.

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTH

LOCATION

5b/J

27

4a/E-F

Passage

28

01/B

Ramp 2

29

2a-7/A-C

Drop of

30

2b-4a/C-K

Retail lobby

31

01-5c/C-M

Retail unit 1,2,3,4,5,6,7

32

5/E

33

3b/E

Glass lift

34

3/E

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/J

Retail lift lobby

1a/B

M&E room

1/C

Store

4/E

Smoke spill fan room

4a/E

Copper pipes compartment

1a/F

Smoke spill fresh air pump room

2b-E

Pedestrian walk way

1-5a/C-J

Passage

1-7/B-M

Car parking

10

2a/C

Handicapped parking space

11

3/E-F

Stair from 3A to 3B

12

01-6/C-K

CIRCULATIO
N

26

RETAIL

RISER / SHAFT
INSTALLATION

Actual
START

RET
LIFT CORE & ESCAPE STAIRCASE
AIL

M&E &AREA
SERVICE ROOM (SERVICE A

PODIUM

CARPAKING & DRIVEWAY M&E SERVICE ROOM

LEVEL 2
LEVEL
TYPICAL COMMON AREA BASEMENT TO LEVEL 36
LEVEL 3A & 3B

MONITORING PROGRESS MECHANIC

LPG Farm 2 (retail)

Retail male & female toilet

Ramp

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION

Actual
START

Progress
(%)

CABLING
INSTALLATION

Actual
START

Progress
(%)

LOOPING &
MERGERING

Actual
START

Progress
(%)

PANEL INSTALLATION
(SUB SWITCHBOARD)

Actual
START

GRID LINE

14

1/H

Male prayer room

15

2/H

Female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

3/M

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

OTHER
ROOMS

2-2a/E-F

LIFT CORE & ESCAPE


STAIRCASE

RISER / SHAFT
INSTALLATION

Actual
START

LIFT CORE & ESCAPE STAIRCASE

NO.

LOCATION

13

OBBY &
E ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36


LEVEL 4A & 4B
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTH

LIFT LOBBY
& SERVICE
R.M

AREA

PODIUM

PARKING & DRIVEWAY

LEVEL LEVEL 3A & 3B

MONITORING PROGRESS MECHANIC

Car park management office

Retail lift lobby


Passage
Stair from 4A to 4B

Store 1, 2

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION

Actual
START

Progress
(%)

CABLING
INSTALLATION

Actual
START

Progress
(%)

LOOPING &
MERGERING

Actual
START

Progress
(%)

PANEL INSTALLATION
(SUB SWITCHBOARD)

Actual
START

MONITORING PROGRESS MECHANIC

GRID LINE

NO.

AREA
LIFT LOBBY &
SERVICE ROOM
PARKING & DRIVEWAY
LIFT CORE & ESCAPE STAIRCASE
M&E

LEVEL 6A & 6B

LIFT LOBBY &


SERVICE ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL 5A & 5B

LEVEL

PODIUM

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTH

LOCATION

RISER / SHAFT
INSTALLATION

Actual
START

4a/D-E

Store 3

2/B

Genset room (hotel)

3/M

Retail lift lobby

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

10

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/M

Retail lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

6/G

Store 4

6/E

Management office

2a/B

Main switch board room (hotel)

2b/B

Transformer room (hotel)

5a-6/C

Transformer (apartment)

6/C

Main switch board room


(apartment)

10

5a-6/C-D

11

4a/E

CW pump room

12

5/E

EFF & CW. Tank

13

6/H

Transformer room (retail)

14

6/J

Main switch boardroom (retail)

Passage
Stair to up from 4A to 4B

Switch gear room (apartment)

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION

Actual
START

Progress
(%)

CABLING
INSTALLATION

Actual
START

Progress
(%)

LOOPING &
MERGERING

Actual
START

Progress
(%)

PANEL INSTALLATION
(SUB SWITCHBOARD)

Actual
START

LIFT CORE & ESCAPE STAIRCASE


M&E AND STORE
USTOMER (HOTEL)

TYPICAL COMMON AREA - BASEMENT


TO LEVEL 36

GRID LINE

NO.

AREA
M&E

PODIUM

PARKING

LEVEL
LEVEL 6A & 6B

MONITORING PROGRESS MECHANIC

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTH

LOCATION

RISER / SHAFT
INSTALLATION

Actual
START

15

6/K

Genset room (retail)

16

1a/F

Fire pump room (hotel)

17

1/F

HR tank 1, 2

18

2/F

WR tank 1, 2

19

01-6/C-K

Ramp

20

5a/B, 2/K

Motocycle parking

21

01-7/B-M

Car parking

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

7/H

AV store

5a-6/C

Spa store

5/D-E

Store

1/C

1/C-D

AWCS

6/C-D

Staircase pressurization room

3a/C

Reception & check-in counter

3a/B

Business center/ library

4/B

10

4a/B

11

2/E

Bakery

12

3/G

All day dining

13

3c-3d/M

14

5/E

Bins room

Social space
Idea room

Pantry
Pre-function room

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION

Actual
START

Progress
(%)

CABLING
INSTALLATION

Actual
START

Progress
(%)

LOOPING &
MERGERING

Actual
START

Progress
(%)

PANEL INSTALLATION
(SUB SWITCHBOARD)

Actual
START

MONITORING PROGRESS MECHANIC

GRID LINE

NO.

CUSTOMER (HOTEL)
AREA
FRONT OF HOUSE (HOTEL)
MAIN KITCHEN
IN KITCHEN

LEVEL 7

LEVEL

PODIUM

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTH

LOCATION

RISER / SHAFT
INSTALLATION

Actual
START

15

4c-G

Function room 1

16

5b/G

Function room 2

17

4a-6/B

Treatment 1, 2, 3

18

5a-6/B

Couple treatment room

19

6-7/B

Zacuzzi

20

6/D

21

2-2a/B

22

1a/B

23

2-2a/B

24

2a/B

25

3/B

GM office

26

5/C

Sales & marketing

27

4-4a/c-D

28

4-4a/C

Manager 1, 2

29

4-4a/D

Luggage room

30

5/D

Store

31

5c/E

Food preparation

32

1-1a/C

33

1-1a/C-D

Walk-in freezer

34

2/C-D

Walk-in chiller

35

1/D

Freeze

36

1/D

Chiller

37

2/D

Pastry store

38

1/D-E

Meat prep

39

1/E

Vege prep

40

2/E

Pastry & bakery

41

2/E

Chocolate room

42

1/E-F

43

1/F

Male & female toilet


Gen. cash
Storage
Account manager
Director finance

Hotel front office

Dry store

Cold kitchen
RM. Service office

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION

Actual
START

Progress
(%)

CABLING
INSTALLATION

Actual
START

Progress
(%)

LOOPING &
MERGERING

Actual
START

Progress
(%)

PANEL INSTALLATION
(SUB SWITCHBOARD)

Actual
START

MONITORING PROGRESS MECHANIC

GRID LINE

NO.

MAIN KITCHEN
AREA
LIFT CORE & ESCAPE STAIRCASE
M&E

TYPICAL COMMON AREA - BASEMENT


TO LEVEL 36

LANDSC
APE

LEVEL

PODIUM

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTH

LOCATION

RISER / SHAFT
INSTALLATION

Actual
START

44

1/F

Chef office

45

1/F

Room service

46

1/F-G

Steward store

47

1-1a/F-G

48

1/G

Dish washing

49

2/F

Cooking area

50

5/A-B

51

4b-7/H-M

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1/C

Bin room

1/C

AWCS

2/B

Ahu room 1

1/G

Ahu room 2

01/F-G

01/G

1a/B-C

M&E area

1a/B

I.T. Store

2-2a/B-C

I.T. office

10

2b/B

11

3/B

Pot & pan washing

Balcony
Deck extension for F&B funtions

Balancing tank
Pump room

Server room
Uniform issue

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION

Actual
START

Progress
(%)

CABLING
INSTALLATION

Actual
START

Progress
(%)

LOOPING &
MERGERING

Actual
START

Progress
(%)

PANEL INSTALLATION
(SUB SWITCHBOARD)

Actual
START

MONITORING PROGRESS MECHANIC

GRID LINE

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTH

LOCATION

12

6/E

Function room storage

13

6/H

AV room

14

2/E

HK manager

15

2/E-F

HR. DIR. Office

16

2/E-F

F&B DIR. Office

17

2/F-G

Executive chef

18

1/F

Working area

19

1/E

Training/ meeting room

20

1a/D

21

1-1a/C

22

2/D

Flower shop

23

2/D

House keeping office

24

1/D

Soiled linen room

25

1/D

Valet laundry

26

1/D-E

Clean linen room

27

1/C-D

Trolley bay

28

3a/B

Clinic

29

4/B

30

5a/B

31

6/B

32

6/B-C

33

6/C

Staf social lounge

34

6/D

Male & female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

NO.

AREA
OFFICE (BOH)
LIFT CORE &
ESCAPE
STAIRCASE

YPICAL COMMON
REA - BASEMENT
TO LEVEL 36

SERVICE AREA (BOH)

LEVEL 7 MEZZANINE

LEVEL

PODIUM

RISER / SHAFT
INSTALLATION

Actual
START

Corridors
Security & receiving area

Male & female changing room,


toilet
Team dinning room
Kitchen
Kitchen storage

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION

Actual
START

Progress
(%)

CABLING
INSTALLATION

Actual
START

Progress
(%)

LOOPING &
MERGERING

Actual
START

Progress
(%)

PANEL INSTALLATION
(SUB SWITCHBOARD)

Actual
START

MONITORING PROGRESS MECHANIC

GRID LINE

NO.

LIFT CORE &


ESCAPE
AREA
STAIRCASE
FACILITY

LEVEL 8

TYPICAL COMMON
AREA - BASEMENT
LEVEL
TO LEVEL 36

PODIUM

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTH

LOCATION

RISER / SHAFT
INSTALLATION

Actual
START

5a/D

Escape staircase S4

11

3a/C

Gym

12

3/B

Male, female changing room

13

3/F

Swimming pool

14

3/J

Pantry

15

4d/J

16

2a-4/B-H

Deck

17

2a-7/A-D

Roof top garden for apartment


tower

18

2b-7/B-J

Steps

19

2b-7/B-J

Ramp

Spiral stair

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION

Actual
START

Progress
(%)

CABLING
INSTALLATION

Actual
START

Progress
(%)

LOOPING &
MERGERING

Actual
START

Progress
(%)

PANEL INSTALLATION
(SUB SWITCHBOARD)

Actual
START

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM


MONITORING PROGRESS MECHANIC

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE STAIRCASE
&E SERVICE ROOM

BASEMENT

PARKING &
DRIVEWAY

LIFT CORE

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

- TELEPHONE, DATA SYSTEM, MATV,


CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)
PODIUM

PANEL INSTALLATION
(SUB SWITCHBOARD)
LOCATION
Progress
(%)

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

01-2/A

Hotel store 1,2

4a/C-D

Store 3

4a-5/C-D

Store (service apt.)

7/G

1-2/F-G

5/C

1-7/A-J

Car parking

1-7/A-J

Motor parking

4a-E

1/E

Ramp 1

10

1/C

Fan room

11

3a/B

Chiller plant room

12

4/B

13

4a/A-B

14

5/A

Domestic tank 1, 2 (retail)

15

5/A

Pump room 1 (retail)

16

5a/B

Pump room 2 (hotel)

17

6/B

18

6/C-D

Pump room 4 (service Apt. +


retail)

19

5a-6/D

Pump room 5 (hotel)

20

5b-5c/H

Pump room 6 (hotel)

21

5b-5c/J

Pump room 7 (retail/ carpark)

22

5a/A

AC make up tank 1, 2 (hotel)

Carpark store
Staircase lobby
Passage

Handicapped parking space

Flood retention tank (below)


Sump pit

Pump room 3 (service apt.)

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ACMV

ELV DEVICES - TELEPHONE, DATA


SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR,
EARTHNING & LIGHTNING
Actual
START

Progress (%)

DUCTING
INSTALLATION VERTICAL
Actual
START

Progress
(%)

DUCTING
INSTALLATION HORIZONTAL
Actual
START

Progress
(%)

CHILL PIPE
INSTALLATION

Actual
START

Progress
(%)

INSTALLATION
CONDUIT & WIRING

Actual
START

BASEMENT

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM


MONITORING PROGRESS MECHANIC

GRID LINE

NO.

M&E SERVICE
AREA
ROOM
LIFT CORE & ESCAPE STAIRCASE
RETAIL

LEVEL1

M&E AND SERVICE


ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

- TELEPHONE, DATA SYSTEM, MATV,


CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)
PODIUM

PANEL INSTALLATION
(SUB SWITCHBOARD)
LOCATION
Progress
(%)

23

7/A

Domestic tank 3 (hotel)

24

7/B

Domestic tank 4 (service apt.)

25

5a-6/C

Wet riser tank 1, 2

26

6-7/C

Hose reel tank 1, 2

27

7/D

28

5b/H

Sprinkler pump stage 1

29

7/J-K

Sprinkler tank 1, 2

30

2/H

Grease interceptor system


(hotel&retail)

31

01/G

OSD, on-site detention tank

32

01/F

Rain water harvesting tank

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1a/A

Store

5a/D

Janitor

5a/D-E

Refuse

5a-D

4a-5B/D-F

1-H

2a-4a/D-L

1-6/C-G

3/M

10

1-7/A-M

11

4a-5b/C-F

12

4/F

Fresh air fanroom (car park)

Refuse bin
Store 1, 2,3,4,5
Ramp 1
Retail lobby
Passage 1, 2, 3, 4
Retail service lift lobby
Retail unit 1,2,3,4,5,6,7,8,9,10
Retail male & female toilet
Glass lift

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ACMV

ELV DEVICES - TELEPHONE, DATA


SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR,
EARTHNING & LIGHTNING
Actual
START

Progress (%)

DUCTING
INSTALLATION VERTICAL
Actual
START

Progress
(%)

DUCTING
INSTALLATION HORIZONTAL
Actual
START

Progress
(%)

CHILL PIPE
INSTALLATION

Actual
START

Progress
(%)

INSTALLATION
CONDUIT & WIRING

Actual
START

LEVEL1

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM


MONITORING PROGRESS MECHANIC

GRID LINE

NO.

AREA
RETAIL
LIFT CORE & ESCAPE
STAIRCASE
M&E & SERVICE ROOM (SERVICE APARTMENT & RETAIL)

LEVEL 2

M&E & SERVICE ROOM (HOTEL)

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

- TELEPHONE, DATA SYSTEM, MATV,


CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)
PODIUM

PANEL INSTALLATION
(SUB SWITCHBOARD)
LOCATION
Progress
(%)

13

3a/F

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

2/C

Hotel lobby

3/B-C

1/C

Receiving area & purchasing

2/D

Luggage room

1a/B

LPG Farm 1 (hotel)

2/B

Loading & Unloading bay

2a/B

Receiving area & platform

1/C-D

Bin center 1

1/C-D

Store

10

5a/E

Retail service lift lobby

11

5/C

Letter box

12

5a/C

Fire control room (retail, apt.)

13

6/C

MDF room

14

6/C-D

Bin center 2

15

5a-6/D

AWCS cable room

16

5a-6/D-E

AWCS

17

5a/E

CWSP

18

5a/E

Full vacuumload station

19

6/E

Loading & Unloading

20

5a/F

Consumer HT room

21

5a/G

TNB room

22

6/G

23

5b/G-H

24

5c/H

Diesel fuel pump room

25

5b/H

Bomba vehicle turning circle

Reception

TNB meter room


M&E room

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ACMV

ELV DEVICES - TELEPHONE, DATA


SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR,
EARTHNING & LIGHTNING
Actual
START

Progress (%)

DUCTING
INSTALLATION VERTICAL
Actual
START

Progress
(%)

DUCTING
INSTALLATION HORIZONTAL
Actual
START

Progress
(%)

CHILL PIPE
INSTALLATION

Actual
START

Progress
(%)

INSTALLATION
CONDUIT & WIRING

Actual
START

M&E &AREA
SERVICE ROOM (SERVICE A

LEVEL 2

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM


MONITORING PROGRESS MECHANIC

NO.

GRID LINE

Progress
(%)

5b/J

27

4a/E-F

Passage

28

01/B

Ramp 2

29

2a-7/A-C

Drop of

30

2b-4a/C-K

Retail lobby

31

01-5c/C-M

Retail unit 1,2,3,4,5,6,7

32

5/E

33

3b/E

Glass lift

34

3/E

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/J

Retail lift lobby

1a/B

M&E room

1/C

Store

4/E

Smoke spill fan room

4a/E

Copper pipes compartment

1a/F

Smoke spill fresh air pump room

2b-E

Pedestrian walk way

1-5a/C-J

Passage

1-7/B-M

Car parking

10

2a/C

Handicapped parking space

11

3/E-F

Stair from 3A to 3B

12

01-6/C-K

RETAIL

CIRCULATIO
N

26

RET
LIFT CORE & ESCAPE STAIRCASE
AIL

TYPICAL COMMON AREA BASEMENT TO LEVEL 36


LEVEL 3A & 3B

PANEL INSTALLATION
(SUB SWITCHBOARD)
LOCATION

CARPAKING & DRIVEWAY M&E SERVICE ROOM

LEVEL

- TELEPHONE, DATA SYSTEM, MATV,


CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)
PODIUM

LPG Farm 2 (retail)

Retail male & female toilet

Ramp

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ACMV

ELV DEVICES - TELEPHONE, DATA


SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR,
EARTHNING & LIGHTNING
Actual
START

Progress (%)

DUCTING
INSTALLATION VERTICAL
Actual
START

Progress
(%)

DUCTING
INSTALLATION HORIZONTAL
Actual
START

Progress
(%)

CHILL PIPE
INSTALLATION

Actual
START

Progress
(%)

INSTALLATION
CONDUIT & WIRING

Actual
START

LEVEL LEVEL 3A & 3B

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM


MONITORING PROGRESS MECHANIC

GRID LINE
1/H

Male prayer room

15

2/H

Female prayer room

LIFT CORE & ESCAPE STAIRCASE

NO.
14

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

3/M

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

LIFT CORE & ESCAPE


STAIRCASE

OTHER
ROOMS

2-2a/E-F

LIFT LOBBY
& SERVICE
R.M

Progress
(%)

13

OBBY &
E ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36


LEVEL 4A & 4B
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

PANEL INSTALLATION
(SUB SWITCHBOARD)
LOCATION

PARKING & DRIVEWAY

AREA

- TELEPHONE, DATA SYSTEM, MATV,


CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)
PODIUM

Car park management office

Retail lift lobby


Passage
Stair from 4A to 4B

Store 1, 2

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ACMV

ELV DEVICES - TELEPHONE, DATA


SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR,
EARTHNING & LIGHTNING
Actual
START

Progress (%)

DUCTING
INSTALLATION VERTICAL
Actual
START

Progress
(%)

DUCTING
INSTALLATION HORIZONTAL
Actual
START

Progress
(%)

CHILL PIPE
INSTALLATION

Actual
START

Progress
(%)

INSTALLATION
CONDUIT & WIRING

Actual
START

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM


MONITORING PROGRESS MECHANIC

GRID LINE

NO.

AREA
LIFT LOBBY &
SERVICE ROOM
PARKING & DRIVEWAY
LIFT CORE & ESCAPE STAIRCASE
M&E

LEVEL 6A & 6B

LIFT LOBBY &


SERVICE ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL 5A & 5B

LEVEL

- TELEPHONE, DATA SYSTEM, MATV,


CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)
PODIUM

PANEL INSTALLATION
(SUB SWITCHBOARD)
LOCATION
Progress
(%)

4a/D-E

Store 3

2/B

Genset room (hotel)

3/M

Retail lift lobby

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

10

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/M

Retail lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

6/G

Store 4

6/E

Management office

2a/B

Main switch board room (hotel)

2b/B

Transformer room (hotel)

5a-6/C

Transformer (apartment)

6/C

Main switch board room


(apartment)

10

5a-6/C-D

11

4a/E

CW pump room

12

5/E

EFF & CW. Tank

13

6/H

Transformer room (retail)

14

6/J

Main switch boardroom (retail)

Passage
Stair to up from 4A to 4B

Switch gear room (apartment)

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ACMV

ELV DEVICES - TELEPHONE, DATA


SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR,
EARTHNING & LIGHTNING
Actual
START

Progress (%)

DUCTING
INSTALLATION VERTICAL
Actual
START

Progress
(%)

DUCTING
INSTALLATION HORIZONTAL
Actual
START

Progress
(%)

CHILL PIPE
INSTALLATION

Actual
START

Progress
(%)

INSTALLATION
CONDUIT & WIRING

Actual
START

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM


MONITORING PROGRESS MECHANIC

GRID LINE

NO.

AREA
M&E
LIFT CORE & ESCAPE STAIRCASE
M&E AND STORE
USTOMER (HOTEL)

TYPICAL COMMON AREA - BASEMENT


TO LEVEL 36

PARKING

LEVEL
LEVEL 6A & 6B

- TELEPHONE, DATA SYSTEM, MATV,


CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)
PODIUM

PANEL INSTALLATION
(SUB SWITCHBOARD)
LOCATION
Progress
(%)

15

6/K

Genset room (retail)

16

1a/F

Fire pump room (hotel)

17

1/F

HR tank 1, 2

18

2/F

WR tank 1, 2

19

01-6/C-K

Ramp

20

5a/B, 2/K

Motocycle parking

21

01-7/B-M

Car parking

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

7/H

AV store

5a-6/C

Spa store

5/D-E

Store

1/C

1/C-D

AWCS

6/C-D

Staircase pressurization room

3a/C

Reception & check-in counter

3a/B

Business center/ library

4/B

10

4a/B

11

2/E

Bakery

12

3/G

All day dining

13

3c-3d/M

14

5/E

Bins room

Social space
Idea room

Pantry
Pre-function room

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ACMV

ELV DEVICES - TELEPHONE, DATA


SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR,
EARTHNING & LIGHTNING
Actual
START

Progress (%)

DUCTING
INSTALLATION VERTICAL
Actual
START

Progress
(%)

DUCTING
INSTALLATION HORIZONTAL
Actual
START

Progress
(%)

CHILL PIPE
INSTALLATION

Actual
START

Progress
(%)

INSTALLATION
CONDUIT & WIRING

Actual
START

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM


MONITORING PROGRESS MECHANIC

GRID LINE

NO.

CUSTOMER (HOTEL)
AREA
FRONT OF HOUSE (HOTEL)
MAIN KITCHEN
IN KITCHEN

LEVEL 7

LEVEL

- TELEPHONE, DATA SYSTEM, MATV,


CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)
PODIUM

PANEL INSTALLATION
(SUB SWITCHBOARD)
LOCATION
Progress
(%)

15

4c-G

Function room 1

16

5b/G

Function room 2

17

4a-6/B

Treatment 1, 2, 3

18

5a-6/B

Couple treatment room

19

6-7/B

Zacuzzi

20

6/D

21

2-2a/B

22

1a/B

23

2-2a/B

24

2a/B

25

3/B

GM office

26

5/C

Sales & marketing

27

4-4a/c-D

28

4-4a/C

Manager 1, 2

29

4-4a/D

Luggage room

30

5/D

Store

31

5c/E

Food preparation

32

1-1a/C

33

1-1a/C-D

Walk-in freezer

34

2/C-D

Walk-in chiller

35

1/D

Freeze

36

1/D

Chiller

37

2/D

Pastry store

38

1/D-E

Meat prep

39

1/E

Vege prep

40

2/E

Pastry & bakery

41

2/E

Chocolate room

42

1/E-F

43

1/F

Male & female toilet


Gen. cash
Storage
Account manager
Director finance

Hotel front office

Dry store

Cold kitchen
RM. Service office

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ACMV

ELV DEVICES - TELEPHONE, DATA


SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR,
EARTHNING & LIGHTNING
Actual
START

Progress (%)

DUCTING
INSTALLATION VERTICAL
Actual
START

Progress
(%)

DUCTING
INSTALLATION HORIZONTAL
Actual
START

Progress
(%)

CHILL PIPE
INSTALLATION

Actual
START

Progress
(%)

INSTALLATION
CONDUIT & WIRING

Actual
START

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM


MONITORING PROGRESS MECHANIC

GRID LINE

NO.

MAIN KITCHEN
AREA
LIFT CORE & ESCAPE STAIRCASE
M&E

TYPICAL COMMON AREA - BASEMENT


TO LEVEL 36

LANDSC
APE

LEVEL

- TELEPHONE, DATA SYSTEM, MATV,


CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)
PODIUM

PANEL INSTALLATION
(SUB SWITCHBOARD)
LOCATION
Progress
(%)

44

1/F

Chef office

45

1/F

Room service

46

1/F-G

Steward store

47

1-1a/F-G

48

1/G

Dish washing

49

2/F

Cooking area

50

5/A-B

51

4b-7/H-M

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1/C

Bin room

1/C

AWCS

2/B

Ahu room 1

1/G

Ahu room 2

01/F-G

01/G

1a/B-C

M&E area

1a/B

I.T. Store

2-2a/B-C

I.T. office

10

2b/B

11

3/B

Pot & pan washing

Balcony
Deck extension for F&B funtions

Balancing tank
Pump room

Server room
Uniform issue

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ACMV

ELV DEVICES - TELEPHONE, DATA


SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR,
EARTHNING & LIGHTNING
Actual
START

Progress (%)

DUCTING
INSTALLATION VERTICAL
Actual
START

Progress
(%)

DUCTING
INSTALLATION HORIZONTAL
Actual
START

Progress
(%)

CHILL PIPE
INSTALLATION

Actual
START

Progress
(%)

INSTALLATION
CONDUIT & WIRING

Actual
START

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM


MONITORING PROGRESS MECHANIC

GRID LINE

NO.

AREA
OFFICE (BOH)
LIFT CORE &
ESCAPE
STAIRCASE

YPICAL COMMON
REA - BASEMENT
TO LEVEL 36

SERVICE AREA (BOH)

LEVEL 7 MEZZANINE

LEVEL

- TELEPHONE, DATA SYSTEM, MATV,


CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)
PODIUM

PANEL INSTALLATION
(SUB SWITCHBOARD)
LOCATION
Progress
(%)

12

6/E

Function room storage

13

6/H

AV room

14

2/E

HK manager

15

2/E-F

HR. DIR. Office

16

2/E-F

F&B DIR. Office

17

2/F-G

Executive chef

18

1/F

Working area

19

1/E

Training/ meeting room

20

1a/D

21

1-1a/C

22

2/D

Flower shop

23

2/D

House keeping office

24

1/D

Soiled linen room

25

1/D

Valet laundry

26

1/D-E

Clean linen room

27

1/C-D

Trolley bay

28

3a/B

Clinic

29

4/B

30

5a/B

31

6/B

32

6/B-C

33

6/C

Staf social lounge

34

6/D

Male & female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

Corridors
Security & receiving area

Male & female changing room,


toilet
Team dinning room
Kitchen
Kitchen storage

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ACMV

ELV DEVICES - TELEPHONE, DATA


SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR,
EARTHNING & LIGHTNING
Actual
START

Progress (%)

DUCTING
INSTALLATION VERTICAL
Actual
START

Progress
(%)

DUCTING
INSTALLATION HORIZONTAL
Actual
START

Progress
(%)

CHILL PIPE
INSTALLATION

Actual
START

Progress
(%)

INSTALLATION
CONDUIT & WIRING

Actual
START

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM


MONITORING PROGRESS MECHANIC

GRID LINE

NO.

LIFT CORE &


ESCAPE
AREA
STAIRCASE
FACILITY

LEVEL 8

TYPICAL COMMON
AREA - BASEMENT
LEVEL
TO LEVEL 36

- TELEPHONE, DATA SYSTEM, MATV,


CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)
PODIUM

PANEL INSTALLATION
(SUB SWITCHBOARD)
LOCATION
Progress
(%)

5a/D

Escape staircase S4

11

3a/C

Gym

12

3/B

Male, female changing room

13

3/F

Swimming pool

14

3/J

Pantry

15

4d/J

16

2a-4/B-H

Deck

17

2a-7/A-D

Roof top garden for apartment


tower

18

2b-7/B-J

Steps

19

2b-7/B-J

Ramp

Spiral stair

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ACMV

ELV DEVICES - TELEPHONE, DATA


SYSTEM, MATV, CCTV, P.A, CARD
ACCESS, GUARD TOUR,
EARTHNING & LIGHTNING
Actual
START

Progress (%)

DUCTING
INSTALLATION VERTICAL
Actual
START

Progress
(%)

DUCTING
INSTALLATION HORIZONTAL
Actual
START

Progress
(%)

CHILL PIPE
INSTALLATION

Actual
START

Progress
(%)

INSTALLATION
CONDUIT & WIRING

Actual
START

RKS - PODIUM

MONITORING PROGRESS MECHANIC


Update : 09 Sep 15

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE STAIRCASE
&E SERVICE ROOM

BASEMENT

PARKING &
DRIVEWAY

LIFT CORE

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

PODIUM

ACMV

INSTALLATION
CONDUIT & WIRING
LOCATION
Progress
(%)

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

01-2/A

Hotel store 1,2

4a/C-D

Store 3

4a-5/C-D

Store (service apt.)

7/G

1-2/F-G

5/C

1-7/A-J

Car parking

1-7/A-J

Motor parking

4a-E

1/E

Ramp 1

10

1/C

Fan room

11

3a/B

Chiller plant room

12

4/B

13

4a/A-B

14

5/A

Domestic tank 1, 2 (retail)

15

5/A

Pump room 1 (retail)

16

5a/B

Pump room 2 (hotel)

17

6/B

18

6/C-D

Pump room 4 (service Apt. +


retail)

19

5a-6/D

Pump room 5 (hotel)

20

5b-5c/H

Pump room 6 (hotel)

21

5b-5c/J

Pump room 7 (retail/ carpark)

22

5a/A

AC make up tank 1, 2 (hotel)

Carpark store
Staircase lobby
Passage

Handicapped parking space

Flood retention tank (below)


Sump pit

Pump room 3 (service apt.)

VENTILATION FAN

Actual
START

Progress
(%)

FAN COIL UNIT (FCU)

Actual
START

Progress
(%)

INSTALLATION GRILL &


AC UNIT

Actual
START

Progress
(%)

WET RISER SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

SPRINKLER SYSTEM
PIPE INSTALLATION

Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

MONITORING PROGRESS MECHANIC


Update : 09 Sep 15

LIFT CORE & ESCAPE STAIRCASE


RETAIL

LEVEL1

GRID LINE

NO.

M&E SERVICE
AREA
ROOM

PODIUM

M&E AND SERVICE


ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

BASEMENT

RKS - PODIUM
ACMV

INSTALLATION
CONDUIT & WIRING
LOCATION
Progress
(%)

23

7/A

Domestic tank 3 (hotel)

24

7/B

Domestic tank 4 (service apt.)

25

5a-6/C

Wet riser tank 1, 2

26

6-7/C

Hose reel tank 1, 2

27

7/D

28

5b/H

Sprinkler pump stage 1

29

7/J-K

Sprinkler tank 1, 2

30

2/H

Grease interceptor system


(hotel&retail)

31

01/G

OSD, on-site detention tank

32

01/F

Rain water harvesting tank

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1a/A

Store

5a/D

Janitor

5a/D-E

Refuse

5a-D

4a-5B/D-F

1-H

2a-4a/D-L

1-6/C-G

3/M

10

1-7/A-M

11

4a-5b/C-F

12

4/F

Fresh air fanroom (car park)

Refuse bin
Store 1, 2,3,4,5
Ramp 1
Retail lobby
Passage 1, 2, 3, 4
Retail service lift lobby
Retail unit 1,2,3,4,5,6,7,8,9,10
Retail male & female toilet
Glass lift

VENTILATION FAN

Actual
START

Progress
(%)

FAN COIL UNIT (FCU)

Actual
START

Progress
(%)

INSTALLATION GRILL &


AC UNIT

Actual
START

Progress
(%)

WET RISER SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

SPRINKLER SYSTEM
PIPE INSTALLATION

Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

RKS - PODIUM

Update : 09 Sep 15

LEVEL1

M&E & SERVICE ROOM (HOTEL)


M&E & SERVICE ROOM (SERVICE APARTMENT & RETAIL)

GRID LINE

NO.

AREA
RETAIL

PODIUM

LIFT CORE & ESCAPE


STAIRCASE

LEVEL
TYPICAL COMMON AREA BASEMENT TO LEVEL 36
LEVEL 2

MONITORING PROGRESS MECHANIC


ACMV

INSTALLATION
CONDUIT & WIRING
LOCATION
Progress
(%)

13

3a/F

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

2/C

Hotel lobby

3/B-C

1/C

Receiving area & purchasing

2/D

Luggage room

1a/B

LPG Farm 1 (hotel)

2/B

Loading & Unloading bay

2a/B

Receiving area & platform

1/C-D

Bin center 1

1/C-D

Store

10

5a/E

Retail service lift lobby

11

5/C

Letter box

12

5a/C

Fire control room (retail, apt.)

13

6/C

MDF room

14

6/C-D

Bin center 2

15

5a-6/D

AWCS cable room

16

5a-6/D-E

AWCS

17

5a/E

CWSP

18

5a/E

Full vacuumload station

19

6/E

Loading & Unloading

20

5a/F

Consumer HT room

21

5a/G

TNB room

22

6/G

23

5b/G-H

24

5c/H

Diesel fuel pump room

25

5b/H

Bomba vehicle turning circle

Reception

TNB meter room


M&E room

VENTILATION FAN

Actual
START

Progress
(%)

FAN COIL UNIT (FCU)

Actual
START

Progress
(%)

INSTALLATION GRILL &


AC UNIT

Actual
START

Progress
(%)

WET RISER SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

SPRINKLER SYSTEM
PIPE INSTALLATION

Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

M&E &AREA
SERVICE ROOM (SERVICE A

Update : 09 Sep 15

GRID LINE

NO.

PODIUM

ACMV

INSTALLATION
CONDUIT & WIRING
LOCATION
Progress
(%)

5b/J

27

4a/E-F

Passage

28

01/B

Ramp 2

29

2a-7/A-C

Drop of

30

2b-4a/C-K

Retail lobby

31

01-5c/C-M

Retail unit 1,2,3,4,5,6,7

32

5/E

33

3b/E

Glass lift

34

3/E

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/J

Retail lift lobby

1a/B

M&E room

1/C

Store

4/E

Smoke spill fan room

4a/E

Copper pipes compartment

1a/F

Smoke spill fresh air pump room

2b-E

Pedestrian walk way

1-5a/C-J

Passage

1-7/B-M

Car parking

10

2a/C

Handicapped parking space

11

3/E-F

Stair from 3A to 3B

12

01-6/C-K

RETAIL

CIRCULATIO
N

26

RET
LIFT CORE & ESCAPE STAIRCASE
AIL

TYPICAL COMMON AREA BASEMENT TO LEVEL 36


LEVEL 3A & 3B

MONITORING PROGRESS MECHANIC

CARPAKING & DRIVEWAY M&E SERVICE ROOM

LEVEL

LEVEL 2

RKS - PODIUM

LPG Farm 2 (retail)

Retail male & female toilet

Ramp

VENTILATION FAN

Actual
START

Progress
(%)

FAN COIL UNIT (FCU)

Actual
START

Progress
(%)

INSTALLATION GRILL &


AC UNIT

Actual
START

Progress
(%)

WET RISER SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

SPRINKLER SYSTEM
PIPE INSTALLATION

Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

Update : 09 Sep 15

GRID LINE

INSTALLATION
CONDUIT & WIRING
LOCATION
Progress
(%)

2-2a/E-F

14

1/H

Male prayer room

15

2/H

Female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

3/M

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

LIFT CORE & ESCAPE


STAIRCASE

OTHER
ROOMS

13

LIFT CORE & ESCAPE STAIRCASE

NO.

ACMV

LIFT LOBBY
& SERVICE
R.M

AREA

PODIUM

OBBY &
E ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36


LEVEL 4A & 4B
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

MONITORING PROGRESS MECHANIC

PARKING & DRIVEWAY

LEVEL LEVEL 3A & 3B

RKS - PODIUM

Car park management office

Retail lift lobby


Passage
Stair from 4A to 4B

Store 1, 2

VENTILATION FAN

Actual
START

Progress
(%)

FAN COIL UNIT (FCU)

Actual
START

Progress
(%)

INSTALLATION GRILL &


AC UNIT

Actual
START

Progress
(%)

WET RISER SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

SPRINKLER SYSTEM
PIPE INSTALLATION

Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

RKS - PODIUM

MONITORING PROGRESS MECHANIC


Update : 09 Sep 15

GRID LINE

NO.

AREA
LIFT LOBBY &
SERVICE ROOM
PARKING & DRIVEWAY
LIFT CORE & ESCAPE STAIRCASE
M&E

LEVEL 6A & 6B

LIFT LOBBY &


SERVICE ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL 5A & 5B

LEVEL

PODIUM

ACMV

INSTALLATION
CONDUIT & WIRING
LOCATION
Progress
(%)

4a/D-E

Store 3

2/B

Genset room (hotel)

3/M

Retail lift lobby

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

10

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/M

Retail lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

6/G

Store 4

6/E

Management office

2a/B

Main switch board room (hotel)

2b/B

Transformer room (hotel)

5a-6/C

Transformer (apartment)

6/C

Main switch board room


(apartment)

10

5a-6/C-D

11

4a/E

CW pump room

12

5/E

EFF & CW. Tank

13

6/H

Transformer room (retail)

14

6/J

Main switch boardroom (retail)

Passage
Stair to up from 4A to 4B

Switch gear room (apartment)

VENTILATION FAN

Actual
START

Progress
(%)

FAN COIL UNIT (FCU)

Actual
START

Progress
(%)

INSTALLATION GRILL &


AC UNIT

Actual
START

Progress
(%)

WET RISER SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

SPRINKLER SYSTEM
PIPE INSTALLATION

Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

RKS - PODIUM

MONITORING PROGRESS MECHANIC

LIFT CORE & ESCAPE STAIRCASE


M&E AND STORE
USTOMER (HOTEL)

TYPICAL COMMON AREA - BASEMENT


TO LEVEL 36

GRID LINE

NO.

AREA
M&E

PODIUM

PARKING

LEVEL
LEVEL 6A & 6B

Update : 09 Sep 15
ACMV

INSTALLATION
CONDUIT & WIRING
LOCATION
Progress
(%)

15

6/K

Genset room (retail)

16

1a/F

Fire pump room (hotel)

17

1/F

HR tank 1, 2

18

2/F

WR tank 1, 2

19

01-6/C-K

Ramp

20

5a/B, 2/K

Motocycle parking

21

01-7/B-M

Car parking

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

7/H

AV store

5a-6/C

Spa store

5/D-E

Store

1/C

1/C-D

AWCS

6/C-D

Staircase pressurization room

3a/C

Reception & check-in counter

3a/B

Business center/ library

4/B

10

4a/B

11

2/E

Bakery

12

3/G

All day dining

13

3c-3d/M

14

5/E

Bins room

Social space
Idea room

Pantry
Pre-function room

VENTILATION FAN

Actual
START

Progress
(%)

FAN COIL UNIT (FCU)

Actual
START

Progress
(%)

INSTALLATION GRILL &


AC UNIT

Actual
START

Progress
(%)

WET RISER SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

SPRINKLER SYSTEM
PIPE INSTALLATION

Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

RKS - PODIUM

MONITORING PROGRESS MECHANIC


Update : 09 Sep 15

GRID LINE

NO.

CUSTOMER (HOTEL)
AREA
FRONT OF HOUSE (HOTEL)
MAIN KITCHEN
IN KITCHEN

LEVEL 7

LEVEL

PODIUM

ACMV

INSTALLATION
CONDUIT & WIRING
LOCATION
Progress
(%)

15

4c-G

Function room 1

16

5b/G

Function room 2

17

4a-6/B

Treatment 1, 2, 3

18

5a-6/B

Couple treatment room

19

6-7/B

Zacuzzi

20

6/D

21

2-2a/B

22

1a/B

23

2-2a/B

24

2a/B

25

3/B

GM office

26

5/C

Sales & marketing

27

4-4a/c-D

28

4-4a/C

Manager 1, 2

29

4-4a/D

Luggage room

30

5/D

Store

31

5c/E

Food preparation

32

1-1a/C

33

1-1a/C-D

Walk-in freezer

34

2/C-D

Walk-in chiller

35

1/D

Freeze

36

1/D

Chiller

37

2/D

Pastry store

38

1/D-E

Meat prep

39

1/E

Vege prep

40

2/E

Pastry & bakery

41

2/E

Chocolate room

42

1/E-F

43

1/F

Male & female toilet


Gen. cash
Storage
Account manager
Director finance

Hotel front office

Dry store

Cold kitchen
RM. Service office

VENTILATION FAN

Actual
START

Progress
(%)

FAN COIL UNIT (FCU)

Actual
START

Progress
(%)

INSTALLATION GRILL &


AC UNIT

Actual
START

Progress
(%)

WET RISER SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

SPRINKLER SYSTEM
PIPE INSTALLATION

Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

RKS - PODIUM

MONITORING PROGRESS MECHANIC


Update : 09 Sep 15

GRID LINE

NO.

MAIN KITCHEN
AREA
LIFT CORE & ESCAPE STAIRCASE
M&E

TYPICAL COMMON AREA - BASEMENT


TO LEVEL 36

LANDSC
APE

LEVEL

PODIUM

ACMV

INSTALLATION
CONDUIT & WIRING
LOCATION
Progress
(%)

44

1/F

Chef office

45

1/F

Room service

46

1/F-G

Steward store

47

1-1a/F-G

48

1/G

Dish washing

49

2/F

Cooking area

50

5/A-B

51

4b-7/H-M

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1/C

Bin room

1/C

AWCS

2/B

Ahu room 1

1/G

Ahu room 2

01/F-G

01/G

1a/B-C

M&E area

1a/B

I.T. Store

2-2a/B-C

I.T. office

10

2b/B

11

3/B

Pot & pan washing

Balcony
Deck extension for F&B funtions

Balancing tank
Pump room

Server room
Uniform issue

VENTILATION FAN

Actual
START

Progress
(%)

FAN COIL UNIT (FCU)

Actual
START

Progress
(%)

INSTALLATION GRILL &


AC UNIT

Actual
START

Progress
(%)

WET RISER SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

SPRINKLER SYSTEM
PIPE INSTALLATION

Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

RKS - PODIUM

MONITORING PROGRESS MECHANIC


Update : 09 Sep 15

GRID LINE

NO.

AREA
OFFICE (BOH)
LIFT CORE &
ESCAPE
STAIRCASE

YPICAL COMMON
REA - BASEMENT
TO LEVEL 36

SERVICE AREA (BOH)

LEVEL 7 MEZZANINE

LEVEL

PODIUM

ACMV

INSTALLATION
CONDUIT & WIRING
LOCATION
Progress
(%)

12

6/E

Function room storage

13

6/H

AV room

14

2/E

HK manager

15

2/E-F

HR. DIR. Office

16

2/E-F

F&B DIR. Office

17

2/F-G

Executive chef

18

1/F

Working area

19

1/E

Training/ meeting room

20

1a/D

21

1-1a/C

22

2/D

Flower shop

23

2/D

House keeping office

24

1/D

Soiled linen room

25

1/D

Valet laundry

26

1/D-E

Clean linen room

27

1/C-D

Trolley bay

28

3a/B

Clinic

29

4/B

30

5a/B

31

6/B

32

6/B-C

33

6/C

Staf social lounge

34

6/D

Male & female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

Corridors
Security & receiving area

Male & female changing room,


toilet
Team dinning room
Kitchen
Kitchen storage

VENTILATION FAN

Actual
START

Progress
(%)

FAN COIL UNIT (FCU)

Actual
START

Progress
(%)

INSTALLATION GRILL &


AC UNIT

Actual
START

Progress
(%)

WET RISER SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

SPRINKLER SYSTEM
PIPE INSTALLATION

Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

RKS - PODIUM

MONITORING PROGRESS MECHANIC


Update : 09 Sep 15

GRID LINE

NO.

LIFT CORE &


ESCAPE
AREA
STAIRCASE
FACILITY

LEVEL 8

TYPICAL COMMON
AREA - BASEMENT
LEVEL
TO LEVEL 36

PODIUM

ACMV

INSTALLATION
CONDUIT & WIRING
LOCATION
Progress
(%)

5a/D

Escape staircase S4

11

3a/C

Gym

12

3/B

Male, female changing room

13

3/F

Swimming pool

14

3/J

Pantry

15

4d/J

16

2a-4/B-H

Deck

17

2a-7/A-D

Roof top garden for apartment


tower

18

2b-7/B-J

Steps

19

2b-7/B-J

Ramp

Spiral stair

VENTILATION FAN

Actual
START

Progress
(%)

FAN COIL UNIT (FCU)

Actual
START

Progress
(%)

INSTALLATION GRILL &


AC UNIT

Actual
START

Progress
(%)

WET RISER SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

SPRINKLER SYSTEM
PIPE INSTALLATION

Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

MONITORING PROGRESS MECHANIC


Update : 09 Sep 15

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE STAIRCASE
&E SERVICE ROOM

BASEMENT

PARKING &
DRIVEWAY

LIFT CORE

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

PODIUM

FIRE FIGHTING

LOCATION

FIRE ALARM SYSTEM


FIREMAN INTERCOM
PIPE INSTALLATION SYSTEM INSTALLATION

Actual
START

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

01-2/A

Hotel store 1,2

4a/C-D

Store 3

4a-5/C-D

Store (service apt.)

7/G

1-2/F-G

5/C

1-7/A-J

Car parking

1-7/A-J

Motor parking

4a-E

1/E

Ramp 1

10

1/C

Fan room

11

3a/B

Chiller plant room

12

4/B

13

4a/A-B

14

5/A

Domestic tank 1, 2 (retail)

15

5/A

Pump room 1 (retail)

16

5a/B

Pump room 2 (hotel)

17

6/B

18

6/C-D

Pump room 4 (service Apt. +


retail)

19

5a-6/D

Pump room 5 (hotel)

20

5b-5c/H

Pump room 6 (hotel)

21

5b-5c/J

Pump room 7 (retail/ carpark)

22

5a/A

AC make up tank 1, 2 (hotel)

Carpark store
Staircase lobby
Passage

Handicapped parking space

Flood retention tank (below)


Sump pit

Pump room 3 (service apt.)

Progress
(%)

Actual
START

Progress
(%)

SPRINKLER HEAD
INSTALLATION

Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION

Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
IN SHEARWALL /
COLUMN
Actual
START

Update : 09 Sep 15

LIFT CORE & ESCAPE STAIRCASE


RETAIL

LEVEL1

GRID LINE

NO.

M&E SERVICE
AREA
ROOM

PODIUM

M&E AND SERVICE


ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

BASEMENT

MONITORING PROGRESS MECHANIC


FIRE FIGHTING

LOCATION

FIRE ALARM SYSTEM


FIREMAN INTERCOM
PIPE INSTALLATION SYSTEM INSTALLATION

Actual
START

23

7/A

Domestic tank 3 (hotel)

24

7/B

Domestic tank 4 (service apt.)

25

5a-6/C

Wet riser tank 1, 2

26

6-7/C

Hose reel tank 1, 2

27

7/D

28

5b/H

Sprinkler pump stage 1

29

7/J-K

Sprinkler tank 1, 2

30

2/H

Grease interceptor system


(hotel&retail)

31

01/G

OSD, on-site detention tank

32

01/F

Rain water harvesting tank

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1a/A

Store

5a/D

Janitor

5a/D-E

Refuse

5a-D

4a-5B/D-F

1-H

2a-4a/D-L

1-6/C-G

3/M

10

1-7/A-M

11

4a-5b/C-F

12

4/F

Fresh air fanroom (car park)

Refuse bin
Store 1, 2,3,4,5
Ramp 1
Retail lobby
Passage 1, 2, 3, 4
Retail service lift lobby
Retail unit 1,2,3,4,5,6,7,8,9,10
Retail male & female toilet
Glass lift

Progress
(%)

Actual
START

Progress
(%)

SPRINKLER HEAD
INSTALLATION

Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION

Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
IN SHEARWALL /
COLUMN
Actual
START

MONITORING PROGRESS MECHANIC

LIFT CORE & ESCAPE


STAIRCASE
M&E & SERVICE ROOM (SERVICE APARTMENT & RETAIL)

LEVEL 2

GRID LINE

NO.

AREA
RETAIL

PODIUM

M&E & SERVICE ROOM (HOTEL)

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

LEVEL1

Update : 09 Sep 15
FIRE FIGHTING

LOCATION

FIRE ALARM SYSTEM


FIREMAN INTERCOM
PIPE INSTALLATION SYSTEM INSTALLATION

Actual
START

13

3a/F

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

2/C

Hotel lobby

3/B-C

1/C

Receiving area & purchasing

2/D

Luggage room

1a/B

LPG Farm 1 (hotel)

2/B

Loading & Unloading bay

2a/B

Receiving area & platform

1/C-D

Bin center 1

1/C-D

Store

10

5a/E

Retail service lift lobby

11

5/C

Letter box

12

5a/C

Fire control room (retail, apt.)

13

6/C

MDF room

14

6/C-D

Bin center 2

15

5a-6/D

AWCS cable room

16

5a-6/D-E

AWCS

17

5a/E

CWSP

18

5a/E

Full vacuumload station

19

6/E

Loading & Unloading

20

5a/F

Consumer HT room

21

5a/G

TNB room

22

6/G

23

5b/G-H

24

5c/H

Diesel fuel pump room

25

5b/H

Bomba vehicle turning circle

Reception

TNB meter room


M&E room

Progress
(%)

Actual
START

Progress
(%)

SPRINKLER HEAD
INSTALLATION

Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION

Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
IN SHEARWALL /
COLUMN
Actual
START

GRID LINE

NO.

PODIUM

FIRE FIGHTING

LOCATION

5b/J

27

4a/E-F

Passage

28

01/B

Ramp 2

29

2a-7/A-C

Drop of

30

2b-4a/C-K

Retail lobby

31

01-5c/C-M

Retail unit 1,2,3,4,5,6,7

32

5/E

33

3b/E

Glass lift

34

3/E

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/J

Retail lift lobby

1a/B

M&E room

1/C

Store

4/E

Smoke spill fan room

4a/E

Copper pipes compartment

1a/F

Smoke spill fresh air pump room

2b-E

Pedestrian walk way

1-5a/C-J

Passage

1-7/B-M

Car parking

10

2a/C

Handicapped parking space

11

3/E-F

Stair from 3A to 3B

12

01-6/C-K

CIRCULATIO
N

26

RETAIL

FIRE ALARM SYSTEM


FIREMAN INTERCOM
PIPE INSTALLATION SYSTEM INSTALLATION

Actual
START

RET
LIFT CORE & ESCAPE STAIRCASE
AIL

M&E &AREA
SERVICE ROOM (SERVICE A

Update : 09 Sep 15

CARPAKING & DRIVEWAY M&E SERVICE ROOM

LEVEL 2
LEVEL
TYPICAL COMMON AREA BASEMENT TO LEVEL 36
LEVEL 3A & 3B

MONITORING PROGRESS MECHANIC

LPG Farm 2 (retail)

Retail male & female toilet

Ramp

Progress
(%)

Actual
START

Progress
(%)

SPRINKLER HEAD
INSTALLATION

Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION

Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
IN SHEARWALL /
COLUMN
Actual
START

Update : 09 Sep 15

GRID LINE

14

1/H

Male prayer room

15

2/H

Female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

3/M

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

OTHER
ROOMS

2-2a/E-F

LIFT CORE & ESCAPE


STAIRCASE

FIRE ALARM SYSTEM


FIREMAN INTERCOM
PIPE INSTALLATION SYSTEM INSTALLATION

Actual
START

LIFT CORE & ESCAPE STAIRCASE

NO.

LOCATION

13

OBBY &
E ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36


LEVEL 4A & 4B
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

FIRE FIGHTING

LIFT LOBBY
& SERVICE
R.M

AREA

PODIUM

PARKING & DRIVEWAY

LEVEL LEVEL 3A & 3B

MONITORING PROGRESS MECHANIC

Car park management office

Retail lift lobby


Passage
Stair from 4A to 4B

Store 1, 2

Progress
(%)

Actual
START

Progress
(%)

SPRINKLER HEAD
INSTALLATION

Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION

Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
IN SHEARWALL /
COLUMN
Actual
START

MONITORING PROGRESS MECHANIC


Update : 09 Sep 15

GRID LINE

NO.

AREA
LIFT LOBBY &
SERVICE ROOM
PARKING & DRIVEWAY
LIFT CORE & ESCAPE STAIRCASE
M&E

LEVEL 6A & 6B

LIFT LOBBY &


SERVICE ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL 5A & 5B

LEVEL

PODIUM

FIRE FIGHTING

LOCATION

FIRE ALARM SYSTEM


FIREMAN INTERCOM
PIPE INSTALLATION SYSTEM INSTALLATION

Actual
START

4a/D-E

Store 3

2/B

Genset room (hotel)

3/M

Retail lift lobby

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

10

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/M

Retail lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

6/G

Store 4

6/E

Management office

2a/B

Main switch board room (hotel)

2b/B

Transformer room (hotel)

5a-6/C

Transformer (apartment)

6/C

Main switch board room


(apartment)

10

5a-6/C-D

11

4a/E

CW pump room

12

5/E

EFF & CW. Tank

13

6/H

Transformer room (retail)

14

6/J

Main switch boardroom (retail)

Passage
Stair to up from 4A to 4B

Switch gear room (apartment)

Progress
(%)

Actual
START

Progress
(%)

SPRINKLER HEAD
INSTALLATION

Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION

Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
IN SHEARWALL /
COLUMN
Actual
START

MONITORING PROGRESS MECHANIC

LIFT CORE & ESCAPE STAIRCASE


M&E AND STORE
USTOMER (HOTEL)

TYPICAL COMMON AREA - BASEMENT


TO LEVEL 36

GRID LINE

NO.

AREA
M&E

PODIUM

PARKING

LEVEL
LEVEL 6A & 6B

Update : 09 Sep 15
FIRE FIGHTING

LOCATION

FIRE ALARM SYSTEM


FIREMAN INTERCOM
PIPE INSTALLATION SYSTEM INSTALLATION

Actual
START

15

6/K

Genset room (retail)

16

1a/F

Fire pump room (hotel)

17

1/F

HR tank 1, 2

18

2/F

WR tank 1, 2

19

01-6/C-K

Ramp

20

5a/B, 2/K

Motocycle parking

21

01-7/B-M

Car parking

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

7/H

AV store

5a-6/C

Spa store

5/D-E

Store

1/C

1/C-D

AWCS

6/C-D

Staircase pressurization room

3a/C

Reception & check-in counter

3a/B

Business center/ library

4/B

10

4a/B

11

2/E

Bakery

12

3/G

All day dining

13

3c-3d/M

14

5/E

Bins room

Social space
Idea room

Pantry
Pre-function room

Progress
(%)

Actual
START

Progress
(%)

SPRINKLER HEAD
INSTALLATION

Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION

Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
IN SHEARWALL /
COLUMN
Actual
START

MONITORING PROGRESS MECHANIC


Update : 09 Sep 15

GRID LINE

NO.

CUSTOMER (HOTEL)
AREA
FRONT OF HOUSE (HOTEL)
MAIN KITCHEN
IN KITCHEN

LEVEL 7

LEVEL

PODIUM

FIRE FIGHTING

LOCATION

FIRE ALARM SYSTEM


FIREMAN INTERCOM
PIPE INSTALLATION SYSTEM INSTALLATION

Actual
START

15

4c-G

Function room 1

16

5b/G

Function room 2

17

4a-6/B

Treatment 1, 2, 3

18

5a-6/B

Couple treatment room

19

6-7/B

Zacuzzi

20

6/D

21

2-2a/B

22

1a/B

23

2-2a/B

24

2a/B

25

3/B

GM office

26

5/C

Sales & marketing

27

4-4a/c-D

28

4-4a/C

Manager 1, 2

29

4-4a/D

Luggage room

30

5/D

Store

31

5c/E

Food preparation

32

1-1a/C

33

1-1a/C-D

Walk-in freezer

34

2/C-D

Walk-in chiller

35

1/D

Freeze

36

1/D

Chiller

37

2/D

Pastry store

38

1/D-E

Meat prep

39

1/E

Vege prep

40

2/E

Pastry & bakery

41

2/E

Chocolate room

42

1/E-F

43

1/F

Male & female toilet


Gen. cash
Storage
Account manager
Director finance

Hotel front office

Dry store

Cold kitchen
RM. Service office

Progress
(%)

Actual
START

Progress
(%)

SPRINKLER HEAD
INSTALLATION

Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION

Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
IN SHEARWALL /
COLUMN
Actual
START

MONITORING PROGRESS MECHANIC


Update : 09 Sep 15

GRID LINE

NO.

MAIN KITCHEN
AREA
LIFT CORE & ESCAPE STAIRCASE
M&E

TYPICAL COMMON AREA - BASEMENT


TO LEVEL 36

LANDSC
APE

LEVEL

PODIUM

FIRE FIGHTING

LOCATION

FIRE ALARM SYSTEM


FIREMAN INTERCOM
PIPE INSTALLATION SYSTEM INSTALLATION

Actual
START

44

1/F

Chef office

45

1/F

Room service

46

1/F-G

Steward store

47

1-1a/F-G

48

1/G

Dish washing

49

2/F

Cooking area

50

5/A-B

51

4b-7/H-M

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1/C

Bin room

1/C

AWCS

2/B

Ahu room 1

1/G

Ahu room 2

01/F-G

01/G

1a/B-C

M&E area

1a/B

I.T. Store

2-2a/B-C

I.T. office

10

2b/B

11

3/B

Pot & pan washing

Balcony
Deck extension for F&B funtions

Balancing tank
Pump room

Server room
Uniform issue

Progress
(%)

Actual
START

Progress
(%)

SPRINKLER HEAD
INSTALLATION

Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION

Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
IN SHEARWALL /
COLUMN
Actual
START

MONITORING PROGRESS MECHANIC


Update : 09 Sep 15

GRID LINE

FIRE FIGHTING

LOCATION

12

6/E

Function room storage

13

6/H

AV room

14

2/E

HK manager

15

2/E-F

HR. DIR. Office

16

2/E-F

F&B DIR. Office

17

2/F-G

Executive chef

18

1/F

Working area

19

1/E

Training/ meeting room

20

1a/D

21

1-1a/C

22

2/D

Flower shop

23

2/D

House keeping office

24

1/D

Soiled linen room

25

1/D

Valet laundry

26

1/D-E

Clean linen room

27

1/C-D

Trolley bay

28

3a/B

Clinic

29

4/B

30

5a/B

31

6/B

32

6/B-C

33

6/C

Staf social lounge

34

6/D

Male & female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

NO.

AREA
OFFICE (BOH)
LIFT CORE &
ESCAPE
STAIRCASE

YPICAL COMMON
REA - BASEMENT
TO LEVEL 36

SERVICE AREA (BOH)

LEVEL 7 MEZZANINE

LEVEL

PODIUM

FIRE ALARM SYSTEM


FIREMAN INTERCOM
PIPE INSTALLATION SYSTEM INSTALLATION

Actual
START

Corridors
Security & receiving area

Male & female changing room,


toilet
Team dinning room
Kitchen
Kitchen storage

Progress
(%)

Actual
START

Progress
(%)

SPRINKLER HEAD
INSTALLATION

Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION

Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
IN SHEARWALL /
COLUMN
Actual
START

MONITORING PROGRESS MECHANIC


Update : 09 Sep 15

GRID LINE

NO.

LIFT CORE &


ESCAPE
AREA
STAIRCASE
FACILITY

LEVEL 8

TYPICAL COMMON
AREA - BASEMENT
LEVEL
TO LEVEL 36

PODIUM

FIRE FIGHTING

LOCATION

FIRE ALARM SYSTEM


FIREMAN INTERCOM
PIPE INSTALLATION SYSTEM INSTALLATION

Actual
START

5a/D

Escape staircase S4

11

3a/C

Gym

12

3/B

Male, female changing room

13

3/F

Swimming pool

14

3/J

Pantry

15

4d/J

16

2a-4/B-H

Deck

17

2a-7/A-D

Roof top garden for apartment


tower

18

2b-7/B-J

Steps

19

2b-7/B-J

Ramp

Spiral stair

Progress
(%)

Actual
START

Progress
(%)

SPRINKLER HEAD
INSTALLATION

Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION

Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
IN SHEARWALL /
COLUMN
Actual
START

MONITORING PROGRESS MECHANIC


PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)
PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
LOCATION IN SHEARWALL /
COLUMN

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE STAIRCASE
&E SERVICE ROOM

BASEMENT

PARKING &
DRIVEWAY

LIFT CORE

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

PODIUM

Progress
(%)

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

01-2/A

Hotel store 1,2

4a/C-D

Store 3

4a-5/C-D

Store (service apt.)

7/G

1-2/F-G

5/C

1-7/A-J

Car parking

1-7/A-J

Motor parking

4a-E

1/E

Ramp 1

10

1/C

Fan room

11

3a/B

Chiller plant room

12

4/B

13

4a/A-B

14

5/A

Domestic tank 1, 2 (retail)

15

5/A

Pump room 1 (retail)

16

5a/B

Pump room 2 (hotel)

17

6/B

18

6/C-D

Pump room 4 (service Apt. +


retail)

19

5a-6/D

Pump room 5 (hotel)

20

5b-5c/H

Pump room 6 (hotel)

21

5b-5c/J

Pump room 7 (retail/ carpark)

22

5a/A

AC make up tank 1, 2 (hotel)

Carpark store
Staircase lobby
Passage

Handicapped parking space

Flood retention tank (below)


Sump pit

Pump room 3 (service apt.)

TRANFER PIPE
INSTALLATION

Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION

Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION

Actual
START

Progress
(%)

SANITARY PIPE
FITTING

Actual
START

Progress
(%)

COLD WATER PIPE


FITTING

HOT WATER PIPE


FITTING

Actual
START

Actual
START

Progress
(%)

Progress
(%)

LIFT CORE & ESCAPE STAIRCASE


RETAIL

LEVEL1

PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)
PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
LOCATION IN SHEARWALL /
COLUMN

GRID LINE

NO.

M&E SERVICE
AREA
ROOM

PODIUM

M&E AND SERVICE


ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

BASEMENT

MONITORING PROGRESS MECHANIC

Progress
(%)

23

7/A

Domestic tank 3 (hotel)

24

7/B

Domestic tank 4 (service apt.)

25

5a-6/C

Wet riser tank 1, 2

26

6-7/C

Hose reel tank 1, 2

27

7/D

28

5b/H

Sprinkler pump stage 1

29

7/J-K

Sprinkler tank 1, 2

30

2/H

Grease interceptor system


(hotel&retail)

31

01/G

OSD, on-site detention tank

32

01/F

Rain water harvesting tank

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1a/A

Store

5a/D

Janitor

5a/D-E

Refuse

5a-D

4a-5B/D-F

1-H

2a-4a/D-L

1-6/C-G

3/M

10

1-7/A-M

11

4a-5b/C-F

12

4/F

Fresh air fanroom (car park)

Refuse bin
Store 1, 2,3,4,5
Ramp 1
Retail lobby
Passage 1, 2, 3, 4
Retail service lift lobby
Retail unit 1,2,3,4,5,6,7,8,9,10
Retail male & female toilet
Glass lift

TRANFER PIPE
INSTALLATION

Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION

Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION

Actual
START

Progress
(%)

SANITARY PIPE
FITTING

Actual
START

Progress
(%)

COLD WATER PIPE


FITTING

HOT WATER PIPE


FITTING

Actual
START

Actual
START

Progress
(%)

Progress
(%)

LIFT CORE & ESCAPE


STAIRCASE
M&E & SERVICE ROOM (SERVICE APARTMENT & RETAIL)

LEVEL 2

PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)
PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
LOCATION IN SHEARWALL /
COLUMN

GRID LINE

NO.

AREA
RETAIL

PODIUM

M&E & SERVICE ROOM (HOTEL)

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

LEVEL1

MONITORING PROGRESS MECHANIC

Progress
(%)

13

3a/F

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

2/C

Hotel lobby

3/B-C

1/C

Receiving area & purchasing

2/D

Luggage room

1a/B

LPG Farm 1 (hotel)

2/B

Loading & Unloading bay

2a/B

Receiving area & platform

1/C-D

Bin center 1

1/C-D

Store

10

5a/E

Retail service lift lobby

11

5/C

Letter box

12

5a/C

Fire control room (retail, apt.)

13

6/C

MDF room

14

6/C-D

Bin center 2

15

5a-6/D

AWCS cable room

16

5a-6/D-E

AWCS

17

5a/E

CWSP

18

5a/E

Full vacuumload station

19

6/E

Loading & Unloading

20

5a/F

Consumer HT room

21

5a/G

TNB room

22

6/G

23

5b/G-H

24

5c/H

Diesel fuel pump room

25

5b/H

Bomba vehicle turning circle

Reception

TNB meter room


M&E room

TRANFER PIPE
INSTALLATION

Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION

Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION

Actual
START

Progress
(%)

SANITARY PIPE
FITTING

Actual
START

Progress
(%)

COLD WATER PIPE


FITTING

HOT WATER PIPE


FITTING

Actual
START

Actual
START

Progress
(%)

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
LOCATION IN SHEARWALL /
COLUMN

GRID LINE

NO.

PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)

Progress
(%)

5b/J

27

4a/E-F

Passage

28

01/B

Ramp 2

29

2a-7/A-C

Drop of

30

2b-4a/C-K

Retail lobby

31

01-5c/C-M

Retail unit 1,2,3,4,5,6,7

32

5/E

33

3b/E

Glass lift

34

3/E

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/J

Retail lift lobby

1a/B

M&E room

1/C

Store

4/E

Smoke spill fan room

4a/E

Copper pipes compartment

1a/F

Smoke spill fresh air pump room

2b-E

Pedestrian walk way

1-5a/C-J

Passage

1-7/B-M

Car parking

10

2a/C

Handicapped parking space

11

3/E-F

Stair from 3A to 3B

12

01-6/C-K

RETAIL

CIRCULATIO
N

26

RET
LIFT CORE & ESCAPE STAIRCASE
AIL

M&E &AREA
SERVICE ROOM (SERVICE A

PODIUM

CARPAKING & DRIVEWAY M&E SERVICE ROOM

LEVEL 2
LEVEL
TYPICAL COMMON AREA BASEMENT TO LEVEL 36
LEVEL 3A & 3B

MONITORING PROGRESS MECHANIC

LPG Farm 2 (retail)

Retail male & female toilet

Ramp

TRANFER PIPE
INSTALLATION

Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION

Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION

Actual
START

Progress
(%)

SANITARY PIPE
FITTING

Actual
START

Progress
(%)

COLD WATER PIPE


FITTING

HOT WATER PIPE


FITTING

Actual
START

Actual
START

Progress
(%)

Progress
(%)

GRID LINE

Progress
(%)

14

1/H

Male prayer room

15

2/H

Female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

3/M

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

LIFT CORE & ESCAPE


STAIRCASE

OTHER
ROOMS

2-2a/E-F

LIFT CORE & ESCAPE STAIRCASE

NO.

PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
LOCATION IN SHEARWALL /
COLUMN

13

OBBY &
E ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36


LEVEL 4A & 4B
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)

LIFT LOBBY
& SERVICE
R.M

AREA

PODIUM

PARKING & DRIVEWAY

LEVEL LEVEL 3A & 3B

MONITORING PROGRESS MECHANIC

Car park management office

Retail lift lobby


Passage
Stair from 4A to 4B

Store 1, 2

TRANFER PIPE
INSTALLATION

Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION

Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION

Actual
START

Progress
(%)

SANITARY PIPE
FITTING

Actual
START

Progress
(%)

COLD WATER PIPE


FITTING

HOT WATER PIPE


FITTING

Actual
START

Actual
START

Progress
(%)

Progress
(%)

MONITORING PROGRESS MECHANIC


PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)
PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
LOCATION IN SHEARWALL /
COLUMN

GRID LINE

NO.

AREA
LIFT LOBBY &
SERVICE ROOM
PARKING & DRIVEWAY
LIFT CORE & ESCAPE STAIRCASE
M&E

LEVEL 6A & 6B

LIFT LOBBY &


SERVICE ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL 5A & 5B

LEVEL

PODIUM

Progress
(%)

4a/D-E

Store 3

2/B

Genset room (hotel)

3/M

Retail lift lobby

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

10

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/M

Retail lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

6/G

Store 4

6/E

Management office

2a/B

Main switch board room (hotel)

2b/B

Transformer room (hotel)

5a-6/C

Transformer (apartment)

6/C

Main switch board room


(apartment)

10

5a-6/C-D

11

4a/E

CW pump room

12

5/E

EFF & CW. Tank

13

6/H

Transformer room (retail)

14

6/J

Main switch boardroom (retail)

Passage
Stair to up from 4A to 4B

Switch gear room (apartment)

TRANFER PIPE
INSTALLATION

Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION

Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION

Actual
START

Progress
(%)

SANITARY PIPE
FITTING

Actual
START

Progress
(%)

COLD WATER PIPE


FITTING

HOT WATER PIPE


FITTING

Actual
START

Actual
START

Progress
(%)

Progress
(%)

LIFT CORE & ESCAPE STAIRCASE


M&E AND STORE
USTOMER (HOTEL)

TYPICAL COMMON AREA - BASEMENT


TO LEVEL 36

PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)
PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
LOCATION IN SHEARWALL /
COLUMN

GRID LINE

NO.

AREA
M&E

PODIUM

PARKING

LEVEL
LEVEL 6A & 6B

MONITORING PROGRESS MECHANIC

Progress
(%)

15

6/K

Genset room (retail)

16

1a/F

Fire pump room (hotel)

17

1/F

HR tank 1, 2

18

2/F

WR tank 1, 2

19

01-6/C-K

Ramp

20

5a/B, 2/K

Motocycle parking

21

01-7/B-M

Car parking

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

7/H

AV store

5a-6/C

Spa store

5/D-E

Store

1/C

1/C-D

AWCS

6/C-D

Staircase pressurization room

3a/C

Reception & check-in counter

3a/B

Business center/ library

4/B

10

4a/B

11

2/E

Bakery

12

3/G

All day dining

13

3c-3d/M

14

5/E

Bins room

Social space
Idea room

Pantry
Pre-function room

TRANFER PIPE
INSTALLATION

Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION

Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION

Actual
START

Progress
(%)

SANITARY PIPE
FITTING

Actual
START

Progress
(%)

COLD WATER PIPE


FITTING

HOT WATER PIPE


FITTING

Actual
START

Actual
START

Progress
(%)

Progress
(%)

MONITORING PROGRESS MECHANIC


PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)
PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
LOCATION IN SHEARWALL /
COLUMN

GRID LINE

NO.

CUSTOMER (HOTEL)
AREA
FRONT OF HOUSE (HOTEL)
MAIN KITCHEN
IN KITCHEN

LEVEL 7

LEVEL

PODIUM

Progress
(%)

15

4c-G

Function room 1

16

5b/G

Function room 2

17

4a-6/B

Treatment 1, 2, 3

18

5a-6/B

Couple treatment room

19

6-7/B

Zacuzzi

20

6/D

21

2-2a/B

22

1a/B

23

2-2a/B

24

2a/B

25

3/B

GM office

26

5/C

Sales & marketing

27

4-4a/c-D

28

4-4a/C

Manager 1, 2

29

4-4a/D

Luggage room

30

5/D

Store

31

5c/E

Food preparation

32

1-1a/C

33

1-1a/C-D

Walk-in freezer

34

2/C-D

Walk-in chiller

35

1/D

Freeze

36

1/D

Chiller

37

2/D

Pastry store

38

1/D-E

Meat prep

39

1/E

Vege prep

40

2/E

Pastry & bakery

41

2/E

Chocolate room

42

1/E-F

43

1/F

Male & female toilet


Gen. cash
Storage
Account manager
Director finance

Hotel front office

Dry store

Cold kitchen
RM. Service office

TRANFER PIPE
INSTALLATION

Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION

Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION

Actual
START

Progress
(%)

SANITARY PIPE
FITTING

Actual
START

Progress
(%)

COLD WATER PIPE


FITTING

HOT WATER PIPE


FITTING

Actual
START

Actual
START

Progress
(%)

Progress
(%)

MONITORING PROGRESS MECHANIC


PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)
PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
LOCATION IN SHEARWALL /
COLUMN

GRID LINE

NO.

MAIN KITCHEN
AREA
LIFT CORE & ESCAPE STAIRCASE
M&E

TYPICAL COMMON AREA - BASEMENT


TO LEVEL 36

LANDSC
APE

LEVEL

PODIUM

Progress
(%)

44

1/F

Chef office

45

1/F

Room service

46

1/F-G

Steward store

47

1-1a/F-G

48

1/G

Dish washing

49

2/F

Cooking area

50

5/A-B

51

4b-7/H-M

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1/C

Bin room

1/C

AWCS

2/B

Ahu room 1

1/G

Ahu room 2

01/F-G

01/G

1a/B-C

M&E area

1a/B

I.T. Store

2-2a/B-C

I.T. office

10

2b/B

11

3/B

Pot & pan washing

Balcony
Deck extension for F&B funtions

Balancing tank
Pump room

Server room
Uniform issue

TRANFER PIPE
INSTALLATION

Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION

Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION

Actual
START

Progress
(%)

SANITARY PIPE
FITTING

Actual
START

Progress
(%)

COLD WATER PIPE


FITTING

HOT WATER PIPE


FITTING

Actual
START

Actual
START

Progress
(%)

Progress
(%)

MONITORING PROGRESS MECHANIC


PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)
PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
LOCATION IN SHEARWALL /
COLUMN

GRID LINE

NO.

AREA
OFFICE (BOH)
LIFT CORE &
ESCAPE
STAIRCASE

YPICAL COMMON
REA - BASEMENT
TO LEVEL 36

SERVICE AREA (BOH)

LEVEL 7 MEZZANINE

LEVEL

PODIUM

Progress
(%)

12

6/E

Function room storage

13

6/H

AV room

14

2/E

HK manager

15

2/E-F

HR. DIR. Office

16

2/E-F

F&B DIR. Office

17

2/F-G

Executive chef

18

1/F

Working area

19

1/E

Training/ meeting room

20

1a/D

21

1-1a/C

22

2/D

Flower shop

23

2/D

House keeping office

24

1/D

Soiled linen room

25

1/D

Valet laundry

26

1/D-E

Clean linen room

27

1/C-D

Trolley bay

28

3a/B

Clinic

29

4/B

30

5a/B

31

6/B

32

6/B-C

33

6/C

Staf social lounge

34

6/D

Male & female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

Corridors
Security & receiving area

Male & female changing room,


toilet
Team dinning room
Kitchen
Kitchen storage

TRANFER PIPE
INSTALLATION

Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION

Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION

Actual
START

Progress
(%)

SANITARY PIPE
FITTING

Actual
START

Progress
(%)

COLD WATER PIPE


FITTING

HOT WATER PIPE


FITTING

Actual
START

Actual
START

Progress
(%)

Progress
(%)

MONITORING PROGRESS MECHANIC


PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)
PREPARE OPENING /
SLEEVE AT FLOOR
SLAB & CONCEAL PIPE
LOCATION IN SHEARWALL /
COLUMN

GRID LINE

NO.

LIFT CORE &


ESCAPE
AREA
STAIRCASE
FACILITY

LEVEL 8

TYPICAL COMMON
AREA - BASEMENT
LEVEL
TO LEVEL 36

PODIUM

Progress
(%)

5a/D

Escape staircase S4

11

3a/C

Gym

12

3/B

Male, female changing room

13

3/F

Swimming pool

14

3/J

Pantry

15

4d/J

16

2a-4/B-H

Deck

17

2a-7/A-D

Roof top garden for apartment


tower

18

2b-7/B-J

Steps

19

2b-7/B-J

Ramp

Spiral stair

TRANFER PIPE
INSTALLATION

Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION

Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION

Actual
START

Progress
(%)

SANITARY PIPE
FITTING

Actual
START

Progress
(%)

COLD WATER PIPE


FITTING

HOT WATER PIPE


FITTING

Actual
START

Actual
START

Progress
(%)

Progress
(%)

MONITORING PROGRESS MECHANIC


AUTOMATED WASTE
COLLECTION SYSTEM
(AWCS)

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE STAIRCASE
&E SERVICE ROOM

BASEMENT

PARKING &
DRIVEWAY

LIFT CORE

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

PODIUM

LOCATION

TRANSPORT PIPE &


FITTING

Actual
START

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

01-2/A

Hotel store 1,2

4a/C-D

Store 3

4a-5/C-D

Store (service apt.)

7/G

1-2/F-G

5/C

1-7/A-J

Car parking

1-7/A-J

Motor parking

4a-E

1/E

Ramp 1

10

1/C

Fan room

11

3a/B

Chiller plant room

12

4/B

13

4a/A-B

14

5/A

Domestic tank 1, 2 (retail)

15

5/A

Pump room 1 (retail)

16

5a/B

Pump room 2 (hotel)

17

6/B

18

6/C-D

Pump room 4 (service Apt. +


retail)

19

5a-6/D

Pump room 5 (hotel)

20

5b-5c/H

Pump room 6 (hotel)

21

5b-5c/J

Pump room 7 (retail/ carpark)

22

5a/A

AC make up tank 1, 2 (hotel)

Carpark store
Staircase lobby
Passage

Handicapped parking space

Flood retention tank (below)


Sump pit

Pump room 3 (service apt.)

Progress
(%)

RAINWATER DOWN PIPE

MARKING (BY
FASTFLOW) & CORING
ON SLAB (BY UMLB)
Actual
START

Progress
(%)

RISER PIPE
INSTALLATION

Actual
START

Progress
(%)

BRACKET
INSTALLATION

Actual
START

Progress
(%)

GROUTING PIPE

Actual
START

Progress
(%)

DISCHARGE PIPE
INSTALLATION

DISCHARGE SUMP

Actual
START

Actual
START

Progress
(%)

AUTOMATED WASTE
COLLECTION SYSTEM
(AWCS)

LIFT CORE & ESCAPE STAIRCASE


RETAIL

LEVEL1

GRID LINE

NO.

M&E SERVICE
AREA
ROOM

PODIUM

M&E AND SERVICE


ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

BASEMENT

MONITORING PROGRESS MECHANIC

LOCATION

TRANSPORT PIPE &


FITTING

Actual
START

23

7/A

Domestic tank 3 (hotel)

24

7/B

Domestic tank 4 (service apt.)

25

5a-6/C

Wet riser tank 1, 2

26

6-7/C

Hose reel tank 1, 2

27

7/D

28

5b/H

Sprinkler pump stage 1

29

7/J-K

Sprinkler tank 1, 2

30

2/H

Grease interceptor system


(hotel&retail)

31

01/G

OSD, on-site detention tank

32

01/F

Rain water harvesting tank

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1a/A

Store

5a/D

Janitor

5a/D-E

Refuse

5a-D

4a-5B/D-F

1-H

2a-4a/D-L

1-6/C-G

3/M

10

1-7/A-M

11

4a-5b/C-F

12

4/F

Fresh air fanroom (car park)

Refuse bin
Store 1, 2,3,4,5
Ramp 1
Retail lobby
Passage 1, 2, 3, 4
Retail service lift lobby
Retail unit 1,2,3,4,5,6,7,8,9,10
Retail male & female toilet
Glass lift

Progress
(%)

RAINWATER DOWN PIPE

MARKING (BY
FASTFLOW) & CORING
ON SLAB (BY UMLB)
Actual
START

Progress
(%)

RISER PIPE
INSTALLATION

Actual
START

Progress
(%)

BRACKET
INSTALLATION

Actual
START

Progress
(%)

GROUTING PIPE

Actual
START

Progress
(%)

DISCHARGE PIPE
INSTALLATION

DISCHARGE SUMP

Actual
START

Actual
START

Progress
(%)

GRID LINE

NO.

AREA
RETAIL
LIFT CORE & ESCAPE
STAIRCASE
M&E & SERVICE ROOM (SERVICE APARTMENT & RETAIL)

LEVEL 2

AUTOMATED WASTE
COLLECTION SYSTEM
(AWCS)

PODIUM

M&E & SERVICE ROOM (HOTEL)

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

LEVEL1

MONITORING PROGRESS MECHANIC

LOCATION

TRANSPORT PIPE &


FITTING

Actual
START

13

3a/F

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

2/C

Hotel lobby

3/B-C

1/C

Receiving area & purchasing

2/D

Luggage room

1a/B

LPG Farm 1 (hotel)

2/B

Loading & Unloading bay

2a/B

Receiving area & platform

1/C-D

Bin center 1

1/C-D

Store

10

5a/E

Retail service lift lobby

11

5/C

Letter box

12

5a/C

Fire control room (retail, apt.)

13

6/C

MDF room

14

6/C-D

Bin center 2

15

5a-6/D

AWCS cable room

16

5a-6/D-E

AWCS

17

5a/E

CWSP

18

5a/E

Full vacuumload station

19

6/E

Loading & Unloading

20

5a/F

Consumer HT room

21

5a/G

TNB room

22

6/G

23

5b/G-H

24

5c/H

Diesel fuel pump room

25

5b/H

Bomba vehicle turning circle

Reception

TNB meter room


M&E room

Progress
(%)

RAINWATER DOWN PIPE

MARKING (BY
FASTFLOW) & CORING
ON SLAB (BY UMLB)
Actual
START

Progress
(%)

RISER PIPE
INSTALLATION

Actual
START

Progress
(%)

BRACKET
INSTALLATION

Actual
START

Progress
(%)

GROUTING PIPE

Actual
START

Progress
(%)

DISCHARGE PIPE
INSTALLATION

DISCHARGE SUMP

Actual
START

Actual
START

Progress
(%)

GRID LINE

NO.

LOCATION

5b/J

27

4a/E-F

Passage

28

01/B

Ramp 2

29

2a-7/A-C

Drop of

30

2b-4a/C-K

Retail lobby

31

01-5c/C-M

Retail unit 1,2,3,4,5,6,7

32

5/E

33

3b/E

Glass lift

34

3/E

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/J

Retail lift lobby

1a/B

M&E room

1/C

Store

4/E

Smoke spill fan room

4a/E

Copper pipes compartment

1a/F

Smoke spill fresh air pump room

2b-E

Pedestrian walk way

1-5a/C-J

Passage

1-7/B-M

Car parking

10

2a/C

Handicapped parking space

11

3/E-F

Stair from 3A to 3B

12

01-6/C-K

CIRCULATIO
N

26

RETAIL

TRANSPORT PIPE &


FITTING

Actual
START

RET
LIFT CORE & ESCAPE STAIRCASE
AIL

M&E &AREA
SERVICE ROOM (SERVICE A

AUTOMATED WASTE
COLLECTION SYSTEM
(AWCS)

PODIUM

CARPAKING & DRIVEWAY M&E SERVICE ROOM

LEVEL 2
LEVEL
TYPICAL COMMON AREA BASEMENT TO LEVEL 36
LEVEL 3A & 3B

MONITORING PROGRESS MECHANIC

LPG Farm 2 (retail)

Retail male & female toilet

Ramp

Progress
(%)

RAINWATER DOWN PIPE

MARKING (BY
FASTFLOW) & CORING
ON SLAB (BY UMLB)
Actual
START

Progress
(%)

RISER PIPE
INSTALLATION

Actual
START

Progress
(%)

BRACKET
INSTALLATION

Actual
START

Progress
(%)

GROUTING PIPE

Actual
START

Progress
(%)

DISCHARGE PIPE
INSTALLATION

DISCHARGE SUMP

Actual
START

Actual
START

Progress
(%)

GRID LINE
1/H

Male prayer room

15

2/H

Female prayer room

LIFT CORE & ESCAPE STAIRCASE

NO.
14

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

3/M

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

OTHER
ROOMS

2-2a/E-F

LIFT CORE & ESCAPE


STAIRCASE

TRANSPORT PIPE &


FITTING

Actual
START

LIFT LOBBY
& SERVICE
R.M

AREA

LOCATION

13

OBBY &
E ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36


LEVEL 4A & 4B
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

AUTOMATED WASTE
COLLECTION SYSTEM
(AWCS)

PODIUM

PARKING & DRIVEWAY

LEVEL LEVEL 3A & 3B

MONITORING PROGRESS MECHANIC

Car park management office

Retail lift lobby


Passage
Stair from 4A to 4B

Store 1, 2

Progress
(%)

RAINWATER DOWN PIPE

MARKING (BY
FASTFLOW) & CORING
ON SLAB (BY UMLB)
Actual
START

Progress
(%)

RISER PIPE
INSTALLATION

Actual
START

Progress
(%)

BRACKET
INSTALLATION

Actual
START

Progress
(%)

GROUTING PIPE

Actual
START

Progress
(%)

DISCHARGE PIPE
INSTALLATION

DISCHARGE SUMP

Actual
START

Actual
START

Progress
(%)

MONITORING PROGRESS MECHANIC


AUTOMATED WASTE
COLLECTION SYSTEM
(AWCS)

GRID LINE

NO.

AREA
LIFT LOBBY &
SERVICE ROOM
PARKING & DRIVEWAY
LIFT CORE & ESCAPE STAIRCASE
M&E

LEVEL 6A & 6B

LIFT LOBBY &


SERVICE ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL 5A & 5B

LEVEL

PODIUM

LOCATION

TRANSPORT PIPE &


FITTING

Actual
START

4a/D-E

Store 3

2/B

Genset room (hotel)

3/M

Retail lift lobby

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

10

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/M

Retail lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

6/G

Store 4

6/E

Management office

2a/B

Main switch board room (hotel)

2b/B

Transformer room (hotel)

5a-6/C

Transformer (apartment)

6/C

Main switch board room


(apartment)

10

5a-6/C-D

11

4a/E

CW pump room

12

5/E

EFF & CW. Tank

13

6/H

Transformer room (retail)

14

6/J

Main switch boardroom (retail)

Passage
Stair to up from 4A to 4B

Switch gear room (apartment)

Progress
(%)

RAINWATER DOWN PIPE

MARKING (BY
FASTFLOW) & CORING
ON SLAB (BY UMLB)
Actual
START

Progress
(%)

RISER PIPE
INSTALLATION

Actual
START

Progress
(%)

BRACKET
INSTALLATION

Actual
START

Progress
(%)

GROUTING PIPE

Actual
START

Progress
(%)

DISCHARGE PIPE
INSTALLATION

DISCHARGE SUMP

Actual
START

Actual
START

Progress
(%)

GRID LINE

NO.

AREA
M&E
LIFT CORE & ESCAPE STAIRCASE
M&E AND STORE
USTOMER (HOTEL)

TYPICAL COMMON AREA - BASEMENT


TO LEVEL 36

AUTOMATED WASTE
COLLECTION SYSTEM
(AWCS)

PODIUM

PARKING

LEVEL
LEVEL 6A & 6B

MONITORING PROGRESS MECHANIC

LOCATION

TRANSPORT PIPE &


FITTING

Actual
START

15

6/K

Genset room (retail)

16

1a/F

Fire pump room (hotel)

17

1/F

HR tank 1, 2

18

2/F

WR tank 1, 2

19

01-6/C-K

Ramp

20

5a/B, 2/K

Motocycle parking

21

01-7/B-M

Car parking

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

7/H

AV store

5a-6/C

Spa store

5/D-E

Store

1/C

1/C-D

AWCS

6/C-D

Staircase pressurization room

3a/C

Reception & check-in counter

3a/B

Business center/ library

4/B

10

4a/B

11

2/E

Bakery

12

3/G

All day dining

13

3c-3d/M

14

5/E

Bins room

Social space
Idea room

Pantry
Pre-function room

Progress
(%)

RAINWATER DOWN PIPE

MARKING (BY
FASTFLOW) & CORING
ON SLAB (BY UMLB)
Actual
START

Progress
(%)

RISER PIPE
INSTALLATION

Actual
START

Progress
(%)

BRACKET
INSTALLATION

Actual
START

Progress
(%)

GROUTING PIPE

Actual
START

Progress
(%)

DISCHARGE PIPE
INSTALLATION

DISCHARGE SUMP

Actual
START

Actual
START

Progress
(%)

MONITORING PROGRESS MECHANIC


AUTOMATED WASTE
COLLECTION SYSTEM
(AWCS)

GRID LINE

NO.

CUSTOMER (HOTEL)
AREA
FRONT OF HOUSE (HOTEL)
MAIN KITCHEN
IN KITCHEN

LEVEL 7

LEVEL

PODIUM

LOCATION

TRANSPORT PIPE &


FITTING

Actual
START

15

4c-G

Function room 1

16

5b/G

Function room 2

17

4a-6/B

Treatment 1, 2, 3

18

5a-6/B

Couple treatment room

19

6-7/B

Zacuzzi

20

6/D

21

2-2a/B

22

1a/B

23

2-2a/B

24

2a/B

25

3/B

GM office

26

5/C

Sales & marketing

27

4-4a/c-D

28

4-4a/C

Manager 1, 2

29

4-4a/D

Luggage room

30

5/D

Store

31

5c/E

Food preparation

32

1-1a/C

33

1-1a/C-D

Walk-in freezer

34

2/C-D

Walk-in chiller

35

1/D

Freeze

36

1/D

Chiller

37

2/D

Pastry store

38

1/D-E

Meat prep

39

1/E

Vege prep

40

2/E

Pastry & bakery

41

2/E

Chocolate room

42

1/E-F

43

1/F

Male & female toilet


Gen. cash
Storage
Account manager
Director finance

Hotel front office

Dry store

Cold kitchen
RM. Service office

Progress
(%)

RAINWATER DOWN PIPE

MARKING (BY
FASTFLOW) & CORING
ON SLAB (BY UMLB)
Actual
START

Progress
(%)

RISER PIPE
INSTALLATION

Actual
START

Progress
(%)

BRACKET
INSTALLATION

Actual
START

Progress
(%)

GROUTING PIPE

Actual
START

Progress
(%)

DISCHARGE PIPE
INSTALLATION

DISCHARGE SUMP

Actual
START

Actual
START

Progress
(%)

MONITORING PROGRESS MECHANIC


AUTOMATED WASTE
COLLECTION SYSTEM
(AWCS)

GRID LINE

NO.

MAIN KITCHEN
AREA
LIFT CORE & ESCAPE STAIRCASE
M&E

TYPICAL COMMON AREA - BASEMENT


TO LEVEL 36

LANDSC
APE

LEVEL

PODIUM

LOCATION

TRANSPORT PIPE &


FITTING

Actual
START

44

1/F

Chef office

45

1/F

Room service

46

1/F-G

Steward store

47

1-1a/F-G

48

1/G

Dish washing

49

2/F

Cooking area

50

5/A-B

51

4b-7/H-M

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1/C

Bin room

1/C

AWCS

2/B

Ahu room 1

1/G

Ahu room 2

01/F-G

01/G

1a/B-C

M&E area

1a/B

I.T. Store

2-2a/B-C

I.T. office

10

2b/B

11

3/B

Pot & pan washing

Balcony
Deck extension for F&B funtions

Balancing tank
Pump room

Server room
Uniform issue

Progress
(%)

RAINWATER DOWN PIPE

MARKING (BY
FASTFLOW) & CORING
ON SLAB (BY UMLB)
Actual
START

Progress
(%)

RISER PIPE
INSTALLATION

Actual
START

Progress
(%)

BRACKET
INSTALLATION

Actual
START

Progress
(%)

GROUTING PIPE

Actual
START

Progress
(%)

DISCHARGE PIPE
INSTALLATION

DISCHARGE SUMP

Actual
START

Actual
START

Progress
(%)

MONITORING PROGRESS MECHANIC


AUTOMATED WASTE
COLLECTION SYSTEM
(AWCS)

GRID LINE

LOCATION

12

6/E

Function room storage

13

6/H

AV room

14

2/E

HK manager

15

2/E-F

HR. DIR. Office

16

2/E-F

F&B DIR. Office

17

2/F-G

Executive chef

18

1/F

Working area

19

1/E

Training/ meeting room

20

1a/D

21

1-1a/C

22

2/D

Flower shop

23

2/D

House keeping office

24

1/D

Soiled linen room

25

1/D

Valet laundry

26

1/D-E

Clean linen room

27

1/C-D

Trolley bay

28

3a/B

Clinic

29

4/B

30

5a/B

31

6/B

32

6/B-C

33

6/C

Staf social lounge

34

6/D

Male & female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

NO.

AREA
OFFICE (BOH)
LIFT CORE &
ESCAPE
STAIRCASE

YPICAL COMMON
REA - BASEMENT
TO LEVEL 36

SERVICE AREA (BOH)

LEVEL 7 MEZZANINE

LEVEL

PODIUM

TRANSPORT PIPE &


FITTING

Actual
START

Corridors
Security & receiving area

Male & female changing room,


toilet
Team dinning room
Kitchen
Kitchen storage

Progress
(%)

RAINWATER DOWN PIPE

MARKING (BY
FASTFLOW) & CORING
ON SLAB (BY UMLB)
Actual
START

Progress
(%)

RISER PIPE
INSTALLATION

Actual
START

Progress
(%)

BRACKET
INSTALLATION

Actual
START

Progress
(%)

GROUTING PIPE

Actual
START

Progress
(%)

DISCHARGE PIPE
INSTALLATION

DISCHARGE SUMP

Actual
START

Actual
START

Progress
(%)

MONITORING PROGRESS MECHANIC


AUTOMATED WASTE
COLLECTION SYSTEM
(AWCS)

GRID LINE

NO.

LIFT CORE &


ESCAPE
AREA
STAIRCASE
FACILITY

LEVEL 8

TYPICAL COMMON
AREA - BASEMENT
LEVEL
TO LEVEL 36

PODIUM

LOCATION

TRANSPORT PIPE &


FITTING

Actual
START

5a/D

Escape staircase S4

11

3a/C

Gym

12

3/B

Male, female changing room

13

3/F

Swimming pool

14

3/J

Pantry

15

4d/J

16

2a-4/B-H

Deck

17

2a-7/A-D

Roof top garden for apartment


tower

18

2b-7/B-J

Steps

19

2b-7/B-J

Ramp

Spiral stair

Progress
(%)

RAINWATER DOWN PIPE

MARKING (BY
FASTFLOW) & CORING
ON SLAB (BY UMLB)
Actual
START

Progress
(%)

RISER PIPE
INSTALLATION

Actual
START

Progress
(%)

BRACKET
INSTALLATION

Actual
START

Progress
(%)

GROUTING PIPE

Actual
START

Progress
(%)

DISCHARGE PIPE
INSTALLATION

DISCHARGE SUMP

Actual
START

Actual
START

Progress
(%)

MONITORING PROGRESS MECHANIC


PODIUM

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE STAIRCASE
&E SERVICE ROOM

BASEMENT

PARKING &
DRIVEWAY

LIFT CORE

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

RAINWATER DOWN PIPE

DISCHARGE SUMP
LOCATION
Progress
(%)

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

01-2/A

Hotel store 1,2

4a/C-D

Store 3

4a-5/C-D

Store (service apt.)

7/G

1-2/F-G

5/C

1-7/A-J

Car parking

1-7/A-J

Motor parking

4a-E

1/E

Ramp 1

10

1/C

Fan room

11

3a/B

Chiller plant room

12

4/B

13

4a/A-B

14

5/A

Domestic tank 1, 2 (retail)

15

5/A

Pump room 1 (retail)

16

5a/B

Pump room 2 (hotel)

17

6/B

18

6/C-D

Pump room 4 (service Apt. +


retail)

19

5a-6/D

Pump room 5 (hotel)

20

5b-5c/H

Pump room 6 (hotel)

21

5b-5c/J

Pump room 7 (retail/ carpark)

22

5a/A

AC make up tank 1, 2 (hotel)

Carpark store
Staircase lobby
Passage

Handicapped parking space

Flood retention tank (below)


Sump pit

Pump room 3 (service apt.)

NO.

M&E SERVICE
AREA
ROOM
LIFT CORE & ESCAPE STAIRCASE
RETAIL

LEVEL1

M&E AND SERVICE


ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

RAINWATER DOWN PIPE

PODIUM

GRID LINE

BASEMENT

MONITORING PROGRESS MECHANIC

DISCHARGE SUMP
LOCATION
Progress
(%)

23

7/A

Domestic tank 3 (hotel)

24

7/B

Domestic tank 4 (service apt.)

25

5a-6/C

Wet riser tank 1, 2

26

6-7/C

Hose reel tank 1, 2

27

7/D

28

5b/H

Sprinkler pump stage 1

29

7/J-K

Sprinkler tank 1, 2

30

2/H

Grease interceptor system


(hotel&retail)

31

01/G

OSD, on-site detention tank

32

01/F

Rain water harvesting tank

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1a/A

Store

5a/D

Janitor

5a/D-E

Refuse

5a-D

4a-5B/D-F

1-H

2a-4a/D-L

1-6/C-G

3/M

10

1-7/A-M

11

4a-5b/C-F

12

4/F

Fresh air fanroom (car park)

Refuse bin
Store 1, 2,3,4,5
Ramp 1
Retail lobby
Passage 1, 2, 3, 4
Retail service lift lobby
Retail unit 1,2,3,4,5,6,7,8,9,10
Retail male & female toilet
Glass lift

NO.

AREA
RETAIL
LIFT CORE & ESCAPE
STAIRCASE
M&E & SERVICE ROOM (SERVICE APARTMENT & RETAIL)

LEVEL 2

M&E & SERVICE ROOM (HOTEL)

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

RAINWATER DOWN PIPE

PODIUM

GRID LINE

LEVEL1

MONITORING PROGRESS MECHANIC

DISCHARGE SUMP
LOCATION
Progress
(%)

13

3a/F

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

2/C

Hotel lobby

3/B-C

1/C

Receiving area & purchasing

2/D

Luggage room

1a/B

LPG Farm 1 (hotel)

2/B

Loading & Unloading bay

2a/B

Receiving area & platform

1/C-D

Bin center 1

1/C-D

Store

10

5a/E

Retail service lift lobby

11

5/C

Letter box

12

5a/C

Fire control room (retail, apt.)

13

6/C

MDF room

14

6/C-D

Bin center 2

15

5a-6/D

AWCS cable room

16

5a-6/D-E

AWCS

17

5a/E

CWSP

18

5a/E

Full vacuumload station

19

6/E

Loading & Unloading

20

5a/F

Consumer HT room

21

5a/G

TNB room

22

6/G

23

5b/G-H

24

5c/H

Diesel fuel pump room

25

5b/H

Bomba vehicle turning circle

Reception

TNB meter room


M&E room

NO.

DISCHARGE SUMP
LOCATION
Progress
(%)

5b/J

27

4a/E-F

Passage

28

01/B

Ramp 2

29

2a-7/A-C

Drop of

30

2b-4a/C-K

Retail lobby

31

01-5c/C-M

Retail unit 1,2,3,4,5,6,7

32

5/E

33

3b/E

Glass lift

34

3/E

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/J

Retail lift lobby

1a/B

M&E room

1/C

Store

4/E

Smoke spill fan room

4a/E

Copper pipes compartment

1a/F

Smoke spill fresh air pump room

2b-E

Pedestrian walk way

1-5a/C-J

Passage

1-7/B-M

Car parking

10

2a/C

Handicapped parking space

11

3/E-F

Stair from 3A to 3B

12

01-6/C-K

RETAIL

CIRCULATIO
N

26

RET
LIFT CORE & ESCAPE STAIRCASE
AIL

TYPICAL COMMON AREA BASEMENT TO LEVEL 36


LEVEL 3A & 3B

PODIUM

CARPAKING & DRIVEWAY M&E SERVICE ROOM

LEVEL

RAINWATER DOWN PIPE

GRID LINE

M&E &AREA
SERVICE ROOM (SERVICE A

LEVEL 2

MONITORING PROGRESS MECHANIC

LPG Farm 2 (retail)

Retail male & female toilet

Ramp

14

1/H

Male prayer room

15

2/H

Female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

3/M

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

LIFT CORE & ESCAPE


STAIRCASE

OTHER
ROOMS

2-2a/E-F

LIFT CORE & ESCAPE STAIRCASE

Progress
(%)

LIFT LOBBY
& SERVICE
R.M

NO.

DISCHARGE SUMP
LOCATION

13

OBBY &
E ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36


LEVEL 4A & 4B
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

PODIUM

PARKING & DRIVEWAY

AREA

RAINWATER DOWN PIPE

GRID LINE

LEVEL LEVEL 3A & 3B

MONITORING PROGRESS MECHANIC

Car park management office

Retail lift lobby


Passage
Stair from 4A to 4B

Store 1, 2

MONITORING PROGRESS MECHANIC


PODIUM

GRID LINE

NO.

AREA
LIFT LOBBY &
SERVICE ROOM
PARKING & DRIVEWAY
LIFT CORE & ESCAPE STAIRCASE
M&E

LEVEL 6A & 6B

LIFT LOBBY &


SERVICE ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL 5A & 5B

LEVEL

RAINWATER DOWN PIPE

DISCHARGE SUMP
LOCATION
Progress
(%)

4a/D-E

Store 3

2/B

Genset room (hotel)

3/M

Retail lift lobby

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

10

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/M

Retail lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

6/G

Store 4

6/E

Management office

2a/B

Main switch board room (hotel)

2b/B

Transformer room (hotel)

5a-6/C

Transformer (apartment)

6/C

Main switch board room


(apartment)

10

5a-6/C-D

11

4a/E

CW pump room

12

5/E

EFF & CW. Tank

13

6/H

Transformer room (retail)

14

6/J

Main switch boardroom (retail)

Passage
Stair to up from 4A to 4B

Switch gear room (apartment)

LIFT CORE & ESCAPE STAIRCASE


M&E AND STORE
USTOMER (HOTEL)

TYPICAL COMMON AREA - BASEMENT


TO LEVEL 36

PARKING

NO.

AREA
M&E

RAINWATER DOWN PIPE

PODIUM

GRID LINE

LEVEL
LEVEL 6A & 6B

MONITORING PROGRESS MECHANIC

DISCHARGE SUMP
LOCATION
Progress
(%)

15

6/K

Genset room (retail)

16

1a/F

Fire pump room (hotel)

17

1/F

HR tank 1, 2

18

2/F

WR tank 1, 2

19

01-6/C-K

Ramp

20

5a/B, 2/K

Motocycle parking

21

01-7/B-M

Car parking

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

7/H

AV store

5a-6/C

Spa store

5/D-E

Store

1/C

1/C-D

AWCS

6/C-D

Staircase pressurization room

3a/C

Reception & check-in counter

3a/B

Business center/ library

4/B

10

4a/B

11

2/E

Bakery

12

3/G

All day dining

13

3c-3d/M

14

5/E

Bins room

Social space
Idea room

Pantry
Pre-function room

MONITORING PROGRESS MECHANIC


PODIUM

GRID LINE

NO.

CUSTOMER (HOTEL)
AREA
FRONT OF HOUSE (HOTEL)
MAIN KITCHEN
IN KITCHEN

LEVEL 7

LEVEL

RAINWATER DOWN PIPE

DISCHARGE SUMP
LOCATION
Progress
(%)

15

4c-G

Function room 1

16

5b/G

Function room 2

17

4a-6/B

Treatment 1, 2, 3

18

5a-6/B

Couple treatment room

19

6-7/B

Zacuzzi

20

6/D

21

2-2a/B

22

1a/B

23

2-2a/B

24

2a/B

25

3/B

GM office

26

5/C

Sales & marketing

27

4-4a/c-D

28

4-4a/C

Manager 1, 2

29

4-4a/D

Luggage room

30

5/D

Store

31

5c/E

Food preparation

32

1-1a/C

33

1-1a/C-D

Walk-in freezer

34

2/C-D

Walk-in chiller

35

1/D

Freeze

36

1/D

Chiller

37

2/D

Pastry store

38

1/D-E

Meat prep

39

1/E

Vege prep

40

2/E

Pastry & bakery

41

2/E

Chocolate room

42

1/E-F

43

1/F

Male & female toilet


Gen. cash
Storage
Account manager
Director finance

Hotel front office

Dry store

Cold kitchen
RM. Service office

MONITORING PROGRESS MECHANIC


PODIUM

GRID LINE

NO.

MAIN KITCHEN
AREA
LIFT CORE & ESCAPE STAIRCASE
M&E

TYPICAL COMMON AREA - BASEMENT


TO LEVEL 36

LANDSC
APE

LEVEL

RAINWATER DOWN PIPE

DISCHARGE SUMP
LOCATION
Progress
(%)

44

1/F

Chef office

45

1/F

Room service

46

1/F-G

Steward store

47

1-1a/F-G

48

1/G

Dish washing

49

2/F

Cooking area

50

5/A-B

51

4b-7/H-M

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1/C

Bin room

1/C

AWCS

2/B

Ahu room 1

1/G

Ahu room 2

01/F-G

01/G

1a/B-C

M&E area

1a/B

I.T. Store

2-2a/B-C

I.T. office

10

2b/B

11

3/B

Pot & pan washing

Balcony
Deck extension for F&B funtions

Balancing tank
Pump room

Server room
Uniform issue

MONITORING PROGRESS MECHANIC

GRID LINE

PODIUM

LOCATION

12

6/E

Function room storage

13

6/H

AV room

14

2/E

HK manager

15

2/E-F

HR. DIR. Office

16

2/E-F

F&B DIR. Office

17

2/F-G

Executive chef

18

1/F

Working area

19

1/E

Training/ meeting room

20

1a/D

21

1-1a/C

22

2/D

Flower shop

23

2/D

House keeping office

24

1/D

Soiled linen room

25

1/D

Valet laundry

26

1/D-E

Clean linen room

27

1/C-D

Trolley bay

28

3a/B

Clinic

29

4/B

30

5a/B

31

6/B

32

6/B-C

33

6/C

Staf social lounge

34

6/D

Male & female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

NO.

AREA
OFFICE (BOH)
LIFT CORE &
ESCAPE
STAIRCASE

YPICAL COMMON
REA - BASEMENT
TO LEVEL 36

SERVICE AREA (BOH)

LEVEL 7 MEZZANINE

LEVEL

RAINWATER DOWN PIPE

DISCHARGE SUMP

Progress
(%)

Corridors
Security & receiving area

Male & female changing room,


toilet
Team dinning room
Kitchen
Kitchen storage

MONITORING PROGRESS MECHANIC


PODIUM

GRID LINE

NO.

LIFT CORE &


ESCAPE
AREA
STAIRCASE
FACILITY

LEVEL 8

TYPICAL COMMON
AREA - BASEMENT
LEVEL
TO LEVEL 36

RAINWATER DOWN PIPE

DISCHARGE SUMP
LOCATION
Progress
(%)

5a/D

Escape staircase S4

11

3a/C

Gym

12

3/B

Male, female changing room

13

3/F

Swimming pool

14

3/J

Pantry

15

4d/J

16

2a-4/B-H

Deck

17

2a-7/A-D

Roof top garden for apartment


tower

18

2b-7/B-J

Steps

19

2b-7/B-J

Ramp

Spiral stair

MONITORING PROGRESS M

LEVEL 8

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD
NO. / NAME OF FLOOR
LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K
D- K

18

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

J -K

1/A

Escape staircase S1
(basement to level 20)

1/G

Escape staircase S2
(basement to level 19)

2/C

Hotel lift lobby at level 3 to


level 18

1a/B

Linen room

1/C

Store

1a/C

Tel/IT

1a/G

Smoke lobby

2/B, 1-2a/B

Balcony

1a-2/B-H

Hotel corridor

1-2a/B-M

Hotel room 1-25

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

RISER / SHAFT
INSTALLATION

Actual
START

Progress
(%)

CABLE LADDER
INSTALLATION

Actual
START

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CABLING INSTALLATION

Actual
START

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION

Actual
START

Progress
(%)

CABLING INSTALLA

Actual
START

LEVEL 10

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18

LOCATION / ROOM
TYPE

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD
NO. / NAME OF FLOOR
LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 9

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

1a/B

Linen room

2
3
4
5

1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4

1a/B
1a/G
1-2b/B-M
1a-2/B-H

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor

RISER / SHAFT
INSTALLATION

Actual
START

Progress
(%)

CABLE LADDER
INSTALLATION

Actual
START

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CABLING INSTALLATION

Actual
START

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION

Actual
START

Progress
(%)

CABLING INSTALLA

Actual
START

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD
NO. / NAME OF FLOOR
LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 12

LEVEL 11

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

2/B, 1-2a/B

Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

RISER / SHAFT
INSTALLATION

Actual
START

Progress
(%)

CABLE LADDER
INSTALLATION

Actual
START

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CABLING INSTALLATION

Actual
START

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION

Actual
START

Progress
(%)

CABLING INSTALLA

Actual
START

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD
NO. / NAME OF FLOOR
LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
LEVEL
12
& AUTHORITY
DRAWINGS

DESCRIPTION

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

RISER / SHAFT
INSTALLATION

Actual
START

Progress
(%)

CABLE LADDER
INSTALLATION

Actual
START

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CABLING INSTALLATION

Actual
START

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION

Actual
START

Progress
(%)

CABLING INSTALLA

Actual
START

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - HOTEL MONITORING PROGRESS M

LEVEL 8

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

AL & ELV
DESCRIPTION
- TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K
D- K

CABLING INSTALLATION

18

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

J -K

1/A

Escape staircase S1
(basement to level 20)

1/G

Escape staircase S2
(basement to level 19)

2/C

Hotel lift lobby at level 3 to


level 18

1a/B

Linen room

1/C

Store

1a/C

Tel/IT

1a/G

Smoke lobby

2/B, 1-2a/B

Balcony

1a-2/B-H

Hotel corridor

1-2a/B-M

Hotel room 1-25

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

Progress
(%)

LOOPING & MERGERING

Actual
START

Progress (%)

PANEL INSTALLATION
(SUB SWITCHBOARD)

Actual
START

Progress
(%)

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ELV DEVICES - TELEPHONE,


DATA SYSTEM, MATV, CCTV,
DUCTING INSTALLATION DUCTING INSTALLATION
P.A, CARD ACCESS, GUARD
- BEDROOM
- BATHROOM
TOUR, EARTHNING &
LIGHTNING
Actual
START

Progress (%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

COPPER PIPE
INSTALLATION

Actual
START

LEVEL 10

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18

LOCATION / ROOM
TYPE

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 9

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

AL & ELV
DESCRIPTION
- TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)

CABLING INSTALLATION

1a/B

Linen room

2
3
4
5

1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4

1a/B
1a/G
1-2b/B-M
1a-2/B-H

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor

Progress
(%)

LOOPING & MERGERING

Actual
START

Progress (%)

PANEL INSTALLATION
(SUB SWITCHBOARD)

Actual
START

Progress
(%)

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ELV DEVICES - TELEPHONE,


DATA SYSTEM, MATV, CCTV,
DUCTING INSTALLATION DUCTING INSTALLATION
P.A, CARD ACCESS, GUARD
- BEDROOM
- BATHROOM
TOUR, EARTHNING &
LIGHTNING
Actual
START

Progress (%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

COPPER PIPE
INSTALLATION

Actual
START

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL 12

LEVEL 11

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

AL & ELV
DESCRIPTION
- TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)

2/B, 1-2a/B

Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

CABLING INSTALLATION

Progress
(%)

LOOPING & MERGERING

Actual
START

Progress (%)

PANEL INSTALLATION
(SUB SWITCHBOARD)

Actual
START

Progress
(%)

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ELV DEVICES - TELEPHONE,


DATA SYSTEM, MATV, CCTV,
DUCTING INSTALLATION DUCTING INSTALLATION
P.A, CARD ACCESS, GUARD
- BEDROOM
- BATHROOM
TOUR, EARTHNING &
LIGHTNING
Actual
START

Progress (%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

COPPER PIPE
INSTALLATION

Actual
START

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
LEVEL
12
& AUTHORITY
DRAWINGS

AL & ELV
DESCRIPTION
- TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

CABLING INSTALLATION

Progress
(%)

LOOPING & MERGERING

Actual
START

Progress (%)

PANEL INSTALLATION
(SUB SWITCHBOARD)

Actual
START

Progress
(%)

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ELV DEVICES - TELEPHONE,


DATA SYSTEM, MATV, CCTV,
DUCTING INSTALLATION DUCTING INSTALLATION
P.A, CARD ACCESS, GUARD
- BEDROOM
- BATHROOM
TOUR, EARTHNING &
LIGHTNING
Actual
START

Progress (%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

COPPER PIPE
INSTALLATION

Actual
START

S - HOTEL

MONITORING PROGRESS M
Update : 09 Sep 15

LEVEL 8

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

ACMV
NO. / NAME OF FLOOR
LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K
D- K

COPPER PIPE
INSTALLATION

18

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

J -K

1/A

Escape staircase S1
(basement to level 20)

1/G

Escape staircase S2
(basement to level 19)

2/C

Hotel lift lobby at level 3 to


level 18

1a/B

Linen room

1/C

Store

1a/C

Tel/IT

1a/G

Smoke lobby

2/B, 1-2a/B

Balcony

1a-2/B-H

Hotel corridor

1-2a/B-M

Hotel room 1-25

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

Progress
(%)

DRAIN PIPE
INSTALLATION

Actual
START

Progress
(%)

FLEXIBLE DUCT
INSTALLATION BEDROOM
Actual
START

Progress
(%)

INSTALLATION CONDUIT FAN COIL UNIT (FCU) & WIRING


DUCT TYPE

Actual
START

Progress
(%)

Actual
START

Progress
(%)

EXHAUST
INSTALLATION

Actual
START

Progress
(%)

GRILL INSTALLATION

Actual
START

Progress
(%)

VENTILATION GRILL LPAD & SSAD SHAFT

Actual
START

Progress
(%)

LEVEL 10

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18

LOCATION / ROOM
TYPE

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

ACMV
NO. / NAME OF FLOOR
LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 9

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

COPPER PIPE
INSTALLATION

1a/B

Linen room

2
3
4
5

1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4

1a/B
1a/G
1-2b/B-M
1a-2/B-H

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor

Progress
(%)

DRAIN PIPE
INSTALLATION

Actual
START

Progress
(%)

FLEXIBLE DUCT
INSTALLATION BEDROOM
Actual
START

Progress
(%)

INSTALLATION CONDUIT FAN COIL UNIT (FCU) & WIRING


DUCT TYPE

Actual
START

Progress
(%)

Actual
START

Progress
(%)

EXHAUST
INSTALLATION

Actual
START

Progress
(%)

GRILL INSTALLATION

Actual
START

Progress
(%)

VENTILATION GRILL LPAD & SSAD SHAFT

Actual
START

Progress
(%)

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

ACMV
NO. / NAME OF FLOOR
LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 12

LEVEL 11

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

2/B, 1-2a/B

Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

COPPER PIPE
INSTALLATION

Progress
(%)

DRAIN PIPE
INSTALLATION

Actual
START

Progress
(%)

FLEXIBLE DUCT
INSTALLATION BEDROOM
Actual
START

Progress
(%)

INSTALLATION CONDUIT FAN COIL UNIT (FCU) & WIRING


DUCT TYPE

Actual
START

Progress
(%)

Actual
START

Progress
(%)

EXHAUST
INSTALLATION

Actual
START

Progress
(%)

GRILL INSTALLATION

Actual
START

Progress
(%)

VENTILATION GRILL LPAD & SSAD SHAFT

Actual
START

Progress
(%)

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

ACMV
NO. / NAME OF FLOOR
LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
LEVEL
12
& AUTHORITY
DRAWINGS

DESCRIPTION

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

COPPER PIPE
INSTALLATION

Progress
(%)

DRAIN PIPE
INSTALLATION

Actual
START

Progress
(%)

FLEXIBLE DUCT
INSTALLATION BEDROOM
Actual
START

Progress
(%)

INSTALLATION CONDUIT FAN COIL UNIT (FCU) & WIRING


DUCT TYPE

Actual
START

Progress
(%)

Actual
START

Progress
(%)

EXHAUST
INSTALLATION

Actual
START

Progress
(%)

GRILL INSTALLATION

Actual
START

Progress
(%)

VENTILATION GRILL LPAD & SSAD SHAFT

Actual
START

Progress
(%)

MONITORING PROGRESS M

LEVEL 8

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

FIRE FIGHTING
NO. / NAME OF FLOOR
LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K
D- K

18

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

J -K

1/A

Escape staircase S1
(basement to level 20)

1/G

Escape staircase S2
(basement to level 19)

2/C

Hotel lift lobby at level 3 to


level 18

1a/B

Linen room

1/C

Store

1a/C

Tel/IT

1a/G

Smoke lobby

2/B, 1-2a/B

Balcony

1a-2/B-H

Hotel corridor

1-2a/B-M

Hotel room 1-25

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

SPRINKLER SYSTEM
PIPE INSTALLATION

Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

WET RISER SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

INSTALLATION CONDUIT
& WIRING FOR FA & FI

Actual
START

Progress
(%)

SPRINKLER HEAD
INSTALLATION

Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION

Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

LEVEL 10

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18

LOCATION / ROOM
TYPE

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

FIRE FIGHTING
NO. / NAME OF FLOOR
LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 9

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

1a/B

Linen room

2
3
4
5

1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4

1a/B
1a/G
1-2b/B-M
1a-2/B-H

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor

SPRINKLER SYSTEM
PIPE INSTALLATION

Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

WET RISER SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

INSTALLATION CONDUIT
& WIRING FOR FA & FI

Actual
START

Progress
(%)

SPRINKLER HEAD
INSTALLATION

Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION

Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

FIRE FIGHTING
NO. / NAME OF FLOOR
LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 12

LEVEL 11

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

2/B, 1-2a/B

Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

SPRINKLER SYSTEM
PIPE INSTALLATION

Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

WET RISER SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

INSTALLATION CONDUIT
& WIRING FOR FA & FI

Actual
START

Progress
(%)

SPRINKLER HEAD
INSTALLATION

Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION

Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

FIRE FIGHTING
NO. / NAME OF FLOOR
LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
LEVEL
12
& AUTHORITY
DRAWINGS

DESCRIPTION

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

SPRINKLER SYSTEM
PIPE INSTALLATION

Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

WET RISER SYSTEM


PIPE INSTALLATION

Actual
START

Progress
(%)

INSTALLATION CONDUIT
& WIRING FOR FA & FI

Actual
START

Progress
(%)

SPRINKLER HEAD
INSTALLATION

Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION

Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

MONITORING PROGRESS M

LEVEL 8

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)
NO. / NAME OF FLOOR
LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

FIRE
DESCRIPTION
FIGHTING

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K
D- K

FIRE ALARM
ACCESSORIES
INSTALLATION

18

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

J -K

1/A

Escape staircase S1
(basement to level 20)

1/G

Escape staircase S2
(basement to level 19)

2/C

Hotel lift lobby at level 3 to


level 18

1a/B

Linen room

1/C

Store

1a/C

Tel/IT

1a/G

Smoke lobby

2/B, 1-2a/B

Balcony

1a-2/B-H

Hotel corridor

1-2a/B-M

Hotel room 1-25

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

Progress
(%)

SMOKE DETECTOR
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

FIREMAN INTERCOM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR SLAB
& CONCEAL PIPE IN
SHEARWALL / COLUMN
Actual
START

Progress
(%)

TRANFER PIPE
INSTALLATION

Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION

Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION

Actual
START

Progress
(%)

SANITARY PIPE FITTING

Actual
START

Progress
(%)

LEVEL 10

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18

LOCATION / ROOM
TYPE

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)
NO. / NAME OF FLOOR
LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 9

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

FIRE
DESCRIPTION
FIGHTING
FIRE ALARM
ACCESSORIES
INSTALLATION

1a/B

Linen room

2
3
4
5

1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4

1a/B
1a/G
1-2b/B-M
1a-2/B-H

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor

Progress
(%)

SMOKE DETECTOR
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

FIREMAN INTERCOM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR SLAB
& CONCEAL PIPE IN
SHEARWALL / COLUMN
Actual
START

Progress
(%)

TRANFER PIPE
INSTALLATION

Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION

Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION

Actual
START

Progress
(%)

SANITARY PIPE FITTING

Actual
START

Progress
(%)

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)
NO. / NAME OF FLOOR
LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 12

LEVEL 11

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

FIRE
DESCRIPTION
FIGHTING

2/B, 1-2a/B

Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

FIRE ALARM
ACCESSORIES
INSTALLATION

Progress
(%)

SMOKE DETECTOR
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

FIREMAN INTERCOM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR SLAB
& CONCEAL PIPE IN
SHEARWALL / COLUMN
Actual
START

Progress
(%)

TRANFER PIPE
INSTALLATION

Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION

Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION

Actual
START

Progress
(%)

SANITARY PIPE FITTING

Actual
START

Progress
(%)

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)
NO. / NAME OF FLOOR
LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
LEVEL
12
& AUTHORITY
DRAWINGS

FIRE
DESCRIPTION
FIGHTING

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

FIRE ALARM
ACCESSORIES
INSTALLATION

Progress
(%)

SMOKE DETECTOR
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

FIREMAN INTERCOM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR SLAB
& CONCEAL PIPE IN
SHEARWALL / COLUMN
Actual
START

Progress
(%)

TRANFER PIPE
INSTALLATION

Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION

Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION

Actual
START

Progress
(%)

SANITARY PIPE FITTING

Actual
START

Progress
(%)

MONITORING PROGRESS M

LEVEL 8

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

UMBING
DESCRIPTION
WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K
D- K

18

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

J -K

1/A

Escape staircase S1
(basement to level 20)

1/G

Escape staircase S2
(basement to level 19)

2/C

Hotel lift lobby at level 3 to


level 18

1a/B

Linen room

1/C

Store

1a/C

Tel/IT

1a/G

Smoke lobby

2/B, 1-2a/B

Balcony

1a-2/B-H

Hotel corridor

1-2a/B-M

Hotel room 1-25

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

RAINWATER DOWN PIPE

COLD WATER PIPE


FITTING

Actual
START

Progress
(%)

HOT WATER PIPE


FITTING

Actual
START

Progress
(%)

OPENING CLEANING

Actual
START

Progress
(%)

PIPE INSTALLATION

Actual
START

Progress
(%)

BRACKET INSTALLATION

Actual
START

Progress
(%)

GROUTING PIPE

Actual
START

Progress
(%)

OUTLET & FLOOR TRAP


INSTALLATION

Actual
START

Progress
(%)

LEVEL 10

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18

LOCATION / ROOM
TYPE

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 9

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

UMBING
DESCRIPTION
WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)

1a/B

Linen room

2
3
4
5

1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4

1a/B
1a/G
1-2b/B-M
1a-2/B-H

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor

RAINWATER DOWN PIPE

COLD WATER PIPE


FITTING

Actual
START

Progress
(%)

HOT WATER PIPE


FITTING

Actual
START

Progress
(%)

OPENING CLEANING

Actual
START

Progress
(%)

PIPE INSTALLATION

Actual
START

Progress
(%)

BRACKET INSTALLATION

Actual
START

Progress
(%)

GROUTING PIPE

Actual
START

Progress
(%)

OUTLET & FLOOR TRAP


INSTALLATION

Actual
START

Progress
(%)

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL 12

LEVEL 11

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

UMBING
DESCRIPTION
WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)

2/B, 1-2a/B

Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

RAINWATER DOWN PIPE

COLD WATER PIPE


FITTING

Actual
START

Progress
(%)

HOT WATER PIPE


FITTING

Actual
START

Progress
(%)

OPENING CLEANING

Actual
START

Progress
(%)

PIPE INSTALLATION

Actual
START

Progress
(%)

BRACKET INSTALLATION

Actual
START

Progress
(%)

GROUTING PIPE

Actual
START

Progress
(%)

OUTLET & FLOOR TRAP


INSTALLATION

Actual
START

Progress
(%)

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
LEVEL
12
& AUTHORITY
DRAWINGS

UMBING
DESCRIPTION
WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM)

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

RAINWATER DOWN PIPE

COLD WATER PIPE


FITTING

Actual
START

Progress
(%)

HOT WATER PIPE


FITTING

Actual
START

Progress
(%)

OPENING CLEANING

Actual
START

Progress
(%)

PIPE INSTALLATION

Actual
START

Progress
(%)

BRACKET INSTALLATION

Actual
START

Progress
(%)

GROUTING PIPE

Actual
START

Progress
(%)

OUTLET & FLOOR TRAP


INSTALLATION

Actual
START

Progress
(%)

MONITORING PROG

LOCATION /
ROOM TYPE

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, G
GRID LINE

NO.

AREA
APARTMENT

LEVEL 8

LEVEL

DESCRIPTION

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2

14

6/G

15

5a/D

16

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)
Fire/ service lift lobby
at basement to level
36 (service apartment)

17

5a/D

18

5/D

19

4d-H

RC Flat roof

20

5/C-G

Apartment corridor

21

4-7/C-H

Service apartment lift


lobby at level 2 to
level 36

Apt. unit (A1a-7a, B1a4a, C1a-2a)

A1

A2

A3

A4

A5

A6

RISER / SHAFT
INSTALLATION
Actual
START

Progress
(%)

CABLE LADDER
INSTALLATION
Actual
START

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CABLING INSTALLATION
Actual
START

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION
Actual
START

Progress
(%)

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

15

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19
20

APARTMENT

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

5a/D

LEVEL 10

LOCATION /
ROOM TYPE

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, G
GRID LINE

NO.

AREA
APARTMENT

LEVEL 9

LEVEL

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14
5a/D
15

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

RISER / SHAFT
INSTALLATION
Actual
START

Progress
(%)

CABLE LADDER
INSTALLATION
Actual
START

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CABLING INSTALLATION
Actual
START

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION
Actual
START

Progress
(%)

AREA
APARTMENT

LEVEL
LEVEL 10

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19

APARTMENT

LEVEL 11

20

LOCATION /
ROOM TYPE

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, G
GRID LINE

NO.

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20
1

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)
A1

RISER / SHAFT
INSTALLATION
Actual
START

Progress
(%)

CABLE LADDER
INSTALLATION
Actual
START

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CABLING INSTALLATION
Actual
START

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION
Actual
START

Progress
(%)

LOCATION /
ROOM TYPE

ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, G
GRID LINE

NO.

AREA
APARTMENT

LEVEL 12

LEVEL

DESCRIPTION

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

RISER / SHAFT
INSTALLATION
Actual
START

Progress
(%)

CABLE LADDER
INSTALLATION
Actual
START

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CABLING INSTALLATION
Actual
START

Progress
(%)

CABLE TRAY /
TRUNKING
INSTALLATION
Actual
START

Progress
(%)

CONDUIT AT COLUMN,
WALL & SLAB
INSTALLATION
Actual
START

Progress
(%)

BOX INSTALLATION
Actual
START

Progress
(%)

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - APARTMENTMONITORING PROG

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 8

LEVEL

- TELEPHONE,
DESCRIPTION
DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2

14

6/G

15

5a/D

16

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)
Fire/ service lift lobby
at basement to level
36 (service apartment)

17

5a/D

18

5/D

19

4d-H

RC Flat roof

20

5/C-G

Apartment corridor

21

4-7/C-H

Service apartment lift


lobby at level 2 to
level 36

Apt. unit (A1a-7a, B1a4a, C1a-2a)

A1

A2

A3

A4

A5

A6

CABLING INSTALLATION LOOPING & MERGERING


Actual
START

Progress
(%)

Actual
START

Progress
(%)

PANEL INSTALLATION
(SUB SWITCHBOARD)
Actual
START

Progress
(%)

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ELV DEVICES - TELEPHONE, DATA


SYSTEM, MATV, CCTV, P.A, CARD DUCTING INSTALLATION DUCTING INSTALLATION
ACCESS, GUARD TOUR,
- LIVING ROOM
- BATHROOM
EARTHNING & LIGHTNING
Actual
START

Progress (%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

15

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19
20

APARTMENT

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

5a/D

LEVEL 10

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 9

LEVEL

- TELEPHONE,
DESCRIPTION
DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14
5a/D
15

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

CABLING INSTALLATION LOOPING & MERGERING


Actual
START

Progress
(%)

Actual
START

Progress
(%)

PANEL INSTALLATION
(SUB SWITCHBOARD)
Actual
START

Progress
(%)

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ELV DEVICES - TELEPHONE, DATA


SYSTEM, MATV, CCTV, P.A, CARD DUCTING INSTALLATION DUCTING INSTALLATION
ACCESS, GUARD TOUR,
- LIVING ROOM
- BATHROOM
EARTHNING & LIGHTNING
Actual
START

Progress (%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

AREA
APARTMENT

LEVEL
LEVEL 10

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19

APARTMENT

LEVEL 11

20

LOCATION /
ROOM TYPE

GRID LINE

NO.

- TELEPHONE,
DESCRIPTION
DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20
1

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)
A1

CABLING INSTALLATION LOOPING & MERGERING


Actual
START

Progress
(%)

Actual
START

Progress
(%)

PANEL INSTALLATION
(SUB SWITCHBOARD)
Actual
START

Progress
(%)

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ELV DEVICES - TELEPHONE, DATA


SYSTEM, MATV, CCTV, P.A, CARD DUCTING INSTALLATION DUCTING INSTALLATION
ACCESS, GUARD TOUR,
- LIVING ROOM
- BATHROOM
EARTHNING & LIGHTNING
Actual
START

Progress (%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 12

LEVEL

- TELEPHONE,
DESCRIPTION
DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING)

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

CABLING INSTALLATION LOOPING & MERGERING


Actual
START

Progress
(%)

Actual
START

Progress
(%)

PANEL INSTALLATION
(SUB SWITCHBOARD)
Actual
START

Progress
(%)

SOCKET OUTLET &


LIGHT FITTING
INSTALLATION
Actual
START

Progress
(%)

ELV DEVICES - TELEPHONE, DATA


SYSTEM, MATV, CCTV, P.A, CARD DUCTING INSTALLATION DUCTING INSTALLATION
ACCESS, GUARD TOUR,
- LIVING ROOM
- BATHROOM
EARTHNING & LIGHTNING
Actual
START

Progress (%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

ARTMENT

MONITORING
FINISHING
PROG
M
Update : 09 Sep 15

LOCATION /
ROOM TYPE

ACMV
GRID LINE

NO.

AREA
APARTMENT

LEVEL 8

LEVEL

DESCRIPTION

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2

14

6/G

15

5a/D

16

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)
Fire/ service lift lobby
at basement to level
36 (service apartment)

17

5a/D

18

5/D

19

4d-H

RC Flat roof

20

5/C-G

Apartment corridor

21

4-7/C-H

Service apartment lift


lobby at level 2 to
level 36

Apt. unit (A1a-7a, B1a4a, C1a-2a)

A1

A2

A3

A4

A5

A6

COPPER PIPE
INSTALLATION
Actual
START

Progress
(%)

DRAIN PIPE
INSTALLATION
Actual
START

Progress
(%)

FLEXIBLE DUCT
INSTALLATION CONDUIT
INSTALLATION - LIVING
& WIRING
ROOM
Actual
START

Progress
(%)

Actual
START

Progress
(%)

FAN COIL UNIT (FCU) DUCT TYPE


Actual
START

Progress
(%)

EXHAUST
INSTALLATION
Actual
START

Progress
(%)

FAN COIL UNIT (FCU) CEILING CASSETTE TYPE


Actual
START

Progress
(%)

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

15

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19
20

APARTMENT

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

5a/D

LEVEL 10

LOCATION /
ROOM TYPE

ACMV
GRID LINE

NO.

AREA
APARTMENT

LEVEL 9

LEVEL

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14
5a/D
15

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

COPPER PIPE
INSTALLATION
Actual
START

Progress
(%)

DRAIN PIPE
INSTALLATION
Actual
START

Progress
(%)

FLEXIBLE DUCT
INSTALLATION CONDUIT
INSTALLATION - LIVING
& WIRING
ROOM
Actual
START

Progress
(%)

Actual
START

Progress
(%)

FAN COIL UNIT (FCU) DUCT TYPE


Actual
START

Progress
(%)

EXHAUST
INSTALLATION
Actual
START

Progress
(%)

FAN COIL UNIT (FCU) CEILING CASSETTE TYPE


Actual
START

Progress
(%)

AREA
APARTMENT

LEVEL
LEVEL 10

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19

APARTMENT

LEVEL 11

20

LOCATION /
ROOM TYPE

ACMV
GRID LINE

NO.

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20
1

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)
A1

COPPER PIPE
INSTALLATION
Actual
START

Progress
(%)

DRAIN PIPE
INSTALLATION
Actual
START

Progress
(%)

FLEXIBLE DUCT
INSTALLATION CONDUIT
INSTALLATION - LIVING
& WIRING
ROOM
Actual
START

Progress
(%)

Actual
START

Progress
(%)

FAN COIL UNIT (FCU) DUCT TYPE


Actual
START

Progress
(%)

EXHAUST
INSTALLATION
Actual
START

Progress
(%)

FAN COIL UNIT (FCU) CEILING CASSETTE TYPE


Actual
START

Progress
(%)

LOCATION /
ROOM TYPE

ACMV
GRID LINE

NO.

AREA
APARTMENT

LEVEL 12

LEVEL

DESCRIPTION

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

COPPER PIPE
INSTALLATION
Actual
START

Progress
(%)

DRAIN PIPE
INSTALLATION
Actual
START

Progress
(%)

FLEXIBLE DUCT
INSTALLATION CONDUIT
INSTALLATION - LIVING
& WIRING
ROOM
Actual
START

Progress
(%)

Actual
START

Progress
(%)

FAN COIL UNIT (FCU) DUCT TYPE


Actual
START

Progress
(%)

EXHAUST
INSTALLATION
Actual
START

Progress
(%)

FAN COIL UNIT (FCU) CEILING CASSETTE TYPE


Actual
START

Progress
(%)

FINISHING MONITORING APARTMENT

MONITORING PROG

LOCATION /
ROOM TYPE

FIRE FIGHTING
GRID LINE

NO.

AREA
APARTMENT

LEVEL 8

LEVEL

DESCRIPTION

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2

14

6/G

15

5a/D

16

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)
Fire/ service lift lobby
at basement to level
36 (service apartment)

17

5a/D

18

5/D

19

4d-H

RC Flat roof

20

5/C-G

Apartment corridor

21

4-7/C-H

Service apartment lift


lobby at level 2 to
level 36

Apt. unit (A1a-7a, B1a4a, C1a-2a)

A1

A2

A3

A4

A5

A6

AC UNIT - WALL
MOUNTED
Actual
START

Progress
(%)

GRILL INSTALLATION
Actual
START

Progress
(%)

VENTILATION GRILL LPAD & SSAD SHAFT


Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION
Actual
START

Progress
(%)

INSTALLATION
CONDUIT & WIRING FOR
FA & FI
Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION
Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

15

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19
20

APARTMENT

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

5a/D

LEVEL 10

LOCATION /
ROOM TYPE

FIRE FIGHTING
GRID LINE

NO.

AREA
APARTMENT

LEVEL 9

LEVEL

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14
5a/D
15

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

AC UNIT - WALL
MOUNTED
Actual
START

Progress
(%)

GRILL INSTALLATION
Actual
START

Progress
(%)

VENTILATION GRILL LPAD & SSAD SHAFT


Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION
Actual
START

Progress
(%)

INSTALLATION
CONDUIT & WIRING FOR
FA & FI
Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION
Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

AREA
APARTMENT

LEVEL
LEVEL 10

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19

APARTMENT

LEVEL 11

20

LOCATION /
ROOM TYPE

FIRE FIGHTING
GRID LINE

NO.

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20
1

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)
A1

AC UNIT - WALL
MOUNTED
Actual
START

Progress
(%)

GRILL INSTALLATION
Actual
START

Progress
(%)

VENTILATION GRILL LPAD & SSAD SHAFT


Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION
Actual
START

Progress
(%)

INSTALLATION
CONDUIT & WIRING FOR
FA & FI
Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION
Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

LOCATION /
ROOM TYPE

FIRE FIGHTING
GRID LINE

NO.

AREA
APARTMENT

LEVEL 12

LEVEL

DESCRIPTION

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

AC UNIT - WALL
MOUNTED
Actual
START

Progress
(%)

GRILL INSTALLATION
Actual
START

Progress
(%)

VENTILATION GRILL LPAD & SSAD SHAFT


Actual
START

Progress
(%)

HOSE REEL SYSTEM


PIPE INSTALLATION
Actual
START

Progress
(%)

INSTALLATION
CONDUIT & WIRING FOR
FA & FI
Actual
START

Progress
(%)

HOSE REEL DRUMSET


INSTALLATION
Actual
START

Progress
(%)

LANDING VALVE &


CANVAS HOSE
INSTALLATION
Actual
START

Progress
(%)

MONITORING PROG

PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYS
LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 8

LEVEL

DESCRIPTION
FIRE FIGHTING

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2

14

6/G

15

5a/D

16

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)
Fire/ service lift lobby
at basement to level
36 (service apartment)

17

5a/D

18

5/D

19

4d-H

RC Flat roof

20

5/C-G

Apartment corridor

21

4-7/C-H

Service apartment lift


lobby at level 2 to
level 36

Apt. unit (A1a-7a, B1a4a, C1a-2a)

A1

A2

A3

A4

A5

A6

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

FIREMAN INTERCOM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR SLAB
& CONCEAL PIPE IN
SHEARWALL / COLUMN
Actual
START

Progress
(%)

TRANFER PIPE
INSTALLATION
Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION
Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION
Actual
START

Progress
(%)

SANITARY PIPE
FITTING
Actual
START

Progress
(%)

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

15

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19
20

APARTMENT

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

5a/D

LEVEL 10

PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYS
LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 9

LEVEL

DESCRIPTION
FIRE FIGHTING

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14
5a/D
15

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

FIREMAN INTERCOM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR SLAB
& CONCEAL PIPE IN
SHEARWALL / COLUMN
Actual
START

Progress
(%)

TRANFER PIPE
INSTALLATION
Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION
Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION
Actual
START

Progress
(%)

SANITARY PIPE
FITTING
Actual
START

Progress
(%)

AREA
APARTMENT

LEVEL
LEVEL 10

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19

APARTMENT

LEVEL 11

20

PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYS
LOCATION /
ROOM TYPE

GRID LINE

NO.

DESCRIPTION
FIRE FIGHTING

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20
1

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)
A1

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

FIREMAN INTERCOM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR SLAB
& CONCEAL PIPE IN
SHEARWALL / COLUMN
Actual
START

Progress
(%)

TRANFER PIPE
INSTALLATION
Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION
Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION
Actual
START

Progress
(%)

SANITARY PIPE
FITTING
Actual
START

Progress
(%)

PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYS
LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 12

LEVEL

DESCRIPTION
FIRE FIGHTING

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

FIRE ALARM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

FIREMAN INTERCOM
ACCESSORIES
INSTALLATION
Actual
START

Progress
(%)

PREPARE OPENING /
SLEEVE AT FLOOR SLAB
& CONCEAL PIPE IN
SHEARWALL / COLUMN
Actual
START

Progress
(%)

TRANFER PIPE
INSTALLATION
Actual
START

Progress
(%)

DROPPER PIPE
INSTALLATION
Actual
START

Progress
(%)

HANGER PIPE
INSTALLATION
Actual
START

Progress
(%)

SANITARY PIPE
FITTING
Actual
START

Progress
(%)

MONITORING
FINISHING MONIT
PROG
Update : 09 Sep 15

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 8

LEVEL

RKS (COLD
DESCRIPTION
WATER, HOT WATER & SANITARY PLUMBING SYSTEM)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2

14

6/G

15

5a/D

16

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)
Fire/ service lift lobby
at basement to level
36 (service apartment)

17

5a/D

18

5/D

19

4d-H

RC Flat roof

20

5/C-G

Apartment corridor

21

4-7/C-H

Service apartment lift


lobby at level 2 to
level 36

Apt. unit (A1a-7a, B1a4a, C1a-2a)

A1

A2

A3

A4

A5

A6

AUTOMATED WASTE COLLECTION SYSTEM (AWCS)

COLD WATER PIPE


FITTING
Actual
START

Progress
(%)

HOT WATER PIPE


FITTING
Actual
START

Progress
(%)

VALVES & WATER


METER INSTALLATION
Actual
START

Progress
(%)

TRANSPORT
PIPE &
FITTING
Actual
START

Progress
(%)

STAINLESS
STEEL
PIPING &
FITTING
Actual
START

HOPPER DOOR
INSTALLATION
Progress
(%)

Actual
START

Progress
(%)

OPENING CLEANING
Actual
START

Progress
(%)

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

15

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19
20

APARTMENT

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

5a/D

LEVEL 10

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 9

LEVEL

RKS (COLD
DESCRIPTION
WATER, HOT WATER & SANITARY PLUMBING SYSTEM)

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14
5a/D
15

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

AUTOMATED WASTE COLLECTION SYSTEM (AWCS)

COLD WATER PIPE


FITTING
Actual
START

Progress
(%)

HOT WATER PIPE


FITTING
Actual
START

Progress
(%)

VALVES & WATER


METER INSTALLATION
Actual
START

Progress
(%)

TRANSPORT
PIPE &
FITTING
Actual
START

Progress
(%)

STAINLESS
STEEL
PIPING &
FITTING
Actual
START

HOPPER DOOR
INSTALLATION
Progress
(%)

Actual
START

Progress
(%)

OPENING CLEANING
Actual
START

Progress
(%)

AREA
APARTMENT

LEVEL
LEVEL 10

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19

APARTMENT

LEVEL 11

20

LOCATION /
ROOM TYPE

GRID LINE

NO.

RKS (COLD
DESCRIPTION
WATER, HOT WATER & SANITARY PLUMBING SYSTEM)

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20
1

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)
A1

AUTOMATED WASTE COLLECTION SYSTEM (AWCS)

COLD WATER PIPE


FITTING
Actual
START

Progress
(%)

HOT WATER PIPE


FITTING
Actual
START

Progress
(%)

VALVES & WATER


METER INSTALLATION
Actual
START

Progress
(%)

TRANSPORT
PIPE &
FITTING
Actual
START

Progress
(%)

STAINLESS
STEEL
PIPING &
FITTING
Actual
START

HOPPER DOOR
INSTALLATION
Progress
(%)

Actual
START

Progress
(%)

OPENING CLEANING
Actual
START

Progress
(%)

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 12

LEVEL

RKS (COLD
DESCRIPTION
WATER, HOT WATER & SANITARY PLUMBING SYSTEM)

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

AUTOMATED WASTE COLLECTION SYSTEM (AWCS)

COLD WATER PIPE


FITTING
Actual
START

Progress
(%)

HOT WATER PIPE


FITTING
Actual
START

Progress
(%)

VALVES & WATER


METER INSTALLATION
Actual
START

Progress
(%)

TRANSPORT
PIPE &
FITTING
Actual
START

Progress
(%)

STAINLESS
STEEL
PIPING &
FITTING
Actual
START

HOPPER DOOR
INSTALLATION
Progress
(%)

Actual
START

Progress
(%)

OPENING CLEANING
Actual
START

Progress
(%)

FINISHING MONITORING APARTMENT

LOCATION /
ROOM TYPE

RAINWATER DOWN PIPE


GRID LINE

NO.

AREA
APARTMENT

LEVEL 8

LEVEL

DESCRIPTION

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2

14

6/G

15

5a/D

16

MONITORING PROG

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)
Fire/ service lift lobby
at basement to level
36 (service apartment)

17

5a/D

18

5/D

19

4d-H

RC Flat roof

20

5/C-G

Apartment corridor

21

4-7/C-H

Service apartment lift


lobby at level 2 to
level 36

Apt. unit (A1a-7a, B1a4a, C1a-2a)

A1

A2

A3

A4

A5

A6

PIPE INSTALLATION
Actual
START

Progress
(%)

BRACKET INSTALLATION
Actual
START

Progress
(%)

GROUTING PIPE
Actual
START

Progress
(%)

OUTLET & FLOOR TRAP


INSTALLATION
Actual
START

Progress
(%)

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

15

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19
20

APARTMENT

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

5a/D

LEVEL 10

LOCATION /
ROOM TYPE

RAINWATER DOWN PIPE


GRID LINE

NO.

AREA
APARTMENT

LEVEL 9

LEVEL

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14
5a/D
15

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

PIPE INSTALLATION
Actual
START

Progress
(%)

BRACKET INSTALLATION
Actual
START

Progress
(%)

GROUTING PIPE
Actual
START

Progress
(%)

OUTLET & FLOOR TRAP


INSTALLATION
Actual
START

Progress
(%)

AREA
APARTMENT

LEVEL
LEVEL 10

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19

APARTMENT

LEVEL 11

20

LOCATION /
ROOM TYPE

RAINWATER DOWN PIPE


GRID LINE

NO.

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20
1

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)
A1

PIPE INSTALLATION
Actual
START

Progress
(%)

BRACKET INSTALLATION
Actual
START

Progress
(%)

GROUTING PIPE
Actual
START

Progress
(%)

OUTLET & FLOOR TRAP


INSTALLATION
Actual
START

Progress
(%)

LOCATION /
ROOM TYPE

RAINWATER DOWN PIPE


GRID LINE

NO.

AREA
APARTMENT

LEVEL 12

LEVEL

DESCRIPTION

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

PIPE INSTALLATION
Actual
START

Progress
(%)

BRACKET INSTALLATION
Actual
START

Progress
(%)

GROUTING PIPE
Actual
START

Progress
(%)

OUTLET & FLOOR TRAP


INSTALLATION
Actual
START

Progress
(%)

MO
LOCATION /
ROOM TYPE

INTERNAL UNIT WORKS (BATHROOM, LIVING ROOM, BEDROOM, KITCHEN)


GRID LINE

NO.

AREA
APARTMENT

LEVEL 8

LEVEL

DESCRIPTION

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2

14

6/G

15

5a/D

16

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)
Fire/ service lift lobby
at basement to level
36 (service apartment)

17

5a/D

18

5/D

19

4d-H

RC Flat roof

20

5/C-G

Apartment corridor

21

4-7/C-H

Service apartment lift


lobby at level 2 to
level 36

Apt. unit (A1a-7a, B1a4a, C1a-2a)

A1

A2

A3

A4

A5

A6

STRUCTURE WORKS
ADJUSTMENT
Actual
START

Progress
(%)

WALL - BLOCKWALL
WATERPROOFING ON
STAIRCASE, M&E SHAFT WET AREA + PONDING
& RISER
TEST + SCREEDING
Actual
START

Progress
(%)

Actual
START

Progress
(%)

WALL - SKIMCOAT /
PLASTERING
Actual
START

Progress
(%)

DOOR - SOLID TIMBER


DOOR SUB FRAME
Actual
START

Progress
(%)

WINDOW - SUB
FRAME
Actual
START

Progress
(%)

SLIDING DOOR - SUB


FRAME
Actual
START

Progress
(%)

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

15

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19
20

APARTMENT

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

5a/D

LEVEL 10

LOCATION /
ROOM TYPE

INTERNAL UNIT WORKS (BATHROOM, LIVING ROOM, BEDROOM, KITCHEN)


GRID LINE

NO.

AREA
APARTMENT

LEVEL 9

LEVEL

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14
5a/D
15

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

STRUCTURE WORKS
ADJUSTMENT
Actual
START

Progress
(%)

WALL - BLOCKWALL
WATERPROOFING ON
STAIRCASE, M&E SHAFT WET AREA + PONDING
& RISER
TEST + SCREEDING
Actual
START

Progress
(%)

Actual
START

Progress
(%)

WALL - SKIMCOAT /
PLASTERING
Actual
START

Progress
(%)

DOOR - SOLID TIMBER


DOOR SUB FRAME
Actual
START

Progress
(%)

WINDOW - SUB
FRAME
Actual
START

Progress
(%)

SLIDING DOOR - SUB


FRAME
Actual
START

Progress
(%)

AREA
APARTMEN

LEVELLEVEL 10

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19

APARTMENT

LEVEL 11

20

LOCATION /
ROOM TYPE

INTERNAL UNIT WORKS (BATHROOM, LIVING ROOM, BEDROOM, KITCHEN)


GRID LINE

NO.

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20
1

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)
A1

STRUCTURE WORKS
ADJUSTMENT
Actual
START

Progress
(%)

WALL - BLOCKWALL
WATERPROOFING ON
STAIRCASE, M&E SHAFT WET AREA + PONDING
& RISER
TEST + SCREEDING
Actual
START

Progress
(%)

Actual
START

Progress
(%)

WALL - SKIMCOAT /
PLASTERING
Actual
START

Progress
(%)

DOOR - SOLID TIMBER


DOOR SUB FRAME
Actual
START

Progress
(%)

WINDOW - SUB
FRAME
Actual
START

Progress
(%)

SLIDING DOOR - SUB


FRAME
Actual
START

Progress
(%)

LOCATION /
ROOM TYPE

INTERNAL UNIT WORKS (BATHROOM, LIVING ROOM, BEDROOM, KITCHEN)


GRID LINE

NO.

AREA
APARTMENT

LEVEL 12

LEVEL

DESCRIPTION

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

STRUCTURE WORKS
ADJUSTMENT
Actual
START

Progress
(%)

WALL - BLOCKWALL
WATERPROOFING ON
STAIRCASE, M&E SHAFT WET AREA + PONDING
& RISER
TEST + SCREEDING
Actual
START

Progress
(%)

Actual
START

Progress
(%)

WALL - SKIMCOAT /
PLASTERING
Actual
START

Progress
(%)

DOOR - SOLID TIMBER


DOOR SUB FRAME
Actual
START

Progress
(%)

WINDOW - SUB
FRAME
Actual
START

Progress
(%)

SLIDING DOOR - SUB


FRAME
Actual
START

Progress
(%)

MONITORING PROGRESS FINISHING - APARTMENT

MO

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 8

LEVEL

DESCRIPTION

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2

14

6/G

15

5a/D

16

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)
Fire/ service lift lobby
at basement to level
36 (service apartment)

17

5a/D

18

5/D

19

4d-H

RC Flat roof

20

5/C-G

Apartment corridor

21

4-7/C-H

Service apartment lift


lobby at level 2 to
level 36

Apt. unit (A1a-7a, B1a4a, C1a-2a)

A1

A2

A3

A4

A5

A6

LOUVRE ALLUMINIUM
- SUB FRAME
Actual
START

Progress
(%)

WINDOW - FRAME
Actual
START

Progress
(%)

WINDOW LAMINATED GLASS


WINDOW FIX PANEL
Actual
START

Progress
(%)

SLIDING DOOR FRAME


Actual
START

Progress
(%)

SLIDING DOOR LAMINATED GLASS


SLIDING DOOR WT FIX
PANEL
Actual
START

Progress
(%)

WALL - ACCOUSTIC
TREATMENT
Actual
START

Progress
(%)

WALL TILE - HT
Actual
START

Progress
(%)

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

15

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19
20

APARTMENT

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

5a/D

LEVEL 10

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 9

LEVEL

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14
5a/D
15

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

LOUVRE ALLUMINIUM
- SUB FRAME
Actual
START

Progress
(%)

WINDOW - FRAME
Actual
START

Progress
(%)

WINDOW LAMINATED GLASS


WINDOW FIX PANEL
Actual
START

Progress
(%)

SLIDING DOOR FRAME


Actual
START

Progress
(%)

SLIDING DOOR LAMINATED GLASS


SLIDING DOOR WT FIX
PANEL
Actual
START

Progress
(%)

WALL - ACCOUSTIC
TREATMENT
Actual
START

Progress
(%)

WALL TILE - HT
Actual
START

Progress
(%)

AREA
APARTMEN

LEVELLEVEL 10

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19

APARTMENT

LEVEL 11

20

LOCATION /
ROOM TYPE

GRID LINE

NO.

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20
1

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)
A1

LOUVRE ALLUMINIUM
- SUB FRAME
Actual
START

Progress
(%)

WINDOW - FRAME
Actual
START

Progress
(%)

WINDOW LAMINATED GLASS


WINDOW FIX PANEL
Actual
START

Progress
(%)

SLIDING DOOR FRAME


Actual
START

Progress
(%)

SLIDING DOOR LAMINATED GLASS


SLIDING DOOR WT FIX
PANEL
Actual
START

Progress
(%)

WALL - ACCOUSTIC
TREATMENT
Actual
START

Progress
(%)

WALL TILE - HT
Actual
START

Progress
(%)

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 12

LEVEL

DESCRIPTION

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

LOUVRE ALLUMINIUM
- SUB FRAME
Actual
START

Progress
(%)

WINDOW - FRAME
Actual
START

Progress
(%)

WINDOW LAMINATED GLASS


WINDOW FIX PANEL
Actual
START

Progress
(%)

SLIDING DOOR FRAME


Actual
START

Progress
(%)

SLIDING DOOR LAMINATED GLASS


SLIDING DOOR WT FIX
PANEL
Actual
START

Progress
(%)

WALL - ACCOUSTIC
TREATMENT
Actual
START

Progress
(%)

WALL TILE - HT
Actual
START

Progress
(%)

MO
Update : 09 Sep 15

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 8

LEVEL

DESCRIPTION

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2

14

6/G

15

5a/D

16

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)
Fire/ service lift lobby
at basement to level
36 (service apartment)

17

5a/D

18

5/D

19

4d-H

RC Flat roof

20

5/C-G

Apartment corridor

21

4-7/C-H

Service apartment lift


lobby at level 2 to
level 36

Apt. unit (A1a-7a, B1a4a, C1a-2a)

A1

A2

A3

A4

A5

A6

WALL - FEATURE WALL


TILE - HT - BATHROOM
Actual
START

Progress
(%)

CEILING FRAME
Actual
START

Progress
(%)

PAINTING WALL
BASED - EMULSION
PAINT FINISH
Actual
START

Progress
(%)

FLOOR SCREEDING
Actual
START

Progress
(%)

FLOOR TILE - HT
Actual
START

Progress
(%)

FLOOR SKIRTING - HT

KITCHEN - WORKTOP

Actual
START

Actual
START

Progress
(%)

Progress
(%)

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

15

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19
20

APARTMENT

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

5a/D

LEVEL 10

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 9

LEVEL

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14
5a/D
15

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

WALL - FEATURE WALL


TILE - HT - BATHROOM
Actual
START

Progress
(%)

CEILING FRAME
Actual
START

Progress
(%)

PAINTING WALL
BASED - EMULSION
PAINT FINISH
Actual
START

Progress
(%)

FLOOR SCREEDING
Actual
START

Progress
(%)

FLOOR TILE - HT
Actual
START

Progress
(%)

FLOOR SKIRTING - HT

KITCHEN - WORKTOP

Actual
START

Actual
START

Progress
(%)

Progress
(%)

AREA
APARTMEN

LEVELLEVEL 10

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19

APARTMENT

LEVEL 11

20

LOCATION /
ROOM TYPE

GRID LINE

NO.

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20
1

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)
A1

WALL - FEATURE WALL


TILE - HT - BATHROOM
Actual
START

Progress
(%)

CEILING FRAME
Actual
START

Progress
(%)

PAINTING WALL
BASED - EMULSION
PAINT FINISH
Actual
START

Progress
(%)

FLOOR SCREEDING
Actual
START

Progress
(%)

FLOOR TILE - HT
Actual
START

Progress
(%)

FLOOR SKIRTING - HT

KITCHEN - WORKTOP

Actual
START

Actual
START

Progress
(%)

Progress
(%)

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 12

LEVEL

DESCRIPTION

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

WALL - FEATURE WALL


TILE - HT - BATHROOM
Actual
START

Progress
(%)

CEILING FRAME
Actual
START

Progress
(%)

PAINTING WALL
BASED - EMULSION
PAINT FINISH
Actual
START

Progress
(%)

FLOOR SCREEDING
Actual
START

Progress
(%)

FLOOR TILE - HT
Actual
START

Progress
(%)

FLOOR SKIRTING - HT

KITCHEN - WORKTOP

Actual
START

Actual
START

Progress
(%)

Progress
(%)

MO
LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 8

LEVEL

DESCRIPTION

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2

14

6/G

15

5a/D

16

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)
Fire/ service lift lobby
at basement to level
36 (service apartment)

17

5a/D

18

5/D

19

4d-H

RC Flat roof

20

5/C-G

Apartment corridor

21

4-7/C-H

Service apartment lift


lobby at level 2 to
level 36

Apt. unit (A1a-7a, B1a4a, C1a-2a)

A1

A2

A3

A4

A5

A6

BATHROOM - VANITY
TOP
Actual
START

Progress
(%)

CEILING BOARD
Actual
START

Progress
(%)

PAINTING CEILING
BASED - EMULSION
PAINT FINISH
Actual
START

Progress
(%)

DOOR - SOLID TIMBER


DOOR FRAME
Actual
START

Progress
(%)

DOOR - SOLID TIMBER


DOOR LEAVE
Actual
START

Progress
(%)

LOUVRE ALLUMINIUM
Actual
START

Progress
(%)

RAILING BALCONY STEEL + LAMINATED


GLASS RAILING
Actual
START

Progress
(%)

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

15

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19
20

APARTMENT

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

5a/D

LEVEL 10

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 9

LEVEL

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14
5a/D
15

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

BATHROOM - VANITY
TOP
Actual
START

Progress
(%)

CEILING BOARD
Actual
START

Progress
(%)

PAINTING CEILING
BASED - EMULSION
PAINT FINISH
Actual
START

Progress
(%)

DOOR - SOLID TIMBER


DOOR FRAME
Actual
START

Progress
(%)

DOOR - SOLID TIMBER


DOOR LEAVE
Actual
START

Progress
(%)

LOUVRE ALLUMINIUM
Actual
START

Progress
(%)

RAILING BALCONY STEEL + LAMINATED


GLASS RAILING
Actual
START

Progress
(%)

AREA
APARTMEN

LEVELLEVEL 10

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19

APARTMENT

LEVEL 11

20

LOCATION /
ROOM TYPE

GRID LINE

NO.

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20
1

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)
A1

BATHROOM - VANITY
TOP
Actual
START

Progress
(%)

CEILING BOARD
Actual
START

Progress
(%)

PAINTING CEILING
BASED - EMULSION
PAINT FINISH
Actual
START

Progress
(%)

DOOR - SOLID TIMBER


DOOR FRAME
Actual
START

Progress
(%)

DOOR - SOLID TIMBER


DOOR LEAVE
Actual
START

Progress
(%)

LOUVRE ALLUMINIUM
Actual
START

Progress
(%)

RAILING BALCONY STEEL + LAMINATED


GLASS RAILING
Actual
START

Progress
(%)

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 12

LEVEL

DESCRIPTION

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

BATHROOM - VANITY
TOP
Actual
START

Progress
(%)

CEILING BOARD
Actual
START

Progress
(%)

PAINTING CEILING
BASED - EMULSION
PAINT FINISH
Actual
START

Progress
(%)

DOOR - SOLID TIMBER


DOOR FRAME
Actual
START

Progress
(%)

DOOR - SOLID TIMBER


DOOR LEAVE
Actual
START

Progress
(%)

LOUVRE ALLUMINIUM
Actual
START

Progress
(%)

RAILING BALCONY STEEL + LAMINATED


GLASS RAILING
Actual
START

Progress
(%)

FINISHING MONITORING APARTMENT

MO

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 8

LEVEL

DESCRIPTION

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2

14

6/G

15

5a/D

16

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)
Fire/ service lift lobby
at basement to level
36 (service apartment)

17

5a/D

18

5/D

19

4d-H

RC Flat roof

20

5/C-G

Apartment corridor

21

4-7/C-H

Service apartment lift


lobby at level 2 to
level 36

Apt. unit (A1a-7a, B1a4a, C1a-2a)

A1

A2

A3

A4

A5

A6

IRONMONGERY
Actual
START

Progress
(%)

PAINTING WALL FINAL


PAINTING CEILING
- EMULSION PAINT
FINAL - EMULSION PAINT
FINISH
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

TIMBER FLOORING WD
Actual
START

Progress
(%)

SKIRTING - TIMBER
Actual
START

Progress
(%)

TRESHOLD ALLUMINIUM
Actual
START

Progress
(%)

KITCHEN - BACK
PAINTED GLASS
Actual
START

Progress
(%)

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

15

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19
20

APARTMENT

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

5a/D

LEVEL 10

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 9

LEVEL

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14
5a/D
15

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

IRONMONGERY
Actual
START

Progress
(%)

PAINTING WALL FINAL


PAINTING CEILING
- EMULSION PAINT
FINAL - EMULSION PAINT
FINISH
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

TIMBER FLOORING WD
Actual
START

Progress
(%)

SKIRTING - TIMBER
Actual
START

Progress
(%)

TRESHOLD ALLUMINIUM
Actual
START

Progress
(%)

KITCHEN - BACK
PAINTED GLASS
Actual
START

Progress
(%)

AREA
APARTMEN

LEVELLEVEL 10

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19

APARTMENT

LEVEL 11

20

LOCATION /
ROOM TYPE

GRID LINE

NO.

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20
1

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)
A1

IRONMONGERY
Actual
START

Progress
(%)

PAINTING WALL FINAL


PAINTING CEILING
- EMULSION PAINT
FINAL - EMULSION PAINT
FINISH
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

TIMBER FLOORING WD
Actual
START

Progress
(%)

SKIRTING - TIMBER
Actual
START

Progress
(%)

TRESHOLD ALLUMINIUM
Actual
START

Progress
(%)

KITCHEN - BACK
PAINTED GLASS
Actual
START

Progress
(%)

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 12

LEVEL

DESCRIPTION

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

IRONMONGERY
Actual
START

Progress
(%)

PAINTING WALL FINAL


PAINTING CEILING
- EMULSION PAINT
FINAL - EMULSION PAINT
FINISH
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

TIMBER FLOORING WD
Actual
START

Progress
(%)

SKIRTING - TIMBER
Actual
START

Progress
(%)

TRESHOLD ALLUMINIUM
Actual
START

Progress
(%)

KITCHEN - BACK
PAINTED GLASS
Actual
START

Progress
(%)

MO
Update : 09 Sep 15

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 8

LEVEL

DESCRIPTION

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2

14

6/G

15

5a/D

16

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)
Fire/ service lift lobby
at basement to level
36 (service apartment)

17

5a/D

18

5/D

19

4d-H

RC Flat roof

20

5/C-G

Apartment corridor

21

4-7/C-H

Service apartment lift


lobby at level 2 to
level 36

Apt. unit (A1a-7a, B1a4a, C1a-2a)

A1

A2

A3

A4

A5

A6

BATHROOM SANITARY FITTING


Actual
START

Progress
(%)

BATHROOM TEMPERED CLEAR GLASS


SHOWER SCREEN
Actual
START

Progress
(%)

BATHROOM - MIRROR
Actual
START

Progress
(%)

ID - KITCHEN CABINET & SHELF


Actual
START

Progress
(%)

ID - KITCHEN APPLIANCES
Actual
START

Progress
(%)

ID - BATHROOM CABINET & SHELF


Actual
START

Progress
(%)

ID - BEDROOM FURNITURE &


APPLIANCES
Actual
START

Progress
(%)

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

15

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19
20

APARTMENT

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

5a/D

LEVEL 10

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 9

LEVEL

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14
5a/D
15

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

BATHROOM SANITARY FITTING


Actual
START

Progress
(%)

BATHROOM TEMPERED CLEAR GLASS


SHOWER SCREEN
Actual
START

Progress
(%)

BATHROOM - MIRROR
Actual
START

Progress
(%)

ID - KITCHEN CABINET & SHELF


Actual
START

Progress
(%)

ID - KITCHEN APPLIANCES
Actual
START

Progress
(%)

ID - BATHROOM CABINET & SHELF


Actual
START

Progress
(%)

ID - BEDROOM FURNITURE &


APPLIANCES
Actual
START

Progress
(%)

AREA
APARTMEN

LEVELLEVEL 10

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19

APARTMENT

LEVEL 11

20

LOCATION /
ROOM TYPE

GRID LINE

NO.

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20
1

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)
A1

BATHROOM SANITARY FITTING


Actual
START

Progress
(%)

BATHROOM TEMPERED CLEAR GLASS


SHOWER SCREEN
Actual
START

Progress
(%)

BATHROOM - MIRROR
Actual
START

Progress
(%)

ID - KITCHEN CABINET & SHELF


Actual
START

Progress
(%)

ID - KITCHEN APPLIANCES
Actual
START

Progress
(%)

ID - BATHROOM CABINET & SHELF


Actual
START

Progress
(%)

ID - BEDROOM FURNITURE &


APPLIANCES
Actual
START

Progress
(%)

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 12

LEVEL

DESCRIPTION

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

BATHROOM SANITARY FITTING


Actual
START

Progress
(%)

BATHROOM TEMPERED CLEAR GLASS


SHOWER SCREEN
Actual
START

Progress
(%)

BATHROOM - MIRROR
Actual
START

Progress
(%)

ID - KITCHEN CABINET & SHELF


Actual
START

Progress
(%)

ID - KITCHEN APPLIANCES
Actual
START

Progress
(%)

ID - BATHROOM CABINET & SHELF


Actual
START

Progress
(%)

ID - BEDROOM FURNITURE &


APPLIANCES
Actual
START

Progress
(%)

MO
LOCATION /
ROOM TYPE

LIFT LOBBY & APARTMENT CORRIDOR


GRID LINE

NO.

AREA
APARTMENT

LEVEL 8

LEVEL

DESCRIPTION

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2

14

6/G

15

5a/D

16

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)
Fire/ service lift lobby
at basement to level
36 (service apartment)

17

5a/D

18

5/D

19

4d-H

RC Flat roof

20

5/C-G

Apartment corridor

21

4-7/C-H

Service apartment lift


lobby at level 2 to
level 36

Apt. unit (A1a-7a, B1a4a, C1a-2a)

A1

A2

A3

A4

A5

A6

ID - LIVING ROOM FURNITURE &


APPLIANCES
Actual
START

Progress
(%)

WALL SKIMCOAT
Actual
START

Progress
(%)

CEILING FINISHES FRAME


Actual
START

Progress
(%)

WALL EMULSION
PAINT - BASED
Actual
START

Progress
(%)

FLOOR FINISHES HOMOGENEOUS TILE


Actual
START

Progress
(%)

SKIRTING HOMOGENOUS TILE


Actual
START

Progress
(%)

CEILING FINISHES GYPSUM BOARD


Actual
START

Progress
(%)

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

15

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19
20

APARTMENT

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

5a/D

LEVEL 10

LOCATION /
ROOM TYPE

LIFT LOBBY & APARTMENT CORRIDOR


GRID LINE

NO.

AREA
APARTMENT

LEVEL 9

LEVEL

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14
5a/D
15

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

ID - LIVING ROOM FURNITURE &


APPLIANCES
Actual
START

Progress
(%)

WALL SKIMCOAT
Actual
START

Progress
(%)

CEILING FINISHES FRAME


Actual
START

Progress
(%)

WALL EMULSION
PAINT - BASED
Actual
START

Progress
(%)

FLOOR FINISHES HOMOGENEOUS TILE


Actual
START

Progress
(%)

SKIRTING HOMOGENOUS TILE


Actual
START

Progress
(%)

CEILING FINISHES GYPSUM BOARD


Actual
START

Progress
(%)

AREA
APARTMEN

LEVELLEVEL 10

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19

APARTMENT

LEVEL 11

20

LOCATION /
ROOM TYPE

LIFT LOBBY & APARTMENT CORRIDOR


GRID LINE

NO.

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20
1

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)
A1

ID - LIVING ROOM FURNITURE &


APPLIANCES
Actual
START

Progress
(%)

WALL SKIMCOAT
Actual
START

Progress
(%)

CEILING FINISHES FRAME


Actual
START

Progress
(%)

WALL EMULSION
PAINT - BASED
Actual
START

Progress
(%)

FLOOR FINISHES HOMOGENEOUS TILE


Actual
START

Progress
(%)

SKIRTING HOMOGENOUS TILE


Actual
START

Progress
(%)

CEILING FINISHES GYPSUM BOARD


Actual
START

Progress
(%)

LOCATION /
ROOM TYPE

LIFT LOBBY & APARTMENT CORRIDOR


GRID LINE

NO.

AREA
APARTMENT

LEVEL 12

LEVEL

DESCRIPTION

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

ID - LIVING ROOM FURNITURE &


APPLIANCES
Actual
START

Progress
(%)

WALL SKIMCOAT
Actual
START

Progress
(%)

CEILING FINISHES FRAME


Actual
START

Progress
(%)

WALL EMULSION
PAINT - BASED
Actual
START

Progress
(%)

FLOOR FINISHES HOMOGENEOUS TILE


Actual
START

Progress
(%)

SKIRTING HOMOGENOUS TILE


Actual
START

Progress
(%)

CEILING FINISHES GYPSUM BOARD


Actual
START

Progress
(%)

FINISHING MONITORING APARTMENT


LOCATION /
ROOM TYPE

M&E RISER AND ROOM (SSAD, HR, ELECT RISER, CW RISER, LPAD, TEL, ELV, WR & AWCS - 10 ROOMS & RISERS)
GRID LINE

NO.

AREA
APARTMENT

LEVEL 8

LEVEL

DESCRIPTION

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2

14

6/G

15

5a/D

16

MO

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)
Fire/ service lift lobby
at basement to level
36 (service apartment)

17

5a/D

18

5/D

19

4d-H

RC Flat roof

20

5/C-G

Apartment corridor

21

4-7/C-H

Service apartment lift


lobby at level 2 to
level 36

Apt. unit (A1a-7a, B1a4a, C1a-2a)

A1

A2

A3

A4

A5

A6

CEILING FINISHES FINISH EMULSION PAINT


Actual
START

Progress
(%)

WALL EMULSION
PAINT - FINAL
Actual
START

Progress
(%)

BACK PAINTED GLASS


ON LIFT LOBBY
Actual
START

Progress
(%)

WALL FINISHES RENDER / SKIM COAT


Actual
START

Progress
(%)

CEILING FINISHES RENDER / SKIM COAT


Actual
START

Progress
(%)

CEMENT SAND SCREED


Actual
START

Progress
(%)

HOMOGENOUS TILE
FOR AWCS
Actual
START

Progress
(%)

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

15

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19
20

APARTMENT

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

5a/D

LEVEL 10

LOCATION /
ROOM TYPE

M&E RISER AND ROOM (SSAD, HR, ELECT RISER, CW RISER, LPAD, TEL, ELV, WR & AWCS - 10 ROOMS & RISERS)
GRID LINE

NO.

AREA
APARTMENT

LEVEL 9

LEVEL

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14
5a/D
15

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

CEILING FINISHES FINISH EMULSION PAINT


Actual
START

Progress
(%)

WALL EMULSION
PAINT - FINAL
Actual
START

Progress
(%)

BACK PAINTED GLASS


ON LIFT LOBBY
Actual
START

Progress
(%)

WALL FINISHES RENDER / SKIM COAT


Actual
START

Progress
(%)

CEILING FINISHES RENDER / SKIM COAT


Actual
START

Progress
(%)

CEMENT SAND SCREED


Actual
START

Progress
(%)

HOMOGENOUS TILE
FOR AWCS
Actual
START

Progress
(%)

AREA
APARTMEN

LEVELLEVEL 10

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19

APARTMENT

LEVEL 11

20

LOCATION /
ROOM TYPE

M&E RISER AND ROOM (SSAD, HR, ELECT RISER, CW RISER, LPAD, TEL, ELV, WR & AWCS - 10 ROOMS & RISERS)
GRID LINE

NO.

DESCRIPTION

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20
1

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)
A1

CEILING FINISHES FINISH EMULSION PAINT


Actual
START

Progress
(%)

WALL EMULSION
PAINT - FINAL
Actual
START

Progress
(%)

BACK PAINTED GLASS


ON LIFT LOBBY
Actual
START

Progress
(%)

WALL FINISHES RENDER / SKIM COAT


Actual
START

Progress
(%)

CEILING FINISHES RENDER / SKIM COAT


Actual
START

Progress
(%)

CEMENT SAND SCREED


Actual
START

Progress
(%)

HOMOGENOUS TILE
FOR AWCS
Actual
START

Progress
(%)

LOCATION /
ROOM TYPE

M&E RISER AND ROOM (SSAD, HR, ELECT RISER, CW RISER, LPAD, TEL, ELV, WR & AWCS - 10 ROOMS & RISERS)
GRID LINE

NO.

AREA
APARTMENT

LEVEL 12

LEVEL

DESCRIPTION

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

CEILING FINISHES FINISH EMULSION PAINT


Actual
START

Progress
(%)

WALL EMULSION
PAINT - FINAL
Actual
START

Progress
(%)

BACK PAINTED GLASS


ON LIFT LOBBY
Actual
START

Progress
(%)

WALL FINISHES RENDER / SKIM COAT


Actual
START

Progress
(%)

CEILING FINISHES RENDER / SKIM COAT


Actual
START

Progress
(%)

CEMENT SAND SCREED


Actual
START

Progress
(%)

HOMOGENOUS TILE
FOR AWCS
Actual
START

Progress
(%)

MO
Update : 09 Sep 15

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 8

LEVEL

W RISER,
DESCRIPTION
LPAD, TEL, ELV, WR & AWCS - 10 ROOMS & RISERS)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2

14

6/G

15

5a/D

16

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)
Fire/ service lift lobby
at basement to level
36 (service apartment)

17

5a/D

18

5/D

19

4d-H

RC Flat roof

20

5/C-G

Apartment corridor

21

4-7/C-H

Service apartment lift


lobby at level 2 to
level 36

Apt. unit (A1a-7a, B1a4a, C1a-2a)

A1

A2

A3

A4

A5

A6

DOOR FRAME
Actual
START

Progress
(%)

DOOR LEAVE
Actual
START

Progress
(%)

CEILING FINISHES PAINTING


Actual
START

Progress
(%)

WALL FINISHING PAINTING


Actual
START

Progress
(%)

IRONMONGERY
Actual
START

Progress
(%)

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

15

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19
20

APARTMENT

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

5a/D

LEVEL 10

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 9

LEVEL

W RISER,
DESCRIPTION
LPAD, TEL, ELV, WR & AWCS - 10 ROOMS & RISERS)

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14
5a/D
15

Escape staircase S3
(basement to level 34)
Escape staircase S4
(basem.t to lower RC
flat roof)

DOOR FRAME
Actual
START

Progress
(%)

DOOR LEAVE
Actual
START

Progress
(%)

CEILING FINISHES PAINTING


Actual
START

Progress
(%)

WALL FINISHING PAINTING


Actual
START

Progress
(%)

IRONMONGERY
Actual
START

Progress
(%)

AREA
APARTMEN

LEVELLEVEL 10

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D
17
5/D
18
19

APARTMENT

LEVEL 11

20

LOCATION /
ROOM TYPE

GRID LINE

NO.

W RISER,
DESCRIPTION
LPAD, TEL, ELV, WR & AWCS - 10 ROOMS & RISERS)

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

A1

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20
1

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)
A1

DOOR FRAME
Actual
START

Progress
(%)

DOOR LEAVE
Actual
START

Progress
(%)

CEILING FINISHES PAINTING


Actual
START

Progress
(%)

WALL FINISHING PAINTING


Actual
START

Progress
(%)

IRONMONGERY
Actual
START

Progress
(%)

LOCATION /
ROOM TYPE

GRID LINE

NO.

AREA
APARTMENT

LEVEL 12

LEVEL

W RISER,
DESCRIPTION
LPAD, TEL, ELV, WR & AWCS - 10 ROOMS & RISERS)

A2

A3

A4

A5

A6

A7

B1

B2

10

B3

11

B4

12

C1

13

C2
6/G

14

Escape staircase S3
(basement to level 34)

15

Escape staircase S4
(basem.t to lower RC
flat roof)

16

Fire/ service lift lobby


1a/B-C at basement to level
19 (hotel)

5a/D

5a/D
17
5/D
18
19
20

5/C-G
4-7/C-H

Fire/ service lift lobby


at basement to level
36 (service apartment)
Service apartment lift
lobby at level 2 to
level 36
Apartment corridor
Apartment units (A1-7,
B1-4, C1-2)

DOOR FRAME
Actual
START

Progress
(%)

DOOR LEAVE
Actual
START

Progress
(%)

CEILING FINISHES PAINTING


Actual
START

Progress
(%)

WALL FINISHING PAINTING


Actual
START

Progress
(%)

IRONMONGERY
Actual
START

Progress
(%)

MONITOR

LEVEL 8

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K
D- K

18

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

J -K

1/A

Escape staircase S1
(basement to level 20)

1/G

Escape staircase S2
(basement to level 19)

2/C

Hotel lift lobby at level 3 to


level 18

1a/B

Linen room

1/C

Store

1a/C

Tel/IT

1a/G

Smoke lobby

2/B, 1-2a/B

Balcony

1a-2/B-H

Hotel corridor

1-2a/B-M

Hotel room 1-25

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

WALL BLOCKWALL

Actual
START

Progress
(%)

SLIDING DOOR - SUB


FRAME

Actual
START

Progress
(%)

DOOR ENTRANCE
SOLID TIMBER - SUB
FRAME
Actual
START

Progress
(%)

WINDOW - SUB
FRAME

Actual
START

Progress
(%)

WALL SKIMCOAT

Actual
START

Progress
(%)

WATERPROOFING ON
WET AREA + PONDING
TEST + SCREEDING
Actual
START

Progress
(%)

WINDOW - FRAME +
GLASS

Actual
START

Progress
(%)

WALL TILE BATHROOM

Actual
START

LEVEL 10

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18

LOCATION / ROOM
TYPE

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 9

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

1a/B

Linen room

2
3
4
5

1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4

1a/B
1a/G
1-2b/B-M
1a-2/B-H

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor

WALL BLOCKWALL

Actual
START

Progress
(%)

SLIDING DOOR - SUB


FRAME

Actual
START

Progress
(%)

DOOR ENTRANCE
SOLID TIMBER - SUB
FRAME
Actual
START

Progress
(%)

WINDOW - SUB
FRAME

Actual
START

Progress
(%)

WALL SKIMCOAT

Actual
START

Progress
(%)

WATERPROOFING ON
WET AREA + PONDING
TEST + SCREEDING
Actual
START

Progress
(%)

WINDOW - FRAME +
GLASS

Actual
START

Progress
(%)

WALL TILE BATHROOM

Actual
START

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL 12

LEVEL 11

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

2/B, 1-2a/B

Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

WALL BLOCKWALL

Actual
START

Progress
(%)

SLIDING DOOR - SUB


FRAME

Actual
START

Progress
(%)

DOOR ENTRANCE
SOLID TIMBER - SUB
FRAME
Actual
START

Progress
(%)

WINDOW - SUB
FRAME

Actual
START

Progress
(%)

WALL SKIMCOAT

Actual
START

Progress
(%)

WATERPROOFING ON
WET AREA + PONDING
TEST + SCREEDING
Actual
START

Progress
(%)

WINDOW - FRAME +
GLASS

Actual
START

Progress
(%)

WALL TILE BATHROOM

Actual
START

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
LEVEL
12
& AUTHORITY
DRAWINGS

DESCRIPTION

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

WALL BLOCKWALL

Actual
START

Progress
(%)

SLIDING DOOR - SUB


FRAME

Actual
START

Progress
(%)

DOOR ENTRANCE
SOLID TIMBER - SUB
FRAME
Actual
START

Progress
(%)

WINDOW - SUB
FRAME

Actual
START

Progress
(%)

WALL SKIMCOAT

Actual
START

Progress
(%)

WATERPROOFING ON
WET AREA + PONDING
TEST + SCREEDING
Actual
START

Progress
(%)

WINDOW - FRAME +
GLASS

Actual
START

Progress
(%)

WALL TILE BATHROOM

Actual
START

MONITORING PROGRESS FINISHING - HOTEL

MONITOR

LEVEL 8

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K
D- K

WALL TILE BATHROOM

18

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

J -K

1/A

Escape staircase S1
(basement to level 20)

1/G

Escape staircase S2
(basement to level 19)

2/C

Hotel lift lobby at level 3 to


level 18

1a/B

Linen room

1/C

Store

1a/C

Tel/IT

1a/G

Smoke lobby

2/B, 1-2a/B

Balcony

1a-2/B-H

Hotel corridor

1-2a/B-M

Hotel room 1-25

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

Progress
(%)

CEILING - GYPSUM FRAME

Actual
START

Progress (%)

WALL PAINTING
BASED

Actual
START

Progress
(%)

FLOOR SCREEDING

Actual
START

Progress
(%)

FLOOR TILE

Actual
START

Progress
(%)

BATHROOM - VANITY
COUNTER

Actual
START

Progress
(%)

SKIRTING - TILE BATHROOM

Actual
START

Progress
(%)

SKIRTING - TIMBER

Actual
START

Progress
(%)

LEVEL 10

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18

LOCATION / ROOM
TYPE

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 9

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

WALL TILE BATHROOM

1a/B

Linen room

2
3
4
5

1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4

1a/B
1a/G
1-2b/B-M
1a-2/B-H

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor

Progress
(%)

CEILING - GYPSUM FRAME

Actual
START

Progress (%)

WALL PAINTING
BASED

Actual
START

Progress
(%)

FLOOR SCREEDING

Actual
START

Progress
(%)

FLOOR TILE

Actual
START

Progress
(%)

BATHROOM - VANITY
COUNTER

Actual
START

Progress
(%)

SKIRTING - TILE BATHROOM

Actual
START

Progress
(%)

SKIRTING - TIMBER

Actual
START

Progress
(%)

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL 12

LEVEL 11

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

2/B, 1-2a/B

Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

WALL TILE BATHROOM

Progress
(%)

CEILING - GYPSUM FRAME

Actual
START

Progress (%)

WALL PAINTING
BASED

Actual
START

Progress
(%)

FLOOR SCREEDING

Actual
START

Progress
(%)

FLOOR TILE

Actual
START

Progress
(%)

BATHROOM - VANITY
COUNTER

Actual
START

Progress
(%)

SKIRTING - TILE BATHROOM

Actual
START

Progress
(%)

SKIRTING - TIMBER

Actual
START

Progress
(%)

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
LEVEL
12
& AUTHORITY
DRAWINGS

DESCRIPTION

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

WALL TILE BATHROOM

Progress
(%)

CEILING - GYPSUM FRAME

Actual
START

Progress (%)

WALL PAINTING
BASED

Actual
START

Progress
(%)

FLOOR SCREEDING

Actual
START

Progress
(%)

FLOOR TILE

Actual
START

Progress
(%)

BATHROOM - VANITY
COUNTER

Actual
START

Progress
(%)

SKIRTING - TILE BATHROOM

Actual
START

Progress
(%)

SKIRTING - TIMBER

Actual
START

Progress
(%)

MONITOR
Update : 09 Sep 15
INTERNAL UNIT WORKS (BATHROOM & BEDROOM)

LEVEL 8

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K
D- K

18

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

J -K

1/A

Escape staircase S1
(basement to level 20)

1/G

Escape staircase S2
(basement to level 19)

2/C

Hotel lift lobby at level 3 to


level 18

1a/B

Linen room

1/C

Store

1a/C

Tel/IT

1a/G

Smoke lobby

2/B, 1-2a/B

Balcony

1a-2/B-H

Hotel corridor

1-2a/B-M

Hotel room 1-25

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

CEILING - GYPSUM
BOARD

Actual
START

Progress
(%)

CEILING - BASED
PAINT

Actual
START

Progress
(%)

CEILING TRIM &


SHADOW GAP METAL
BEADING
Actual
START

Progress
(%)

DOOR ENTRANCE
SOLID TIMBER - FRAME
& LEAVE
Actual
START

Progress
(%)

SLIDING DOOR FRAME & LEAVE

Actual
START

Progress
(%)

IRONMONGERY

Actual
START

Progress
(%)

CEILING - FINISH
PAINT

Actual
START

Progress
(%)

WALL PAINTIN
FINISH

Actual
START

INTERNAL UNIT WORKS (BATHROOM & BEDROOM)

LEVEL 10

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18

LOCATION / ROOM
TYPE

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 9

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

1a/B

Linen room

2
3
4
5

1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4

1a/B
1a/G
1-2b/B-M
1a-2/B-H

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor

CEILING - GYPSUM
BOARD

Actual
START

Progress
(%)

CEILING - BASED
PAINT

Actual
START

Progress
(%)

CEILING TRIM &


SHADOW GAP METAL
BEADING
Actual
START

Progress
(%)

DOOR ENTRANCE
SOLID TIMBER - FRAME
& LEAVE
Actual
START

Progress
(%)

SLIDING DOOR FRAME & LEAVE

Actual
START

Progress
(%)

IRONMONGERY

Actual
START

Progress
(%)

CEILING - FINISH
PAINT

Actual
START

Progress
(%)

WALL PAINTIN
FINISH

Actual
START

INTERNAL UNIT WORKS (BATHROOM & BEDROOM)

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL 12

LEVEL 11

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

2/B, 1-2a/B

Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

CEILING - GYPSUM
BOARD

Actual
START

Progress
(%)

CEILING - BASED
PAINT

Actual
START

Progress
(%)

CEILING TRIM &


SHADOW GAP METAL
BEADING
Actual
START

Progress
(%)

DOOR ENTRANCE
SOLID TIMBER - FRAME
& LEAVE
Actual
START

Progress
(%)

SLIDING DOOR FRAME & LEAVE

Actual
START

Progress
(%)

IRONMONGERY

Actual
START

Progress
(%)

CEILING - FINISH
PAINT

Actual
START

Progress
(%)

WALL PAINTIN
FINISH

Actual
START

INTERNAL UNIT WORKS (BATHROOM & BEDROOM)

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
LEVEL
12
& AUTHORITY
DRAWINGS

DESCRIPTION

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

CEILING - GYPSUM
BOARD

Actual
START

Progress
(%)

CEILING - BASED
PAINT

Actual
START

Progress
(%)

CEILING TRIM &


SHADOW GAP METAL
BEADING
Actual
START

Progress
(%)

DOOR ENTRANCE
SOLID TIMBER - FRAME
& LEAVE
Actual
START

Progress
(%)

SLIDING DOOR FRAME & LEAVE

Actual
START

Progress
(%)

IRONMONGERY

Actual
START

Progress
(%)

CEILING - FINISH
PAINT

Actual
START

Progress
(%)

WALL PAINTIN
FINISH

Actual
START

MONITOR

LEVEL 8

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K
D- K

WALL PAINTING
FINISH

18

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

J -K

1/A

Escape staircase S1
(basement to level 20)

1/G

Escape staircase S2
(basement to level 19)

2/C

Hotel lift lobby at level 3 to


level 18

1a/B

Linen room

1/C

Store

1a/C

Tel/IT

1a/G

Smoke lobby

2/B, 1-2a/B

Balcony

1a-2/B-H

Hotel corridor

1-2a/B-M

Hotel room 1-25

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

Progress
(%)

BATHROOM SANITARY FITTING

Actual
START

Progress
(%)

BATHROOM - CISTERN
MOVEABLE COVER IN
GRANITE FINISH
Actual
START

Progress
(%)

BATHROOM ARTWORK

Actual
START

Progress
(%)

BAHTROOM - MIRROR

Actual
START

Progress
(%)

BATHROOM TEMPERED GLASS


SHELVES
Actual
START

Progress
(%)

ID - BATHROOM COUNTER DRAWER,


VANITY SHELVES IN
SOLID TIMBER FINISH
Actual
START

Progress
(%)

ID - BEDROOM ARCHITRAVE IN SOLID


TIMBER FINISH
Actual
START

Progress
(%)

LEVEL 10

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18

LOCATION / ROOM
TYPE

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 9

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

WALL PAINTING
FINISH

1a/B

Linen room

2
3
4
5

1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4

1a/B
1a/G
1-2b/B-M
1a-2/B-H

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor

Progress
(%)

BATHROOM SANITARY FITTING

Actual
START

Progress
(%)

BATHROOM - CISTERN
MOVEABLE COVER IN
GRANITE FINISH
Actual
START

Progress
(%)

BATHROOM ARTWORK

Actual
START

Progress
(%)

BAHTROOM - MIRROR

Actual
START

Progress
(%)

BATHROOM TEMPERED GLASS


SHELVES
Actual
START

Progress
(%)

ID - BATHROOM COUNTER DRAWER,


VANITY SHELVES IN
SOLID TIMBER FINISH
Actual
START

Progress
(%)

ID - BEDROOM ARCHITRAVE IN SOLID


TIMBER FINISH
Actual
START

Progress
(%)

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL 12

LEVEL 11

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

2/B, 1-2a/B

Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

WALL PAINTING
FINISH

Progress
(%)

BATHROOM SANITARY FITTING

Actual
START

Progress
(%)

BATHROOM - CISTERN
MOVEABLE COVER IN
GRANITE FINISH
Actual
START

Progress
(%)

BATHROOM ARTWORK

Actual
START

Progress
(%)

BAHTROOM - MIRROR

Actual
START

Progress
(%)

BATHROOM TEMPERED GLASS


SHELVES
Actual
START

Progress
(%)

ID - BATHROOM COUNTER DRAWER,


VANITY SHELVES IN
SOLID TIMBER FINISH
Actual
START

Progress
(%)

ID - BEDROOM ARCHITRAVE IN SOLID


TIMBER FINISH
Actual
START

Progress
(%)

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
LEVEL
12
& AUTHORITY
DRAWINGS

DESCRIPTION

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

WALL PAINTING
FINISH

Progress
(%)

BATHROOM SANITARY FITTING

Actual
START

Progress
(%)

BATHROOM - CISTERN
MOVEABLE COVER IN
GRANITE FINISH
Actual
START

Progress
(%)

BATHROOM ARTWORK

Actual
START

Progress
(%)

BAHTROOM - MIRROR

Actual
START

Progress
(%)

BATHROOM TEMPERED GLASS


SHELVES
Actual
START

Progress
(%)

ID - BATHROOM COUNTER DRAWER,


VANITY SHELVES IN
SOLID TIMBER FINISH
Actual
START

Progress
(%)

ID - BEDROOM ARCHITRAVE IN SOLID


TIMBER FINISH
Actual
START

Progress
(%)

MONITOR

LEVEL 8

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K
D- K

18

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

J -K

1/A

Escape staircase S1
(basement to level 20)

1/G

Escape staircase S2
(basement to level 19)

2/C

Hotel lift lobby at level 3 to


level 18

1a/B

Linen room

1/C

Store

1a/C

Tel/IT

1a/G

Smoke lobby

2/B, 1-2a/B

Balcony

1a-2/B-H

Hotel corridor

1-2a/B-M

Hotel room 1-25

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

ID - BEDROOM DRAPERY

Actual
START

Progress
(%)

ID - BEDROOM BEDHEAD FRAME IN


ALUMINIUM &
LAMINATE FINISH
Actual
START

Progress
(%)

ID - BEDROOM UPHOLSTERED FINISH

Actual
START

Progress
(%)

ID - BEDROOM MIRROR WORKS

Actual
START

Progress
(%)

ID - BEDROOM FLOOR FINISH CARPET

Actual
START

Progress
(%)

ID - BEDROOM FURNITURE &


APPLIANCES
Actual
START

Progress
(%)

WALL - SKIMCOAT

Actual
START

Progress
(%)

CONCRETE CURB
PIPE CHASE DOO

Actual
START

LEVEL 10

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18

LOCATION / ROOM
TYPE

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 9

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

1a/B

Linen room

2
3
4
5

1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4

1a/B
1a/G
1-2b/B-M
1a-2/B-H

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor

ID - BEDROOM DRAPERY

Actual
START

Progress
(%)

ID - BEDROOM BEDHEAD FRAME IN


ALUMINIUM &
LAMINATE FINISH
Actual
START

Progress
(%)

ID - BEDROOM UPHOLSTERED FINISH

Actual
START

Progress
(%)

ID - BEDROOM MIRROR WORKS

Actual
START

Progress
(%)

ID - BEDROOM FLOOR FINISH CARPET

Actual
START

Progress
(%)

ID - BEDROOM FURNITURE &


APPLIANCES
Actual
START

Progress
(%)

WALL - SKIMCOAT

Actual
START

Progress
(%)

CONCRETE CURB
PIPE CHASE DOO

Actual
START

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL 12

LEVEL 11

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

2/B, 1-2a/B

Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

ID - BEDROOM DRAPERY

Actual
START

Progress
(%)

ID - BEDROOM BEDHEAD FRAME IN


ALUMINIUM &
LAMINATE FINISH
Actual
START

Progress
(%)

ID - BEDROOM UPHOLSTERED FINISH

Actual
START

Progress
(%)

ID - BEDROOM MIRROR WORKS

Actual
START

Progress
(%)

ID - BEDROOM FLOOR FINISH CARPET

Actual
START

Progress
(%)

ID - BEDROOM FURNITURE &


APPLIANCES
Actual
START

Progress
(%)

WALL - SKIMCOAT

Actual
START

Progress
(%)

CONCRETE CURB
PIPE CHASE DOO

Actual
START

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
LEVEL
12
& AUTHORITY
DRAWINGS

DESCRIPTION

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

ID - BEDROOM DRAPERY

Actual
START

Progress
(%)

ID - BEDROOM BEDHEAD FRAME IN


ALUMINIUM &
LAMINATE FINISH
Actual
START

Progress
(%)

ID - BEDROOM UPHOLSTERED FINISH

Actual
START

Progress
(%)

ID - BEDROOM MIRROR WORKS

Actual
START

Progress
(%)

ID - BEDROOM FLOOR FINISH CARPET

Actual
START

Progress
(%)

ID - BEDROOM FURNITURE &


APPLIANCES
Actual
START

Progress
(%)

WALL - SKIMCOAT

Actual
START

Progress
(%)

CONCRETE CURB
PIPE CHASE DOO

Actual
START

MONITOR
LIFT LOBBY & HOTEL CORRIDOR

LEVEL 8

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K
D- K

CONCRETE CURB ON
PIPE CHASE DOOR

18

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

J -K

1/A

Escape staircase S1
(basement to level 20)

1/G

Escape staircase S2
(basement to level 19)

2/C

Hotel lift lobby at level 3 to


level 18

1a/B

Linen room

1/C

Store

1a/C

Tel/IT

1a/G

Smoke lobby

2/B, 1-2a/B

Balcony

1a-2/B-H

Hotel corridor

1-2a/B-M

Hotel room 1-25

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

Progress
(%)

CEILING - FRAME
INSTALLATION

Actual
START

Progress
(%)

FLOOR - SCREEDING

Actual
START

Progress
(%)

PIPE CHASE DOOR


PIPE CHASE DOOR
LOUVRE & TIMBER
LOUVRE & TIMBER
HOLLOW CORE - FRAME HOLLOW CORE - LEAVE
Actual
START

Progress
(%)

Actual
START

Progress
(%)

SKIRTING IN SOLID
TIMBER

CEILING - GYPSUM
BOARD

CEILING - PAINTING

Actual

Actual

Actual

START

Progress
(%)

START

Progress
(%)

START

Progress
(%)

LIFT LOBBY & HOTEL CORRIDOR

LEVEL 10

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18

LOCATION / ROOM
TYPE

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 9

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

CONCRETE CURB ON
PIPE CHASE DOOR

1a/B

Linen room

2
3
4
5

1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4

1a/B
1a/G
1-2b/B-M
1a-2/B-H

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor

Progress
(%)

CEILING - FRAME
INSTALLATION

Actual
START

Progress
(%)

FLOOR - SCREEDING

Actual
START

Progress
(%)

PIPE CHASE DOOR


PIPE CHASE DOOR
LOUVRE & TIMBER
LOUVRE & TIMBER
HOLLOW CORE - FRAME HOLLOW CORE - LEAVE
Actual
START

Progress
(%)

Actual
START

Progress
(%)

SKIRTING IN SOLID
TIMBER

CEILING - GYPSUM
BOARD

CEILING - PAINTING

Actual

Actual

Actual

START

Progress
(%)

START

Progress
(%)

START

Progress
(%)

LIFT LOBBY & HOTEL CORRIDOR

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL 12

LEVEL 11

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

2/B, 1-2a/B

Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

CONCRETE CURB ON
PIPE CHASE DOOR

Progress
(%)

CEILING - FRAME
INSTALLATION

Actual
START

Progress
(%)

FLOOR - SCREEDING

Actual
START

Progress
(%)

PIPE CHASE DOOR


PIPE CHASE DOOR
LOUVRE & TIMBER
LOUVRE & TIMBER
HOLLOW CORE - FRAME HOLLOW CORE - LEAVE
Actual
START

Progress
(%)

Actual
START

Progress
(%)

SKIRTING IN SOLID
TIMBER

CEILING - GYPSUM
BOARD

CEILING - PAINTING

Actual

Actual

Actual

START

Progress
(%)

START

Progress
(%)

START

Progress
(%)

LIFT LOBBY & HOTEL CORRIDOR

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
LEVEL
12
& AUTHORITY
DRAWINGS

DESCRIPTION

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

CONCRETE CURB ON
PIPE CHASE DOOR

Progress
(%)

CEILING - FRAME
INSTALLATION

Actual
START

Progress
(%)

FLOOR - SCREEDING

Actual
START

Progress
(%)

PIPE CHASE DOOR


PIPE CHASE DOOR
LOUVRE & TIMBER
LOUVRE & TIMBER
HOLLOW CORE - FRAME HOLLOW CORE - LEAVE
Actual
START

Progress
(%)

Actual
START

Progress
(%)

SKIRTING IN SOLID
TIMBER

CEILING - GYPSUM
BOARD

CEILING - PAINTING

Actual

Actual

Actual

START

Progress
(%)

START

Progress
(%)

START

Progress
(%)

MONITOR

LEVEL 8

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

DESCRIPTION

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

LOBBY & HOTEL CORRIDOR

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K
D- K

18

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

J -K

1/A

Escape staircase S1
(basement to level 20)

1/G

Escape staircase S2
(basement to level 19)

2/C

Hotel lift lobby at level 3 to


level 18

1a/B

Linen room

1/C

Store

1a/C

Tel/IT

1a/G

Smoke lobby

2/B, 1-2a/B

Balcony

1a-2/B-H

Hotel corridor

1-2a/B-M

Hotel room 1-25

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

CEILING - PORTAL
CEILING IN
BACKPAINTED GLASS
FINISH
Actual
START

Progress
(%)

WALL - END WALL IN


COPPER FREE MIRROR
FINISH
Actual
START

Progress
(%)

ID WALL - IN WALL
COVERING FINISH

ID FLOOR - CARPET
INSTALLATION

Actual

Actual

START

Progress
(%)

START

Progress
(%)

WALL FINISHES RENDER / SKIM COAT

Actual
START

Progress
(%)

CEILING FINISHES RENDER / SKIM COAT

Actual
START

Progress
(%)

CEMENT SAND
SCREED

Actual
START

Progress
(%)

HOMOGENOUS
FOR AWCS

Actual
START

LEVEL 10

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18

LOCATION / ROOM
TYPE

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

DESCRIPTION

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 9

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

LOBBY & HOTEL CORRIDOR

1a/B

Linen room

2
3
4
5

1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4

1a/B
1a/G
1-2b/B-M
1a-2/B-H

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor

CEILING - PORTAL
CEILING IN
BACKPAINTED GLASS
FINISH
Actual
START

Progress
(%)

WALL - END WALL IN


COPPER FREE MIRROR
FINISH
Actual
START

Progress
(%)

ID WALL - IN WALL
COVERING FINISH

ID FLOOR - CARPET
INSTALLATION

Actual

Actual

START

Progress
(%)

START

Progress
(%)

WALL FINISHES RENDER / SKIM COAT

Actual
START

Progress
(%)

CEILING FINISHES RENDER / SKIM COAT

Actual
START

Progress
(%)

CEMENT SAND
SCREED

Actual
START

Progress
(%)

HOMOGENOUS
FOR AWCS

Actual
START

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

DESCRIPTION

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 12

LEVEL 11

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

LOBBY & HOTEL CORRIDOR

2/B, 1-2a/B

Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

CEILING - PORTAL
CEILING IN
BACKPAINTED GLASS
FINISH
Actual
START

Progress
(%)

WALL - END WALL IN


COPPER FREE MIRROR
FINISH
Actual
START

Progress
(%)

ID WALL - IN WALL
COVERING FINISH

ID FLOOR - CARPET
INSTALLATION

Actual

Actual

START

Progress
(%)

START

Progress
(%)

WALL FINISHES RENDER / SKIM COAT

Actual
START

Progress
(%)

CEILING FINISHES RENDER / SKIM COAT

Actual
START

Progress
(%)

CEMENT SAND
SCREED

Actual
START

Progress
(%)

HOMOGENOUS
FOR AWCS

Actual
START

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

DESCRIPTION

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
LEVEL
12
& AUTHORITY
DRAWINGS

LOBBY & HOTEL CORRIDOR

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

CEILING - PORTAL
CEILING IN
BACKPAINTED GLASS
FINISH
Actual
START

Progress
(%)

WALL - END WALL IN


COPPER FREE MIRROR
FINISH
Actual
START

Progress
(%)

ID WALL - IN WALL
COVERING FINISH

ID FLOOR - CARPET
INSTALLATION

Actual

Actual

START

Progress
(%)

START

Progress
(%)

WALL FINISHES RENDER / SKIM COAT

Actual
START

Progress
(%)

CEILING FINISHES RENDER / SKIM COAT

Actual
START

Progress
(%)

CEMENT SAND
SCREED

Actual
START

Progress
(%)

HOMOGENOUS
FOR AWCS

Actual
START

MONITOR
M&E RISER AND ROOM

LEVEL 8

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K
D- K

HOMOGENOUS TILE
FOR AWCS

18

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

J -K

1/A

Escape staircase S1
(basement to level 20)

1/G

Escape staircase S2
(basement to level 19)

2/C

Hotel lift lobby at level 3 to


level 18

1a/B

Linen room

1/C

Store

1a/C

Tel/IT

1a/G

Smoke lobby

2/B, 1-2a/B

Balcony

1a-2/B-H

Hotel corridor

1-2a/B-M

Hotel room 1-25

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

Progress
(%)

DOOR FRAME

Actual
START

Progress
(%)

DOOR LEAVE

Actual
START

Progress
(%)

CEILING FINISHES PAINTING

WALL FINISHING PAINTING

Actual

Actual

START

Progress
(%)

START

Progress
(%)

IRONMONGERY

Actual
START

Progress
(%)

M&E RISER AND ROOM

LEVEL 10

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18

LOCATION / ROOM
TYPE

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

LEVEL 9

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

HOMOGENOUS TILE
FOR AWCS

1a/B

Linen room

2
3
4
5

1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4

1a/B
1a/G
1-2b/B-M
1a-2/B-H

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor

Progress
(%)

DOOR FRAME

Actual
START

Progress
(%)

DOOR LEAVE

Actual
START

Progress
(%)

CEILING FINISHES PAINTING

WALL FINISHING PAINTING

Actual

Actual

START

Progress
(%)

START

Progress
(%)

IRONMONGERY

Actual
START

Progress
(%)

M&E RISER AND ROOM

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL 12

LEVEL 11

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
& AUTHORITY
DRAWINGS

DESCRIPTION

2/B, 1-2a/B

Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

02

S-K

04

Disable -K

06

S -K

08

S-K

10

S -T

12

S-K

14

S -T

16

S-K

18

D- K

10

01

D- K

11

03

S-K

12

05

D- K

13

07

S -T

14

09

S-K

15

11

P -T

16

13

P-K

17

15

P -T

18

17

P-K

HOMOGENOUS TILE
FOR AWCS

Progress
(%)

DOOR FRAME

Actual
START

Progress
(%)

DOOR LEAVE

Actual
START

Progress
(%)

CEILING FINISHES PAINTING

WALL FINISHING PAINTING

Actual

Actual

START

Progress
(%)

START

Progress
(%)

IRONMONGERY

Actual
START

Progress
(%)

M&E RISER AND ROOM

NO. / NAME OF FLOOR


LEVELS FOR
CONSTRUCTION &
AUTHORITY
DRAWINGS

GRID LINE/ NAME OF


FLOOR LEVELS FOR
SIGNAGE AND HOTEL
OPERATION

LOCATION / ROOM
TYPE

LEVEL / NAME OF
FLOOR LEVELS AS
PER CONSTRUCTION
LEVEL
12
& AUTHORITY
DRAWINGS

DESCRIPTION

19

19

P-K

20

21

P-K

21

23

S -T

22

25

D-T

23

20

1/A

1/G

2/C

1
2
3
4
5

1a/B
1a/G
1-2b/B-M
1a-2/B-H
2/B, 1-2a/B

J -K
Escape staircase S1
(basement to level 20)
Escape staircase S2
(basement to level 19)
Hotel lift lobby at level 3 to
level 18
Linen room
Smoke lobby
Hotel room 1-25
Hotel corridor
Balcony

HOMOGENOUS TILE
FOR AWCS

Progress
(%)

DOOR FRAME

Actual
START

Progress
(%)

DOOR LEAVE

Actual
START

Progress
(%)

CEILING FINISHES PAINTING

WALL FINISHING PAINTING

Actual

Actual

START

Progress
(%)

START

Progress
(%)

IRONMONGERY

Actual
START

Progress
(%)

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE STAIRCASE
M&E SERVICE ROOM

BASEMENT

PARKING &
DRIVEWAY

LIFT CORE

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

BLOCKWALL
LOCATION
Actual
START

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

01-2/A

Hotel store 1,2

4a/C-D

Store 3

4a-5/C-D

Store (service apt.)

7/G

1-2/F-G

5/C

1-7/A-J

Car parking

1-7/A-J

Motor parking

4a-E

1/E

Ramp 1

10

1/C

Fan room

11

3a/B

Chiller plant room

12

4/B

13

4a/A-B

14

5/A

Domestic tank 1, 2 (retail)

15

5/A

Pump room 1 (retail)

16

5a/B

Pump room 2 (hotel)

17

6/B

18

6/C-D

Pump room 4 (service Apt. + retail)

19

5a-6/D

Pump room 5 (hotel)

20

5b-5c/H

Pump room 6 (hotel)

21

5b-5c/J

Pump room 7 (retail/ carpark)

22

5a/A

AC make up tank 1, 2 (hotel)

23

7/A

Carpark store
Staircase lobby
Passage

Handicapped parking space

Flood retention tank (below)


Sump pit

Pump room 3 (service apt.)

Domestic tank 3 (hotel)

Progress
(%)

BLOCKWALL M&E
SHAFT & RISER
Actual
START

Progress
(%)

WALL - SKIMCOAT
WITH PAINT FINISH
Actual
START

Progress
(%)

WATERPROOFING +
PONDING TEST +
SCREEDING
Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - SUB FRAME
Actual
START

Progress
(%)

STEEL DOOR - SUB


FRAME
Actual
START

Progress
(%)

TIMBER FLUSH DOOR


SUB FRAME
Actual
START

BA

GRID LINE

NO.

M&E SERVICE
AREA
ROOM
PE

REA L 36

RETAIL

LEVEL1

M&E AND SERVICE


ROOM

LIFT CORE & ESCAPE STAIRCASE

LEVEL
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

BLOCKWALL
LOCATION
Actual
START

24

7/B

Domestic tank 4 (service apt.)

25

5a-6/C

Wet riser tank 1, 2

26

6-7/C

Hose reel tank 1, 2

27

7/D

28

5b/H

Sprinkler pump stage 1

29

7/J-K

Sprinkler tank 1, 2

30

2/H

Grease interceptor system


(hotel&retail)

31

01/G

OSD, on-site detention tank

32

01/F

Rain water harvesting tank

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1a/A

Store

5a/D

Janitor

5a/D-E

Refuse

5a-D

4a-5B/D-F

1-H

2a-4a/D-L

1-6/C-G

3/M

10

1-7/A-M

11

4a-5b/C-F

12

4/F

Glass lift

13

3a/F

Escalator

1/A

Escape staircase S1

Fresh air fanroom (car park)

Refuse bin
Store 1, 2,3,4,5
Ramp 1
Retail lobby
Passage 1, 2, 3, 4
Retail service lift lobby
Retail unit 1,2,3,4,5,6,7,8,9,10
Retail male & female toilet

Progress
(%)

BLOCKWALL M&E
SHAFT & RISER
Actual
START

Progress
(%)

WALL - SKIMCOAT
WITH PAINT FINISH
Actual
START

Progress
(%)

WATERPROOFING +
PONDING TEST +
SCREEDING
Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - SUB FRAME
Actual
START

Progress
(%)

STEEL DOOR - SUB


FRAME
Actual
START

Progress
(%)

TIMBER FLUSH DOOR


SUB FRAME
Actual
START

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE
STAIRCASE
M&E & SERVICE ROOM (SERVICE APARTMENT & RETAIL)
CIRCULATIO
N

LEVEL 2

M&E & SERVICE ROOM (HOTEL)

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

BLOCKWALL
LOCATION
Actual
START

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

2/C

Hotel lobby

3/B-C

1/C

Receiving area & purchasing

2/D

Luggage room

1a/B

LPG Farm 1 (hotel)

2/B

Loading & Unloading bay

2a/B

Receiving area & platform

1/C-D

Bin center 1

1/C-D

Store

10

5a/E

Retail service lift lobby

11

5/C

Letter box

12

5a/C

Fire control room (retail, apt.)

13

6/C

MDF room

14

6/C-D

Bin center 2

15

5a-6/D

AWCS cable room

16

5a-6/D-E

AWCS

17

5a/E

CWSP

18

5a/E

Full vacuumload station

19

6/E

Loading & Unloading

20

5a/F

Consumer HT room

21

5a/G

TNB room

22

6/G

23

5b/G-H

24

5c/H

Diesel fuel pump room

25

5b/H

Bomba vehicle turning circle

26

5b/J

LPG Farm 2 (retail)

27

4a/E-F

Passage

28

01/B

Ramp 2

29

2a-7/A-C

Drop of

Reception

TNB meter room


M&E room

Progress
(%)

BLOCKWALL M&E
SHAFT & RISER
Actual
START

Progress
(%)

WALL - SKIMCOAT
WITH PAINT FINISH
Actual
START

Progress
(%)

WATERPROOFING +
PONDING TEST +
SCREEDING
Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - SUB FRAME
Actual
START

Progress
(%)

STEEL DOOR - SUB


FRAME
Actual
START

Progress
(%)

TIMBER FLUSH DOOR


SUB FRAME
Actual
START

GRID LINE

NO.

AREA

LOCATION
Actual
START

2b-4a/C-K

Retail lobby

31

01-5c/C-M

Retail unit 1,2,3,4,5,6,7

32

5/E

33

3b/E

Glass lift

34

3/E

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/J

Retail lift lobby

1a/B

M&E room

1/C

Store

4/E

Smoke spill fan room

4a/E

Copper pipes compartment

1a/F

Smoke spill fresh air pump room

2b-E

Pedestrian walk way

1-5a/C-J

Passage

1-7/B-M

Car parking

10

2a/C

Handicapped parking space

11

3/E-F

Stair from 3A to 3B

12

01-6/C-K

Ramp

13

2-2a/E-F

Car park management office

14

1/H

Male prayer room

15

2/H

Female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

RETAIL

30

RET
LIFT CORE & ESCAPE STAIRCASE
AIL

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

STAIRCASE

OTHER
ROOMS

LEVEL 3A & 3B
AREA VEL 36

BLOCKWALL

CARPAKING & DRIVEWAY M&E SERVICE ROOM

LEVEL

Retail male & female toilet

Progress
(%)

BLOCKWALL M&E
SHAFT & RISER
Actual
START

Progress
(%)

WALL - SKIMCOAT
WITH PAINT FINISH
Actual
START

Progress
(%)

WATERPROOFING +
PONDING TEST +
SCREEDING
Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - SUB FRAME
Actual
START

Progress
(%)

STEEL DOOR - SUB


FRAME
Actual
START

Progress
(%)

TIMBER FLUSH DOOR


SUB FRAME
Actual
START

GRID LINE

LIFT CORE & ESCAPE STAIRCASE


AREA

NO.

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

LIFT LOBBY
& SERVICE
R.M

1-2/B-C

Store 1, 2

4a/D-E

Store 3

3/M

PARKING & DRIVEWAY

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

2/B

Genset room (hotel)

3/M

Retail lift lobby

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

LIFT CORE & ESCAPE


STAIRCASE

LIFT LOBBY &


SERVICE ROOM

BLOCKWALL

PARKING & DRIVEWAY

LEVEL 5A & 5B

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL 4A & 4B

TYPICAL COMMON AREA LEVEL


BASEMENT TO LEVEL 36

LOCATION
Actual
START

Retail lift lobby


Passage
Stair from 4A to 4B

Passage
Stair to up from 4A to 4B

Handicaped parking space

Progress
(%)

BLOCKWALL M&E
SHAFT & RISER
Actual
START

Progress
(%)

WALL - SKIMCOAT
WITH PAINT FINISH
Actual
START

Progress
(%)

WATERPROOFING +
PONDING TEST +
SCREEDING
Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - SUB FRAME
Actual
START

Progress
(%)

STEEL DOOR - SUB


FRAME
Actual
START

Progress
(%)

TIMBER FLUSH DOOR


SUB FRAME
Actual
START

GRID LINE

NO.

PARKINGAREA
& DRIVEWAY
M&E
STAIRCASE

A - BASEMENT
6

PARKING

LEVEL 6A & 6B

LIFT LOBBY &


SERVICE ROOM

LIFT CORE & ESCAPE STAIRCASE

LEVEL
LEVEL 5A & 5B
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

BLOCKWALL
LOCATION
Actual
START

10

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/M

Retail lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

6/G

Store 4

6/E

Management office

2a/B

Main switch board room (hotel)

2b/B

Transformer room (hotel)

5a-6/C

Transformer (apartment)

6/C

10

5a-6/C-D

11

4a/E

CW pump room

12

5/E

EFF & CW. Tank

13

6/H

Transformer room (retail)

14

6/J

Main switch boardroom (retail)

15

6/K

Genset room (retail)

16

1a/F

Fire pump room (hotel)

17

1/F

HR tank 1, 2

18

2/F

WR tank 1, 2

19

01-6/C-K

Ramp

20

5a/B, 2/K

Motocycle parking

21

01-7/B-M

Car parking

1/A

Escape staircase S1

1/G

Escape staircase S2

Main switch board room (apartment)


Switch gear room (apartment)

Progress
(%)

BLOCKWALL M&E
SHAFT & RISER
Actual
START

Progress
(%)

WALL - SKIMCOAT
WITH PAINT FINISH
Actual
START

Progress
(%)

WATERPROOFING +
PONDING TEST +
SCREEDING
Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - SUB FRAME
Actual
START

Progress
(%)

STEEL DOOR - SUB


FRAME
Actual
START

Progress
(%)

TIMBER FLUSH DOOR


SUB FRAME
Actual
START

GRID LINE

NO.

LIFT CORE & ESCAPE STAIRCASE


AREA
HOUSE (HOTEL)

CUSTOMER (HOTEL)

M&E AND STORE

TYPICAL COMMON AREA - BASEMENT


LEVEL
TO LEVEL 36

BLOCKWALL
LOCATION
Actual
START

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

7/H

AV store

5a-6/C

Spa store

5/D-E

Store

1/C

1/C-D

AWCS

6/C-D

Staircase pressurization room

3a/C

Reception & check-in counter

3a/B

Business center/ library

4/B

10

4a/B

11

2/E

Bakery

12

3/G

All day dining

13

3c-3d/M

14

5/E

15

4c-G

Function room 1

16

5b/G

Function room 2

17

4a-6/B

Treatment 1, 2, 3

18

5a-6/B

Couple treatment room

19

6-7/B

Zacuzzi

20

6/D

21

2-2a/B

22

1a/B

23

2-2a/B

24

2a/B

Bins room

Social space
Idea room

Pantry
Pre-function room

Male & female toilet


Gen. cash
Storage
Account manager
Director finance

Progress
(%)

BLOCKWALL M&E
SHAFT & RISER
Actual
START

Progress
(%)

WALL - SKIMCOAT
WITH PAINT FINISH
Actual
START

Progress
(%)

WATERPROOFING +
PONDING TEST +
SCREEDING
Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - SUB FRAME
Actual
START

Progress
(%)

STEEL DOOR - SUB


FRAME
Actual
START

Progress
(%)

TIMBER FLUSH DOOR


SUB FRAME
Actual
START

GRID LINE

NO.

FRONT OF HOUSE (HOTEL)


AREA
E STAIRCASE

EA - BASEMENT
36

LANDSC
APE

MAIN KITCHEN

MAIN KITCHEN

LEVEL 7

LEVEL

BLOCKWALL
LOCATION
Actual
START

25

3/B

GM office

26

5/C

Sales & marketing

27

4-4a/c-D

28

4-4a/C

Manager 1, 2

29

4-4a/D

Luggage room

30

5/D

Store

31

5c/E

Food preparation

32

1-1a/C

33

1-1a/C-D

Walk-in freezer

34

2/C-D

Walk-in chiller

35

1/D

Freeze

36

1/D

Chiller

37

2/D

Pastry store

38

1/D-E

Meat prep

39

1/E

Vege prep

40

2/E

Pastry & bakery

41

2/E

Chocolate room

42

1/E-F

43

1/F

RM. Service office

44

1/F

Chef office

45

1/F

Room service

46

1/F-G

Steward store

47

1-1a/F-G

48

1/G

Dish washing

49

2/F

Cooking area

50

5/A-B

51

4b-7/H-M

1/A

Escape staircase S1

1/G

Escape staircase S2

Hotel front office

Dry store

Cold kitchen

Pot & pan washing

Balcony
Deck extension for F&B funtions

Progress
(%)

BLOCKWALL M&E
SHAFT & RISER
Actual
START

Progress
(%)

WALL - SKIMCOAT
WITH PAINT FINISH
Actual
START

Progress
(%)

WATERPROOFING +
PONDING TEST +
SCREEDING
Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - SUB FRAME
Actual
START

Progress
(%)

STEEL DOOR - SUB


FRAME
Actual
START

Progress
(%)

TIMBER FLUSH DOOR


SUB FRAME
Actual
START

GRID LINE

NO.

LIFT CORE & ESCAPE STAIRCASE


AREA
OFFICE (BOH)

LEVEL 7 MEZZANINE

M&E

TYPICAL COMMON AREA - BASEMENT


LEVEL
TO LEVEL 36

BLOCKWALL
LOCATION
Actual
START

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1/C

Bin room

1/C

AWCS

2/B

Ahu room 1

1/G

Ahu room 2

01/F-G

01/G

1a/B-C

M&E area

1a/B

I.T. Store

2-2a/B-C

I.T. office

10

2b/B

11

3/B

Uniform issue

12

6/E

Function room storage

13

6/H

AV room

14

2/E

HK manager

15

2/E-F

HR. DIR. Office

16

2/E-F

F&B DIR. Office

17

2/F-G

Executive chef

18

1/F

Working area

19

1/E

Training/ meeting room

20

1a/D

21

1-1a/C

22

2/D

Balancing tank
Pump room

Server room

Corridors
Security & receiving area
Flower shop

Progress
(%)

BLOCKWALL M&E
SHAFT & RISER
Actual
START

Progress
(%)

WALL - SKIMCOAT
WITH PAINT FINISH
Actual
START

Progress
(%)

WATERPROOFING +
PONDING TEST +
SCREEDING
Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - SUB FRAME
Actual
START

Progress
(%)

STEEL DOOR - SUB


FRAME
Actual
START

Progress
(%)

TIMBER FLUSH DOOR


SUB FRAME
Actual
START

LEVEL 7 MEZZ

GRID LINE

NO.

AREA
LIFT CORE &
ESCAPE
STAIRCASE
FACILITY

LEVEL 8

TYPICAL COMMON
AREA - BASEMENT
TO LEVEL 36

SERVICE AREA (BOH)

LEVEL

BLOCKWALL
LOCATION
Actual
START

23

2/D

House keeping office

24

1/D

Soiled linen room

25

1/D

Valet laundry

26

1/D-E

Clean linen room

27

1/C-D

Trolley bay

28

3a/B

Clinic

29

4/B

30

5a/B

31

6/B

32

6/B-C

33

6/C

Staf social lounge

34

6/D

Male & female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

11

3a/C

Gym

12

3/B

Male, female changing room

13

3/F

Swimming pool

14

3/J

Pantry

15

4d/J

16

2a-4/B-H

Deck

17

2a-7/A-D

Roof top garden for apartment


tower

18

2b-7/B-J

Steps

19

2b-7/B-J

Ramp

Male & female changing room, toilet


Team dinning room
Kitchen
Kitchen storage

Spiral stair

Progress
(%)

BLOCKWALL M&E
SHAFT & RISER
Actual
START

Progress
(%)

WALL - SKIMCOAT
WITH PAINT FINISH
Actual
START

Progress
(%)

WATERPROOFING +
PONDING TEST +
SCREEDING
Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - SUB FRAME
Actual
START

Progress
(%)

STEEL DOOR - SUB


FRAME
Actual
START

Progress
(%)

TIMBER FLUSH DOOR


SUB FRAME
Actual
START

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE STAIRCASE
M&E SERVICE ROOM

BASEMENT

PARKING &
DRIVEWAY

LIFT CORE

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

MONITORING PROGRESS FINISHING - PODIUM

TIMBER FLUSH DOOR WALL SUB FRAME


HOMOGENEOUS TILE
LOCATION
Progress
(%)

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

01-2/A

Hotel store 1,2

4a/C-D

Store 3

4a-5/C-D

Store (service apt.)

7/G

1-2/F-G

5/C

1-7/A-J

Car parking

1-7/A-J

Motor parking

4a-E

1/E

Ramp 1

10

1/C

Fan room

11

3a/B

Chiller plant room

12

4/B

13

4a/A-B

14

5/A

Domestic tank 1, 2 (retail)

15

5/A

Pump room 1 (retail)

16

5a/B

Pump room 2 (hotel)

17

6/B

18

6/C-D

Pump room 4 (service Apt. + retail)

19

5a-6/D

Pump room 5 (hotel)

20

5b-5c/H

Pump room 6 (hotel)

21

5b-5c/J

Pump room 7 (retail/ carpark)

22

5a/A

AC make up tank 1, 2 (hotel)

23

7/A

Carpark store
Staircase lobby
Passage

Handicapped parking space

Flood retention tank (below)


Sump pit

Pump room 3 (service apt.)

Domestic tank 3 (hotel)

Actual
START

Progress
(%)

WALL - GRANITE

WALL - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

CEILING - RENDER /
SKIMCOAT
Actual
START

Progress
(%)

M
CEILING - FRAME FOR
CEILING - RENDER /
PLASTER BOARD AND
SKIMCOAT WITH PAINT
EMULTION PAINTED
FINISH
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

BA

GRID LINE

NO.

M&E SERVICE
AREA
ROOM
PE

REA L 36

RETAIL

LEVEL1

M&E AND SERVICE


ROOM

LIFT CORE & ESCAPE STAIRCASE

LEVEL
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

MONITORING PROGRESS FINISHING - PODIUM

TIMBER FLUSH DOOR WALL SUB FRAME


HOMOGENEOUS TILE
LOCATION
Progress
(%)

24

7/B

Domestic tank 4 (service apt.)

25

5a-6/C

Wet riser tank 1, 2

26

6-7/C

Hose reel tank 1, 2

27

7/D

28

5b/H

Sprinkler pump stage 1

29

7/J-K

Sprinkler tank 1, 2

30

2/H

Grease interceptor system


(hotel&retail)

31

01/G

OSD, on-site detention tank

32

01/F

Rain water harvesting tank

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1a/A

Store

5a/D

Janitor

5a/D-E

Refuse

5a-D

4a-5B/D-F

1-H

2a-4a/D-L

1-6/C-G

3/M

10

1-7/A-M

11

4a-5b/C-F

12

4/F

Glass lift

13

3a/F

Escalator

1/A

Escape staircase S1

Fresh air fanroom (car park)

Refuse bin
Store 1, 2,3,4,5
Ramp 1
Retail lobby
Passage 1, 2, 3, 4
Retail service lift lobby
Retail unit 1,2,3,4,5,6,7,8,9,10
Retail male & female toilet

Actual
START

Progress
(%)

WALL - GRANITE

WALL - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

CEILING - RENDER /
SKIMCOAT
Actual
START

Progress
(%)

M
CEILING - FRAME FOR
CEILING - RENDER /
PLASTER BOARD AND
SKIMCOAT WITH PAINT
EMULTION PAINTED
FINISH
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE
STAIRCASE
M&E & SERVICE ROOM (SERVICE APARTMENT & RETAIL)
CIRCULATIO
N

LEVEL 2

M&E & SERVICE ROOM (HOTEL)

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

MONITORING PROGRESS FINISHING - PODIUM

TIMBER FLUSH DOOR WALL SUB FRAME


HOMOGENEOUS TILE
LOCATION
Progress
(%)

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

2/C

Hotel lobby

3/B-C

1/C

Receiving area & purchasing

2/D

Luggage room

1a/B

LPG Farm 1 (hotel)

2/B

Loading & Unloading bay

2a/B

Receiving area & platform

1/C-D

Bin center 1

1/C-D

Store

10

5a/E

Retail service lift lobby

11

5/C

Letter box

12

5a/C

Fire control room (retail, apt.)

13

6/C

MDF room

14

6/C-D

Bin center 2

15

5a-6/D

AWCS cable room

16

5a-6/D-E

AWCS

17

5a/E

CWSP

18

5a/E

Full vacuumload station

19

6/E

Loading & Unloading

20

5a/F

Consumer HT room

21

5a/G

TNB room

22

6/G

23

5b/G-H

24

5c/H

Diesel fuel pump room

25

5b/H

Bomba vehicle turning circle

26

5b/J

LPG Farm 2 (retail)

27

4a/E-F

Passage

28

01/B

Ramp 2

29

2a-7/A-C

Drop of

Reception

TNB meter room


M&E room

Actual
START

Progress
(%)

WALL - GRANITE

WALL - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

CEILING - RENDER /
SKIMCOAT
Actual
START

Progress
(%)

M
CEILING - FRAME FOR
CEILING - RENDER /
PLASTER BOARD AND
SKIMCOAT WITH PAINT
EMULTION PAINTED
FINISH
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

NO.

AREA

GRID LINE

Progress
(%)

2b-4a/C-K

Retail lobby

31

01-5c/C-M

Retail unit 1,2,3,4,5,6,7

32

5/E

33

3b/E

Glass lift

34

3/E

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/J

Retail lift lobby

1a/B

M&E room

1/C

Store

4/E

Smoke spill fan room

4a/E

Copper pipes compartment

1a/F

Smoke spill fresh air pump room

2b-E

Pedestrian walk way

1-5a/C-J

Passage

1-7/B-M

Car parking

10

2a/C

Handicapped parking space

11

3/E-F

Stair from 3A to 3B

12

01-6/C-K

Ramp

13

2-2a/E-F

Car park management office

14

1/H

Male prayer room

15

2/H

Female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

RETAIL

30

RET
LIFT CORE & ESCAPE STAIRCASE
AIL

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

STAIRCASE

OTHER
ROOMS

LEVEL 3A & 3B
AREA VEL 36

TIMBER FLUSH DOOR WALL SUB FRAME


HOMOGENEOUS TILE
LOCATION

CARPAKING & DRIVEWAY M&E SERVICE ROOM

LEVEL

MONITORING PROGRESS FINISHING - PODIUM

Retail male & female toilet

Actual
START

Progress
(%)

WALL - GRANITE

WALL - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

CEILING - RENDER /
SKIMCOAT
Actual
START

Progress
(%)

M
CEILING - FRAME FOR
CEILING - RENDER /
PLASTER BOARD AND
SKIMCOAT WITH PAINT
EMULTION PAINTED
FINISH
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

GRID LINE

LIFT CORE & ESCAPE STAIRCASE


AREA

NO.

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

LIFT LOBBY
& SERVICE
R.M

1-2/B-C

Store 1, 2

4a/D-E

Store 3

3/M

PARKING & DRIVEWAY

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

2/B

Genset room (hotel)

3/M

Retail lift lobby

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

LIFT CORE & ESCAPE


STAIRCASE

LIFT LOBBY &


SERVICE ROOM

TIMBER FLUSH DOOR WALL SUB FRAME


HOMOGENEOUS TILE
LOCATION

PARKING & DRIVEWAY

LEVEL 5A & 5B

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL 4A & 4B

TYPICAL COMMON AREA LEVEL


BASEMENT TO LEVEL 36

MONITORING PROGRESS FINISHING - PODIUM

Progress
(%)

Retail lift lobby


Passage
Stair from 4A to 4B

Passage
Stair to up from 4A to 4B

Handicaped parking space

Actual
START

Progress
(%)

WALL - GRANITE

WALL - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

CEILING - RENDER /
SKIMCOAT
Actual
START

Progress
(%)

M
CEILING - FRAME FOR
CEILING - RENDER /
PLASTER BOARD AND
SKIMCOAT WITH PAINT
EMULTION PAINTED
FINISH
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

GRID LINE

NO.

PARKINGAREA
& DRIVEWAY
M&E
STAIRCASE

A - BASEMENT
6

PARKING

LEVEL 6A & 6B

LIFT LOBBY &


SERVICE ROOM

LIFT CORE & ESCAPE STAIRCASE

LEVEL
LEVEL 5A & 5B
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

MONITORING PROGRESS FINISHING - PODIUM

TIMBER FLUSH DOOR WALL SUB FRAME


HOMOGENEOUS TILE
LOCATION
Progress
(%)

10

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/M

Retail lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

6/G

Store 4

6/E

Management office

2a/B

Main switch board room (hotel)

2b/B

Transformer room (hotel)

5a-6/C

Transformer (apartment)

6/C

10

5a-6/C-D

11

4a/E

CW pump room

12

5/E

EFF & CW. Tank

13

6/H

Transformer room (retail)

14

6/J

Main switch boardroom (retail)

15

6/K

Genset room (retail)

16

1a/F

Fire pump room (hotel)

17

1/F

HR tank 1, 2

18

2/F

WR tank 1, 2

19

01-6/C-K

Ramp

20

5a/B, 2/K

Motocycle parking

21

01-7/B-M

Car parking

1/A

Escape staircase S1

1/G

Escape staircase S2

Main switch board room (apartment)


Switch gear room (apartment)

Actual
START

Progress
(%)

WALL - GRANITE

WALL - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

CEILING - RENDER /
SKIMCOAT
Actual
START

Progress
(%)

M
CEILING - FRAME FOR
CEILING - RENDER /
PLASTER BOARD AND
SKIMCOAT WITH PAINT
EMULTION PAINTED
FINISH
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

GRID LINE

NO.

LIFT CORE & ESCAPE STAIRCASE


AREA
HOUSE (HOTEL)

CUSTOMER (HOTEL)

M&E AND STORE

TYPICAL COMMON AREA - BASEMENT


LEVEL
TO LEVEL 36

MONITORING PROGRESS FINISHING - PODIUM

TIMBER FLUSH DOOR WALL SUB FRAME


HOMOGENEOUS TILE
LOCATION
Progress
(%)

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

7/H

AV store

5a-6/C

Spa store

5/D-E

Store

1/C

1/C-D

AWCS

6/C-D

Staircase pressurization room

3a/C

Reception & check-in counter

3a/B

Business center/ library

4/B

10

4a/B

11

2/E

Bakery

12

3/G

All day dining

13

3c-3d/M

14

5/E

15

4c-G

Function room 1

16

5b/G

Function room 2

17

4a-6/B

Treatment 1, 2, 3

18

5a-6/B

Couple treatment room

19

6-7/B

Zacuzzi

20

6/D

21

2-2a/B

22

1a/B

23

2-2a/B

24

2a/B

Bins room

Social space
Idea room

Pantry
Pre-function room

Male & female toilet


Gen. cash
Storage
Account manager
Director finance

Actual
START

Progress
(%)

WALL - GRANITE

WALL - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

CEILING - RENDER /
SKIMCOAT
Actual
START

Progress
(%)

M
CEILING - FRAME FOR
CEILING - RENDER /
PLASTER BOARD AND
SKIMCOAT WITH PAINT
EMULTION PAINTED
FINISH
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

GRID LINE

NO.

FRONT OF HOUSE (HOTEL)


AREA
E STAIRCASE

EA - BASEMENT
36

LANDSC
APE

MAIN KITCHEN

MAIN KITCHEN

LEVEL 7

LEVEL

MONITORING PROGRESS FINISHING - PODIUM

TIMBER FLUSH DOOR WALL SUB FRAME


HOMOGENEOUS TILE
LOCATION
Progress
(%)

25

3/B

GM office

26

5/C

Sales & marketing

27

4-4a/c-D

28

4-4a/C

Manager 1, 2

29

4-4a/D

Luggage room

30

5/D

Store

31

5c/E

Food preparation

32

1-1a/C

33

1-1a/C-D

Walk-in freezer

34

2/C-D

Walk-in chiller

35

1/D

Freeze

36

1/D

Chiller

37

2/D

Pastry store

38

1/D-E

Meat prep

39

1/E

Vege prep

40

2/E

Pastry & bakery

41

2/E

Chocolate room

42

1/E-F

43

1/F

RM. Service office

44

1/F

Chef office

45

1/F

Room service

46

1/F-G

Steward store

47

1-1a/F-G

48

1/G

Dish washing

49

2/F

Cooking area

50

5/A-B

51

4b-7/H-M

1/A

Escape staircase S1

1/G

Escape staircase S2

Hotel front office

Dry store

Cold kitchen

Pot & pan washing

Balcony
Deck extension for F&B funtions

Actual
START

Progress
(%)

WALL - GRANITE

WALL - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

CEILING - RENDER /
SKIMCOAT
Actual
START

Progress
(%)

M
CEILING - FRAME FOR
CEILING - RENDER /
PLASTER BOARD AND
SKIMCOAT WITH PAINT
EMULTION PAINTED
FINISH
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

GRID LINE

NO.

LIFT CORE & ESCAPE STAIRCASE


AREA
OFFICE (BOH)

LEVEL 7 MEZZANINE

M&E

TYPICAL COMMON AREA - BASEMENT


LEVEL
TO LEVEL 36

MONITORING PROGRESS FINISHING - PODIUM

TIMBER FLUSH DOOR WALL SUB FRAME


HOMOGENEOUS TILE
LOCATION
Progress
(%)

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1/C

Bin room

1/C

AWCS

2/B

Ahu room 1

1/G

Ahu room 2

01/F-G

01/G

1a/B-C

M&E area

1a/B

I.T. Store

2-2a/B-C

I.T. office

10

2b/B

11

3/B

Uniform issue

12

6/E

Function room storage

13

6/H

AV room

14

2/E

HK manager

15

2/E-F

HR. DIR. Office

16

2/E-F

F&B DIR. Office

17

2/F-G

Executive chef

18

1/F

Working area

19

1/E

Training/ meeting room

20

1a/D

21

1-1a/C

22

2/D

Balancing tank
Pump room

Server room

Corridors
Security & receiving area
Flower shop

Actual
START

Progress
(%)

WALL - GRANITE

WALL - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

CEILING - RENDER /
SKIMCOAT
Actual
START

Progress
(%)

M
CEILING - FRAME FOR
CEILING - RENDER /
PLASTER BOARD AND
SKIMCOAT WITH PAINT
EMULTION PAINTED
FINISH
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

LEVEL 7 MEZZ

GRID LINE

NO.

AREA
LIFT CORE &
ESCAPE
STAIRCASE
FACILITY

LEVEL 8

TYPICAL COMMON
AREA - BASEMENT
TO LEVEL 36

SERVICE AREA (BOH)

LEVEL

MONITORING PROGRESS FINISHING - PODIUM

TIMBER FLUSH DOOR WALL SUB FRAME


HOMOGENEOUS TILE
LOCATION
Progress
(%)

23

2/D

House keeping office

24

1/D

Soiled linen room

25

1/D

Valet laundry

26

1/D-E

Clean linen room

27

1/C-D

Trolley bay

28

3a/B

Clinic

29

4/B

30

5a/B

31

6/B

32

6/B-C

33

6/C

Staf social lounge

34

6/D

Male & female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

11

3a/C

Gym

12

3/B

Male, female changing room

13

3/F

Swimming pool

14

3/J

Pantry

15

4d/J

16

2a-4/B-H

Deck

17

2a-7/A-D

Roof top garden for apartment


tower

18

2b-7/B-J

Steps

19

2b-7/B-J

Ramp

Male & female changing room, toilet


Team dinning room
Kitchen
Kitchen storage

Spiral stair

Actual
START

Progress
(%)

WALL - GRANITE

WALL - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

CEILING - RENDER /
SKIMCOAT
Actual
START

Progress
(%)

M
CEILING - FRAME FOR
CEILING - RENDER /
PLASTER BOARD AND
SKIMCOAT WITH PAINT
EMULTION PAINTED
FINISH
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

G - PODIUM

M
Update : 09 Sep 15

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE STAIRCASE
M&E SERVICE ROOM

BASEMENT

PARKING &
DRIVEWAY

LIFT CORE

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

PODIUM

LOCATION

CEILING - FRAME FOR


EXPOSED GRID
GYPSUM CEILING
PANEL
Actual
START

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

01-2/A

Hotel store 1,2

4a/C-D

Store 3

4a-5/C-D

Store (service apt.)

7/G

1-2/F-G

5/C

1-7/A-J

Car parking

1-7/A-J

Motor parking

4a-E

1/E

Ramp 1

10

1/C

Fan room

11

3a/B

Chiller plant room

12

4/B

13

4a/A-B

14

5/A

Domestic tank 1, 2 (retail)

15

5/A

Pump room 1 (retail)

16

5a/B

Pump room 2 (hotel)

17

6/B

18

6/C-D

Pump room 4 (service Apt. + retail)

19

5a-6/D

Pump room 5 (hotel)

20

5b-5c/H

Pump room 6 (hotel)

21

5b-5c/J

Pump room 7 (retail/ carpark)

22

5a/A

AC make up tank 1, 2 (hotel)

23

7/A

Carpark store
Staircase lobby
Passage

Handicapped parking space

Flood retention tank (below)


Sump pit

Pump room 3 (service apt.)

Domestic tank 3 (hotel)

Progress
(%)

FLOOR - CEMENT
SAND SCREED
Actual
START

Progress
(%)

FLOOR - FLOWCRETE
COATING
Actual
START

Progress
(%)

FLOOR HOMOGENEOUS TILE


Actual
START

Progress
(%)

FLOOR - GRANITE

FLOOR - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

SKIRTING HOMOGENOUS TILE


Actual
START

BA

M
Update : 09 Sep 15

GRID LINE

PODIUM

NO.

M&E SERVICE
AREA
ROOM
LIFT CORE & ESCAPE STAIRCASE
PE

REA L 36

RETAIL

LEVEL1

M&E AND SERVICE


ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

G - PODIUM

LOCATION

CEILING - FRAME FOR


EXPOSED GRID
GYPSUM CEILING
PANEL
Actual
START

24

7/B

Domestic tank 4 (service apt.)

25

5a-6/C

Wet riser tank 1, 2

26

6-7/C

Hose reel tank 1, 2

27

7/D

28

5b/H

Sprinkler pump stage 1

29

7/J-K

Sprinkler tank 1, 2

30

2/H

Grease interceptor system


(hotel&retail)

31

01/G

OSD, on-site detention tank

32

01/F

Rain water harvesting tank

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1a/A

Store

5a/D

Janitor

5a/D-E

Refuse

5a-D

4a-5B/D-F

1-H

2a-4a/D-L

1-6/C-G

3/M

10

1-7/A-M

11

4a-5b/C-F

12

4/F

Glass lift

13

3a/F

Escalator

1/A

Escape staircase S1

Fresh air fanroom (car park)

Refuse bin
Store 1, 2,3,4,5
Ramp 1
Retail lobby
Passage 1, 2, 3, 4
Retail service lift lobby
Retail unit 1,2,3,4,5,6,7,8,9,10
Retail male & female toilet

Progress
(%)

FLOOR - CEMENT
SAND SCREED
Actual
START

Progress
(%)

FLOOR - FLOWCRETE
COATING
Actual
START

Progress
(%)

FLOOR HOMOGENEOUS TILE


Actual
START

Progress
(%)

FLOOR - GRANITE

FLOOR - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

SKIRTING HOMOGENOUS TILE


Actual
START

G - PODIUM

M
Update : 09 Sep 15

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE
STAIRCASE
M&E & SERVICE ROOM (SERVICE APARTMENT & RETAIL)
CIRCULATIO
N

LEVEL 2

M&E & SERVICE ROOM (HOTEL)

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

PODIUM

LOCATION

CEILING - FRAME FOR


EXPOSED GRID
GYPSUM CEILING
PANEL
Actual
START

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

2/C

Hotel lobby

3/B-C

1/C

Receiving area & purchasing

2/D

Luggage room

1a/B

LPG Farm 1 (hotel)

2/B

Loading & Unloading bay

2a/B

Receiving area & platform

1/C-D

Bin center 1

1/C-D

Store

10

5a/E

Retail service lift lobby

11

5/C

Letter box

12

5a/C

Fire control room (retail, apt.)

13

6/C

MDF room

14

6/C-D

Bin center 2

15

5a-6/D

AWCS cable room

16

5a-6/D-E

AWCS

17

5a/E

CWSP

18

5a/E

Full vacuumload station

19

6/E

Loading & Unloading

20

5a/F

Consumer HT room

21

5a/G

TNB room

22

6/G

23

5b/G-H

24

5c/H

Diesel fuel pump room

25

5b/H

Bomba vehicle turning circle

26

5b/J

LPG Farm 2 (retail)

27

4a/E-F

Passage

28

01/B

Ramp 2

29

2a-7/A-C

Drop of

Reception

TNB meter room


M&E room

Progress
(%)

FLOOR - CEMENT
SAND SCREED
Actual
START

Progress
(%)

FLOOR - FLOWCRETE
COATING
Actual
START

Progress
(%)

FLOOR HOMOGENEOUS TILE


Actual
START

Progress
(%)

FLOOR - GRANITE

FLOOR - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

SKIRTING HOMOGENOUS TILE


Actual
START

G - PODIUM

M
Update : 09 Sep 15

GRID LINE

NO.

AREA

2b-4a/C-K

Retail lobby

31

01-5c/C-M

Retail unit 1,2,3,4,5,6,7

32

5/E

33

3b/E

Glass lift

34

3/E

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/J

Retail lift lobby

1a/B

M&E room

1/C

Store

4/E

Smoke spill fan room

4a/E

Copper pipes compartment

1a/F

Smoke spill fresh air pump room

2b-E

Pedestrian walk way

1-5a/C-J

Passage

1-7/B-M

Car parking

10

2a/C

Handicapped parking space

11

3/E-F

Stair from 3A to 3B

12

01-6/C-K

Ramp

13

2-2a/E-F

Car park management office

14

1/H

Male prayer room

15

2/H

Female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

RETAIL

30

OTHER
ROOMS
STAIRCASE

CEILING - FRAME FOR


EXPOSED GRID
GYPSUM CEILING
PANEL
Actual
START

RET
LIFT CORE & ESCAPE STAIRCASE
AIL

TYPICAL COMMON AREA BASEMENT TO LEVEL 36


LEVEL 3A & 3B
AREA VEL 36

LOCATION

CARPAKING & DRIVEWAY M&E SERVICE ROOM

LEVEL

PODIUM

Retail male & female toilet

Progress
(%)

FLOOR - CEMENT
SAND SCREED
Actual
START

Progress
(%)

FLOOR - FLOWCRETE
COATING
Actual
START

Progress
(%)

FLOOR HOMOGENEOUS TILE


Actual
START

Progress
(%)

FLOOR - GRANITE

FLOOR - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

SKIRTING HOMOGENOUS TILE


Actual
START

G - PODIUM

M
Update : 09 Sep 15

NO.

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

LIFT LOBBY
& SERVICE
R.M

1-2/B-C

Store 1, 2

4a/D-E

Store 3

3/M

PARKING & DRIVEWAY

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

LIFT LOBBY &


SERVICE ROOM

GRID LINE

LIFT CORE & ESCAPE STAIRCASE


AREA

6/G

1-2/B-C

Store 1, 2

4a/D-E

Store 3

2/B

Genset room (hotel)

3/M

Retail lift lobby

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

LIFT CORE & ESCAPE


STAIRCASE

PARKING & DRIVEWAY

LEVEL 5A & 5B

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL 4A & 4B

TYPICAL COMMON AREA LEVEL


BASEMENT TO LEVEL 36

PODIUM

LOCATION

CEILING - FRAME FOR


EXPOSED GRID
GYPSUM CEILING
PANEL
Actual
START

Retail lift lobby


Passage
Stair from 4A to 4B

Passage
Stair to up from 4A to 4B

Handicaped parking space

Progress
(%)

FLOOR - CEMENT
SAND SCREED
Actual
START

Progress
(%)

FLOOR - FLOWCRETE
COATING
Actual
START

Progress
(%)

FLOOR HOMOGENEOUS TILE


Actual
START

Progress
(%)

FLOOR - GRANITE

FLOOR - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

SKIRTING HOMOGENOUS TILE


Actual
START

GRID LINE

PODIUM

NO.

PARKINGAREA
& DRIVEWAY
LIFT CORE & ESCAPE STAIRCASE
M&E
STAIRCASE

PARKING

LEVEL 6A & 6B
A - BASEMENT
6

M
Update : 09 Sep 15

LIFT LOBBY &


SERVICE ROOM

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL
LEVEL 5A & 5B

G - PODIUM

LOCATION

CEILING - FRAME FOR


EXPOSED GRID
GYPSUM CEILING
PANEL
Actual
START

10

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/M

Retail lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

6/G

Store 4

6/E

Management office

2a/B

Main switch board room (hotel)

2b/B

Transformer room (hotel)

5a-6/C

Transformer (apartment)

6/C

10

5a-6/C-D

11

4a/E

CW pump room

12

5/E

EFF & CW. Tank

13

6/H

Transformer room (retail)

14

6/J

Main switch boardroom (retail)

15

6/K

Genset room (retail)

16

1a/F

Fire pump room (hotel)

17

1/F

HR tank 1, 2

18

2/F

WR tank 1, 2

19

01-6/C-K

Ramp

20

5a/B, 2/K

Motocycle parking

21

01-7/B-M

Car parking

1/A

Escape staircase S1

1/G

Escape staircase S2

Main switch board room (apartment)


Switch gear room (apartment)

Progress
(%)

FLOOR - CEMENT
SAND SCREED
Actual
START

Progress
(%)

FLOOR - FLOWCRETE
COATING
Actual
START

Progress
(%)

FLOOR HOMOGENEOUS TILE


Actual
START

Progress
(%)

FLOOR - GRANITE

FLOOR - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

SKIRTING HOMOGENOUS TILE


Actual
START

G - PODIUM

M
Update : 09 Sep 15

GRID LINE

NO.

LIFT CORE & ESCAPE STAIRCASE


AREA
HOUSE (HOTEL)

CUSTOMER (HOTEL)

M&E AND STORE

TYPICAL COMMON AREA - BASEMENT


LEVEL
TO LEVEL 36

PODIUM

LOCATION

CEILING - FRAME FOR


EXPOSED GRID
GYPSUM CEILING
PANEL
Actual
START

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

7/H

AV store

5a-6/C

Spa store

5/D-E

Store

1/C

1/C-D

AWCS

6/C-D

Staircase pressurization room

3a/C

Reception & check-in counter

3a/B

Business center/ library

4/B

10

4a/B

11

2/E

Bakery

12

3/G

All day dining

13

3c-3d/M

14

5/E

15

4c-G

Function room 1

16

5b/G

Function room 2

17

4a-6/B

Treatment 1, 2, 3

18

5a-6/B

Couple treatment room

19

6-7/B

Zacuzzi

20

6/D

21

2-2a/B

22

1a/B

23

2-2a/B

24

2a/B

Bins room

Social space
Idea room

Pantry
Pre-function room

Male & female toilet


Gen. cash
Storage
Account manager
Director finance

Progress
(%)

FLOOR - CEMENT
SAND SCREED
Actual
START

Progress
(%)

FLOOR - FLOWCRETE
COATING
Actual
START

Progress
(%)

FLOOR HOMOGENEOUS TILE


Actual
START

Progress
(%)

FLOOR - GRANITE

FLOOR - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

SKIRTING HOMOGENOUS TILE


Actual
START

G - PODIUM

M
Update : 09 Sep 15

GRID LINE

NO.

FRONT OF HOUSE (HOTEL)


AREA
E STAIRCASE

EA - BASEMENT
36

LANDSC
APE

MAIN KITCHEN

MAIN KITCHEN

LEVEL 7

LEVEL

PODIUM

LOCATION

CEILING - FRAME FOR


EXPOSED GRID
GYPSUM CEILING
PANEL
Actual
START

25

3/B

GM office

26

5/C

Sales & marketing

27

4-4a/c-D

28

4-4a/C

Manager 1, 2

29

4-4a/D

Luggage room

30

5/D

Store

31

5c/E

Food preparation

32

1-1a/C

33

1-1a/C-D

Walk-in freezer

34

2/C-D

Walk-in chiller

35

1/D

Freeze

36

1/D

Chiller

37

2/D

Pastry store

38

1/D-E

Meat prep

39

1/E

Vege prep

40

2/E

Pastry & bakery

41

2/E

Chocolate room

42

1/E-F

43

1/F

RM. Service office

44

1/F

Chef office

45

1/F

Room service

46

1/F-G

Steward store

47

1-1a/F-G

48

1/G

Dish washing

49

2/F

Cooking area

50

5/A-B

51

4b-7/H-M

1/A

Escape staircase S1

1/G

Escape staircase S2

Hotel front office

Dry store

Cold kitchen

Pot & pan washing

Balcony
Deck extension for F&B funtions

Progress
(%)

FLOOR - CEMENT
SAND SCREED
Actual
START

Progress
(%)

FLOOR - FLOWCRETE
COATING
Actual
START

Progress
(%)

FLOOR HOMOGENEOUS TILE


Actual
START

Progress
(%)

FLOOR - GRANITE

FLOOR - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

SKIRTING HOMOGENOUS TILE


Actual
START

G - PODIUM

M
Update : 09 Sep 15

GRID LINE

NO.

LIFT CORE & ESCAPE STAIRCASE


AREA
OFFICE (BOH)

LEVEL 7 MEZZANINE

M&E

TYPICAL COMMON AREA - BASEMENT


LEVEL
TO LEVEL 36

PODIUM

LOCATION

CEILING - FRAME FOR


EXPOSED GRID
GYPSUM CEILING
PANEL
Actual
START

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1/C

Bin room

1/C

AWCS

2/B

Ahu room 1

1/G

Ahu room 2

01/F-G

01/G

1a/B-C

M&E area

1a/B

I.T. Store

2-2a/B-C

I.T. office

10

2b/B

11

3/B

Uniform issue

12

6/E

Function room storage

13

6/H

AV room

14

2/E

HK manager

15

2/E-F

HR. DIR. Office

16

2/E-F

F&B DIR. Office

17

2/F-G

Executive chef

18

1/F

Working area

19

1/E

Training/ meeting room

20

1a/D

21

1-1a/C

22

2/D

Balancing tank
Pump room

Server room

Corridors
Security & receiving area
Flower shop

Progress
(%)

FLOOR - CEMENT
SAND SCREED
Actual
START

Progress
(%)

FLOOR - FLOWCRETE
COATING
Actual
START

Progress
(%)

FLOOR HOMOGENEOUS TILE


Actual
START

Progress
(%)

FLOOR - GRANITE

FLOOR - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

SKIRTING HOMOGENOUS TILE


Actual
START

LEVEL 7 MEZZ

LIFT CORE &


ESCAPE
STAIRCASE

GRID LINE

NO.

AREA

PODIUM

FACILITY

TYPICAL COMMON
AREA - BASEMENT
TO LEVEL 36
LEVEL 8

M
Update : 09 Sep 15

SERVICE AREA (BOH)

LEVEL

G - PODIUM

LOCATION

CEILING - FRAME FOR


EXPOSED GRID
GYPSUM CEILING
PANEL
Actual
START

23

2/D

House keeping office

24

1/D

Soiled linen room

25

1/D

Valet laundry

26

1/D-E

Clean linen room

27

1/C-D

Trolley bay

28

3a/B

Clinic

29

4/B

30

5a/B

31

6/B

32

6/B-C

33

6/C

Staf social lounge

34

6/D

Male & female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

11

3a/C

Gym

12

3/B

Male, female changing room

13

3/F

Swimming pool

14

3/J

Pantry

15

4d/J

16

2a-4/B-H

Deck

17

2a-7/A-D

Roof top garden for apartment


tower

18

2b-7/B-J

Steps

19

2b-7/B-J

Ramp

Male & female changing room, toilet


Team dinning room
Kitchen
Kitchen storage

Spiral stair

Progress
(%)

FLOOR - CEMENT
SAND SCREED
Actual
START

Progress
(%)

FLOOR - FLOWCRETE
COATING
Actual
START

Progress
(%)

FLOOR HOMOGENEOUS TILE


Actual
START

Progress
(%)

FLOOR - GRANITE

FLOOR - RENDER /
SKIMCOAT

Actual
START

Actual
START

Progress
(%)

Progress
(%)

SKIRTING HOMOGENOUS TILE


Actual
START

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE STAIRCASE
M&E SERVICE ROOM

BASEMENT

PARKING &
DRIVEWAY

LIFT CORE

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

PODIUM

LOCATION

SKIRTING HOMOGENOUS TILE


Progress
(%)

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

01-2/A

Hotel store 1,2

4a/C-D

Store 3

4a-5/C-D

Store (service apt.)

7/G

1-2/F-G

5/C

1-7/A-J

Car parking

1-7/A-J

Motor parking

4a-E

1/E

Ramp 1

10

1/C

Fan room

11

3a/B

Chiller plant room

12

4/B

13

4a/A-B

14

5/A

Domestic tank 1, 2 (retail)

15

5/A

Pump room 1 (retail)

16

5a/B

Pump room 2 (hotel)

17

6/B

18

6/C-D

Pump room 4 (service Apt. + retail)

19

5a-6/D

Pump room 5 (hotel)

20

5b-5c/H

Pump room 6 (hotel)

21

5b-5c/J

Pump room 7 (retail/ carpark)

22

5a/A

AC make up tank 1, 2 (hotel)

23

7/A

Carpark store
Staircase lobby
Passage

Handicapped parking space

Flood retention tank (below)


Sump pit

Pump room 3 (service apt.)

Domestic tank 3 (hotel)

SKIRTING - TIMBER
Actual
START

Progress
(%)

FLOOR - RENDER /
SKIMCOAT WITH PAINT WALL BASED PAINTING WALL FINAL PAINTING
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - LEAVE
Actual
START

Progress
(%)

TIMBER FLUSH DOOR LEAVE


Actual
START

Progress
(%)

BA

GRID LINE

PODIUM

NO.

M&E SERVICE
AREA
ROOM
PE

REA L 36

RETAIL

LEVEL1

M&E AND SERVICE


ROOM

LIFT CORE & ESCAPE STAIRCASE

LEVEL
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LOCATION

SKIRTING HOMOGENOUS TILE


Progress
(%)

24

7/B

Domestic tank 4 (service apt.)

25

5a-6/C

Wet riser tank 1, 2

26

6-7/C

Hose reel tank 1, 2

27

7/D

28

5b/H

Sprinkler pump stage 1

29

7/J-K

Sprinkler tank 1, 2

30

2/H

Grease interceptor system


(hotel&retail)

31

01/G

OSD, on-site detention tank

32

01/F

Rain water harvesting tank

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1a/A

Store

5a/D

Janitor

5a/D-E

Refuse

5a-D

4a-5B/D-F

1-H

2a-4a/D-L

1-6/C-G

3/M

10

1-7/A-M

11

4a-5b/C-F

12

4/F

Glass lift

13

3a/F

Escalator

1/A

Escape staircase S1

Fresh air fanroom (car park)

Refuse bin
Store 1, 2,3,4,5
Ramp 1
Retail lobby
Passage 1, 2, 3, 4
Retail service lift lobby
Retail unit 1,2,3,4,5,6,7,8,9,10
Retail male & female toilet

SKIRTING - TIMBER
Actual
START

Progress
(%)

FLOOR - RENDER /
SKIMCOAT WITH PAINT WALL BASED PAINTING WALL FINAL PAINTING
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - LEAVE
Actual
START

Progress
(%)

TIMBER FLUSH DOOR LEAVE


Actual
START

Progress
(%)

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE
STAIRCASE
M&E & SERVICE ROOM (SERVICE APARTMENT & RETAIL)
CIRCULATIO
N

LEVEL 2

M&E & SERVICE ROOM (HOTEL)

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

PODIUM

LOCATION

SKIRTING HOMOGENOUS TILE


Progress
(%)

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

2/C

Hotel lobby

3/B-C

1/C

Receiving area & purchasing

2/D

Luggage room

1a/B

LPG Farm 1 (hotel)

2/B

Loading & Unloading bay

2a/B

Receiving area & platform

1/C-D

Bin center 1

1/C-D

Store

10

5a/E

Retail service lift lobby

11

5/C

Letter box

12

5a/C

Fire control room (retail, apt.)

13

6/C

MDF room

14

6/C-D

Bin center 2

15

5a-6/D

AWCS cable room

16

5a-6/D-E

AWCS

17

5a/E

CWSP

18

5a/E

Full vacuumload station

19

6/E

Loading & Unloading

20

5a/F

Consumer HT room

21

5a/G

TNB room

22

6/G

23

5b/G-H

24

5c/H

Diesel fuel pump room

25

5b/H

Bomba vehicle turning circle

26

5b/J

LPG Farm 2 (retail)

27

4a/E-F

Passage

28

01/B

Ramp 2

29

2a-7/A-C

Drop of

Reception

TNB meter room


M&E room

SKIRTING - TIMBER
Actual
START

Progress
(%)

FLOOR - RENDER /
SKIMCOAT WITH PAINT WALL BASED PAINTING WALL FINAL PAINTING
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - LEAVE
Actual
START

Progress
(%)

TIMBER FLUSH DOOR LEAVE


Actual
START

Progress
(%)

NO.

AREA

GRID LINE

Progress
(%)

2b-4a/C-K

Retail lobby

31

01-5c/C-M

Retail unit 1,2,3,4,5,6,7

32

5/E

33

3b/E

Glass lift

34

3/E

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/J

Retail lift lobby

1a/B

M&E room

1/C

Store

4/E

Smoke spill fan room

4a/E

Copper pipes compartment

1a/F

Smoke spill fresh air pump room

2b-E

Pedestrian walk way

1-5a/C-J

Passage

1-7/B-M

Car parking

10

2a/C

Handicapped parking space

11

3/E-F

Stair from 3A to 3B

12

01-6/C-K

Ramp

13

2-2a/E-F

Car park management office

14

1/H

Male prayer room

15

2/H

Female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

RETAIL

30

RET
LIFT CORE & ESCAPE STAIRCASE
AIL

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

STAIRCASE

OTHER
ROOMS

LEVEL 3A & 3B
AREA VEL 36

LOCATION

SKIRTING HOMOGENOUS TILE

CARPAKING & DRIVEWAY M&E SERVICE ROOM

LEVEL

PODIUM

Retail male & female toilet

SKIRTING - TIMBER
Actual
START

Progress
(%)

FLOOR - RENDER /
SKIMCOAT WITH PAINT WALL BASED PAINTING WALL FINAL PAINTING
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - LEAVE
Actual
START

Progress
(%)

TIMBER FLUSH DOOR LEAVE


Actual
START

Progress
(%)

NO.

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

LIFT LOBBY
& SERVICE
R.M

1-2/B-C

Store 1, 2

4a/D-E

Store 3

3/M

PARKING & DRIVEWAY

GRID LINE

LIFT CORE & ESCAPE STAIRCASE


AREA

6/G

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

2/B

Genset room (hotel)

3/M

Retail lift lobby

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

LIFT CORE & ESCAPE


STAIRCASE

LIFT LOBBY &


SERVICE ROOM

SKIRTING HOMOGENOUS TILE

PARKING & DRIVEWAY

LEVEL 5A & 5B

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL 4A & 4B

TYPICAL COMMON AREA LEVEL


BASEMENT TO LEVEL 36

PODIUM

LOCATION

Progress
(%)

Retail lift lobby


Passage
Stair from 4A to 4B

Passage
Stair to up from 4A to 4B

Handicaped parking space

SKIRTING - TIMBER
Actual
START

Progress
(%)

FLOOR - RENDER /
SKIMCOAT WITH PAINT WALL BASED PAINTING WALL FINAL PAINTING
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - LEAVE
Actual
START

Progress
(%)

TIMBER FLUSH DOOR LEAVE


Actual
START

Progress
(%)

GRID LINE

PODIUM

NO.

PARKINGAREA
& DRIVEWAY
M&E
STAIRCASE

A - BASEMENT
6

PARKING

LEVEL 6A & 6B

LIFT LOBBY &


SERVICE ROOM

LIFT CORE & ESCAPE STAIRCASE

LEVEL
LEVEL 5A & 5B
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LOCATION

SKIRTING HOMOGENOUS TILE


Progress
(%)

10

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/M

Retail lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

6/G

Store 4

6/E

Management office

2a/B

Main switch board room (hotel)

2b/B

Transformer room (hotel)

5a-6/C

Transformer (apartment)

6/C

10

5a-6/C-D

11

4a/E

CW pump room

12

5/E

EFF & CW. Tank

13

6/H

Transformer room (retail)

14

6/J

Main switch boardroom (retail)

15

6/K

Genset room (retail)

16

1a/F

Fire pump room (hotel)

17

1/F

HR tank 1, 2

18

2/F

WR tank 1, 2

19

01-6/C-K

Ramp

20

5a/B, 2/K

Motocycle parking

21

01-7/B-M

Car parking

1/A

Escape staircase S1

1/G

Escape staircase S2

Main switch board room (apartment)


Switch gear room (apartment)

SKIRTING - TIMBER
Actual
START

Progress
(%)

FLOOR - RENDER /
SKIMCOAT WITH PAINT WALL BASED PAINTING WALL FINAL PAINTING
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - LEAVE
Actual
START

Progress
(%)

TIMBER FLUSH DOOR LEAVE


Actual
START

Progress
(%)

GRID LINE

NO.

LIFT CORE & ESCAPE STAIRCASE


AREA
HOUSE (HOTEL)

CUSTOMER (HOTEL)

M&E AND STORE

TYPICAL COMMON AREA - BASEMENT


LEVEL
TO LEVEL 36

PODIUM

LOCATION

SKIRTING HOMOGENOUS TILE


Progress
(%)

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

7/H

AV store

5a-6/C

Spa store

5/D-E

Store

1/C

1/C-D

AWCS

6/C-D

Staircase pressurization room

3a/C

Reception & check-in counter

3a/B

Business center/ library

4/B

10

4a/B

11

2/E

Bakery

12

3/G

All day dining

13

3c-3d/M

14

5/E

15

4c-G

Function room 1

16

5b/G

Function room 2

17

4a-6/B

Treatment 1, 2, 3

18

5a-6/B

Couple treatment room

19

6-7/B

Zacuzzi

20

6/D

21

2-2a/B

22

1a/B

23

2-2a/B

24

2a/B

Bins room

Social space
Idea room

Pantry
Pre-function room

Male & female toilet


Gen. cash
Storage
Account manager
Director finance

SKIRTING - TIMBER
Actual
START

Progress
(%)

FLOOR - RENDER /
SKIMCOAT WITH PAINT WALL BASED PAINTING WALL FINAL PAINTING
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - LEAVE
Actual
START

Progress
(%)

TIMBER FLUSH DOOR LEAVE


Actual
START

Progress
(%)

GRID LINE

NO.

FRONT OF HOUSE (HOTEL)


AREA
E STAIRCASE

EA - BASEMENT
36

LANDSC
APE

MAIN KITCHEN

MAIN KITCHEN

LEVEL 7

LEVEL

PODIUM

LOCATION

SKIRTING HOMOGENOUS TILE


Progress
(%)

25

3/B

GM office

26

5/C

Sales & marketing

27

4-4a/c-D

28

4-4a/C

Manager 1, 2

29

4-4a/D

Luggage room

30

5/D

Store

31

5c/E

Food preparation

32

1-1a/C

33

1-1a/C-D

Walk-in freezer

34

2/C-D

Walk-in chiller

35

1/D

Freeze

36

1/D

Chiller

37

2/D

Pastry store

38

1/D-E

Meat prep

39

1/E

Vege prep

40

2/E

Pastry & bakery

41

2/E

Chocolate room

42

1/E-F

43

1/F

RM. Service office

44

1/F

Chef office

45

1/F

Room service

46

1/F-G

Steward store

47

1-1a/F-G

48

1/G

Dish washing

49

2/F

Cooking area

50

5/A-B

51

4b-7/H-M

1/A

Escape staircase S1

1/G

Escape staircase S2

Hotel front office

Dry store

Cold kitchen

Pot & pan washing

Balcony
Deck extension for F&B funtions

SKIRTING - TIMBER
Actual
START

Progress
(%)

FLOOR - RENDER /
SKIMCOAT WITH PAINT WALL BASED PAINTING WALL FINAL PAINTING
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - LEAVE
Actual
START

Progress
(%)

TIMBER FLUSH DOOR LEAVE


Actual
START

Progress
(%)

GRID LINE

NO.

LIFT CORE & ESCAPE STAIRCASE


AREA
OFFICE (BOH)

LEVEL 7 MEZZANINE

M&E

TYPICAL COMMON AREA - BASEMENT


LEVEL
TO LEVEL 36

PODIUM

LOCATION

SKIRTING HOMOGENOUS TILE


Progress
(%)

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1/C

Bin room

1/C

AWCS

2/B

Ahu room 1

1/G

Ahu room 2

01/F-G

01/G

1a/B-C

M&E area

1a/B

I.T. Store

2-2a/B-C

I.T. office

10

2b/B

11

3/B

Uniform issue

12

6/E

Function room storage

13

6/H

AV room

14

2/E

HK manager

15

2/E-F

HR. DIR. Office

16

2/E-F

F&B DIR. Office

17

2/F-G

Executive chef

18

1/F

Working area

19

1/E

Training/ meeting room

20

1a/D

21

1-1a/C

22

2/D

Balancing tank
Pump room

Server room

Corridors
Security & receiving area
Flower shop

SKIRTING - TIMBER
Actual
START

Progress
(%)

FLOOR - RENDER /
SKIMCOAT WITH PAINT WALL BASED PAINTING WALL FINAL PAINTING
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - LEAVE
Actual
START

Progress
(%)

TIMBER FLUSH DOOR LEAVE


Actual
START

Progress
(%)

LEVEL 7 MEZZ
LIFT CORE &
ESCAPE
STAIRCASE
FACILITY

TYPICAL COMMON
AREA - BASEMENT
TO LEVEL 36
LEVEL 8

GRID LINE

NO.

AREA

PODIUM

SERVICE AREA (BOH)

LEVEL

LOCATION

SKIRTING HOMOGENOUS TILE


Progress
(%)

23

2/D

House keeping office

24

1/D

Soiled linen room

25

1/D

Valet laundry

26

1/D-E

Clean linen room

27

1/C-D

Trolley bay

28

3a/B

Clinic

29

4/B

30

5a/B

31

6/B

32

6/B-C

33

6/C

Staf social lounge

34

6/D

Male & female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

11

3a/C

Gym

12

3/B

Male, female changing room

13

3/F

Swimming pool

14

3/J

Pantry

15

4d/J

16

2a-4/B-H

Deck

17

2a-7/A-D

Roof top garden for apartment


tower

18

2b-7/B-J

Steps

19

2b-7/B-J

Ramp

Male & female changing room, toilet


Team dinning room
Kitchen
Kitchen storage

Spiral stair

SKIRTING - TIMBER
Actual
START

Progress
(%)

FLOOR - RENDER /
SKIMCOAT WITH PAINT WALL BASED PAINTING WALL FINAL PAINTING
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

Actual
START

Progress
(%)

FIRE RATE TIMBER


DOOR - LEAVE
Actual
START

Progress
(%)

TIMBER FLUSH DOOR LEAVE


Actual
START

Progress
(%)

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE STAIRCASE
M&E SERVICE ROOM

BASEMENT

PARKING &
DRIVEWAY

LIFT CORE

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

STEEL DOOR - LEAVE


LOCATION
Actual
START

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

01-2/A

Hotel store 1,2

4a/C-D

Store 3

4a-5/C-D

Store (service apt.)

7/G

1-2/F-G

5/C

1-7/A-J

Car parking

1-7/A-J

Motor parking

4a-E

1/E

Ramp 1

10

1/C

Fan room

11

3a/B

Chiller plant room

12

4/B

13

4a/A-B

14

5/A

Domestic tank 1, 2 (retail)

15

5/A

Pump room 1 (retail)

16

5a/B

Pump room 2 (hotel)

17

6/B

18

6/C-D

Pump room 4 (service Apt. + retail)

19

5a-6/D

Pump room 5 (hotel)

20

5b-5c/H

Pump room 6 (hotel)

21

5b-5c/J

Pump room 7 (retail/ carpark)

22

5a/A

AC make up tank 1, 2 (hotel)

23

7/A

Carpark store
Staircase lobby
Passage

Handicapped parking space

Flood retention tank (below)


Sump pit

Pump room 3 (service apt.)

Domestic tank 3 (hotel)

Progress
(%)

STEEL ROLLER
SHUTTER
Actual
START

Progress
(%)

CEILING - GYPSUM
CEILING - EXPOSED
PLASTER BOARD AND
GRID GYPSUM CEILING
EMULTION PAINTED
PANEL
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

CEILING BASED
PAINTING
Actual
START

Progress
(%)

CEILING FINAL
PAINTING
Actual
START

Progress
(%)

IRONMONGERY - FIRE
RATE TIMBER DOOR
Actual
START

BA

GRID LINE

NO.

M&E SERVICE
AREA
ROOM
PE

REA L 36

RETAIL

LEVEL1

M&E AND SERVICE


ROOM

LIFT CORE & ESCAPE STAIRCASE

LEVEL
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

STEEL DOOR - LEAVE


LOCATION
Actual
START

24

7/B

Domestic tank 4 (service apt.)

25

5a-6/C

Wet riser tank 1, 2

26

6-7/C

Hose reel tank 1, 2

27

7/D

28

5b/H

Sprinkler pump stage 1

29

7/J-K

Sprinkler tank 1, 2

30

2/H

Grease interceptor system


(hotel&retail)

31

01/G

OSD, on-site detention tank

32

01/F

Rain water harvesting tank

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1a/A

Store

5a/D

Janitor

5a/D-E

Refuse

5a-D

4a-5B/D-F

1-H

2a-4a/D-L

1-6/C-G

3/M

10

1-7/A-M

11

4a-5b/C-F

12

4/F

Glass lift

13

3a/F

Escalator

1/A

Escape staircase S1

Fresh air fanroom (car park)

Refuse bin
Store 1, 2,3,4,5
Ramp 1
Retail lobby
Passage 1, 2, 3, 4
Retail service lift lobby
Retail unit 1,2,3,4,5,6,7,8,9,10
Retail male & female toilet

Progress
(%)

STEEL ROLLER
SHUTTER
Actual
START

Progress
(%)

CEILING - GYPSUM
CEILING - EXPOSED
PLASTER BOARD AND
GRID GYPSUM CEILING
EMULTION PAINTED
PANEL
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

CEILING BASED
PAINTING
Actual
START

Progress
(%)

CEILING FINAL
PAINTING
Actual
START

Progress
(%)

IRONMONGERY - FIRE
RATE TIMBER DOOR
Actual
START

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE
STAIRCASE
M&E & SERVICE ROOM (SERVICE APARTMENT & RETAIL)
CIRCULATIO
N

LEVEL 2

M&E & SERVICE ROOM (HOTEL)

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

STEEL DOOR - LEAVE


LOCATION
Actual
START

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

2/C

Hotel lobby

3/B-C

1/C

Receiving area & purchasing

2/D

Luggage room

1a/B

LPG Farm 1 (hotel)

2/B

Loading & Unloading bay

2a/B

Receiving area & platform

1/C-D

Bin center 1

1/C-D

Store

10

5a/E

Retail service lift lobby

11

5/C

Letter box

12

5a/C

Fire control room (retail, apt.)

13

6/C

MDF room

14

6/C-D

Bin center 2

15

5a-6/D

AWCS cable room

16

5a-6/D-E

AWCS

17

5a/E

CWSP

18

5a/E

Full vacuumload station

19

6/E

Loading & Unloading

20

5a/F

Consumer HT room

21

5a/G

TNB room

22

6/G

23

5b/G-H

24

5c/H

Diesel fuel pump room

25

5b/H

Bomba vehicle turning circle

26

5b/J

LPG Farm 2 (retail)

27

4a/E-F

Passage

28

01/B

Ramp 2

29

2a-7/A-C

Drop of

Reception

TNB meter room


M&E room

Progress
(%)

STEEL ROLLER
SHUTTER
Actual
START

Progress
(%)

CEILING - GYPSUM
CEILING - EXPOSED
PLASTER BOARD AND
GRID GYPSUM CEILING
EMULTION PAINTED
PANEL
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

CEILING BASED
PAINTING
Actual
START

Progress
(%)

CEILING FINAL
PAINTING
Actual
START

Progress
(%)

IRONMONGERY - FIRE
RATE TIMBER DOOR
Actual
START

GRID LINE

NO.

AREA

LOCATION
Actual
START

2b-4a/C-K

Retail lobby

31

01-5c/C-M

Retail unit 1,2,3,4,5,6,7

32

5/E

33

3b/E

Glass lift

34

3/E

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/J

Retail lift lobby

1a/B

M&E room

1/C

Store

4/E

Smoke spill fan room

4a/E

Copper pipes compartment

1a/F

Smoke spill fresh air pump room

2b-E

Pedestrian walk way

1-5a/C-J

Passage

1-7/B-M

Car parking

10

2a/C

Handicapped parking space

11

3/E-F

Stair from 3A to 3B

12

01-6/C-K

Ramp

13

2-2a/E-F

Car park management office

14

1/H

Male prayer room

15

2/H

Female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

RETAIL

30

RET
LIFT CORE & ESCAPE STAIRCASE
AIL

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

STAIRCASE

OTHER
ROOMS

LEVEL 3A & 3B
AREA VEL 36

STEEL DOOR - LEAVE

CARPAKING & DRIVEWAY M&E SERVICE ROOM

LEVEL

Retail male & female toilet

Progress
(%)

STEEL ROLLER
SHUTTER
Actual
START

Progress
(%)

CEILING - GYPSUM
CEILING - EXPOSED
PLASTER BOARD AND
GRID GYPSUM CEILING
EMULTION PAINTED
PANEL
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

CEILING BASED
PAINTING
Actual
START

Progress
(%)

CEILING FINAL
PAINTING
Actual
START

Progress
(%)

IRONMONGERY - FIRE
RATE TIMBER DOOR
Actual
START

GRID LINE

LIFT CORE & ESCAPE STAIRCASE


AREA

NO.

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

LIFT LOBBY
& SERVICE
R.M

1-2/B-C

Store 1, 2

4a/D-E

Store 3

3/M

PARKING & DRIVEWAY

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

2/B

Genset room (hotel)

3/M

Retail lift lobby

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

LIFT CORE & ESCAPE


STAIRCASE

LIFT LOBBY &


SERVICE ROOM

STEEL DOOR - LEAVE

PARKING & DRIVEWAY

LEVEL 5A & 5B

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL 4A & 4B

TYPICAL COMMON AREA LEVEL


BASEMENT TO LEVEL 36

LOCATION
Actual
START

Retail lift lobby


Passage
Stair from 4A to 4B

Passage
Stair to up from 4A to 4B

Handicaped parking space

Progress
(%)

STEEL ROLLER
SHUTTER
Actual
START

Progress
(%)

CEILING - GYPSUM
CEILING - EXPOSED
PLASTER BOARD AND
GRID GYPSUM CEILING
EMULTION PAINTED
PANEL
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

CEILING BASED
PAINTING
Actual
START

Progress
(%)

CEILING FINAL
PAINTING
Actual
START

Progress
(%)

IRONMONGERY - FIRE
RATE TIMBER DOOR
Actual
START

GRID LINE

NO.

PARKINGAREA
& DRIVEWAY
M&E
STAIRCASE

A - BASEMENT
6

PARKING

LEVEL 6A & 6B

LIFT LOBBY &


SERVICE ROOM

LIFT CORE & ESCAPE STAIRCASE

LEVEL
LEVEL 5A & 5B
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

STEEL DOOR - LEAVE


LOCATION
Actual
START

10

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/M

Retail lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

6/G

Store 4

6/E

Management office

2a/B

Main switch board room (hotel)

2b/B

Transformer room (hotel)

5a-6/C

Transformer (apartment)

6/C

10

5a-6/C-D

11

4a/E

CW pump room

12

5/E

EFF & CW. Tank

13

6/H

Transformer room (retail)

14

6/J

Main switch boardroom (retail)

15

6/K

Genset room (retail)

16

1a/F

Fire pump room (hotel)

17

1/F

HR tank 1, 2

18

2/F

WR tank 1, 2

19

01-6/C-K

Ramp

20

5a/B, 2/K

Motocycle parking

21

01-7/B-M

Car parking

1/A

Escape staircase S1

1/G

Escape staircase S2

Main switch board room (apartment)


Switch gear room (apartment)

Progress
(%)

STEEL ROLLER
SHUTTER
Actual
START

Progress
(%)

CEILING - GYPSUM
CEILING - EXPOSED
PLASTER BOARD AND
GRID GYPSUM CEILING
EMULTION PAINTED
PANEL
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

CEILING BASED
PAINTING
Actual
START

Progress
(%)

CEILING FINAL
PAINTING
Actual
START

Progress
(%)

IRONMONGERY - FIRE
RATE TIMBER DOOR
Actual
START

GRID LINE

NO.

LIFT CORE & ESCAPE STAIRCASE


AREA
HOUSE (HOTEL)

CUSTOMER (HOTEL)

M&E AND STORE

TYPICAL COMMON AREA - BASEMENT


LEVEL
TO LEVEL 36

STEEL DOOR - LEAVE


LOCATION
Actual
START

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

7/H

AV store

5a-6/C

Spa store

5/D-E

Store

1/C

1/C-D

AWCS

6/C-D

Staircase pressurization room

3a/C

Reception & check-in counter

3a/B

Business center/ library

4/B

10

4a/B

11

2/E

Bakery

12

3/G

All day dining

13

3c-3d/M

14

5/E

15

4c-G

Function room 1

16

5b/G

Function room 2

17

4a-6/B

Treatment 1, 2, 3

18

5a-6/B

Couple treatment room

19

6-7/B

Zacuzzi

20

6/D

21

2-2a/B

22

1a/B

23

2-2a/B

24

2a/B

Bins room

Social space
Idea room

Pantry
Pre-function room

Male & female toilet


Gen. cash
Storage
Account manager
Director finance

Progress
(%)

STEEL ROLLER
SHUTTER
Actual
START

Progress
(%)

CEILING - GYPSUM
CEILING - EXPOSED
PLASTER BOARD AND
GRID GYPSUM CEILING
EMULTION PAINTED
PANEL
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

CEILING BASED
PAINTING
Actual
START

Progress
(%)

CEILING FINAL
PAINTING
Actual
START

Progress
(%)

IRONMONGERY - FIRE
RATE TIMBER DOOR
Actual
START

GRID LINE

NO.

FRONT OF HOUSE (HOTEL)


AREA
E STAIRCASE

EA - BASEMENT
36

LANDSC
APE

MAIN KITCHEN

MAIN KITCHEN

LEVEL 7

LEVEL

STEEL DOOR - LEAVE


LOCATION
Actual
START

25

3/B

GM office

26

5/C

Sales & marketing

27

4-4a/c-D

28

4-4a/C

Manager 1, 2

29

4-4a/D

Luggage room

30

5/D

Store

31

5c/E

Food preparation

32

1-1a/C

33

1-1a/C-D

Walk-in freezer

34

2/C-D

Walk-in chiller

35

1/D

Freeze

36

1/D

Chiller

37

2/D

Pastry store

38

1/D-E

Meat prep

39

1/E

Vege prep

40

2/E

Pastry & bakery

41

2/E

Chocolate room

42

1/E-F

43

1/F

RM. Service office

44

1/F

Chef office

45

1/F

Room service

46

1/F-G

Steward store

47

1-1a/F-G

48

1/G

Dish washing

49

2/F

Cooking area

50

5/A-B

51

4b-7/H-M

1/A

Escape staircase S1

1/G

Escape staircase S2

Hotel front office

Dry store

Cold kitchen

Pot & pan washing

Balcony
Deck extension for F&B funtions

Progress
(%)

STEEL ROLLER
SHUTTER
Actual
START

Progress
(%)

CEILING - GYPSUM
CEILING - EXPOSED
PLASTER BOARD AND
GRID GYPSUM CEILING
EMULTION PAINTED
PANEL
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

CEILING BASED
PAINTING
Actual
START

Progress
(%)

CEILING FINAL
PAINTING
Actual
START

Progress
(%)

IRONMONGERY - FIRE
RATE TIMBER DOOR
Actual
START

GRID LINE

NO.

LIFT CORE & ESCAPE STAIRCASE


AREA
OFFICE (BOH)

LEVEL 7 MEZZANINE

M&E

TYPICAL COMMON AREA - BASEMENT


LEVEL
TO LEVEL 36

STEEL DOOR - LEAVE


LOCATION
Actual
START

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1/C

Bin room

1/C

AWCS

2/B

Ahu room 1

1/G

Ahu room 2

01/F-G

01/G

1a/B-C

M&E area

1a/B

I.T. Store

2-2a/B-C

I.T. office

10

2b/B

11

3/B

Uniform issue

12

6/E

Function room storage

13

6/H

AV room

14

2/E

HK manager

15

2/E-F

HR. DIR. Office

16

2/E-F

F&B DIR. Office

17

2/F-G

Executive chef

18

1/F

Working area

19

1/E

Training/ meeting room

20

1a/D

21

1-1a/C

22

2/D

Balancing tank
Pump room

Server room

Corridors
Security & receiving area
Flower shop

Progress
(%)

STEEL ROLLER
SHUTTER
Actual
START

Progress
(%)

CEILING - GYPSUM
CEILING - EXPOSED
PLASTER BOARD AND
GRID GYPSUM CEILING
EMULTION PAINTED
PANEL
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

CEILING BASED
PAINTING
Actual
START

Progress
(%)

CEILING FINAL
PAINTING
Actual
START

Progress
(%)

IRONMONGERY - FIRE
RATE TIMBER DOOR
Actual
START

LEVEL 7 MEZZ

GRID LINE

NO.

AREA
LIFT CORE &
ESCAPE
STAIRCASE
FACILITY

LEVEL 8

TYPICAL COMMON
AREA - BASEMENT
TO LEVEL 36

SERVICE AREA (BOH)

LEVEL

STEEL DOOR - LEAVE


LOCATION
Actual
START

23

2/D

House keeping office

24

1/D

Soiled linen room

25

1/D

Valet laundry

26

1/D-E

Clean linen room

27

1/C-D

Trolley bay

28

3a/B

Clinic

29

4/B

30

5a/B

31

6/B

32

6/B-C

33

6/C

Staf social lounge

34

6/D

Male & female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

11

3a/C

Gym

12

3/B

Male, female changing room

13

3/F

Swimming pool

14

3/J

Pantry

15

4d/J

16

2a-4/B-H

Deck

17

2a-7/A-D

Roof top garden for apartment


tower

18

2b-7/B-J

Steps

19

2b-7/B-J

Ramp

Male & female changing room, toilet


Team dinning room
Kitchen
Kitchen storage

Spiral stair

Progress
(%)

STEEL ROLLER
SHUTTER
Actual
START

Progress
(%)

CEILING - GYPSUM
CEILING - EXPOSED
PLASTER BOARD AND
GRID GYPSUM CEILING
EMULTION PAINTED
PANEL
FINISH
Actual
START

Progress
(%)

Actual
START

Progress
(%)

CEILING BASED
PAINTING
Actual
START

Progress
(%)

CEILING FINAL
PAINTING
Actual
START

Progress
(%)

IRONMONGERY - FIRE
RATE TIMBER DOOR
Actual
START

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE STAIRCASE
M&E SERVICE ROOM

BASEMENT

PARKING &
DRIVEWAY

LIFT CORE

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

IRONMONGERY - FIRE
RATE TIMBER DOOR
LOCATION
Progress
(%)

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

01-2/A

Hotel store 1,2

4a/C-D

Store 3

4a-5/C-D

Store (service apt.)

7/G

1-2/F-G

5/C

1-7/A-J

Car parking

1-7/A-J

Motor parking

4a-E

1/E

Ramp 1

10

1/C

Fan room

11

3a/B

Chiller plant room

12

4/B

13

4a/A-B

14

5/A

Domestic tank 1, 2 (retail)

15

5/A

Pump room 1 (retail)

16

5a/B

Pump room 2 (hotel)

17

6/B

18

6/C-D

Pump room 4 (service Apt. + retail)

19

5a-6/D

Pump room 5 (hotel)

20

5b-5c/H

Pump room 6 (hotel)

21

5b-5c/J

Pump room 7 (retail/ carpark)

22

5a/A

AC make up tank 1, 2 (hotel)

23

7/A

Carpark store
Staircase lobby
Passage

Handicapped parking space

Flood retention tank (below)


Sump pit

Pump room 3 (service apt.)

Domestic tank 3 (hotel)

IRONMONGERY TIMBER FLUSH DOOR


Actual
START

Progress
(%)

IRONMONGERY STEEL DOOR

IRONMONGERY STEEL ROLLER


SHUTTER

SANITARY WARE FAUCET

SANITARY WARE

Actual
START

Actual
START

Actual
START

Actual
START

Progress
(%)

Progress
(%)

Progress
(%)

Progress
(%)

RAILING
Actual
START

Progress
(%)

BA

GRID LINE

NO.

M&E SERVICE
AREA
ROOM
PE

REA L 36

RETAIL

LEVEL1

M&E AND SERVICE


ROOM

LIFT CORE & ESCAPE STAIRCASE

LEVEL
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

IRONMONGERY - FIRE
RATE TIMBER DOOR
LOCATION
Progress
(%)

24

7/B

Domestic tank 4 (service apt.)

25

5a-6/C

Wet riser tank 1, 2

26

6-7/C

Hose reel tank 1, 2

27

7/D

28

5b/H

Sprinkler pump stage 1

29

7/J-K

Sprinkler tank 1, 2

30

2/H

Grease interceptor system


(hotel&retail)

31

01/G

OSD, on-site detention tank

32

01/F

Rain water harvesting tank

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1a/A

Store

5a/D

Janitor

5a/D-E

Refuse

5a-D

4a-5B/D-F

1-H

2a-4a/D-L

1-6/C-G

3/M

10

1-7/A-M

11

4a-5b/C-F

12

4/F

Glass lift

13

3a/F

Escalator

1/A

Escape staircase S1

Fresh air fanroom (car park)

Refuse bin
Store 1, 2,3,4,5
Ramp 1
Retail lobby
Passage 1, 2, 3, 4
Retail service lift lobby
Retail unit 1,2,3,4,5,6,7,8,9,10
Retail male & female toilet

IRONMONGERY TIMBER FLUSH DOOR


Actual
START

Progress
(%)

IRONMONGERY STEEL DOOR

IRONMONGERY STEEL ROLLER


SHUTTER

SANITARY WARE FAUCET

SANITARY WARE

Actual
START

Actual
START

Actual
START

Actual
START

Progress
(%)

Progress
(%)

Progress
(%)

Progress
(%)

RAILING
Actual
START

Progress
(%)

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE
STAIRCASE
M&E & SERVICE ROOM (SERVICE APARTMENT & RETAIL)
CIRCULATIO
N

LEVEL 2

M&E & SERVICE ROOM (HOTEL)

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

IRONMONGERY - FIRE
RATE TIMBER DOOR
LOCATION
Progress
(%)

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

2/C

Hotel lobby

3/B-C

1/C

Receiving area & purchasing

2/D

Luggage room

1a/B

LPG Farm 1 (hotel)

2/B

Loading & Unloading bay

2a/B

Receiving area & platform

1/C-D

Bin center 1

1/C-D

Store

10

5a/E

Retail service lift lobby

11

5/C

Letter box

12

5a/C

Fire control room (retail, apt.)

13

6/C

MDF room

14

6/C-D

Bin center 2

15

5a-6/D

AWCS cable room

16

5a-6/D-E

AWCS

17

5a/E

CWSP

18

5a/E

Full vacuumload station

19

6/E

Loading & Unloading

20

5a/F

Consumer HT room

21

5a/G

TNB room

22

6/G

23

5b/G-H

24

5c/H

Diesel fuel pump room

25

5b/H

Bomba vehicle turning circle

26

5b/J

LPG Farm 2 (retail)

27

4a/E-F

Passage

28

01/B

Ramp 2

29

2a-7/A-C

Drop of

Reception

TNB meter room


M&E room

IRONMONGERY TIMBER FLUSH DOOR


Actual
START

Progress
(%)

IRONMONGERY STEEL DOOR

IRONMONGERY STEEL ROLLER


SHUTTER

SANITARY WARE FAUCET

SANITARY WARE

Actual
START

Actual
START

Actual
START

Actual
START

Progress
(%)

Progress
(%)

Progress
(%)

Progress
(%)

RAILING
Actual
START

Progress
(%)

NO.

AREA

GRID LINE

Progress
(%)

2b-4a/C-K

Retail lobby

31

01-5c/C-M

Retail unit 1,2,3,4,5,6,7

32

5/E

33

3b/E

Glass lift

34

3/E

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/J

Retail lift lobby

1a/B

M&E room

1/C

Store

4/E

Smoke spill fan room

4a/E

Copper pipes compartment

1a/F

Smoke spill fresh air pump room

2b-E

Pedestrian walk way

1-5a/C-J

Passage

1-7/B-M

Car parking

10

2a/C

Handicapped parking space

11

3/E-F

Stair from 3A to 3B

12

01-6/C-K

Ramp

13

2-2a/E-F

Car park management office

14

1/H

Male prayer room

15

2/H

Female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

RETAIL

30

RET
LIFT CORE & ESCAPE STAIRCASE
AIL

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

STAIRCASE

OTHER
ROOMS

LEVEL 3A & 3B
AREA VEL 36

IRONMONGERY - FIRE
RATE TIMBER DOOR
LOCATION

CARPAKING & DRIVEWAY M&E SERVICE ROOM

LEVEL

Retail male & female toilet

IRONMONGERY TIMBER FLUSH DOOR


Actual
START

Progress
(%)

IRONMONGERY STEEL DOOR

IRONMONGERY STEEL ROLLER


SHUTTER

SANITARY WARE FAUCET

SANITARY WARE

Actual
START

Actual
START

Actual
START

Actual
START

Progress
(%)

Progress
(%)

Progress
(%)

Progress
(%)

RAILING
Actual
START

Progress
(%)

GRID LINE

LIFT CORE & ESCAPE STAIRCASE


AREA

NO.

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

LIFT LOBBY
& SERVICE
R.M

1-2/B-C

Store 1, 2

4a/D-E

Store 3

3/M

PARKING & DRIVEWAY

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

2/B

Genset room (hotel)

3/M

Retail lift lobby

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

LIFT CORE & ESCAPE


STAIRCASE

LIFT LOBBY &


SERVICE ROOM

IRONMONGERY - FIRE
RATE TIMBER DOOR
LOCATION

PARKING & DRIVEWAY

LEVEL 5A & 5B

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL 4A & 4B

TYPICAL COMMON AREA LEVEL


BASEMENT TO LEVEL 36

Progress
(%)

Retail lift lobby


Passage
Stair from 4A to 4B

Passage
Stair to up from 4A to 4B

Handicaped parking space

IRONMONGERY TIMBER FLUSH DOOR


Actual
START

Progress
(%)

IRONMONGERY STEEL DOOR

IRONMONGERY STEEL ROLLER


SHUTTER

SANITARY WARE FAUCET

SANITARY WARE

Actual
START

Actual
START

Actual
START

Actual
START

Progress
(%)

Progress
(%)

Progress
(%)

Progress
(%)

RAILING
Actual
START

Progress
(%)

GRID LINE

NO.

PARKINGAREA
& DRIVEWAY
M&E
STAIRCASE

A - BASEMENT
6

PARKING

LEVEL 6A & 6B

LIFT LOBBY &


SERVICE ROOM

LIFT CORE & ESCAPE STAIRCASE

LEVEL
LEVEL 5A & 5B
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

IRONMONGERY - FIRE
RATE TIMBER DOOR
LOCATION
Progress
(%)

10

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/M

Retail lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

6/G

Store 4

6/E

Management office

2a/B

Main switch board room (hotel)

2b/B

Transformer room (hotel)

5a-6/C

Transformer (apartment)

6/C

10

5a-6/C-D

11

4a/E

CW pump room

12

5/E

EFF & CW. Tank

13

6/H

Transformer room (retail)

14

6/J

Main switch boardroom (retail)

15

6/K

Genset room (retail)

16

1a/F

Fire pump room (hotel)

17

1/F

HR tank 1, 2

18

2/F

WR tank 1, 2

19

01-6/C-K

Ramp

20

5a/B, 2/K

Motocycle parking

21

01-7/B-M

Car parking

1/A

Escape staircase S1

1/G

Escape staircase S2

Main switch board room (apartment)


Switch gear room (apartment)

IRONMONGERY TIMBER FLUSH DOOR


Actual
START

Progress
(%)

IRONMONGERY STEEL DOOR

IRONMONGERY STEEL ROLLER


SHUTTER

SANITARY WARE FAUCET

SANITARY WARE

Actual
START

Actual
START

Actual
START

Actual
START

Progress
(%)

Progress
(%)

Progress
(%)

Progress
(%)

RAILING
Actual
START

Progress
(%)

GRID LINE

NO.

LIFT CORE & ESCAPE STAIRCASE


AREA
HOUSE (HOTEL)

CUSTOMER (HOTEL)

M&E AND STORE

TYPICAL COMMON AREA - BASEMENT


LEVEL
TO LEVEL 36

IRONMONGERY - FIRE
RATE TIMBER DOOR
LOCATION
Progress
(%)

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

7/H

AV store

5a-6/C

Spa store

5/D-E

Store

1/C

1/C-D

AWCS

6/C-D

Staircase pressurization room

3a/C

Reception & check-in counter

3a/B

Business center/ library

4/B

10

4a/B

11

2/E

Bakery

12

3/G

All day dining

13

3c-3d/M

14

5/E

15

4c-G

Function room 1

16

5b/G

Function room 2

17

4a-6/B

Treatment 1, 2, 3

18

5a-6/B

Couple treatment room

19

6-7/B

Zacuzzi

20

6/D

21

2-2a/B

22

1a/B

23

2-2a/B

24

2a/B

Bins room

Social space
Idea room

Pantry
Pre-function room

Male & female toilet


Gen. cash
Storage
Account manager
Director finance

IRONMONGERY TIMBER FLUSH DOOR


Actual
START

Progress
(%)

IRONMONGERY STEEL DOOR

IRONMONGERY STEEL ROLLER


SHUTTER

SANITARY WARE FAUCET

SANITARY WARE

Actual
START

Actual
START

Actual
START

Actual
START

Progress
(%)

Progress
(%)

Progress
(%)

Progress
(%)

RAILING
Actual
START

Progress
(%)

GRID LINE

NO.

FRONT OF HOUSE (HOTEL)


AREA
E STAIRCASE

EA - BASEMENT
36

LANDSC
APE

MAIN KITCHEN

MAIN KITCHEN

LEVEL 7

LEVEL

IRONMONGERY - FIRE
RATE TIMBER DOOR
LOCATION
Progress
(%)

25

3/B

GM office

26

5/C

Sales & marketing

27

4-4a/c-D

28

4-4a/C

Manager 1, 2

29

4-4a/D

Luggage room

30

5/D

Store

31

5c/E

Food preparation

32

1-1a/C

33

1-1a/C-D

Walk-in freezer

34

2/C-D

Walk-in chiller

35

1/D

Freeze

36

1/D

Chiller

37

2/D

Pastry store

38

1/D-E

Meat prep

39

1/E

Vege prep

40

2/E

Pastry & bakery

41

2/E

Chocolate room

42

1/E-F

43

1/F

RM. Service office

44

1/F

Chef office

45

1/F

Room service

46

1/F-G

Steward store

47

1-1a/F-G

48

1/G

Dish washing

49

2/F

Cooking area

50

5/A-B

51

4b-7/H-M

1/A

Escape staircase S1

1/G

Escape staircase S2

Hotel front office

Dry store

Cold kitchen

Pot & pan washing

Balcony
Deck extension for F&B funtions

IRONMONGERY TIMBER FLUSH DOOR


Actual
START

Progress
(%)

IRONMONGERY STEEL DOOR

IRONMONGERY STEEL ROLLER


SHUTTER

SANITARY WARE FAUCET

SANITARY WARE

Actual
START

Actual
START

Actual
START

Actual
START

Progress
(%)

Progress
(%)

Progress
(%)

Progress
(%)

RAILING
Actual
START

Progress
(%)

GRID LINE

NO.

LIFT CORE & ESCAPE STAIRCASE


AREA
OFFICE (BOH)

LEVEL 7 MEZZANINE

M&E

TYPICAL COMMON AREA - BASEMENT


LEVEL
TO LEVEL 36

IRONMONGERY - FIRE
RATE TIMBER DOOR
LOCATION
Progress
(%)

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1/C

Bin room

1/C

AWCS

2/B

Ahu room 1

1/G

Ahu room 2

01/F-G

01/G

1a/B-C

M&E area

1a/B

I.T. Store

2-2a/B-C

I.T. office

10

2b/B

11

3/B

Uniform issue

12

6/E

Function room storage

13

6/H

AV room

14

2/E

HK manager

15

2/E-F

HR. DIR. Office

16

2/E-F

F&B DIR. Office

17

2/F-G

Executive chef

18

1/F

Working area

19

1/E

Training/ meeting room

20

1a/D

21

1-1a/C

22

2/D

Balancing tank
Pump room

Server room

Corridors
Security & receiving area
Flower shop

IRONMONGERY TIMBER FLUSH DOOR


Actual
START

Progress
(%)

IRONMONGERY STEEL DOOR

IRONMONGERY STEEL ROLLER


SHUTTER

SANITARY WARE FAUCET

SANITARY WARE

Actual
START

Actual
START

Actual
START

Actual
START

Progress
(%)

Progress
(%)

Progress
(%)

Progress
(%)

RAILING
Actual
START

Progress
(%)

LEVEL 7 MEZZ

GRID LINE

NO.

AREA
LIFT CORE &
ESCAPE
STAIRCASE
FACILITY

LEVEL 8

TYPICAL COMMON
AREA - BASEMENT
TO LEVEL 36

SERVICE AREA (BOH)

LEVEL

IRONMONGERY - FIRE
RATE TIMBER DOOR
LOCATION
Progress
(%)

23

2/D

House keeping office

24

1/D

Soiled linen room

25

1/D

Valet laundry

26

1/D-E

Clean linen room

27

1/C-D

Trolley bay

28

3a/B

Clinic

29

4/B

30

5a/B

31

6/B

32

6/B-C

33

6/C

Staf social lounge

34

6/D

Male & female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

11

3a/C

Gym

12

3/B

Male, female changing room

13

3/F

Swimming pool

14

3/J

Pantry

15

4d/J

16

2a-4/B-H

Deck

17

2a-7/A-D

Roof top garden for apartment


tower

18

2b-7/B-J

Steps

19

2b-7/B-J

Ramp

Male & female changing room, toilet


Team dinning room
Kitchen
Kitchen storage

Spiral stair

IRONMONGERY TIMBER FLUSH DOOR


Actual
START

Progress
(%)

IRONMONGERY STEEL DOOR

IRONMONGERY STEEL ROLLER


SHUTTER

SANITARY WARE FAUCET

SANITARY WARE

Actual
START

Actual
START

Actual
START

Actual
START

Progress
(%)

Progress
(%)

Progress
(%)

Progress
(%)

RAILING
Actual
START

Progress
(%)

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE STAIRCASE
M&E SERVICE ROOM

BASEMENT

PARKING &
DRIVEWAY

LIFT CORE

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

LOCATION

BACK PAINTED GLASS


ON LIFT LOBBY
APARTMENT
Actual
START

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

01-2/A

Hotel store 1,2

4a/C-D

Store 3

4a-5/C-D

Store (service apt.)

7/G

1-2/F-G

5/C

1-7/A-J

Car parking

1-7/A-J

Motor parking

4a-E

1/E

Ramp 1

10

1/C

Fan room

11

3a/B

Chiller plant room

12

4/B

13

4a/A-B

14

5/A

Domestic tank 1, 2 (retail)

15

5/A

Pump room 1 (retail)

16

5a/B

Pump room 2 (hotel)

17

6/B

18

6/C-D

Pump room 4 (service Apt. + retail)

19

5a-6/D

Pump room 5 (hotel)

20

5b-5c/H

Pump room 6 (hotel)

21

5b-5c/J

Pump room 7 (retail/ carpark)

22

5a/A

AC make up tank 1, 2 (hotel)

23

7/A

Carpark store
Staircase lobby
Passage

Handicapped parking space

Flood retention tank (below)


Sump pit

Pump room 3 (service apt.)

Domestic tank 3 (hotel)

Progress
(%)

BALUSTRADE /
BOLLARD
Actual
START

Progress
(%)

BA

GRID LINE

NO.

M&E SERVICE
AREA
ROOM
PE

REA L 36

RETAIL

LEVEL1

M&E AND SERVICE


ROOM

LIFT CORE & ESCAPE STAIRCASE

LEVEL
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LOCATION

BACK PAINTED GLASS


ON LIFT LOBBY
APARTMENT
Actual
START

24

7/B

Domestic tank 4 (service apt.)

25

5a-6/C

Wet riser tank 1, 2

26

6-7/C

Hose reel tank 1, 2

27

7/D

28

5b/H

Sprinkler pump stage 1

29

7/J-K

Sprinkler tank 1, 2

30

2/H

Grease interceptor system


(hotel&retail)

31

01/G

OSD, on-site detention tank

32

01/F

Rain water harvesting tank

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1a/A

Store

5a/D

Janitor

5a/D-E

Refuse

5a-D

4a-5B/D-F

1-H

2a-4a/D-L

1-6/C-G

3/M

10

1-7/A-M

11

4a-5b/C-F

12

4/F

Glass lift

13

3a/F

Escalator

1/A

Escape staircase S1

Fresh air fanroom (car park)

Refuse bin
Store 1, 2,3,4,5
Ramp 1
Retail lobby
Passage 1, 2, 3, 4
Retail service lift lobby
Retail unit 1,2,3,4,5,6,7,8,9,10
Retail male & female toilet

Progress
(%)

BALUSTRADE /
BOLLARD
Actual
START

Progress
(%)

GRID LINE

NO.

AREA
LIFT CORE & ESCAPE
STAIRCASE
M&E & SERVICE ROOM (SERVICE APARTMENT & RETAIL)
CIRCULATIO
N

LEVEL 2

M&E & SERVICE ROOM (HOTEL)

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL

LOCATION

BACK PAINTED GLASS


ON LIFT LOBBY
APARTMENT
Actual
START

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

2/C

Hotel lobby

3/B-C

1/C

Receiving area & purchasing

2/D

Luggage room

1a/B

LPG Farm 1 (hotel)

2/B

Loading & Unloading bay

2a/B

Receiving area & platform

1/C-D

Bin center 1

1/C-D

Store

10

5a/E

Retail service lift lobby

11

5/C

Letter box

12

5a/C

Fire control room (retail, apt.)

13

6/C

MDF room

14

6/C-D

Bin center 2

15

5a-6/D

AWCS cable room

16

5a-6/D-E

AWCS

17

5a/E

CWSP

18

5a/E

Full vacuumload station

19

6/E

Loading & Unloading

20

5a/F

Consumer HT room

21

5a/G

TNB room

22

6/G

23

5b/G-H

24

5c/H

Diesel fuel pump room

25

5b/H

Bomba vehicle turning circle

26

5b/J

LPG Farm 2 (retail)

27

4a/E-F

Passage

28

01/B

Ramp 2

29

2a-7/A-C

Drop of

Reception

TNB meter room


M&E room

Progress
(%)

BALUSTRADE /
BOLLARD
Actual
START

Progress
(%)

GRID LINE

NO.

AREA

2b-4a/C-K

Retail lobby

31

01-5c/C-M

Retail unit 1,2,3,4,5,6,7

32

5/E

33

3b/E

Glass lift

34

3/E

Escalator

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/J

Retail lift lobby

1a/B

M&E room

1/C

Store

4/E

Smoke spill fan room

4a/E

Copper pipes compartment

1a/F

Smoke spill fresh air pump room

2b-E

Pedestrian walk way

1-5a/C-J

Passage

1-7/B-M

Car parking

10

2a/C

Handicapped parking space

11

3/E-F

Stair from 3A to 3B

12

01-6/C-K

Ramp

13

2-2a/E-F

Car park management office

14

1/H

Male prayer room

15

2/H

Female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

RETAIL

30

OTHER
ROOMS
STAIRCASE

BACK PAINTED GLASS


ON LIFT LOBBY
APARTMENT
Actual
START

RET
LIFT CORE & ESCAPE STAIRCASE
AIL

TYPICAL COMMON AREA BASEMENT TO LEVEL 36


LEVEL 3A & 3B
AREA VEL 36

LOCATION

CARPAKING & DRIVEWAY M&E SERVICE ROOM

LEVEL

Retail male & female toilet

Progress
(%)

BALUSTRADE /
BOLLARD
Actual
START

Progress
(%)

NO.

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

LIFT LOBBY
& SERVICE
R.M

1-2/B-C

Store 1, 2

4a/D-E

Store 3

3/M

PARKING & DRIVEWAY

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

Handicaped parking space

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

LIFT LOBBY &


SERVICE ROOM

GRID LINE

LIFT CORE & ESCAPE STAIRCASE


AREA

6/G

1-2/B-C

Store 1, 2

4a/D-E

Store 3

2/B

Genset room (hotel)

3/M

Retail lift lobby

1-5/B-M

2/E-F

01-6/C-K

Ramp

1-7/B-M

Car parking

2a/B, 5-C

LIFT CORE & ESCAPE


STAIRCASE

PARKING & DRIVEWAY

LEVEL 5A & 5B

TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LEVEL 4A & 4B

TYPICAL COMMON AREA LEVEL


BASEMENT TO LEVEL 36

LOCATION

BACK PAINTED GLASS


ON LIFT LOBBY
APARTMENT
Actual
START

Retail lift lobby


Passage
Stair from 4A to 4B

Passage
Stair to up from 4A to 4B

Handicaped parking space

Progress
(%)

BALUSTRADE /
BOLLARD
Actual
START

Progress
(%)

GRID LINE

NO.

PARKINGAREA
& DRIVEWAY
M&E
STAIRCASE

A - BASEMENT
6

PARKING

LEVEL 6A & 6B

LIFT LOBBY &


SERVICE ROOM

LIFT CORE & ESCAPE STAIRCASE

LEVEL
LEVEL 5A & 5B
TYPICAL COMMON AREA BASEMENT TO LEVEL 36

LOCATION

BACK PAINTED GLASS


ON LIFT LOBBY
APARTMENT
Actual
START

10

2-2a/J-M

Motocycle

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

3/M

Retail lift lobby

1-2/B-C

Store 1, 2

4a/D-E

Store 3

6/G

Store 4

6/E

Management office

2a/B

Main switch board room (hotel)

2b/B

Transformer room (hotel)

5a-6/C

Transformer (apartment)

6/C

10

5a-6/C-D

11

4a/E

CW pump room

12

5/E

EFF & CW. Tank

13

6/H

Transformer room (retail)

14

6/J

Main switch boardroom (retail)

15

6/K

Genset room (retail)

16

1a/F

Fire pump room (hotel)

17

1/F

HR tank 1, 2

18

2/F

WR tank 1, 2

19

01-6/C-K

Ramp

20

5a/B, 2/K

Motocycle parking

21

01-7/B-M

Car parking

1/A

Escape staircase S1

1/G

Escape staircase S2

Main switch board room (apartment)


Switch gear room (apartment)

Progress
(%)

BALUSTRADE /
BOLLARD
Actual
START

Progress
(%)

GRID LINE

NO.

LIFT CORE & ESCAPE STAIRCASE


AREA
HOUSE (HOTEL)

CUSTOMER (HOTEL)

M&E AND STORE

TYPICAL COMMON AREA - BASEMENT


LEVEL
TO LEVEL 36

LOCATION

BACK PAINTED GLASS


ON LIFT LOBBY
APARTMENT
Actual
START

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

7/H

AV store

5a-6/C

Spa store

5/D-E

Store

1/C

1/C-D

AWCS

6/C-D

Staircase pressurization room

3a/C

Reception & check-in counter

3a/B

Business center/ library

4/B

10

4a/B

11

2/E

Bakery

12

3/G

All day dining

13

3c-3d/M

14

5/E

15

4c-G

Function room 1

16

5b/G

Function room 2

17

4a-6/B

Treatment 1, 2, 3

18

5a-6/B

Couple treatment room

19

6-7/B

Zacuzzi

20

6/D

21

2-2a/B

22

1a/B

23

2-2a/B

24

2a/B

Bins room

Social space
Idea room

Pantry
Pre-function room

Male & female toilet


Gen. cash
Storage
Account manager
Director finance

Progress
(%)

BALUSTRADE /
BOLLARD
Actual
START

Progress
(%)

GRID LINE

NO.

FRONT OF HOUSE (HOTEL)


AREA
E STAIRCASE

EA - BASEMENT
36

LANDSC
APE

MAIN KITCHEN

MAIN KITCHEN

LEVEL 7

LEVEL

LOCATION

BACK PAINTED GLASS


ON LIFT LOBBY
APARTMENT
Actual
START

25

3/B

GM office

26

5/C

Sales & marketing

27

4-4a/c-D

28

4-4a/C

Manager 1, 2

29

4-4a/D

Luggage room

30

5/D

Store

31

5c/E

Food preparation

32

1-1a/C

33

1-1a/C-D

Walk-in freezer

34

2/C-D

Walk-in chiller

35

1/D

Freeze

36

1/D

Chiller

37

2/D

Pastry store

38

1/D-E

Meat prep

39

1/E

Vege prep

40

2/E

Pastry & bakery

41

2/E

Chocolate room

42

1/E-F

43

1/F

RM. Service office

44

1/F

Chef office

45

1/F

Room service

46

1/F-G

Steward store

47

1-1a/F-G

48

1/G

Dish washing

49

2/F

Cooking area

50

5/A-B

51

4b-7/H-M

1/A

Escape staircase S1

1/G

Escape staircase S2

Hotel front office

Dry store

Cold kitchen

Pot & pan washing

Balcony
Deck extension for F&B funtions

Progress
(%)

BALUSTRADE /
BOLLARD
Actual
START

Progress
(%)

GRID LINE

NO.

LIFT CORE & ESCAPE STAIRCASE


AREA
OFFICE (BOH)

LEVEL 7 MEZZANINE

M&E

TYPICAL COMMON AREA - BASEMENT


LEVEL
TO LEVEL 36

LOCATION

BACK PAINTED GLASS


ON LIFT LOBBY
APARTMENT
Actual
START

6/G

Escape staircase S3

5a/D

Escape staircase S4

1a/B-C

Fire/ service lift lobby

5a/D

Fire/ service lift lobby

2/C

Hotel lift lobby

5/D

Service apartment lift lobby

1/C

Bin room

1/C

AWCS

2/B

Ahu room 1

1/G

Ahu room 2

01/F-G

01/G

1a/B-C

M&E area

1a/B

I.T. Store

2-2a/B-C

I.T. office

10

2b/B

11

3/B

Uniform issue

12

6/E

Function room storage

13

6/H

AV room

14

2/E

HK manager

15

2/E-F

HR. DIR. Office

16

2/E-F

F&B DIR. Office

17

2/F-G

Executive chef

18

1/F

Working area

19

1/E

Training/ meeting room

20

1a/D

21

1-1a/C

22

2/D

Balancing tank
Pump room

Server room

Corridors
Security & receiving area
Flower shop

Progress
(%)

BALUSTRADE /
BOLLARD
Actual
START

Progress
(%)

LEVEL 7 MEZZ

GRID LINE

NO.

AREA
LIFT CORE &
ESCAPE
STAIRCASE
FACILITY

LEVEL 8

TYPICAL COMMON
AREA - BASEMENT
TO LEVEL 36

SERVICE AREA (BOH)

LEVEL

LOCATION

BACK PAINTED GLASS


ON LIFT LOBBY
APARTMENT
Actual
START

23

2/D

House keeping office

24

1/D

Soiled linen room

25

1/D

Valet laundry

26

1/D-E

Clean linen room

27

1/C-D

Trolley bay

28

3a/B

Clinic

29

4/B

30

5a/B

31

6/B

32

6/B-C

33

6/C

Staf social lounge

34

6/D

Male & female prayer room

1/A

Escape staircase S1

1/G

Escape staircase S2

6/G

Escape staircase S3

5a/D

Escape staircase S4

11

3a/C

Gym

12

3/B

Male, female changing room

13

3/F

Swimming pool

14

3/J

Pantry

15

4d/J

16

2a-4/B-H

Deck

17

2a-7/A-D

Roof top garden for apartment


tower

18

2b-7/B-J

Steps

19

2b-7/B-J

Ramp

Male & female changing room, toilet


Team dinning room
Kitchen
Kitchen storage

Spiral stair

Progress
(%)

BALUSTRADE /
BOLLARD
Actual
START

Progress
(%)