You are on page 1of 9

A Project On DSPCL (Seebpore

Unit)

Presented By:
1. Angshuman Pal 7. Manindra
Chandra Sarkar
2. Ansuman
Samanta 8. Pallab Kumar
Ghoshal
3. Bhim Sarkar
9. Pulak Mondal
4. Debranjan Maji
10. Rajib
5. Kaustuv Adhikary Bhandari
6. Manab Narayan (Students of
Sen B.tech 3rd Year
NPTI(ER))
ACKNOWLEDGEMENT:

We Would Like to Thank The


following people for their
support in arranging for our
Training and their support in
field:
• Mr. G. Dalal
• Mr. Ranjit Das
• Mr. S.K. Bose
We would also like to
thank many other people
for their support.

DPSC Limited SYSTEM consists mainly of 2


generating stations one each at Chinakuri
and Dishergarh and two 11KV networks one
covering Dishergarh and Chinakuri areas
and the other covering Seebpore, Luchipur
and Satgram areas. The present generating
capacity of Chinakuri Power Station (CPS) is
30MW . Generating Capacity of Dishergarh
Power Station is about 12MW .The
Generating Stations are basically providing
survival power requirement to our
consumers. These generating stations
supply 42MW power out of our total
requirement of 122 MW. The balance power
is mainly drawn from DVC's system at four
intake points viz., Dishergarh, Satgram,
Seebpore and Luchipur. The Power from
DVC system is taken at 33 KV and it is then
stepped down to 11 KV for distribution for
our consumers. The Company's generation
meets about 32% of its system demand,
while the balance 68% is sourced from DVC
and WBSEB.The system details are as
follows :

2003-04 2004-05 2005-06


Million Million Million
Units Units Units
Own Generation 219.98 243.27 245.91
Power Purchase :
DVC 577.03 610.70 643.07
WBSEB 50.48 42.20 38.49
Units Available for 847.49 896.17 927.47
Sales to : 196.72
WBSEB 194.75 474.97 163.80
Eastern Coalfields 466.62 484.53
Other Sales Viz.,
Public Utilities 168.50
Commercial 140.53 193.83
Consumers
System Loss 43.87 45.53 42.81
Sytem Loss as % of
5.68 % 5.17 % 4.62 %
Sytem Units

Power Distribution: Network System

The present peak load of the company is


122 MW and Power is supplied
predominantly at 11kv.Around 32% of the
load is met from own generation , while the
balance is met through imports of power
from DVC and WBSEB.Imports of power take
place from DVC at four points spread over
its licensed area and from WBSEB at one
point.The Company supplies power to
WBSEB consumer at 18 different points in its
licensed area spread over Asansol/Raniganj
Coal & Industrial belts.

Power Distribution: Transmission is an


intermediary between Generation & Supply
of Power. DPSC Limited is transmits of power
at 33 kV from DTPS to Company's area of
supply in Asansol - Raniganj for delivery to
Supply Division after stepping down to 11 kV
through a 550 kV network linking
Sales
Growth Due to
• Maintaining & supplying good quality power
to its consumers.
• Development of New Industries in the
licensed area.
• Increase in sales of the Energy.
• Reduce Auxiliary and Coal Consumptions in
the power stations.
• Reduce T&D Losses.
• Maximize generation from own low-cost
generating station (CPS).
System Loss

DPSC Limited is maintaining a testing


laboratory with sizeable work force to
improve metering system and to arrest
commercial losses as well.

Major activities undertaken for the last


two / three years:
• Introduction of microprocessor based State-
of the -Art static meter in consumer
premises.
• Introduction of new tamper proof metering
box / cubicle to reduce attempt of theft.
• Improvement of meter sealing system.
• Phasing out existing meters by good quality
meters.
• Increasing vigilance for supervision and
checking of meter readings.
• System study of the consumers' point
including load pattern and period of
operation.
• Computerized billing and follow up action.
• Augmentation of overloaded overhead /
underground lines.
• Improvement of system power factor by way
of installing reactive power compensation
units.
• Shifting of Distribution / Power Receiving
Points at load centres.
• Installation of 132 kV / 33 kV capacitors to
maintain quality of power to consumers

The total load of the system is 122 MW.


Due to restriction on constructing 33
KV Transmission network due to DVC
Act, the distribution had to be done at
11KV.In spite of the above limitation,
the T&D loss is in the range of 6%
which is one of the lowest in the
country.

Consumer Profile

Eastern Coalfields Limited (ECL) is the


single largest consumer of the
Company constituting 60% of the Load
of the Company. About 25% of the Load
is that of WBSEB who buy power from
DPS at 11 KV. Balance 15% of the load
absorbed by other industries and by
essential services like Hospitals,
Nursing Homes, Pumping Stations,
Railways, TV & Radio Stations Etc.