TAQA (250 MW) plant is the 1st biggest lignite fired plant as a
single unit of independent power producer category in India
It is located in uthangal , 4okm west of cuddalore, 12km from
neyveli township to the west of NLC TPS ll.
TAQA supplies power to :
Cuddalore
Dievakurichi
Perambalore
TS ll Neyveli.
Primary fuel lignite is being supplied to the project under 30
year contract with neyveli lignite coorporation.
Total area: 212 acres.
MAIN EQUIPMENTS:
Boiler( benson type, drumless, 5400c ,175 bar)
Auxiliary boiler(2650c,15.8 bar)
Turbine(single flow HP , combined IP-LP)
Generator (250MW,50Hz,18kV).
ESP (electrostatic precipitator).
Cooling tower
DM plant.(500m3)
Ash handling plant
Lignite handling plant.
Condensate storage tank(400m3)
Raw water reservoir(52000m3)
Ash pond.
Chimney(220m)
GROUND HOPPER
PADDLE FEEDER
1A-CONVEYOR
CRUSHER
2A-CONVEYOR
TP (Transfer point )
3A-CONVEYOR
SHUTTLE CONVEYOR
6 BOILER BUNKER
WATER CYCLE:
Main water supply is from the raw water reservoir using
12 borewells( 8 working, 4 standby)
Water is then supplied to DEMINERALISATION PLANT for
the removal of impurities and dissolved minerals.
Water then reaches CONDENSATE STORAGE TANK.
Then to the DEAIRATOR for the removal of dissolved
gases.( dissolved oxygen causes damage to the turbine)
Water is then supplied to the ECONOMISER
Water wall tubes
COLD SUPPORTER TUBES
CYCLONE SEPARATOR (separates steam from water)
SUPER HEATER 1
SH 2
SH 3
HP TURBINE
RE-HEATER
LP TURBINE
CONDENSOR
Water from the condenser is supplied back to the
deaerator.
AIR CYCLE:
COMPRESSED AIR
dry ash
ESP
ID FAN
VALVES CONTROLLED BY
PNEUMATICS
CHIMNEY
SILO
TRANSFER TO CEMENT FACTORY
WET ASH REMOVAL:The Sand particles which is in the coal gets separated while burning
in the furnace due to gravity. Those particles contain considerable amount of
moisture and they are flushed out to the ash pond. If needed they are
transported through lorries.
The Flow process is as follows:
FURNACE
SLAG
FEED CONVEYOR
LOADED IN
FLESHING POINT
LORRY
SLAG SUMP
ASH POND
DAY3:Demineralisation plant
12 borewells supply the water into the water reservoir whose
capacity is 52000 m3 and 5m depth.(8 working and 4 standby)
Water is then taken into a common sump.
Next stage consists of: 1. hyden pump 2.jockey pump. 3.cw
make up pump 4.dm feed pump 5.seal water pump
In DM plant, water is first passed through DUAL MEDIA FILTER
consisting of sand , pebbles which removes impurities in water.
ACTUATED CARBON FILTER where chlorine is removed from the
water. Actuated carbon absorbs the chlorine and odour.
The chlorineless water is passed into the SAC( strong acid
cation resin)
SBA ( strong base anion resin)
SBA ll
MIXED BED RESIN.
ULTRAFILTRATION(for the removal of suspended silica
particles)
DM storage tank
CONDENSATE STORAGE TANK.
FLOW PROCESS
RAW WATER
DUAL MEDIA FILTER (DMF)
TO REMOVE Cl
REMOVES SALTS
MAINTAIN TDS
ACCESSORIES
Feed pump
Economizer
Super heater
Re- heater
Raph (regenerative air pre-heater)
Scaph (Steam coil air pre-heater)
Induced draught fan & forced draught fan
Chimney
1)Feed pump is used to supply demineralised water to
pipe tubes, around the boilers.
2) Economizer are mechanical devices used to reduce
energy consumption, or to perform another useful
EJECTOR
GSC
LP HEATER ( 3 LPH )
HP HEATER ( 2 HPH )
ECONOMISER COIL
SUPER HEATER - 540 0C & 175 bar
HP TURBINE - 536 0c & 171 bar at inlet
360 0c & 38.4 bar AT outlet
RE HEATER
IP TURBINE - 535 0C & 34.2 bar
LP TURBINE
CONDENSOR