58486 Federal Register / Vol. 70, No.

193 / Thursday, October 6, 2005 / Notices

Docket No.: M–2005–022–C. kept on the surface and made available and continue until conclusion of the
FR Notice: 70 FR 19506. to the authorized representative of the Board’s agenda.
Petitioner: Consolidation Coal Secretary. This is considered an LOCATION: 3333 K Street, NW.,
Company. acceptable alternative method for the Washington, DC 20007, 3rd Floor
Regulation Affected: 30 CFR 75.503 Elk Creek Mine. The petition for Conference Room.
[18.35 of Part 18]. modification is granted for the deluge- STATUS OF MEETING: Open. Directors will
Summary of Findings: Petitioner’s type water spray systems installed for participate by telephone conference in
proposal is to use trailing cables with a nozzles in the Elk Creek Mine with such a manner as to enable interested
maximum length 1,000 feet for conditions. members of the public to hear and
supplying power to permissible Docket No.: M–2005–037–C. identify all persons participating in the
equipment used in the continuous FR Notice: 70 FR 32379. meeting. Members of the public wishing
mining section of the Blacksville No. 2 Petitioner: Bridger Coal Company. to observe the meeting may do so by
Mine. This is considered an acceptable Regulation Affected: 30 CFR 75.1101– joining participating staff at the location
alternative method for the Blacksville 8. indicated above.
No. 2 Mine. The petition for Summary of Findings: Petitioner’s MATTERS TO BE CONSIDERED: 1. Approval
modification is granted for the trailing proposal is to use a water sprinkler of the agenda.
cables supplying three-phase, 995-volt system that will consist of a single 2. Consider and act on A Report of the
power to continuous mining machines overhead pipe system with automatic Legal Services Corporation,
and trailing cables supplying three- sprinklers located no more than 10 feet Documenting the Justice Gap in
phase, 575-volt power to loading apart so that the water discharged from America.
machines, shuttle cars, roof bolters, the sprinklers will cover 50 feet of fire- 3. Consider and act on other business.
section ventilation fans, and de-gas resistant belt, or 150 feet of nonfire- 4. Public comment.
drills for the Blacksville No. 2 Mine resistant belt, adjacent to the belt drive. FOR FURTHER INFORMATION CONTACT:
with conditions. The petitioner proposes to have the Patricia Batie, Manager of Board
Docket No.: M–2005–029–C. sprinkler located not more than 10 feet Operations, at (202) 295–1500.
FR Notice: 70 FR 22376. apart so that the water discharged from SPECIAL NEEDS: Upon request, meeting
Petitioner: Parkwood Resources, Inc. the sprinkler(s) will cover the drive notices will be made available in
Regulation Affected: 30 CFR 75.1100– motor(s), belt take-up, electrical alternate formats to accommodate visual
2(e)(2). controls, and gear reducing unit for each and hearing impairments. Individuals
Summary of Findings: Petitioner’s belt drive, and the sprinkler system will who have a disability and need an
proposal is to use two (2) fire use either pendant or upright type accommodation to attend the meeting
extinguishers or one fire extinguisher of sprinkler heads. This is considered an may notify Patricia Batie at (202) 295–
twice the required capacity at all acceptable alternative method for the 1500.
temporary electrical installations in lieu Bridger Underground Mine. The
Dated: October 4, 2005.
of using one fire extinguisher and 240 petition for modification is granted for
pounds of rock dust. This is considered the Bridger Underground Mine with Victor M. Fortuno,
an acceptable alternative method for the conditions. Vice President for Legal Affairs, General
Cherry Tree Mine. The petition for Counsel & Corporate Secretary.
Docket No.: M–2005–038–C. [FR Doc. 05–20192 Filed 10–4–05; 12:10 pm]
modification is granted for temporary FR Notice: 70 FR 32379.
electrical installations, provided the Petitioner: Alfred Brown Coal BILLING CODE 7050–01–P

Petitioner maintains two portable fire Company.


extinguishers having at least the Regulation Affected: 30 CFR 75.1100–
minimum capacity specified for a 2(a)(2). NATIONAL ARCHIVES AND RECORDS
portable fire extinguisher in 30 CFR Summary of Findings: Petitioner’s ADMINISTRATION
75.1100–1(e) at each of the temporary proposal is to use two (2) portable fire
electrical installations at the Cherry extinguishers near the slope bottom and Agency Information Collection
Tree Mine with conditions. an additional portable fire extinguisher Activities: Submission for OMB
within 500 feet of the working face for Review; Comment Request
Docket No.: M–2005–036–C.
FR Notice: 70 CFR 32379. equivalent fire protection at the 7 Ft. AGENCY: National Archives and Records
Petitioner: Hopkins County Coal, LLC. Slope Mine. This is considered an Administration (NARA).
Regulation Affected: 30 CFR 75.1101– acceptable alternative method for the 7 ACTION: Notice.
1(b). Ft. Slope Mine. The petition for
Summary of Findings: Petitioner’s modification is granted for firefighting SUMMARY: NARA is giving public notice
proposal is to use an alternative method equipment in the working section for that the agency has submitted to OMB
of compliance in lieu of providing blow- the 7 Ft. Slope Mine with conditions. for approval the information collection
off dust covers for deluge-type water described in this notice. The public is
[FR Doc. 05–20081 Filed 10–5–05; 8:45 am]
spray nozzles. The petitioner proposes invited to comment on the proposed
BILLING CODE 4510–43–P
to have a certified person trained in information collection pursuant to the
specific testing procedures to the Paperwork Reduction Act of 1995.
deluge-type water pray fire suppression DATES: Written comments must be
LEGAL SERVICES CORPORATION submitted to OMB at the address below
systems at each belt drive conduct a
visual examination of each deluge-type Sunshine Act Meeting of the Board of on or before November 7, 2005 to be
water spray fire-suppression system; Directors assured of consideration.
conduct a functional test of the deluge- ADDRESSES: Send comments to Desk
type water spray fire suppression TIME AND DATE: The Board of Directors Officer for NARA, Office of Management
systems to check for proper of the Legal Services Corporation will and Budget, New Executive Office
performance, and record the results of meet on October 11, 2005 via conference Building, Washington, DC 20503; fax:
the examination in a book that will be call. The meeting will begin at 4 p.m., 202–395–5167.

VerDate Aug<31>2005 19:52 Oct 05, 2005 Jkt 208001 PO 00000 Frm 00117 Fmt 4703 Sfmt 4703 E:\FR\FM\06OCN1.SGM 06OCN1