You are on page 1of 4

CURRICULUM VITAE

(Applied

for Land Surveyor)

Tanveer Ahmed
Abbettabad.pakistan@gmail.com
+971553267791
AIMS & CAREER OBJECTIVE,
To work in an organization this can utilize my potential to its full extent & increase
my knowledge and responsibilities with suitable levels of promotion for maximum
satisfaction.

Personal Details
Profession
Date of Birth
Nationality
Marital Status
Languages

Land Surveyor
:
15-07-1978
Pakistan
single
English, Urdu, Hindi, Arabic.

:
:
:

Academic Qualification
ss.c

Board Of Intermediates & Secondary Education Abbottabad

Pakistan

Technical Qualification
Diploma of Civil Surveyor from Board of Technical Education Abbottabad
pakisatn

Key Experience
Over the post (11) year experience a professional civil and surveyor, road work,
pipe line work
and mechanical surveying work and building work.

Professional Experience
Gulf Target
I am working here from 20 Aug 2013 till date as chief surveyor

Project:

Road maintenance and infrastructure (ADM)

Responsibilities
Inspection with consultant for car parking and Road maintenance and pipe
line
Topographic Survey, as built Survey,
Checking and controlling the horizontal and vertical profile of pipeline.
Coordination
With Engineers regarding site situation etc
Handle the 10 surveyor for road maintenance work pipe line work
Fixing new control point and Shifting Bench mark
New location marking on the road as per Coordinate
Daily Survey Report

GS Engineering (Abu Dhabi)


I have worked from 20 Nov 2011 to june07 2013 as Senior Surveyor

Project:

Ruwais Refinery Expansion Project Takreer Abu Dhabi (EPC-2)

Responsibilities
I have worked as Civil & Mechanical Survey inspector (S M P) Structure
Maintaining the quality of work as per drawings and specifications
Regular site visit and completion of investigation reports on daily basis
Skill of Topography and countering maps
Skill of setting out and layout of warehouses, shelters, substation buildings,
residential buildings and mobilization (general residential camp)
Using Geometric tools i.e. Total station, GPS and Auto level for the external
survey
Management and inspection of the construction of auditorium, Residential
Apartment, Warehouses, Workshop structures, oil and gas pipe lines,
sewerage lines and general buildings line
Preparation of shop drawings and service drawings
Civil and structural building controller and construction base coordinator in
ABUDHABI RUWAIS OIL& GASS REFINERY
Preparation of inspection requests

Nagarjuna contracting company (LLC


I have worked from 25 Oct 2010 to 30 Oct 2011 as Senior Surveyor

Project:

100 kilometers of water pipeline projects (50 KMs. Each in two


packages) awarded by DEWA UAE

Responsibilities
Setting Out of pipe line and chambers

Leveling of laying the pipeline


Daily Survey Report

Techno Engineering Services pvt. Ltd. (Abu Dhabi)


I have worked From 29 May 2009 to 15 Oct 2010 as chief surveyor

Project:

ADCOP Abu Dhabi Crude Oil Pipeline (410 Km) from Habshan to

Fujairah
Responsibilities
Worked as sr. surveyor Traversing and fixing new control
Points and benchmark, setting out of new IPs, Topographic Survey, as built
Survey, Checking and controlling the horizontal and vertical profile of
pipeline. Coordination
With Engineers regarding site situation etc

PACT General Contracting W.L.L. (Abu Dhabi)


I have worked From 02 January 2004 to March 2007 as Surveyor

Project:

908-Irrigation ring main zayed city Mussafah


142/22-pipeline Sewerage line
C200-Pipeline Sewerage . Ruwais

Responsibilities
Worked as senior surveyor on various projects in Abu Dhabi
Construction of Manholes, CC, IC, Air Valve, Washout Chamber, House Connection,
Dewatering, Deflection, GRP, UPVC, A/C Ductile Iron, Pipe laying of Sewerage, Storm
Water, Setting out for Pressure Lines.

Project:

ICAD Residential city ABUDHABI-142/22 ABUDHABI

Responsibilities
Recording the topography data from site & survey crews and forward to
drafting section for further processing.
Managing the crews, layout of sewerage and water lines according to the
invert levels.
Making the program for next day and managing the surveying progress
according the given program.
Shifting of survey penetration point with optical plummet instrument in High
Rise Tower.
Responsible to work for building layout, piles survey, column layout,
coordination with consultant.

Responsible to work for building layout, piles survey, column layout and
coordination with consultants.

Descon.(Abu Dhabi)
I have worked From 14 April 2007 to March 2008 as seneior surveyor

Project:

( A G D II) ASab Gas Development Phase II

Responsibilities
Worked as Land Surveyor and Mechanical
Surveyor Coordinating Survey task with the Consultant.
Schedule Chart for the work and progress.
Preparing and maintaining accuracy in work.
Coordination with site engineers Regarding Site Situation.

Abdul Aziz-G. (Pakistan)


I have worked From Sep, 2001 to December 2003 as surveyor

Project:

ROAD Jallsi Darrah (28 Km)

Responsibilities
Setting out, Topographical Survey, Shifting of Benchmarks.
Survey for Volume Calculation.
Daily Survey Report.

Instrument

GPS
Trimble Sokkia12oo,and Leica 1202
Total Station
Sokkia, leica, Geomax,Nikon DTM 352&332
Level Machines (ALL Types)
Theodolit

You might also like