You are on page 1of 14

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


PROJECT MANAGEMENT OFFICE - BUREAU OF DESIGN
MANILA, PHILIPPINES

VARIOUS DPWH PROPOSED PROJECTS


(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)
STANDARD TWO-STOREY
SCHOOL BUILDING
(2, 4, & 6 - CLASSROOMS)

REVIEWED:

RECOMMENDING APPROVAL:

APPROVED :

CONCURRED :

MARIANO C. DEL CASTILLO

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

ARMIN A. LUISTRO

OIC, BUILDINGS DIVISION, BOD

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

SECRETARY
DEPARTMENT OF EDUCATION

VARIOUS DPWH PROPOSED PROJECTS


(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)

STANDARD TWO-STOREY
SCHOOL BUILDING
(2, 4, & 6 - CLASSROOMS)

JOINT VENTURE OF

BILL OF QUANTITIES
TWO-CLASSROOMS

A.

I.

Mobilization / Demobilization

II.

Temporary Facilities

III.

Safety and Health

IV.

Earthworks

V.

Termite Control Works

VI.

Concrete Works

VII.

Masonry Works

VIII.

Fabricated Materials and Hardwares

(SEE COVER SHEET)

QUANTITY ENGINEER

JOVEN T. SANTOS

DOMICIANO B. LUSICA

COST ENGINEER

PROJECT MANAGER

OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD TWO-STOREY
SCHOOL BUILDING
( 2-CLASSROOMS )

BOD
BILL OF QUANTITIES

G-1

1
41

BILL OF QUANTITIES

IX.

XIII.

Electrical Works

XIV.

Plumbing / Sanitary Works

Finishing Works

X.

Carpentry Works

XI.

Roof and Framing Works

XII.

Painting Works

(SEE COVER SHEET)

QUANTITY ENGINEER

JOVEN T. SANTOS

DOMICIANO B. LUSICA

COST ENGINEER

PROJECT MANAGER

OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD TWO-STOREY
SCHOOL BUILDING
( 2-CLASSROOMS )

BOD
BILL OF QUANTITIES

G-2

2
41

BILL OF QUANTITIES
FOUR-CLASSROOMS

A.

I.

Mobilization / Demobilization

II.

Temporary Facilities

III.

Safety and Health

IV.

Earthworks

V.

Termite Control Works

VI.

Concrete Works

VII.

Masonry Works

VIII.

Fabricated Materials and Hardwares

(SEE COVER SHEET)

QUANTITY ENGINEER

JOVEN T. SANTOS

DOMICIANO B. LUSICA

COST ENGINEER

PROJECT MANAGER

OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD TWO-STOREY
SCHOOL BUILDING
( 4-CLASSROOMS )

BOD
BILL OF QUANTITIES

G-3

3
41

BILL OF QUANTITIES

IX.

XIII.

Electrical Works

XIV.

Plumbing / Sanitary Works

Finishing Works

X.

Carpentry Works

XI.

Roof and Framing Works

XII.

Painting Works

(SEE COVER SHEET)

QUANTITY ENGINEER

JOVEN T. SANTOS

DOMICIANO B. LUSICA

COST ENGINEER

PROJECT MANAGER

OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD TWO-STOREY
SCHOOL BUILDING
( 4-CLASSROOMS )

BOD
BILL OF QUANTITIES

G-4

4
41

BILL OF QUANTITIES
SIX-CLASSROOMS

A.

I.

Mobilization / Demobilization

II.

Temporary Facilities

III.

Safety and Health

IV.

Earthworks

V.

Termite Control Works

VI.

Concrete Works

VII.

Masonry Works

VIII.

Fabricated Materials and Hardwares

(SEE COVER SHEET)

QUANTITY ENGINEER

JOVEN T. SANTOS

DOMICIANO B. LUSICA

COST ENGINEER

PROJECT MANAGER

OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD TWO-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )

BOD
BILL OF QUANTITIES

G-5

5
41

BILL OF QUANTITIES

IX.

XIII.

Electrical Works

XIV.

Plumbing / Sanitary Works

Finishing Works

X.

Carpentry Works

XI.

Roof and Framing Works

XII.

Painting Works

(SEE COVER SHEET)

QUANTITY ENGINEER

JOVEN T. SANTOS

DOMICIANO B. LUSICA

COST ENGINEER

PROJECT MANAGER

OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD TWO-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )

BOD
BILL OF QUANTITIES

G-6

6
41

PERSPECTIVE
TABLE OF CONTENTS
GENERAL
G-1
G-2
G-3
G-4
G-5
G-6

STRUCTURAL

ARCHITECTURAL

BILL OF QUANTITIES
BILL OF QUANTITIES
BILL OF QUANTITIES
BILL OF QUANTITIES
BILL OF QUANTITIES
BILL OF QUANTITIES

A - 10

BAY SECTIONS, DOOR FRAME TYPICAL PLAN & SECTION,


JALOUSIE DETAILS & FIRE ESCAPE DETAILS

A - 11

DETAIL PLAN OF TOILET & SECTION,


DETAIL OF COUNTER SINK, URINAL SECTION & DETAIL
BLACKBOARD DETAIL

A - 12

ARCHITECTURAL
A-1

PERSPECTIVE, TABLE OF CONTENTS

A-2

KEY PLAN

A-3

GROUND FLOOR PLAN, SECOND FLOOR PLAN,


SCHEDULE OF FINISHES

A-4

FRONT ELEVATION, REAR ELEVATION, LEFT & RIGHT SIDE ELEV.

A-5

CROSS SECTION, LONGITUDINAL SECTION & GROUND FLOOR


REFLECTED CEILING PLAN

PLUMBING
P-1

GROUND FLOOR AND SECOND FLOOR


PLUMBING LAYOUT

P-2

GROUND FLOOR AND SECOND FLOOR


WATER LINE LAYOUT

ELECTRICAL

S-1

GENERAL NOTES & STANDARD DETAILS

S-2

STANDARD DETAILS

S-3

STANDARD DETAILS

S-4

FOUNDATION PLAN AND SECOND FLOOR FRAMING


PLAN

P-3

ISOMETRIC WATER LINE LAYOUT AND


SEWER LINE LAYOUT

S-5

ROOF FRAMING PLAN, ELEV. OF END WALL


FRAME, DET. SECTION OF LRB-1 AND PC-1,
CONNECTION OF PURLINS TO LRB-1, CONCRETE
SUN BREAKER DETAIL & STIFFENER DETAIL

P-4

ISOMETRIC DRAINAGE LINE LAYOUT


ROOF DRAINAGE LAYOUT, DETAIL SECTION
OF DRAIN PIPE AND SPOT DETAIL

P-5
S-6

SCHEDULE OF FOOTINGS & COLUMN, RAMP DETAIL,


DETAIL OF STAIR ON GRADE, DETAIL OF FOOTING,
WALL FOOTING & FOOTING TIE BEAM,
TYPICAL DETAIL OF R.C. COLUMNS

S-7

PLAN FOOTING F-1, F2 & F3 ELEV. FOOTING F-1,


F2 & F3 PLAN FOOTING CF-1 & TYPICAL ELEV. OF
MICRO-PILE

A-6

SECOND FLOOR REFLECTED CEILING PLAN & ROOF PLAN

A-7

SCHEDULE OF DOORS & WINDOWS, DETAIL OF RAMP

S-8

TRUSS DETAIL, CONNECTION DETAILS

A-8

SECTION DETAIL OF EAVES, SPOT DETAIL CORNER CEILING,


CONCRETE SUN BREAKER DETAIL, PERSPECTIVE, SECTION
& SPOT DETAIL OF CEILING, PLAN & SECTION OF VENTILATION

S-9

SCHEDULE OF BEAM & SLAB, TYPICAL BEAM & SLAB


ELEVATION, STAIR DETAILS

A-9

STAIR DETAIL

S - 10

FIRE ESCAPE ELEVATION

S - 11

FIRE ESCAPE DETAIL

(SEE COVER SHEET)

NOTE :
OIC, BUILDINGS DIVISION

PLAN OF SEPTIC TANK, LONGITUDINAL


SECTION, CROSS SECTION DETAIL,
MANHOLE COVER DETAIL,
CATCH BASIN DETAIL, LEGEND AND
PLUMBING NOTES

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

EE - 1

GENERAL NOTES, LEGEND, LOAD SCHEDULE,


SINGLE LINE DIAGRAM AND ELECTRICAL RISER
DIAGRAM ( 2-CL )

EE - 2

POWER LAYOUT & LIGHTING LAYOUT ( 2-CL )

EE - 1

GENERAL NOTES, LEGEND, LOAD SCHEDULE,


SINGLE LINE DIAGRAM AND ELECTRICAL RISER
DIAGRAM ( 4-CL )

EE - 2

POWER LAYOUT & LIGHTING LAYOUT ( 4-CL )

EE - 1

GENERAL NOTES, LEGEND, LOAD SCHEDULE,


SINGLE LINE DIAGRAM AND ELECTRICAL RISER
DIAGRAM ( 6-CL )

EE - 2

POWER LAYOUT ( 6-CL )

EE - 3

LIGHTING LAYOUT ( 6-CL )

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD TWO-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )

PERSPECTIVE,
TABLE OF CONTENTS

BOD

A-1

7
41

( 4-CLASSROOMS )

( 2-CLASSROOMS )

SECOND FLOOR PLAN

SECOND FLOOR PLAN

( 4-CLASSROOMS )

( 2-CLASSROOMS )

GROUND FLOOR PLAN

GROUND FLOOR PLAN


K E Y

P L A N

(SEE COVER SHEET)

NOTE :
OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD TWO-STOREY
SCHOOL BUILDING
( 2, 4 & 6-CLASSROOMS )

BOD
KEY PLAN

A-2

8
41

SCHEDULE OF FINISHES

SECOND FLOOR PLAN

GROUND FLOOR PLAN

(SEE COVER SHEET)

NOTE :
OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD TWO-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )

GROUND FLOOR PLAN,


SECOND FLOOR PLAN &
SCHEDULE OF FINISHES

BOD

A-3

9
41

LEFT SIDE ELEVATION

RIGHT SIDE ELEVATION

REAR ELEVATION

FRONT ELEVATION

(SEE COVER SHEET)

NOTE :
OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD TWO-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )

FRONT ELEVATION,
REAR ELEVATION,
LEFT & RIGHT SIDE ELEVATION

BOD

A-4

10
41

GROUND FLOOR REFLECTED CEILING PLAN

LONGITUDINAL SECTION

CROSS SECTION

(SEE COVER SHEET)

NOTE :
OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD TWO-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )

LONGITUDINAL SECTION,
CROSS SECTION, & GROUND FLOOR
REFLECTED CEILING PLAN

BOD

A-5

11
41

ROOF PLAN

SECOND FLOOR REFLECTED CEILING PLAN

(SEE COVER SHEET)

NOTE :
OIC, BUILDINGS DIVISION

(SEE COVER SHEET)

(SEE COVER SHEET)

GILBERTO S. REYES

RAUL C. ASIS

ROGELIO L. SINGSON

DIRECTOR IV, BOD

UNDERSECRETARY

SECRETARY

VARIOUS DPWH
PROPOSED PROJECTS

STANDARD TWO-STOREY
SCHOOL BUILDING
( 6-CLASSROOMS )

BOD
SECOND FLOOR REFLECTED
CEILING PLAN & ROOF PLAN

A-6

12
41

You might also like