Hydrology and Irrigation Engineering

10CV55

Assignment Questions
Unit 1: INTRODUCTION & PRECIPITATION
1. Define hydrology. With a neat sketch, explain the Horton's qualitative representation of
the hydrologic cycle.
2. Discuss briefly the importance of hydrology and its practical applications in civil
engineering.
3. Draw the Hortons qualitative representation of hydrological cycle .Explain the cycle of
all components /phases?
4. Draw a neat sketch showing the catchment Hydrological cycle. Write down the 'water
budget' equation for any one of the zones.
5. Explain with neat sketch, Horton's Engineering representation of' Hydrologic cycle.
6. Hydrology is a highly inter - disciplinary science. Justify.
7. What are the seasons of India? Discuss the movement pattern of wind during monsoon
and retreating monsoon seasons in the country.
8. Describe the features - type, amount and distribution of rainfall, of the three seasons of
rainfall in Karnataka.
9. List out the various practical applications of hydrology?
10. Define precipitation. Explain different forms of precipitation?
11. What are the forms of precipitation? Explain any one of them?
12. Describe various types and forms of precipitation.
13. Describe the methods of recording of rainfall
14. What are the advantages and disadvantages of recording type of rainguage?
15. Describe the principle of working of a float type recording rainguage with a neat sketch.
Discuss its advantages and disadvantages.
16. Differentiate between recording and non - recording type of raingauges.
17. Critically compare recording rainguage (self) with non recording type rainguage.
18. Describe the three methods of determining the average depth of rainfall over an area.
Bring out the merits and demerits of each method.
19. An area is composed of a square of side 10 km and an equilateral triangles placed on the
left side. The annual precipitation recorded at four corners and the centre of the square
considered clock wise from the top left corner is 460mm, 650mm, 760mm, 800mm and
Dept of Civil Engineering, SJBIT

Page 1

Hydrology and Irrigation Engineering

10CV55

700mm respectively. The apex of the triangle has recorded 600mm of annual
precipitation. Find the mean precipitation over the area by Thiessen polygon method and
find the percentage difference with that of the arithmetic mean method.
20. Thiessen polygons constructed for a network of the raingauges in a river basin yielded.
Thiessen weights of 0.10, 0.16, 0.12, 0.11, 0.09, 0.08, 0.07, 0.11, 0.06 and 0.10. If the
rainfalls recorded at these gauges during a cyclonic storm are 132, 114, 162, 138, 207,
156, 135, 158, 108 and 150 mm respectively. Determine the average depth of rainfall by
Thiessen mean and arithmetic mean method.
21. A catchment is in the shape of an equilateral triangle placed over a square. Rain gauges
of the apex of the triangle and the next two successive corners of the square record 23, 18
and 16cm during a storm, determine the Theissen mean rainfall for the catchment.
22. A storm produced rainfall of 65, 74, and 100mm at three stations P, Q, and R
respectively. The normal annual rainfall at the stations X, P, Q and R are 660, 792, 786
and 1040 respectively. Estimate the missing storm rainfall at station X.
23. The normal annual precipitation of five rain gauge stations P, Q, R, S and T are 1200,
1020, 780, 1135 and 1350mm respectively. During a particular storm the precipitation
recorded by stations P, Q, R and S are 135, 95, 70 and 100mm respectively. The
instrument at 'T' is inoperative during that storm. Estimate the missing precipitation at
station T.
24. During a month, a rain guage went out of order while the other four gauges in the basin
reported rainfalls of 110, 90, 120 and 115mm. If the normal annual rainfall for these four
gauges are 115, 95, 125 and 120mm respectively and the normal rainfall for the broken
gauge is 98cm, estimate the monthly rainfall at the broken gauge.
25. Explain how the double mass curve method is used to test consistency of rainfall record.
26. Explain the method of checking rainfall data for consistency and show how records can
be adjusted for the current regime.
27. Estimate from depth area curve , the average depth of precipitation that may be expected
over an area of 2400 Sq.km due to the storm of 27th September 1978 which lasted for 24
hours. Assume the storm centre to be located at the centre of the area. The isohyetal as
map for the storm gave the areas enclosed between different isohyetes as follows.

Dept of Civil Engineering, SJBIT

Page 2

Hydrology and Irrigation Engineering


Isohyet

21

10CV55

20

19

18

17

16

15

14

13

12

enclosed 54

134

203

254

295

328

353

371

388

391

Area

(mm)

(km2)

28. The annual rainfall data being reported from a station A for 22 years are available, since
1969. In order to check the consistency of the data, six neighboring stations have been
chosen and the annual rainfall values of these stations have been averaged for all the

1987
1988
1989
1990

1984
1985
1986

1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979

Year

1980
1981
1982
1983

years on record since 1969. These values are given below:

158
145
132
95

148
142
140

130
137
130
163

164
155
143
115

135
163
135

143
130
146
161

Station

177
144
178
162
194
168
196
144
160
196
141

at station A in cm

143
132
146
147
161
155
152
117
128
193
156

Yearly Precipitation

average

yearly precipitation
in cm
`

i) Find out if any inconsistency in precipitation record of station A is indicated. And if


yes, since when, a change in the precipitation regime is indicated?
ii) Adjust the recorded data at station A and determine its mean annual precipitation.
29. What are the recommendations of Indian standard institution on rain gauge network
establishment? Briefly explain optimum number of rain gauge stations in a catchment.
30. Explain the method of finding optimum number of rain gauges in a catchment.
31. A catchment has five rain gauge stations, which record 66, 74, 81, 69 and 90 cm of
rainfall in a year. Determine the percentage error in the arithmetic mean for the area. If
the error is to be 2% less than this, determine the additional number of stations required.
If you use a formula, derive it.
32. During a storm, one of the rain gauge stations 'X' failed to record the rainfall. Data in four
surrounding stations during the same storm are recorded as 7.5, 10, 12 and 9mm.
Coordinates of these four stations in km with station 'X' as the origin are (18, 4) , (-8, 16),

Dept of Civil Engineering, SJBIT

Page 3

Hydrology and Irrigation Engineering

10CV55

(-13, -21) and (-16, 23) respectively. Determine the missing rainfall record at station 'X.
33. A catchment has 8 rain gauges of which one is a self recording type and 7 are the
standard type. For a 5% error in the estimation (E) of the mean rainfall, what should the
required no. of additional rain gauges, if annual precipitation at the 8 stations are?
Station

Rainfall (cm) 74 87 94 88 104

118 60 95

34. The average annual rainfalls in cm, at four existing raingauge stations in a basin are 105,
79, 70 and 66. If the average depth of rainfall over the basin is to be estimated within
10% error. Determine the additional number of gauges needed.
35. The annual rainfall at 7 rain gauge stations in a basin is 580, 940, 600, 450, 200, 880 and
680mm respectively. What is the percentage accuracy of the existing network in the
estimation of the average depth of rainfall over the basin? How many additional gauges
are required if it is desired to limit the error to only 10%.
36. A catchment has six rainguage stations. In a year, the annual rainfall recorded by the
gauges are as follows:
Station

Rainfall (cm) 82.6

102.9 180.3 110.3

98.8 136.7

For a 10% error in the estimation of the mean rainfall, calculate the optimum number of
stations in the catchment.
37. Define rainfall hyetograph. How to construct the double mass curve?
38. Explain mass curve analysis, with a neat sketch. Define intensity, duration and frequency
of rainfall.
39. Following are the rain gauge observations during a storm:
Time since start of storm, mins.

10

15

Accumulated rainfall , cms

0.1 0.2 0.8

20

25

30

35

40

45

50

1.5 1.8 2.0 2.5 2.7 2.9 3.1

Construct i) Mass curve of precipitation ii) Hyetograph.

Dept of Civil Engineering, SJBIT

Page 4

Hydrology and Irrigation Engineering

10CV55

40. The annual rainfall values at a P for a period of 20 years area as follows
Year

1975

1976

1977

1978

1979

1980

1981

1982

1983

1984

1985

Annual

120

84

68

92

102

92

95

88

76

84

101

rainfall
(cm)

Determine
i)

The value of annual rainfall at P with a recurrence interval of 15 years.

ii)

The probability of occurrence of an annual rainfall of magnitude 100cm at a station P

iii)

75% depenable annual rainfall at the station.

Unit 2: LOSSES FROM PRECIPITATION


1. Define evaporation. With a neat sketch, explain the measurement of evaporation using IS
class A pan.
2. Discuss briefly the various abstractions from precipitation.
3. Briefly explain "Evaporation Process".
4. Describe briefly a) Reference crop evapotranspiration b) Actual evapotranspiration
5. Distinguish between
a) Infiltration capacity and infiltration rate.
b) Actual and potential evapotranspiration
c) Field capacity and permanent wilting point
d) Depression storage and interception.
6. Define i) evaporation ii) potential evapo transpiration iii) Actual evapotranspiration iv)
Pan coefficient.
7. Describe the factors influencing evaporation rate from an open water surface. Define the
terms potential evapotranspiration and actual evapotranspiration, giving their relationship
with evaporation.
8. Explain how consumptive use can be estimated using the Blaney - Criddle method.
9. Describe the factor affecting evapotranspiration process.
10. State Dalton's law of evaporation and discuss the significance of each parameter in
Dalton's equation.
Dept of Civil Engineering, SJBIT

Page 5

Hydrology and Irrigation Engineering

10CV55

11. What is the actual evaporation, if 9 litres of water is removed from an evaporation pan of
diameter 1.22mm, to maintain the stipulated water level in the pan? A rainfall of 9mm
has been recorded simultaneously. Pan coefficient is 0.9 for the evaporation pan
considered.
12. Calculate the daily lake evaporation from the following data from a class A pan. Assume
pan coefficient-0.75.
Date

7/6/06 8/6/06 9/6/06 10/6/06 11/6/06

Rainfall (mm)

06

Water added (mm) +08

00

16

03

05

+12

-05

+10

+09

13. Write a neat sketch showing the IS - Pan evaporatimeter. Describe how it is used to
measure the evaporation rates. What are its drawbacks?
14. Explain any three methods for determination of lake evaporation.
15. Describe the importance of pan coefficient in the determination of lake evaporation.
16. Define pan coefficient with a neat sketch. Explain the IS1 standard evaporation pan.
Explain i) Actual evapotranspiration

ii) Potential evapotranspiration

iii) Available

water.
17. What are the measures taken to reduce the rate of evaporation?
18. The water spread area in a lake nearby in the beginning of Jan in a year was 2.8 sq. km
and at the end of Dec it was measured as 2.55 sq km. Calculate the loss of water due to
evaporation assuming pan coefficient of 0.7.
19. Determine the E.T. and irrigation requirement for wheat, if the water application
efficiency is 65% and the (Cu) coefficient for the growing season is 0.8 from the
following data:

Month

Mean monthly temp. C Monthly % of sunshine hrs.

Effective rainfall cm

Nov

18.0

7.20

2.6

Dec

15.0

7.15

2.8

Jan

13.5

7.30

3.5

Feb

14.5

7.10

2.0

20. Following are the data of average monthly percentage sunshine hours (p), mean monthly
Dept of Civil Engineering, SJBIT

Page 6

Hydrology and Irrigation Engineering

10CV55

temperature (Tm) and vegetable's crop coefficient (k) for a place at 20N latitude.
Month Jan

Feb

Mar April May June July Aug Sept Oct

Nov Dec

7.73 7.26 8.2

8.52

9.14 9.2

9.25 8.95 8.30 8.19 7.58 7.88

Tm

12

15

20

22

22

20

20

15

10

0.5

0.55 0.6

0.65

0.7

0.75 0.8

0.8

0.7

0.65 0.55 0.5

16

11

If a farmer grows vegetables from July to December, what is total evapotranspiration


during that time period?

21. At site the value of evaporation in cm from Jan - Dec are 16.7, 14.3, 17.8, 25.0, 28.6,
21.4, 16.7, 16.7, 16.7. 21.4, 16.7, 16.7. Determine the evapotranspiration and irrigation
requirement for wheat if the water efficiency is 65% and the consumptive use coefficient for
the growing seasons following data.
Month

Mean

Monthly Monthly

% Effective

Temperature (C) Sunshine hours

Rainfall (cm)

Nov

18

7.2

2.6

Dec

15

7.15

2.8

Jan

13.5

7.3

3,5

Feb

14.5

7.1

2.0

22. Define infiltration. What are the factors that affect infiltration?
23. Explain the factors affecting infiltration capacity.
24. Explain the methods of estimating yield of a catchment.
25. Explain factors affecting Infiltration capacity.
26. What are infiltration indices? Distinguish between - Index and W - Index.
27. Explain with a neat sketch, the method of determining infiltration.
28. Describe a double ring infiltrometer for measuring infiltration rate. What is the
significance of the outer ring?
29. Define infiltration. Explain how the constant fc, fo and k in the Hortons equation can be
obtained from the Experimental data.
30. Total observed runoff volume during a 6 hr storm with a uniform intensity of 15mm/hr is
21.6xl06 cum. If the area of the basin is 300 sq.km, find the average infiltration rate for
Dept of Civil Engineering, SJBIT

Page 7

Hydrology and Irrigation Engineering

10CV55

the basin.
31. A 6 hour storm produced rainfall intensities of 7, 18, 25, 12, 10 and 3mm / hr in
successive one - hour intervals over a basin of 800km2. The resulting runoff is observed
to be 2640 hectare - mt. Determine the - index of the basin. An infiltration test on a ring
with 35cm diameter yielded the following data.
Time

from the starts

(mts)
Cumulative vol. of water
added (cm3).

10

20

30

60

90

150

178 658 1173 1924 2500 3345 3875 4595 5315

i) Determine the infiltration capacity rates for the time intervals.


ii) What is the average infiltration capacity for the first 10 minutes and for the first 30
minutes?
32. The rates of rainfall for the successive 30 min period of a 3 hr storm are 1.6, 3.6, 5.0, 2.8,
2.2, 1.0 cm/hr.
Corresponding surface runoff is estimated to be 3.6cm. Establish - index. Also determine
W - index.
33. Define infiltration. The rate of infiltration from the beginning of a storm are given below
Time (mm)

30 60 90 120 150 180 210 240

Rate of infiltration mm/hr

600 54 22 20 16

14

12

08

08

Fit an infiltration capacity curve of the exponential form.


34. A storm with 10.00 cm precipitation produced a direct runoff of 5.8 cm. Given the time
distribution of the storm as below, estimate the -index of the storm.
Time from start (hr)
Incremental rainfall in
each hour (cm)

0.4

0.9

1.5

2.3

1.8

1.6

1.0

0.5

35. The total observed run off volume during a 6 hour storm with a uniform intensity of 1.5
cm/hr is 21.6 x 106 m3. If the area of the basin is 400 km3, find the average infiltration
rate for the basin.
36. Explain briefly: i) infiltration capacity ii) - index

iii) w - index.

37. Infiltration equation for a basin is given by f = 5 + 21e-4t, where f is in mm/h and t is in
hours. Determine the values of initial infiltration capacity (f0), final steady infiltration rate
Dept of Civil Engineering, SJBIT

Page 8

120

Hydrology and Irrigation Engineering

10CV55

(fc) and decay coefficient (k). For a storm of

intensity more than f0, determine

infiltration depth and average infiltration rate for first 15 and 60 minutes.
38. What are phi - index and w - index? Explain determination of effective rainfall of a
watershed by the phi - index method.
39. An infiltration test using a ring infiltrometer with 30cm diameter yielded the following
data :
Time from the start 0

10

20

30

60

90

150

210

278

658

1173 1924 2500 3345 3875 4595 5315

(minutes)
Cumulative volume of 0
water added (cm3)
i) Determine the infiltration capacity rates for the time intervals in the experiment.
ii) What is the ultimate infiltration capacity rate fc?
iii) What is the average infiltration capacity for the first 10 minutes and for the first 30
minutes of the experiment?
40. The infiltration rates measured during a test are listed below. Determine the parameters of
the Horton's curve, by the graphical procedure. (10 Marks)
Time (min) :

0.5 2.5 10

f(mm/h)

30

60

90

150

7.5 6.8 5.6 3.6 2.1 2.0

41. Rainfall during the successive 15 minutes of a storm are 6, 20, 24, 28, 12 and 9mm.
Determine the - index for the catchment, (Hint: consider per 15 - minutes for
calculations) if the runoff is 39mm. (10 Marks)

42. A 6 hr storm producing rainfall intensities of 7, 18, 25, 12, 10 and 3mm/h in successive
one hour interval over a basin of 800 sq.km. The resulting runoff is observed to be 2640
ha -m. Determine the - index for the basin.

43. The mass curve of a rainfall of duration 100 min is given below. If the catchment had an
initial loss of 0.6cm and -index of 0.6cm/hr . Calculate the total surface runoff from the
catchment

Dept of Civil Engineering, SJBIT

Page 9

Hydrology and Irrigation Engineering


Time

from 0

start

of

10CV55

20

40

60

80

100

0.5

1.2

2.6

3.3

3.5

rainfall (min)
Cumulative

rainfall (cm)

44. In a 140-min storm the following rates of a rainfall were observed in successive 20-min
intervals 6.0, 6.0,18.0 ,13.0, 2.0, 2.0 and 12.0 mm/h . Assuming the index value as
3.0mm/h and a initial loss of 0.8mm, determine the total rainfall, net runoff and W- index
for the storm.

Unit 3:HYDROGPRAPH
1. Explain 'Unit hydrograph theory'. Derive the unit hydrograph from an isolated storm.
2. Define the term Runoff and list the various factors that affect the runoff of a given area.
3. Define Runoff. With a neat sketch, explain the runoff process.
4. What is unit hydrograph? Discuss its use and limitations.
5. Critically explain any five factors affecting runoff.
6. Compare any three methods used for determining runoff.
7. Distinguish between i) direct run off and base flow, ii) overland flow and interflow.
8. Briefly explain 'schematic representation of runoff components.
9. What are the components of hydrograph? Explain how base flow is separated from a
simple storage hydrograph.
10. With a neat sketch, explain the various components of a flood hydrograph. Also explain
any one method of base flow separation.
11. Write a note on water budget equation. List the factors affecting runoff.
12. Define runoff. Annual rainfall and runoff in mm, over a catchment area are given below :
Year

1980 81

Rainfall 910

82

83

84

85

86

87

88

89

90

91

1110 605 1300 1470 990 1480 520 1195 900 660 750

(mm)
Runoff

305

515

245 620

750

403 654

165 472

390 275 230

(mm)
Develop a rainfall - runoff relation by the method of least squares. Find the correlation
Dept of Civil Engineering, SJBIT

Page 10

Hydrology and Irrigation Engineering

10CV55

coefficient. If the rainfall for a particular year is 125cm, what will be the runoff for that
year?
13. The data in respect of a catchment are as follows :
Intensity of rainfall = 1 cm/hr; Duration of rainfall = 4 hours
Runoff coefficient = 0.5, 0.6, 0.7 and 0.8 for 1st hour, 2nd hour, 3rd hour and after 3rd hour
respectively.
Zone

II

III

Area

20 ha 30 ha

50 ha 40 ha

Time of concentration

1 hr

3hr

2hr

IV

4hr

Determine contribution to runoff from all the zones at the end of each hour starting 1st
hour ending 8th hour after commencement of rainfall.
14. Derive the unit hydrograph for a catchment of 200 km2 if the following discharges were
Time (hrs)
Discharge

17

18

09

10

11

12

13

14

15

16

19

20

21

22

23

24

25

26

(m3/s)
observed in the stream as a result of 6 hour rainfall storm. The base can be assumed to
have increased linearly.

15. The ordinates of a 4h unit hydrograph of a basin area 630 Km2 measured at 2 hour
interval are given below. Obtain the ordinates of 6h unit hydrograph for the basin using S curve technique.

Time hrs

0 2

10

12

14 16 18 20 22

4h UH (cumec)

0 25 100 160 190 170 110 70 30 20 6

24

1.5 0

16. Derive the ordinates of a 3 hour unit hydrograph, if the 6 - hour unit hydrograph for the
basin has the following ordinates (m3/s) at 3 hour intervals: 0, 20, 80, 130, 150, 130, 90,
52, 27, 15, 5, 0. Work only up to the peak.
17. Given below are the monthly rainfall P and the corresponding runoff R values covering a
Dept of Civil Engineering, SJBIT

Page 11

Hydrology and Irrigation Engineering

10CV55

period of 18 months for a catchment. Develop a correlation equation between R and P.


Month

35

40

30

15

10

31

36

0.5 10

138 8.2 3.1 3.2 0.1 12

16

Month

10

11

12

13

14

15

16

17

18

30

10

22

30

25

2.3 1.6

0.0 6.5 9.4 7.6 1.5 0.5

18. Calculate - index of a storm from the following data. Plot the rainfall histogram and
mark the - index on the plot. Catchment area = 430 sq. km ; Volume of direct runoff
after separation of base flow = 10.75mm3 .
Runoff started at 3pm on 17/8/2007
Time of rainfall (hrs)

15 18 21 24 03

Depth of rainfall (mm) 12 15 09 22 02

19. A catchment is divided into five sub areas as given below :


Subarea (km'*)

1.5 3

2.5

Runoff coefficient (c)

0.7 0.6 0.4 0.55 0.9

Calculate the 25 year flood using the rational method. Assume a concentration time of 35
min and use the function
I = 75T0.22 , where I is in cm/hr and t is in min.
(t + 12)0.85
20. How do you determine the stage for zero discharge, if the stage and corresponding
discharge data of a stream
section are available?
21. Rainfall intensity of a Watershed of 5 sq.km area is given by
I= 100Tr0.2 .mm/hr
(t + 16)0.8
where Tr = return period in years and t = time of concentration in minutes. The watershed
has a slope of 0.005 with maximum travel length of 2000m, the land use pattern has 20%
agricultural land (c = 0.3), 10% forest land

(c = 0.16) and rest is impervious.

Estimate 50 year peak flood for the area, c = coefficient of runoff.


Dept of Civil Engineering, SJBIT

Page 12

Hydrology and Irrigation Engineering

10CV55

Unit -4: ESTIMATION OF FLOOD & FLOOD ROUTING


1. What do you mean by the term flood? Mention any two factors affecting flood?
2. Mention any two empirical formulae for estimating flood?
3. What do you mean by flood control? Explain any two methods of flood control.
4. Distinguish between
a) Hydraulic and hydrological method of flood routing
b) Hydrologic storage routing and hydrologic channel routing
c) Prism storage and wedge storage.
5. What are the basic equations used for flood routing
a) Hydrologic method and hydraulic method.
6. Describe a numerical method of hydrologic reservoir routing.

Unit -5: INTRODUCTION TO IRRIGATION


1. Define the term irrigation. What are the reasons for adopting it?
2. Define irrigation. What is the necessity of irrigation?
3. Define Irrigation. What are the types of flow irrigation? Explain any two flow irrigation
systems.
4. What are the benefits and ill effects of irrigation?
5. List the benefits of irrigation.
6. What are the benefits that can be accrued from irrigation projects? Explain in brief.
7. List the benefits and ill effects of irrigation.
8. Explain Flow irrigation with the help of neat sketches.
9. List the methods of irrigation and explain any three methods.
10. What are the primary objectives of an irrigation method? List the various methods of
irrigation adopted for distribution of water in the field.
11. List out the various methods of application of irrigation water. (including subgroups)

12. What are the methods of applying water to crops? Explain any two surface irrigation
methods.
13. What is Bandhara irrigation? What are its advantages and disadvantages? Explain Phad
Dept of Civil Engineering, SJBIT

Page 13

Hydrology and Irrigation Engineering

10CV55

system of irrigation.
14. With neat sketches, explain Bandhara irrigation. List its advantages and disadvantages.
15. Discuss Phad system of irrigation as applied to Bhandhara irrigation.
16. List the advantages of sprinkler irrigation, with its limitations.
17. What are the limitations of sprinkler irrigation system?
18. Explain drip irrigation. List its advantages and disadvantages.
19. Write short notes on supplemental irrigation.
20. Write a short note on infiltration galleries.
Unit 6: SOIL-WATER-CROP RELATIONSHIP
1. Give brief classification of Indian soils.
2. What are the functions of irrigation soils? Explain briefly.
3. What are the physical properties of soil?
4. Explain frequency of irrigation and irrigation efficiency.
5. Define crop rotation. What are its advantages? List some crop rotations.
6. How do you estimate the frequency of irrigation on the basis of soil moisture basis?
7. After how many days will you supply water to soil (clay loam) in order to ensure efficient
irrigation of the given crop if:
i) Field capacity of soil is 27%

ii) Permanent wilting point is 14%.

iii) Density of soil is 1.5 g/cc

iv) Effective depth of root zone is 75cm

v) Daily consumptive use of water for the given crop is 11mm.


8. After how many days will you supply water to soil in order to ensure sufficient irrigation
of the given crop, if the field capacity of the soil = 30%, permanent wilting point = 14%,
density of soil = 0.0125 N/cm3, effective depth of root zone = 70 cm and daily
consumptive use of water for the given

crop = 10.5 mm.

9. After how many days will you supply water to soil in order to ensure sufficient irrigation
of given crop, if
Field capacity of soil

= 28%

Optimum moisture content, when water is be supplied


Dry density of soil
Effective root zone depth
Dept of Civil Engineering, SJBIT

= 16%

=13 kN/m3
= 0.7 m
Page 14

Hydrology and Irrigation Engineering


Daily consumptive use of water for given crop

10CV55
=12 mm

10. Calculate the depth of available soil moisture in the root zone of the clay loamy soil using
the following data. Also find after how many days will you supply water to the soil in
order to ensure efficient irrigation of the given crop if
Field capacity = 27%
Permanent wilting point = 13%
Dry density of soil = 1.5 gm/cm
Root zone depth = 1.25 m
Daily consumptive use of water for the given crop = 20 mm.
11. After how many days will you supply water to soil (clay loam) in order to ensure efficient
irrigation of the given crop if,
Field capacity of soil = 27%
Permanent wilting point = 14%
Density of soil =13 kN/m3
Effective depth of root zone = 0.75 m
Daily consumptive use of water for the given crop =1.1 cms
12. When will a soil be fertile? How can soil fertility be maintained?
13. Write a note on crop rotation?

Unit 7 :WATER REQUIREMENT OF CROPS


1. What do you mean by Duty and Delta? How are they expressed?
2. Define duty, delta and base period. Obtain the relationship between them.
3. Define 'flow duty' and 'quantity duty'. Obtain the relationship between Duty, Delta and
Base period.
4. Explain i) Gross command area ii) Culturable command area iii) Consumptive use
5. Define duty, delta and base period and establish the relationship between them.
6. What are the factors affecting duty?
7. Define various irrigation efficiencies used in irrigation system.
8. A water course commands an irrigation area of 800 ha. The intensity of irrigation for rice
in this area is 50%. The transplantation of rice crop takes 15 days and the total depth of
water required by the crop is 60 cm. Determine

i) Duty on the field during

transplantation ii) Duty at the head of distributory assuming losses of water to be 20% in
Dept of Civil Engineering, SJBIT

Page 15

Hydrology and Irrigation Engineering

10CV55

the water courses. iii) Calculate the discharge required in the water course.
9. Culturable command area under a canal system is 50000 hectares. Base period, intensity
of irrigation and duty of various crops are given in the table below. Determine the
discharge for which the canal is to be designed.
Base period Intensity

Crop

of Duty

(days)

Irrigation (%)

(hectares / cumec)

Kharif

110

30

900

Rabi

120

45

2000

Sugarcane 360

20

2500

10. The base period, duty at the field of difference crops, and area under each crop in the
command area are given below. Find the required reservoir capacity to cater to the needs
of the crops.
Crops

Base period Duty @ field Area under the


(days)

(Ha/cumec)

crop (Ha)

Wheat

120

1800

4800

Sugar cane

360

800

5600

Cotton

200

1400

2400

Rice

120

900

3200

11. A main canal taking off from a storage reservoir has to irrigate a land with the following
crops, the details of which are given below.
Crop

Crop period Area to be irrigated Duty


(days)

(Hectares)

(Hect/cumec)

Sugar cane (Perinnial )

365

1250

850

Paddy (Kharif)

120

1500

850

Wheat (Rabi)

120

2500

1700

Assuming 25% losses in the canal system and giving an allowance of 20% for peak
demand, calculate the capacity of the main canal. What is the total volume of water
required for each crop?
12. Culturable command area of a reservoir is 50000 hectares. Find out the reservoir

Dept of Civil Engineering, SJBIT

Page 16

Hydrology and Irrigation Engineering

10CV55

capacity, if the canal losses are 5% and reservoir losses 8%. Base period, intensity of
irrigation and duty of various crops are given in the following table:

Crop

Base period Duty

Intensity of irrigation

(days)

(hect/cumecs) (%)

Wheat

120

2000

20

Rice

140

900

15

Cotton

180

1600

10

Sugarcane 360

2500

20

13. What shall be the reservoir capacity for the season, if it is serving 24000 ha of paddy,
6000 ha of ground nut, 6000 ha of maize and 12000 ha of cotton? The following depth
(cm) of water is required during different months?
Month

Paddy

Ground
nut

Maize

Cotton

September (1-30) 7.9

October (1-31)

29.9

3.4

4.0

November (1-30) 20.7

6.3

15.1

8.0

16.2

23.8

20.6

December (1-31)

Assume 25% canal losses and 20% reservoir evaporation losses.

Unit 8: CANALS
1. With a neat sketch, explain any one type in each of cross drainage work
2. Carrying canal water over the drainage ii) Carrying drainage over the canal.
3. What is a Canal? Explain the general considerations for alignment of Canals.
4. Explain various considerations for alignment of a canal.
5. With a neat sketch, explain the cross drainage works constructed for bypassing canal over
drainage.
6. Design an irrigation channel in alluvial soil according to Laceys silt theory for the
Dept of Civil Engineering, SJBIT

Page 17

Hydrology and Irrigation Engineering

10CV55

following data: Full supply discharge=10 cumec, Laceys silt factor=0.9, Side slope of
channel=(H):1(V)
7. Design an irrigation channel to carry a discharge of 45 cumecs. Assume N = 0.0225 and
m = 1. The channel has a bed slope of 0.16 meter per kilometer. Use Kennedy's theory.
Assume a trial depth for D as 1.8m.
8. An irrigation engineer has designed an irrigation canal using Kennedy's theory, for the
following details. He had concluded that full supply depth of 1.8 m is sufficient for the
canal. Check whether his design can be adopted.
Discharge

= 45 cumecs

Manning's Rugosity coefficient

= 0.0225

Bed slope of channel

=0.16 m/km

Critical velocity ratio

=1

9. Give the classification of canals. Explain salient features of each of them.


10. Write the steps involved in hydraulic design of an aqueduct.
11. Design an irrigation canal for the following data using Lacey's silt theory. Full supply
discharge = 35 cumec, silt factor = f = 1 side slope = 1H : 2V.
12. What are the factors to be considered in alignment of an irrigation canal? What are the
main functions of head regulator and cross regulator?
13. A channel section has to be designed for the following data:
Discharge Q = 30 cumecs,

Silt factor f - 1.00, Side slope : 0.5 H : 1 V

Find also the longitudinal slope.


14. List the functions of head regulator and cross regulator work.
15. Design an irrigation channel in alluvial soil according to Lacey's silt theory for the
following data: Fully supply discharge =15 m/sec; Lacey's silt factor = 1.0; Side slope
of channel =2 H: 1V
16. "Lacey's conception of design of canal on an alluvial soil is superior to Kennedys
concept". Justify the statement.
17. Explain the design principle of trapezoidal notch type of fall.
18. Design an irrigation channel to carry 50 cumecs of discharge. The channel is to be laid at
a slope of 1 in 4000. Take CVR = 1.1 and Chezy's C - 49.726 in the equation V = C RS.
Assume trial depth = 2.7 m. Whether the trial depth is suited for the discharge?
Dept of Civil Engineering, SJBIT

Page 18