You are on page 1of 11

SAT REPORT

PSS
11kV/415V substation
CLIENT
PROJECT NO
PSS
PROJECT NAME

: ADDC
:
: 01
:

CONTRACTOR
SHEET NO
DATE

CONSULTANT

:
: 1 of 11
:

NAME PLATE
Sl .No

Make & Type

Rated Voltage

Normal current

(A) General Check:


Sl.no

Description

1
2
3
4
5

Earthing Circuit of Cubic


Label of Panels
Marking of equipment and terminals
Tightening of connection
Visual inspection of the panel and components

6
7
8
9
10

Voltage presence indication


Lamp Test
Scheme & Loop wiring verification check
MCBs rating as per drawing and working properly
SF6 Pressure Gauge

Remarks

(B) Operation Check:


Sl.no
1
2
3
4
5

Description

Remarks

Mechanical opening and closing of C.B


Mechanical opening and closing of Ring Switch
C.B protection Trip indication
Mechanical opening and closing of Earth Switch
Pull to Trip Bar

Tested by ( for spaceage)


Name:
Signature:
Date:

Witnessed by (ADDC)

SAT REPORT
PSS
11kV/415V substation
CLIENT
PROJECT NO
PSS
PROJECT NAME

: ADDC
:
: 01
:

CONSULTANT

CONTRACTOR
SHEET NO
DATE

:
: 2 of 11
:

(C) Interlock Check


Sl.no
1
2

Description

Remarks

Mechanical Interlock between CB & Ring Switch


Mechanical interlock between Earth Switch & Ring Switch
1) INSULATION RESISTANCE TEST BEFORE HI-POT
Test Connection
R: Y+B+E
Y: R+B+E
B: R+Y+E

Applied Test Voltage dc /1Min

Measured Resistance ()

Remarks

Leakage Current (mA)

Remarks

Measured Resistance ()

Remarks

2) DIELECTRIC TEST (for 1 minute)


Test Connection
R: Y+B+E
Y: R+B+E
B: R+Y+E

Applied Test Voltage ac /1Min

3) INSULATION RESISTANCE TEST AFTER HI-POT


Test Connection
R: Y+B+E
Y: R+B+E
B: R+Y+E

Applied Test Voltage dc /1Min


5kV

Test Equipment used:


INSTRUMENT NAME
SL. NO.
MAKE & MODEL
CALIB. DUE

MEGGER

Tested by ( for spaceage)


Name:
Signature:
Date:

HIGH VOLTAGE TESTER

Witnessed by (ADDC)

SAT REPORT
PSS
11kV/415V substation
CLIENT
PROJECT NO
PSS
PROJECT NAME

: ADDC
:
: 01
:

CONTRACTOR
SHEET NO
DATE

CONSULTANT

:
: 3 of 11
:

4) PROTECTION RELAY TEST


Relay Make/ Type

SCHNEIDER ELECTRIC /
MICOM P124
100 / 1A

CT Ratio
I>
I>>

t>
t>>

Transformer Rate

1500 kVA

Relay Sl. No.


Io >
Io >>

to >
to >>

(a)OVERCURRENT (I>)
Set
Value
(A)

APPLIED
CURRENT (A)

PICK UP CURRENT (A)


R-Y

Y-B

B-R

CALCULATED
TIME (sec)

MEASURED TIME (sec)


R-Y

Y-B

B-R

2 x Is
5 x Is
(b) OVERCURRENT (I>>)
Set
Value
(A)

APPLIED
CURRENT (A)

PICK UP CURRENT (A)


R-Y

Y-B

B-R

CALCULATED
TIME (sec)
Y-B

MEASURED TIME (sec)


R-Y

Y-B

B-R

2 x Is
(c) EARTH FAULT (Ie>)
Set
Value
(A)

APPLIED
CURRENT (A)

PICK UP
CURRENT (A)

CALCULATED TIME (sec)

MEASURED TIME (sec)

CALCULATED TIME (sec)

MEASURED TIME (sec)

2 x Is
5 x Is
(d) EARTH FAULT (Ie>>)
Set
Value
(A)

APPLIED
CURRENT (A)

PICK UP
CURRENT (A)

2 x Is

Tested by ( for spaceage)


Name:
Signature:
Date:

Witnessed by (ADDC)

SAT REPORT
PSS
11kV/415V substation
CLIENT
PROJECT NO
PSS

: ADDC
:
: 01
:

PROJECT NAME

Fault Record:
Record No
Fault

CONTRACTOR
SHEET NO
DATE

CONSULTANT

:
:

Threshold
Magnitude

Remarks:
Trip Test: Connected through (1) Primary Injection
1. Phase fault:

:
: 4 of 11
:

:
:

(2) Secondary Injection


2. Earth Fault :

Relay Final Setting:


In

: 1A

kVA

: 1500

CT Ratio

: 100/1 A

O/C Curve: IEC SI


I>
I>>

t>
t>>
E/F Curve: IEC SI

Ie>
Ie>>

t>
t>>
5) CT RATIO TEST

PROTECTION
CT

E/F

Injected Current (A)


RY / RN
YB / YN
BR / BN
-------------

R
--

-----

POLARITY CHECKS:
Observations of Polarity Checks for Protection CT
R - Phase
Y - Phase

Tested by ( for spaceage)


Name:
Signature:
Date:

Measured Current (A)


Y
B
--

N
----

CT RATIO
FOR
100 / 1 A

---

--

Remarks
B - Phase

Witnessed by (ADDC)

SAT REPORT
PSS
11kV/415V substation
CLIENT
PROJECT NO
PSS
PROJECT NAME

6)
Make/Type
CT Ratio

: ADDC
:
: 01
:

CONSULTANT

:
: 5 of 11
:

Metering core- Y-Phase

Ratio Test
Core No. Ref
S1-S2

CONTRACTOR
SHEET NO
DATE

Sl .No
VA/Cl

CT Ratio (A)

Primary injected current (A)

Secondary measured current (A)

7) Earth Fault Indicator:


Make/Type
Set trip level
Pick up Value
Reset time

:
:
:
: 4 hrs

Test Equipment used:


INSTRUMENT NAME
SL. NO.
MAKE & MODEL
CALIB. DUE

TRIP LEVEL: 25, 50, 100 A


Serial No.
Supply
LED Indicaton

SEC IN KIT

:
:
:

MULTIMETER

8) Earth Resistance ():


TRM Body
Transformer body
Transformer neutral
Test Equipment used:
INSTRUMENT NAME
SL. NO.
MAKE & MODEL
CALIB. DUE

DIGITAL GROUND TESTER


DGT/SP/01
Megger & DET4TC2

Tested by ( for spaceage)


Name:
Signature:
Date:

Witnessed by (ADDC)

SAT REPORT
PSS
11kV/415V substation
CLIENT
PROJECT NO
PSS
PROJECT NAME

: ADDC
:
: 01
:

CONSULTANT

CONTRACTOR
SHEET NO
DATE

:
: 6 of 11
:

9) Transformer Test Report


Name Plate Details

SIEMENS TRANSFORMERS LLC

Sl.No

10003214

Year of Manufacture

2014

Rating KVA

1500

Type of Cooling

ONAN

Frequency (Hz)

50

Rated Voltage (kV)

11 / 0.415

Impedance Normal Tap (%)

5.75
0

Temperature Rise Oil/Winding C

45 / 55

Vector Group Symbol

Dyn11

Rated Current (A)

78.7 / 2086.8

Oil Weight (Lit)

861

Total Weight (Kg)

4350

(a) Visual Check:


Sl.No
01
02
03
04
05
06
07
08
09
10

Description

Remarks

Installing according to drawing


No Oil leakage & Oil Level position correct
All drain valves are fully closed
No visible cracks or breaks to bushing
All bushing connections are fully tightened
Main tank grounding correct
Neutral grounding is correct (fixed, tightened & insulated)
Pressure relief valve are correctly installed
Earthing of cable boxes and other removable parts
Winding temperature are correctly installed

Tested by ( for spaceage)


Name:
Signature:
Date:

Witnessed by (ADDC)

SAT REPORT
PSS
11kV/415V substation
CLIENT
PROJECT NO
PSS

: ADDC
:
: 01
:

PROJECT NAME

CONTRACTOR
SHEET NO
DATE

CONSULTANT

:
: 7 of 11
:

(b) Insulation Resistance Test


Winding

Voltage in dc

Ref

(V)

HV to Earth

5000

HV to LV

2500

LV to Earth

1000

Insulation Resistance (G)


15sec

60sec

Polarisation Index (PI) Value =


(60Sec/ 15Sec)

(c) Winding Resistance


H.V Side
Taps

Resistance ()
1U-1V

1V-1W

1W-1U

1
2
3
4
5
L.V Side ()
Taps

Resistance ()
2u-2v

2v-2w

2w-2u

2u-2n

2v-2n

2w-2n

(d) Magnetising Current Test

As per the test result attached

Tested by ( for spaceage)


Name:
Signature:
Date:

Witnessed by (ADDC)

SAT REPORT
PSS
11kV/415V substation
CLIENT
PROJECT NO
PSS
PROJECT NAME

: ADDC
:
: 01
:

CONTRACTOR
SHEET NO
DATE

CONSULTANT

:
: 8 of 11
:

(e) Magnetising Core Balance test


Applied Voltage
r-n

y-n
-

b-n

r-n

y-n

b-n

Remarks

Measured Voltage

(f) Turns Ratio Test

As per the test result attached


(g) Vector Group Test

As per the test result attached


(h) Functional Checks of Supervisory Equipments:
Sl.No
01
02
03
04
05
06

Checks
Vertical Oil Level Switch
Oil Temperature Indicator
Pressure relief valve
OTI Alarm Setting Temperature (
OTI Trip Setting Temperature (
OTI alarm/trip contacts

Remarks

0
0

C)
C)

SNAG LIST

Tested by ( for spaceage)


Name:
Signature:
Date:

Witnessed by (ADDC)

SAT REPORT
PSS
11kV/415V substation
CLIENT
PROJECT NO
PSS
PROJECT NAME

: ADDC
:
: 01
:

CONSULTANT

CONTRACTOR
SHEET NO
DATE

:
: 9 of 11
:

MDB TESTING
Name Plate Details:
Manufacturer
Serial No.
Year of Mfg
Normal current rating of Bus Bar
Normal current rating of I/C unit
Rated Voltage
(A) General Check:
Sl.no
1
2
3
4
5
6
7
8
9
10

Description

Remarks

Earthing Circuit of Cubic


Label of Panels
Marking of equipment and terminals
Tightening of connection
Visual inspection of the panel and components
Check function of CBs draw out rack
Check selector switches
Check manual operation of CBs
MCBs rating as per drawing and working properly
Check Fuses

Tested by ( for spaceage)


Name:
Signature:
Date:

Witnessed by (ADDC)

SAT REPORT
PSS
11kV/415V substation
CLIENT
PROJECT NO
PSS
PROJECT NAME

: ADDC
:
: 01
:

CONSULTANT

CONTRACTOR
SHEET NO
DATE

:
: 10 of 11
:

(B) Operation Check:


Sl.no

Description

1
2
3
4
5
7
8
9
10
11

Remarks

Verify CBs open/close manual


Simulate external control signal and verify CBs open/close automatically
Verify operation of all selector switches and push buttons
Verify operation of all instrumentation, ammeters, voltmeters, lamps etc.
Verify operation of safety shutdowns, UVR, ELR
Verify test, rack in and rack out position
Verify spring charge status and indication
Verify auto and manual status
Verify CBs open, on and trip status
Verify remote start and stop commands

INSULATION RESISTANCE TEST


PHASE

APPLIED
VOLTAGE (V)

IR VALUE IN

REMARKS

R EARTH
Y EARTH
B EARTH
R-N
Y-N
B-N
R-Y
Y-B
B-R

Tested by ( for spaceage)


Name:
Signature:
Date:

Witnessed by (ADDC)

SAT REPORT
PSS
11kV/415V substation
CLIENT
PROJECT NO
PSS
PROJECT NAME

: ADDC
:
: 01
:

CONTRACTOR
SHEET NO
DATE

CONSULTANT

:
: 11 of 11
:

For MDB, verify all outgoing MCCB I/O points


Status
Q1

Q2

Q3

Q4

Q5

Q6

Q7

Q8

Q9

Ref

On status
Off status
Trip
Selector
switch
local
mode
status
Selector
switch
remote
mode
status

Tested by ( for spaceage)


Name:
Signature:
Date:

Witnessed by (ADDC)