You are on page 1of 9

]ONTROLLED

DOCUMENT

:HECKED

:ORINFORMATION
.ORFASRICATION
:ORERICTION

:ORPURCHASING
:ORUSE
qSBUILD

c.'y'
Yl. L-)r s-{DARYA PALA Eng. Co.

0
REV DATE

FIRSTISSUE

Mohammadi

DESCRIPTION

PREP./DESIGN

Moosavi

H.Vanaki

CHECKED APPROVED

g
.figRt
N.t.G.C.

OIVNFR:

NATIONALIRANIANGASCOMPANY
DOCUMENT
No.:
PC EC TAG DIS TP SN
037 TK 3710 ME PR 003

HIRBODAN
EPCCO.

PROJECT NAME :

ILAM GAS TREATING PLANT


SPHERICAL STORAGETANKS

CONTRACTOR
:RICTION

DOC. NAME :

ERECTION PROCEDURE
SPHERICAL TANKS

]UALN CONTROL

:O[,IMERCIAL

ITEM NO/S TK-3710 A/B/C/D

]LIENT

Y OF AZARAS ND CO (AIC)

VAT.ENG.

AzarAb Ref.No.

ilffi
AZARAIJ

CUSTOMER
JOBNo.

]ETAILENG.
r'ESSELTEQUIP,2

ueslcxc ENc.DEPr.
AZARAB wousrruxco

DOC.No.
File Name: Page Rev.
vH-v0434101-tto3
1 r '
PROJECT
No.

v043

z/g

r'ESSELAEQUIP,l
JRO PLANNING

qRCHIVE
]ECIPIENTS

DOC NO.:

AZAR-AB INDUSTRIES
II,AI4 SPHERE_

TABLEOF CONTENTS

General

Foundation

Erection

Pagd 2/9

vH-V043-0101-003

AZAR-AB TNDUSTRTES
ILAM SPHERE-

DOC NO.:

1- General
Thisprocedure
appliesto fielderectionworkof 1047m3spherical
tanks
TK-3710NBICIDat ILAMGASTREATINGPLANT.
All fielderectionshallbe performedstrictlyin accordancewiththe drawings
approvedby the owner.

2- Foundation
Beforeerectionworkof tanks,Foundation
shallbe checkedby thetankbuilder
in accordance
withfieldin specificmanual.lf thereweresomeobstracles
on
tankerection,
suchfoundation
shouldbe repairedby foundation
constructor.

3- Erection
3.1-Theerectionsequence
shallbe as follows:
- Lowerpartof columnson thefoundations.
- Equatorplateswithuppercolumns.
- Intermediate
equatorplates.
- Bottomcrownplates.
- Top crownplates.
3.2-Prior
to the erectionof column,the levelof foundation
shallbe adjusted
to the specifiedlevelwithshimplate.The clearancebetweenfoundation
andcolumnbaseshallbe concreted
beforethe hvdrostatic
test.
3.3-Erection
of lowercolumns.
Duringerectionof lowercolumn,levelandplumpness
shallbe checked.
(note:The referencepointshallbe markedbeforeerection,this
pointshallbe determined
fromtop of column.(FlG.
1)
3.4-Allowable
tolerance
of plumpness
andlevelof eachcolumnsis as
following:
Plumpness: H/500mm(Plus/Minus)
Level : 3 mm(Plus/Minus)

Page'3/9

VH_V043-0101-003

AZAR-AB INDUSTRIES
II,AM SPHERE-

DOC NO.:

VII-V043-0101-003

3.5-Erection
of equatorplatewithuppercolumn.
- Priorto the equatorplateerection,erectiontoolsmustbe installed.And
thenstagingshallbe installed
on the equatorplates.
typicallayoutis shownin FIG.2,butshape,number& locationof
erectiontools may be changedif necessary.
- Two plateswith uppercolumn(MarkedA) shallbe erected.
- The intermediateplatewithoutuppercolumn(MarkedB) shallbe erected.
- Followthe sameprocedurefor the remainingequalorplates.
- Aftererectionof the eouatorolatesinsidediameter"D"shallbe checked.
the out of roundness
shallnotexceed1%of the nominaldiametershown
in drawing(FlG.3).
3.6-Erectionof bottomandtop crownplates.
- Eachbottomandtop crownsconsistof sevenplates.
- the adjacentplates(markedC) shallbe assembled
plates.
priorto 3 remaining
- the plates(markedD) shallbe assembled
priorto erectionof centerplate.

Page'4/9

AZAR-AB

DOCNO. : Vrr-V043-0101-003

XNDUSIRXES

F I G ,1

Paqe 5/9

AZAR-AB IIIDUSTRIES
rr.Al,t SPHERE-

DoC NO.:
---!--------

VH-V043-0101-003

AZAR-AB IIIDUSTRIES
rLAId SPEERE-

DOC NO.:

FIG, 3
Pag 7/9

vH-V043-0101-003

AZAR-AB INDUSIRIES
IIAM SPIIERE-

DOC NO.:

FIG.4

Page 8/9

VA-V043-0101-003

Doc No':

AZAR-AB rNDusrRrEs
II,AM SPHERE-

-t-

-FIG'5,
Pasa 9/9

vH-V043-0101-003