CL of pile

RCC pedestal

Average FGL

Notes

CL of pile

1. All dimensions are in millimeters and levels are in meters unless otherwise specified
2. All concrete grade shall be machine mixed and machine vibrated
3. Concrete grade for pilecap, footing, tie beam, pedestal & columns K300
4. Reinforcement shall be SD 40, Yield Point 390 N/mm2 for Deformed Bar &
235 N/mm2 for Plain bar
5. Clear cover to main reinforcement for RC members shall be as below
a) Pilecap = 60mm b) Foundation = 50mm (Bottom & Sides)
c) Columns, Pedestals = 50mm d) Beam = 40mm
6. Follow only written dimensions, do not measure dimensions
7. Layout dimension to be checked with arch. / Vender dwg if any ambiguity
is there, contact engineer in-charge prior to proceed
8. Maximum load carrying capacity of pile: ( LRFD approach )
b) Horizontal = 94KN
9. Compaction of earth below foundation / grade slab shall be up to 95%proctor density.
10. Inside filling and outside filling upto FGL shall be done simultaneously
11. For layout and exact location of brick wall refer arch.drg.

RCC pedestal

Average FGL
Reinforcement
5nos.-D16

Reinforcement
8nos.-D16

Pilecap or beam

Pilecap or beam
900

Varies

Varies

600
D10 @150 c/c

Pile cut off lvl.

D10 @150 c/c

Pile cut off lvl.

75
450

75

Reference drawings

Well compacted earth

Well compacted earth

Inner surface to be
roughened

100 Thk lean concrete

900

In-situ concrete
plug ( grade K300)
1.5mm M.S. Plate
as formwork
to receive in-situ
concrete plug

In-situ concrete
plug ( grade K300)
Inner surface to be
roughened
1.5mm M.S. Plate
as formwork
to receive in-situ
concrete plug

Pile P1 from pile cut off lvl


( 12m+12m+6m )

70

100

350

Prestressing
steel bar
10nos.-7.4Dia PC Bar

Key to symbols

Section

600

1:20

Pile P2 from pile cut off lvl


( 12m+12m+12m )

Section

1:20

36000 length of Pile

A
150mm

30000 length of Pile

4
A

150mm

Spiral stirrups

Spiral stirrups

70

Prestressing
steel bar
24nos.-9Dia PC Bar

100

End plate

Prestressing
steel bar
Spiral stirrups

1:10

Full Butt weld


12
12

1.5mm

Steel band

Detail

1:10

Issued for Construction

Date

Drawn

Description

Sequis Center
3rd Floor
Jalan Jenderal Sudirman Kav 71
Jakarta, 12190
Indonesia
T +62 21 2526588
F +62 21 2526592
W www.mottmac.com

Spiral stirrups

Detail

1:10

Full Butt weld

End plate

Nilesh

Prestressing
steel bar

Client

End plate
16

28.02.14

Full Butt weld

1.5mm

Detail

A
Rev

Full Butt weld


Steel band

End plate

16

100 Thk lean concrete

1. CCA-0001-01-P1 General Notes


2. CCA-0002-01-P1 Typical Details of Columns, Footings, Beams, wall Foundation etc

Title

Detail

1:10

PT Energi Sejahtera Mas


Plaza-BII, Tower-I, 07th Floor
Jl. M H Thamrin 51
Jakarta, 10350
Indonesia
Golden Chemical Renewable

Designed

RNV

Eng check

Drawn

NMW

Coordination WB

Dwg check

ASP

Approved

Scale at A2
M.S. shoe
Mott MacDonald Limited

M.S. shoe
1:20

1:20
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.

1:100

Status

BKP

GDS
Rev

CON

Drawing Number

312700-CCB-0014-01