MDD, OMC
CBR
Sulphalte and chloride content
Density and moisture content
Backfilling of structures MDD, OMC
Density and moisture content
3000M 2
3000M 2
6000 M 2
1500M 2
5M3 of backfill
3 tests per layer
6-Electrical work:
1-What is different type of cable?
Ans: .4kv, 6.6kv, 11kv 3c*240mm and 3c*300mm no FOC cable, 33kv 3c *240mm and
Prepared By: Civil Engineer Azhar Iqbal Tarar
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Page 18
Page 19
Page 20
Page 21
Page 22
Page 23
Page 24
Page 25
Page 26
Page 27
Page 28
Page 29
Page 30
Page 31
Page 32
Page 33
Page 34
Page 35
Page 36
Page 37
Page 38
Page 39
Page 40
Page 41
Page 42
Page 43
Page 44
Page 45
Page 46
Production/day
500 M cube
115 Truck
1350 M cube
25 Trip
850 M cube, 2000M square
3000 M squire
1500 M sq
850m cube or 8 trips
5000m sq
1500 m sq
1500 M sq
5000 m sq/2000 Ton
5000 m sq/2000 Ton
2500 m sq/1000 Ton
10 Trip
50 Truck
10,000 m sq
7 trip/3000 M cube
10,000 m sq/1530 Ton
10,000 m sq/1530 Ton
5000m sq/765 Ton
Production/day
10,000 m sq
10,000 m sq/1530 Ton
10,000 m sq/1530 Ton
10,000 m sq
1530 Ton
Page 47
Bitumen Tanker 1
Paver
1
STR
1
PTR
1
Compressor 1
Hand Roller
1
Plate Compactor
Water Tanker 1
Clipper machine
Truck
20
Bob Cat
1
Masson
1
Carpenter
2
Labour
4
Steel fixer
1
Masson
1
Carpenter
2
Labour
2
Masson
1
Labour
1
Masson
1
10,000 m sq
9,000 m sq/1200Ton
9,000 m sq/1200Ton
4500 m sq/600Ton
9,000 m sq
9,000 m sq/1200 Ton
9, 000 m sq/1200 Ton
9,000 m sq
Pipe fitter
Labour
1
2
1530 Ton
500 m sq
100 m
100 m
50 m
15 m sq
JCB
1
Labour
2
19-Lay pipe including formation preparation and bedding.
Pipe fitter
1
Labour
5
Description of work
Machinery Quantity
Production/day
100 M
Charge hand
Labour
Charge hand
Labour
1
7
1
2
100 M
100 M
100 M
Page 48
JCB
Charge hand
Labour
JCB
1
1
4
1
100 M
Page 49
Page 50
Page 51
Page 52
Page 53