Budsetarv Estimate
To,
Date:
19.10.15
2. Removing of old 5" pipe line thickener no.2 to screw pump house in 50 feet length.
3. Fabricate new 5" pipe line for thickener no.2 to screw pump hose in 50 feet length.
4. lnstallation of 6" thickener no.2 to screw pump hose in 50 feet length.
5. Do welding work in 6" pipe line such as taffit and flange welding.
6. To fitted 6" gate valve in 6" pipe line.
7. Making support for 6" pipe line.
8. Making clamp for 6" pipe line.
Connected 6" pipe line in Sump pump no.4 delivery line'
l0.Welding machine, welding electrode and gas cutter in contractor scope
11.All material will be provided by S.P.M.
All above work our labor Rate with tools & tackle & consumable items: 7000.00
9.
work of new centrifugal pump on Under Ground water tank No,2 (UGT No'2) at New
Filtration plant:
1. Shifting work of new pump from store to UGT NO'2.
2. Fabricate bottom frame and mounted.
3. Erection work of new pump.
4. Do proper levelling work of pump.
5. Do proper alignment of pump and motor.
6. Shifting material of suction and delivery pipeline from store to UGT No.2.
C. Installation
f(ffi41c
1. Shifting Material of 1" pipe line from store to new filtration plant'
2. Removing of old 1" damaged pipe line from sump pump house to U'G'T' No'1'
3. Fabricate new 1" pipe line for sump pump house to U'G'T' No'1'
4. lnstallation of 1" pipe line from sump pump house to U'G'T' No'1'
3.rMakine+nos.ofchannelin2.5meterlengthfroml00mm,|,sectionbeambygascutting&
welding work.
+. ruakingznos.of
channe|
in3 meter length for oriental support from 1oo mm '1, section beam
by
6.
7.
8. Erection work of gantry in 15 feet height'
9. Grouted gantry near U.G.T. No. 1.
AllaboveworkourlaborRatewithtools&tackle&consumableitems:12000'00
lnstallation of Cantilever santrv on Thickener No'1 at E'T' Plant:
illriftlng N'l.t"rial of cantilever Gantry from scrap yard & store to E'T' Plant'
gear box '
2. Making new cantilever gantry for loading and unloading of thickener
gas cutting &
3. Making 2 nos. of channel in 4 meter length from 1oo mm 'l' section beam by
F,
Welding work.
4.Making2nos.ofchannelinl.5meterlengthfororientalsupportfroml00mm'l,sectionbeam
work.
5.
6. Do welding work in 1.5 meter channel and 4 meter length box.
7. Fitted cross basing angle in cantilever gantry by welding work.
8. Making Huck of cantilever gantry for chain pulley'
9. Mounted rhuck on cantilever gantry.
weldinf work.
1. Shifting Material of cantilever Gantry from scrap yard & store to E.T. Plant'
2. Making new cantilever gantry for loading and unloading of thickener gear box .
3. Making 2 nos. of channel in 5 meter length from 100 mm 'l' section beam by gas cutting &
Welding work.
4. Making 2 nos. of channel in 2 meter length for oriental supportfrom 100 mm'l'section beam
by gas cutting & welding work.
5. Making box of 5 meter length by lapping of 2 nos. 'l' section beam by welding work'
6. Do welding work in 2 meter cha nnel and 4 meter length box.
s.P.M.
scope.i* *
All above work our labor Rate with tools & tackle & consumable items: 8000.00
l. lnstallation of Cantilever gantrv between equalization tank no, 5 & 6 at E.T. Plant:
1. Shifting Material of cantilever Gantry from scrap yard & store to E.T. Plant.
2. Making n"ew cantilever gantry for loading and unloading of thickener gear box .
3. Making 2 nos. of channel in 3.5 meter length from 100 mm'l'section beam by gas cutting &
Welding work.
4. Making 2 nos. of channel in 1.5 meter length for oriental support from 100 mm 'l' section bea m
by gas cutting & welding work.
5. Making box of 3.5 meter length by lapping of 2 nos. 'l' section beam by welding work.
6. Do welding work in 1.5 meter channel and 3.5 meter length box.
7. Fitted cross basing angle in cantilever gantry by welding work.
8. Making Huck of cantilever gantry for chain pulley.
9. Mounted huck on cantilever gantry.
10. Erection work of cantilever gantry in 3.5 meter height.
9. Grouted cantilever gantry near Thickener no.1.
10. Do painting work on cantilever gantry.
11. Making support of cantilever gantry in proper manner.
1-2. Welding machine, welding electrode and gas cutter in contractor scope.
13. All material will be provided by S.P.M.
All above work our labor Rate with tools & tackle & consumable items: 7000.00
i. lnstallation of 3/ 4" S.S pipe line for PAC chemical in 3 nos. tank at Water treatment plant :
1. Shifting Material of 3/4" S.S. pipe line from store to Water treatment plant.
2. Removing of old 3/4" pipe line of all 3 nos. tank from PAC tank to flux mixer cha m ber in length 180 feet.
3. Fabricate new 3/4" S.S. pipe line of all 3 nos. tank for PAC tank to flux mixer cha m ber.
4. lnstallation of 3/4" S.S. pipe line of all 3 nos. tank from PAC tank to flux mixer chamber in length 150 feet
with 2" header.
5. Do welding work in 3/4" S.S. pipe line such as taffit and flange welding.
6. To fitted 3/4" PVC ball valve in 3/4" S.S. pipe line for all PAC tank.
7. tnstallation of cable trench for support of 3/4" S.S. pipeline from PAC tank to flux mixer chamber in length
150 feet
8. Making support for cable trench.
9. Making clamp for 3/4" pipe line.
9. Fitted controlling valve of 3/4" near flux mixer chamber in 3/4" pipe line for dossing of PAC chemical in
flux mixer chamber.
10. Welding machine, welding electrode and gas cutter in contractor scope.
11. All material will be provided by S.P.M.
All above work our labor Rate with tools & tackle & consumable items: 19000.00
Grand Total Amount of All above work: 100000.00