You are on page 1of 78

CONTENT

1. General .............................................................................................................................................1
2. Main function...................................................................................................................................3
3. Control principle ..............................................................................................................................8
4. Technique index .............................................................................................................................10
5. Frame and panel definition ............................................................................................................13
5.1 Trunk configuration ..............................................................................................................13
5.2 Main inserted pieces..............................................................................................................13
5.3 Panel definition and illumination..........................................................................................14
5.4 Keystroke definition..............................................................................................................15
5.5 Display lamp illumination.....................................................................................................15
6Man-machine operation ...............................................................................................................17
6.1 Main page layout illumination ..............................................................................................17
6.2 LCD main menu tree frame illumination..............................................................................17
6.3 Main Menu instruction..........................................................................................................18
6.4 Run Monitor instruction........................................................................................................19
6.5 Set Point instruction ..............................................................................................................19
6.6 Parameter Set Instruction ......................................................................................................21
6.7 Event Record Instruction ......................................................................................................24
6.8 Manual Print introduction .....................................................................................................25
6.9 Other Function introduction..................................................................................................26
7. Instruction of backboard terminals connection and installation ....................................................30
7.1 Power board terminals instruction ........................................................................................32
7.2 TA board terminals instruction..............................................................................................32
7.3 TV board terminals instruction .............................................................................................32
7.4 CPU board terminals instruction...........................................................................................33
7.5 EDI heavy current input board terminals instruction............................................................35
7.6 Output board terminals instruction .......................................................................................35
8. Debug and dispose of abnormity ...................................................................................................38
9. Commissioning instructions and notices........................................................................................40
10. Storage and maintain....................................................................................................................40
11. Whole set supplied .......................................................................................................................40
Appendix 1: Set point table................................................................................................................41
Appendix 2: Parameter list.................................................................................................................46
Appendix 3: Back up scheme instruction ..........................................................................................49
(V1.42)
2011.03.

The company reserves the right to change products, the specification is subject to change without
notificationthe device shall prevail. For details, please call the company or the local agents.

SID-409 RESERVE SUPPLY AUTO-TRANSFER DEVICE (TYPE B)


1. General
1.1 Application
An uninterruptible power supply is the important assurance for national economy normally
operating, the power system development and technical advance is toward the goal. The assurance
of uninterruptible power supply relays on every stage of power generation and transmission.
SID-409 reserve supply auto-transfer device (type B) improved many requirements on power
supply reliability, especially industry enterprise. With rich operation experience in local, we present
SID-409, a fine designed reserve supply auto-transfer device. And provide 21 kinds (9 fixed, the
other can customize the design according to the users demands) reserve supply auto-transfer logic
to adapt different primary main bus connection.

1.2 Device frame character


Standard 4U 19/2 inches strengthen unit trunk, designed according to resisting strong
oscillation, strong disturb, applying to wicked environment.
All industrial and military for IC, the device possesses high stability and reliability.
High speed industrial RISC processor for main control CPU, the main frequency reaches
200MHz, support DSP expand dictates.
Adopt high speed high precision multi-route A/D synchronized sampling technique, sampling
64 points each cycle, ensure high measurement accuracy.
The software based on the embedded RTOS and the TCP/IP protocol, is of stability and
credibility, easily expanded
LCD display, entirely English menu man-computer interface, the operation and the debugging
are convenient.
Various reserve supply auto-transfer scheme are embedded in the device, the special scheme
according to the needs of customer can be customized at any moment.
10 set point area are optional, it is safe and convenient to transfer between every two area.
Big capability of recording information function.
Powerful of switching wave record function, once can record information, including analog
value and digital value, output value and set-point during the process of switching. The record
can be uploaded to the computer through the Ethernet, where it will be analyzed and exported
as a standard COMTRADE file.
Automatically or manually print protection set-point and event record.
1
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Support multi-language, can switch online.


Strong communication function, supporting Ethernet, double RS485, CAN bus, multi
communication stipulation, such as integrated IEC60870-5-1-103, modbus.

1.3 Device specification


SID-409 reserve supply auto-transfer device (type B) used four postfixes to denotethe first one
is TV voltage select, the second one is TA current select, the third one is JK6 inserter select, and the
last one is voltage levels select, the definition of each code is described as follows:
Format: SID-409B /****
DC220V or DC110V, input voltage levels select;
N or T or O, N means no inserter (routine allocation), T means allocate
operation board, O means allocate output expansion board;
5A or 1A, CT rated output current;
380V or 100V, PT output voltage.

2
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

2. Main function
The main function of SID-409 as follows:
Reserve supply auto put in function
Normal manual switch function
Protection function
Reserve supply auto put in fault lock function
Event record function
Transferring record wave function
Communication, print, GPS adjusting time function

2.1 Reserve supply auto put in function explanation


The device possesses auto-transfer reserve supply function when the bus lost power (or the
working switch mis-trip), can realize varied operating mode of one bus breaker and four incomer
breaker. In appendix 3, some common used running modes such as bus breaker or bridge breaker
switch, two incomers switch, hot backup transformer switch, cold backup transformer transfer,
double reserve supply transfer are illuminated in detail. The users can set the scheme according to
their needs by setting parameters. Furthermore, we can customize the scheme according to your
demands.
2.1.1 Backup switch principle
1) To avoid backup switch mis-trip which caused by work bus voltage short-term declining, the
low-volt. start delay of the backup switch device must longer than the longest external fault clearing
time.
2) To avoid backup supply closed due to fault or work supply send power to backup supply after
the close operation of backup switch device, we need to ensure that put in the backup supply after
tripping work supply, and the delay time before closing the backup supply must longer than the time
that work breaker cut off the circuit completely.
3) The backup switch device shouldnt switch when receiving the external lock signal (backup
switch general lock).
4) The backup switch device shouldnt switch when the backup supply does not meet the
requirements.
5) Manual remove work supply should not cause device action when normal operating.
6) Trip or close action of the device can only carried out once.
7) When the backup transformer is cold backup, we need to dispel the transient exciting current
3
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

caused by putting in backup supply to ensure the success of backup switch, so SID-3YL Inrush
Suppressor is needed when the transformer backup switch is cold backup.
2.1.2 Backup switch control logic
The reserve supply switch process concludes: charging, operation and affirm reset.
The charging:
When incomer and bus voltage and every breaker state are at normal condition, the charging
begins. The Auto switch lamp on the panel begins to wink, and after ten seconds the lamp
constant bright, it indicates that the Reserve auto-transfer enter operation and monitor state.
The operation process:
Under monitoring state, if the reserve supply has voltage and no blocking signal, then the
following conditions happen:
1)

Bus voltage lower than no-voltage set-point, and the last time exceed the no-voltage starting
time.

2)

The work power switch turn to open and remain mis-trip starting time.

If any conditions is satisfied, and the working line has no current (to avoid mis-trip when the bus
TV line-break, use line current as the lock criterion of bus no-voltage), it will trip off the work
power switch. The device will close the reserve supply switch and input the reserve supply when
the bus no-voltage test condition is satisfied and the delay set-point is maturated. After transfer, no
matter success or fail, the device enters the state of affirm reset.
The affirm reset process:
Under the affirm reset state, the device stores the record wave dates. It may not enter charging
state to ready for next transfer until delay 10s and remote or local reset operation is received. If the
operation succeeded, the device reset automatically after 10s.

2.2 Normal manual switch explanation


2.2.1 Manual switch principle
1) Manual switch is available only when work supply switch and backup supply switch are
exclusive. When plural reserve normal operating, the signal should selected by external connect
mode to ensure the exclusive of manual switch. See appendix 1 for the detail logic.
2) Manually switch start signal can either input from local, or from remote communication
control command. Signal must be longer than 50ms pulse signal.
3) Manual switch must be bi-directional; we can not only cut work supply to backup supply, but
also cut backup supply to work supply.
4
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

4) The manual switch function can be select, and the switch mode can be set according to
different needs.
Through setting the manual switch set-point, the device can realize flexible configuration of
manual switch function in a variety of occasions, the set options as follows:
[Exit] --- Exit manual switch function.
[Series] --- Check bus, backup supply with voltage, trip work (backup) switch first, and then
close backup (work) switch.
[Auto Parallel] --- Detect bus voltage and backup supply voltage, if the parallel synchronizing
condition is satisfied, close backup switch first, then trip work switch.
[Semi-auto Parallel] --- Detect bus voltage and backup supply voltage, if the parallel
synchronizing condition is satisfied, close backup switch. Work switch is operated manually.
[Parallel & Series] --- Detect the parallel synchronization conditions as the [Auto Parallel] logic,
if the synchronization conditions can not satisfied in the detect delay then choose [Series Switch].
2.2.2 Manual switch control logic
Under normal running condition, the device can realize the transfer function between work
supply and reserve supply through external manual switch (pulse) signal or remote switch order.
Normal manual switch has test synchronization function.
When the breaker state is satisfied for manual switch condition, the manual switch lamp
normal bright, and the Reserve auto-transfer device enter the manual switch operation and monitor
state. Under this state, if local or remote manual switch signal is gathered, working breaker will
transfer with backup breaker automatically. If the operation fails, the device enter waiting affirm
reset state. It may not enter charging state to ready for next transfer until delay 10s and remote or
local reset operation is received. If the operation succeeded, the device reset automatically after 10s.

2.3 Protection function


SID-409 has protection function, the main function includes: bus linkage over-current protection
segment 1 and segment 2, bus over-current instantaneous trip protection; each incomer, bus
no-voltage alarm protection; TV disconnection alarm function. The value, delayed time and soft
switch of each protection can be set independently in protection set-point.
2.3.1 Bus linkage over-current protection segment 1
When bus linkage over-current protection segment 1 function is put in, bus linkage current is
larger than segment 1 set-point, bus breaker tripped after time set-point delayed
2.3.2 Bus linkage over-current protection segment 2
5
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

When the bus linkage over-current protection segment 2 function is put in, and the bus linkage
current larger than segment 2 set-point, bus breaker will tripped after time set-point delayed.
2.3.3Bus linkage haste protection
When bus breaker changes from open to closed, the device opens haste protection for 5 seconds.
During the period if haste protection function is put in, bus linkage current is larger than current set
point, the bus breaker tripped after set time delayed.
2.3.4 No-voltage alarm protection
When no-voltage alarm protection of every incomer and bus is put in and the voltage is lower
than each no-voltage alarm voltage set-point, the general alarm signal is port-out after no-voltage
alarm set time delayed.
2.3.5 Incomer TV disconnection alarm
Each incomer TV secondary disconnection protection soft switch put in and incomer voltage
lower than 70%Un and incomer breaker is at closed, after ten seconds delayed, alarm signal send by
protection and device TV disconnection alarm signal is sent out.
2.3.6 Bus TV disconnection alarm
Bus TV disconnection protection soft switch put in, single phase or three-phase voltages lower
than 70%Un, after ten seconds delayed, alarm signal sent by protection and device TV disconnection
alarm signal is sent out.

2.4 Reserve supply auto put in fault lock function


The device possesses fault lock function. It can detect abnormality of the breaker and external
lock signal and self check internal hardware for determining whether need to lock transfer. The
criterion of breaker abnormal detect is that the breaker is opening and the line has current and can
last 2 second.

2.5 Event record function


The device possesses record function of remote signal event, protection event, wave record event,
operation event, self check event. Users can inquire record information like action time, event name
through event record on LCD screen.

2.6 Wave record function


The device begins to record wave once transfer is started. The wave recorded includes 25 cycles
before start and 50 cycles after start-up. Each transfer total wave recording time is 1.5 seconds and
6
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

total twice. The device storage is up to 12 groups of record data. The contents include bus voltage,
bus current, incomer voltage, incomer current and all digital input information e.g.. The wave
recording event index can be looked over in wave recording event, the waveform, record data can
be transmitted to background computer for analyzing.

2.7 Communication/print/GPS adjust time function


The device possesses powerful and reliable communication function. It has installed an Ethernet
interface, three RS485 serial interfaces and a CAN bus. Among them, RS485 interface 1 and the
Ethernet interface and CAN bus can be used to communicate with supervisory control background
with different communication hardware. RS485 serial interface 2 is for print function, it can connect
with printer directly or connect to SID-401PS print server deployed by my company, realize
multi-device sharing one printer, RS485 serial interface 3 is used to communicate with GPS,
complete adjusting time function. If two RS485 communications is needed in local, RS485 serial
interface 2 can be used to communicate with supervisory control, print function can be realized by
SID-401PS print server through Ethernet.

7
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

3. Control principle
In the backup switching process, before closing the breaker, to avoid the high residual voltage
causing large surge current when closing, it will damage the device or make the backup switch and
normal switch fail, so in occasion that the reliability requirement is very strict but speed
requirements isnt that high, we can use bus un-voltage detection to ensure the success of backup
switch or normal series switch. Un-voltage switch means after tripping the work supply switch,
check bus voltage, until the three line voltages of bus are all lower than voltage set-point of bus
un-volt. switch, and after the time set-point of un-volt. switch, closing the backup supply switch is
allowable, the software flow of backup switch control logic is shown in figure 1.
Normal manual switch is mainly used in work supply and backup supply switching for each other
when normal operating, such as overhaul, test etc. Therefore, in occasion of high requirement of
continuity and reliability about supply and allow short time loop closing, we can select Parallel
Auto / Semi-auto mode, while if loop closing is not allowed, we must select series mode. Normal
manual switch logic is shown in figure 2.
Control logic software procedure:
START

A
Fill the auto-switch
charge condition?

Reset the charge timer


auto-switch lamp dark

Trip succeed?

Y
Charge 10s timer
come?

Switch longest delay


time come?

N
Reset the charge timer
auto-switch lamp dark,
return to charge status

N
Work switch open and
delay time come?

Report overtime
incident

Report closed failed


incident

Bus un-voltage and


delay time come?
Y
Close reserve supply
switch
Close succeed

N
Bus un-voltage and
delay time come?

Charge complete, autoswitch lamp normally light


Fill the auto-switch
discharge condition?

Report trip failed


incident

The auto-switch lamp


glitter when charging

Y
Trip work supply switch

Switch succeed
Device locked
General alarm
Waiting for reset

Switch failed
Device locked
General alarm
Waiting for reset

Figure 1 Auto-switch control logic

8
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Figure 2 Manual switch logic

9
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

4. Technique index
4.1 Rated data
Power supply

220V, 110V AC/DC allowable error +15%, -20% (indicated when


contract)

TV signal

110V or 380V (indicated when contract)

TA signal

5A or 1A (indicated when contract)

Frequency

50 Hz

Thermal stability
AC voltage circuit: long run

1.2 Un

Un----rated voltage

AC current circuit: long run

2 In

In-----rated current

1 second

40 In

4.2 Power consumption


AC voltage signal

<0.5 VA/phase

AC current signal

<1 VA/phase

(In=5A)

<0.5 VA/X phase (In=1A)


Power supply

Normal < 15W


When protection acting <30W

4.3 Environment condition


Work temperature:
Store condition:

-20~+ 55
in house whose temperature is -30~+80, the relative humidity not

larger than 80%, surrounding air does not contain acidic, alkaline or other caustic, volatile gas,
and the house is rain and snow prevented; under high-point, if no excitation, no irreversible
change, the device can working normally when temperature restore.
Relative humidity: the month average of maximal relative humidity of the most humid month
is 90%, and the month average of minimal temperature is 25 and no dew appears. The
highest temperature is +40, the maximal average humidity does not exceed 50%.
Atmospheric pressure: relative height above sea level is less than 2 km.

4.4 Anti-interference performance


Pulse group interference
The device can endure decaying and surging wave whose frequency is 1 MHz and 100 KHz
10
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

as stated in GB/T14598.13-1998(the first half wave voltage magnitude common-mode is 2.5


KV, difference mode is 1 KV) pulse group interference test.
Fast transient interference
The device can endure fast transient interference test whose inclemency grade is A as stated
in the fourth chapter of GB/T14598.10-1996
Radiant electromagnetic field interference
The device can endure Radiant electromagnetic field interference test whose inclemency
grade is as stated in the fourth chapter of GB/T14598.9-1995
Static discharge
The device can endure static discharge test whose inclemency grade is 3 as stated in 4.1 of
GB/T14598.14-1998.

4.5 Insulated performance


Insulation resistance
Impose 500V open circuit voltage of test instrument on each electric conducting circuit to
ground (namely enclosure or uncharged metal part), AC loop to DC loop, AC current loop to
AC voltage loop, and the insulation resistance tested should not lower than 100 M.
Dielectric strength
It can endure AC voltage of 50 Hz, 2 KV (effective value) on each electric conducting
circuit to ground (namely enclosure or uncharged metal part), AC loop to DC loop, AC
current loop to AC voltage loop, lasting for 1 min, no breakdown and flashover phenomenon.
Impulse voltage
It can endure 5 KV (peak value) standard lightning surge test on each electric conducting
circuit to ground (namely enclosure or uncharged metal part), AC loop to DC loop, AC
current loop to AC voltage loop

4.6 Mechanical performance


Vibration response
The device can endure vibration response test whose inclemency grade is as stated in
4.2.1 of GB/T11287-2000
Impact response
The device can endure impact response test whose inclemency grade is as stated in 4.2.1
of GB/T14537-1993.
11
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Vibration endurance
The device can endure vibration endure test whose inclemency grade is as stated in 4.2.2
of GB/T11287-2000.
Impact endurance
The device can endure impact endure test whose inclemency grade is as stated in 4.2.2
of GB/T14537-1993.
Collision
The device can endure collision test whose inclemency grade is as stated in 4.3 of
GB/T14537-1993.

4.7 Measuring precision


Measuring error of each analogue value not exceed 3% of rating
Digital value resolution not large than 1 ms
Frequency measuring error not exceed 0.01Hz
Time element error not exceed 1% set value +30ms

12
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

5. Frame and panel definition


5.1 Trunk configuration
Adopt whole panel form. LCD, signal indicator, operation keyboard are collocated on the panel.
It is a 19/2 inch 4U strengthened trunk, it is designed for resisting strong vibration, strong
interference. Ensure high reliability even on wicked spot. It is no need adding AC or DC
anti-interference module no matter packaged or install separately.
The outline size is shown in figure 3; the install aperture size is shown in figure 4.

Figure 3 Outline picture

Figure 4 Install aperture size on face

5.2 Main inserted pieces


The device is composing of signal inserted piece, supply inserted piece, CPU inserted piece, AC
inserted piece and man-machine conversation inserted piece.
Supply inserted piece
Through this module convert external AC or DC supply to DC supplies that device need to work.
13
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

It outputs +5V, 12V and +24V. +5V voltage is for digital circuit, 12V is for A/D sampling,
and 24V is for driving relay and light coupling circuit of internal DI signal.
AC inserted piece
TV inserted board can connect to 7 channels of voltage.
TA inserted board can connect to 6 channels of current.
CPU inserted piece
CPU inserted piece is composing of main control CPU, SDRAM, Flash Memory and A/D
sample chip. The main control CPU is high speed RISC MPU, its master frequency reaches
200MHz, support DSP operation dictate integration. It adopts 14 channels high precision
high speed synchronous sampling technique to ensure response speed of device. All
industrial and military IC make the device own high stability and high reliability.
Signal inserted piece
Signal board can divided into two types: digital input and digital output.
There are one input pieces, and can totally connect to 15 strong electric input points. The
drive voltage is 220V DC, brought in from extern.
There are two digital output pieces, owning 23 independent output nodes.
Man-machine conversation inserted piece
It mainly refers to the fore panel which provides 9 keystrokes, 16 signal lamp, a LCD screen
of 192*64 size for convenient of man-machine conversation, and at the same time a USB 2.0
Host interface for special use of factory test.

5.3 Panel definition and illumination


The sketch map of panel is shown below.

Figure 5 Front view picture of panel

Panel of the device is composing of display lamps, LCD screen and keyboard viewed from left to
14
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

right.

5.4 Keystroke definition


There are four direction-control keys and +, -, enter, exit, reset key on the panel.
Upwards key, used to move cursor upwards
Downwards key, used to move cursor downwards
Left key, used to move cursor to left. Press longer than 3s, can achieve switch between
Chinese and English.
Right key, used to move curse to right
Plus key, used to modify number, achieve adding 1
Minus key, used to modify number, achieve reducing 1
Enter

is used to enter the next stage menu or to confirm operation

Exit

is used to return to the last menu or to cancel operation

Reset

press transitorily revert control, alarm, lamp signal. Long-term (longer than 1.6s) press

revert device.
Note that, display in reverse of parameter, symbol, number or letter express the present location
of cursor.

5.5 Display lamp illumination


On the panel there are two rows of 16 display lamps, used to display different operating condition.
The illumination is shown in the follow table.
Table 1 Panel lamp illumination
Name
POWER SUPPLY

Illumination

Name

Power supply indicating

1DL

lamp, normal light


ALARM

Alarm signal lamp, light

Blocking

signal

1DL acting display lamp, light for


closing, dark for tripping

2DL

when alarming
BLOCKING

Illumination

2DL acting display lamp, light for


closing, dark for tripping

lamp,

3DL

light when lock signal

3DL acting display lamp, light for


closing, dark for tripping

putout
COMMUNICATION

Communication indicating
lamglitter when message

4DL

4DL acting display lamp, light for


closing, dark for tripping

normal
15
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com


ACTION

Action signal lamp, light

COUPLER

when device acting


LOAD SHEDDING

Load

shedding

Coupler acting display lamp, light for


closing, dark for tripping

signal

BACKUP

Reserve auto-transfer charging monitor

lamp, light when load

SWITCH

lamp, crush out when condition not

shedding

satisfied; glitter when condition fulfill;


lighting when over charged

COUPLER

Coupler

closed

signal

CLOSED

lamp, light when coupler

MANAUL

Manual switch allowable lamp, light

SWITCH

when manual switch is allowed

RUNNING

Device running lamp, glitter once per

closed
COUPLER

Coupler

tripped

signal

TRIPPED

lamp, light when coupler

second normally

tripped

16
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

6Man-machine operation
Man-machine page layout is made up of display lightkeystrokeLCD. The hardware has been
explained before, please refer to frame and panel definition in section 5. And here will be a
presentation about the content and manipulation of every LCD page layout.

6.1 Main page layout illumination


The page layout when electrified is shown in figure 6:

Figure 6 Main page layout view of run

In the figure:
On the top left corner is scheme name: SID-409.
On the right of top corner is the number of the scheme running currently: scheme 02 (See
appendix 3 for detail)
On the middle: The name of the device: Reserve Supply Auto-transfer Device.
Area Number of the set-point running currently: 02.
Running time: 2008-06-06 14:06:06.
On the bottom line is the status of device, if any abnormal present, the corresponding record will
display at here. Record displays when abnormal disappear; if transfer acted, here display
corresponding action event for prompt. Check event details in event record.

6.2 LCD main menu tree frame illumination


In the boot-strap page, press "Enter" key to enter the main menu of the device. Man-machine
command main menu is a multi-level menu with tree frame, shown in Figure 7. In the main menu
page, press "up" and "down" key to move the cursor to select the entry, press "Enter" key to enter
the next level menu, press the "Exit" key to return to the previous menu. If the next level menu is
still selection menu, you can continue use "up" and "down" key to select the entry, press the "Enter"
key to enter next screen. The "up" "down" "left" "right" keys in most screens is adjusted by cursor,
the data can modify by using "+" and "-" keys, and write the corresponding numerical into the
memory. For the selection menu, when the cursor moved to the specified location, press "Enter" key
17
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

to enter the project will be selected.


Measure Primary Value
Measurement Value

Measure Secondary Value

Digital Input Status

Run Moniotr

Set Point Monitor

Set Point Area


0-9

Reserve Supply Transfer Set


Protect Set
Manual Switch Set
Expand Set

Set Point Area


0-9

Reserve Supply Transfer Set


Protect Set
Manual Switch Set
Expand Set

Set Point Switch


Set Point

Set Point Modify


Set Point Copy
Telesignalling
AC Measure
Communication

Parameter Set

Language
MAIN
MENU

Scheme
Telesignalling Event
Self-checking Event
Event Record

Operate Event
Protection Event
Record Waveform Event
Print Event

Manual Print

Print Set Point

Device Debug
Time Adjust

Driving
Communication
Record Waveform
Telecontrol

Event Clear
Other Function

Password Set
Product Information
Manufacturer Founction

Revert Way
Measure Debug
Telemetering Cycle
Resume Default Value
Reset Count
Linkage Logic
Output Board Choose
Software Updata

Figure 7 Tree structure multilevel menu

6.3 Main Menu instruction


The main menu is shown in figure 8. There are six options: Run Monitor, Set Point, Set
18
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Parameter, Event Record, Manual Print, and Other Functions

Figure 8 Main menu

6.4 Run Monitor instruction


Choose Run Monitor in main menu, press Enter to enter Run Monitor page. There are
three monitor options in the page, as shown in figure 9:

Figure 9 Run monitor

Measurement Value monitor:


This is for monitoring measurement value like magnitude, phase angle and frequency of incomer

and bus of 7 AC voltage channels and 6 current channels. After enter the run monitor main menu
through pressing Enter, the user can choose primary value and secondary value to examine.

Digital Input Status monitor:


This is for monitoring the open or close status of 16 digital inputs. You can enter this menu

through choosing Digital Input Status and pressing ENTER.

Set Point monitor:


This is for monitoring the set point. In Run Monitor page, choose Set Point Monitor and press

Enter to put in. The device provides ten set point areas numbered from 0~9. Before enter Set
Point Monitor, you need to choose set point area, Current Set Point Area is currently running set
point area number, Select Set Point Area is the set point area which need to be monitoredpress
+/- to change Select Set Point Area number. You can examine set point of ten areas. If the set point
area selected is the same of the current one, then you can check the set point of current area.
Note that: Set Point Monitor is only used for check set point, but not for modifying. If you want
to modify the set point, enter Set Point and input the right password.

6.5 Set Point instruction


Choose Set Point in main menu, press Enter, and input right password (the ex-factory
19
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

password is 0000 and you can set new password as you like) to enter Set Point page. There are
three setting contents in the page, which is shown in figure 10:
Set Point
Set Point Switch
Set Point Modify
Set Point Copy
Device Status: Normal

Figure 10 Set Point

Set Point Switch


Switch different set point area to current area. Press +/- to modify Set Point Select Area area

number, press ENTER to complete the switch. For example, Current Set Point Area is 2, Set
Point Select Area is 0, as shown in figure 11, after press enter button, the Current Set Point
Area is modified to 0, as shown in fig. 12.

Figure 11 Set Point Switch Forehead

Figure 12 Set Point Switch Rear


Set Point Modify:

This is for modifying set point with different type in different area. After enter Set Point
Modify, you should firstly choose the area number which needs to be modified. Current Set Point
Area shows the area number that device currently uses, Set Point select area shows the area
number that you want to modify. Press +/- to change the select area numberpress Enter to enter
the corresponding page. There is four type set point for the device: Reverse Supply transfer Set
Point, Manual Switch Set Point, Protection Set Point and Expand Set point, and the menu is shown
in figure 13. You can consult Appendix 1 Set point table and setting introduction to modify set point.
Please pay attention to the range of value. If the scope is exceededthe modified value will not be
memorized. Press Enter to save the set after modifying, and return to previous menu.

20
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Figure 13 Set Point Modify

Set Point Copy:


This is for copying set point from Source Set Point Area to Aim Set Point Area. Press +/- to

change the number of set point area. Press up, Down to move cursor, choose the content which
you want to amend. Press Enter to copy date from Source Set Point Are to Aim Set Point
Area. For example, if you want to copy date from set point area 1 to set point area 2firstly

set

Source Set Point Area to 1as shown in figure 14and then press Down to move cursor to Aim
Set Point Area, set Aim Set Point Area to 2as shown in figure 15. After pressing Enter, the
set point will be copied from Set Point Area 1 to Set Point Area 2.

Figure 14 Set Point Copy Forehead

Figure 15 Set Point Copy Rear

6.6 Parameter Set Instruction


Select Parameter Set in main menu, press ENTER and input right password, then enter
Parameter Set page. There are five contents in the page layout, as shown in figure16.

Figure 16 Parameter Set

Telesignalling Parameter:
This is used for setting 17 channels the anti-trill time and digital input propertynormal

open/normal close of Telesignalling sampling. Press Up, Down to turn over pages and
21
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

choose digital input with different number to set. Press LeftRight to select the anti-trill time
and digital input property of this route, press +/- to set the time value and convert the digital input
property between normal open and normal close. As shown in figure 17. In the figure, the number
01 on top left corner represents the current digital input sequence number, the number 16 on
top right corner represents that there are 17 routes of signal totally. After finish the settingpress
Enter to save, and return to previous menu.

Figure 17 Telesignalling Parameter

AC Parameters:

These parameters are for setting current transformer and potential transformer ratio, secondary
rated value of TV/TA. Press Up and Down to turn over page and choose AC variable with
different sequence number to set. Press Left and Right to choose rated value and ratio
property of this route of AC variable secondary TV/TA, press +/- to set the rated value and ratio.
The primary rated value of instrument transformer is calculated automatically and is shown in
figure 18. In the figure, the number 1 on top left corner represents current AC variable
sequence number, the number 9 on top right corner represents that there are 9 routes of AC
variable totally. After finish the settingpress Enter to save, and return to the previous menu.

Figure 18 AC Parameters

Communication Parameter:
This function is for setting series interface, Ethernet interface and CAN Bus communication

parameters. After entering Communication Parameter page, press Up, Down to choose the set
communication type. Choose Network Parameter to enter Network Parameter Set page, you can set
IP, subnet Mask and Gateway of network, as shown in figure 19. Choose CAN Bus to enter the
CAN Bus and set the parameters. You can set CAN Bus Communication Address, Baud Ratio, as
22
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

shown in figure 19.


Choose Series Port Parameter to enter the page and set the parameters. You can set
Communication Address, Communication Rule, Baud Ratio, Check Way of the three series port:
supervisor guardian used RS485-1, print use RS485-2, GPS private use RS485 as shown in figure
20. After finish the settingpress Enter to save, and return to the previous menu.
Net 1 Set

Net 2 Set

IP Addr 192.000.000.002
Mask
255.255.000.000
Gateway 192.000.000.001

IP Addr 192.001.000.002
Mask
255.255.000.000
Gateway 192.001.000.001

Device Status: Normal

Device Status: Normal

Figure 19 Net Parameter

Figure 20 Series Parameter

Note:
In RS485 series port 1-3 parameter Setting, Communication Rule SID-TEST is used to test series
port communication link hardware.
RS485 series port 1 is used to communicate with background supervisory control.
Communication rule which contains IEC60870-5-103, Modbus is supplied to users for choosing.
Communication AddressBaud RatioCheck Way can be set according to the setting area.
RS485 series port 2 is used to communicate with printer. Baud Ratio is fixed to 9600 bpsCheck
Way is No Check. Note that when the device is connected with printer directlyyou must choose
EPSON ESC/P rule. And when the device connects with printer through print server SID-401PS,
you must choose SID-401PS rule. Supervision communication can choose IEC60870-5-103
Modbus.
RS485 series port 3 is used to communicate with GPS. Communication rule contains
IRIG-BRS485IRIG-BTTLWEIKOT.

Language Setting:
This is for setting page layout with Chinese or English language. Press up, down to choose

Chinese or Englishpress Enter to complete setting of display languageshow as figure 21.


Besides you can switch the language by shortcut key Left. After press exceed three seconds
in any page, you can switch the language.

23
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Figure 21 Language Setting

Scheme Set:
This is for setting scheme that consists with locale primary electric main connection, as shown in

figure 22. The characteristic of every scheme and primary main bus connection is introduced in
presentation of logic scheme in Appendix 3. Press +/- to set the serial number of scheme. After
finish the setting, press Enter to save, and return to previous menu. Return to main menu, you can
see the scheme number running currently on the top right corner.

Figure 22 Scheme Set

6.7 Event Record Instruction


Select Event Record in main menu, press ENTER to enter Event Record page. There are five
items of contents. as shown in figure 23.

Figure 23 Event Record

Telesignalling Event:
It is for displaying telesignalling event happened. The telesignalling event can be divided into

real telesignlling event (real status change event of 16 real digital input signal channels) and virtual
telesignalling event (action event is recorded in the process of auto-transfer and manual switch).
Press up, down to turn over page. The event is listed by time, and the number of latest event is
1.
Protection Event:

It is used for displaying protection or switch event which had happened. Press up, down to
turn over page. The event is listed by time, and the number of latest event is 1.
Record Waveform Event:
24
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

This is used for displaying recorded event and waveform. Events are listed by time. The last
event gets 1.
Operation Event:

It is for displaying local operation (remote debug, modify set point, parameter etc) and remote
control that have happened. Press up, down to turn over page. The event is listed by time, and
the number of latest event is 1.
Self Check Event:

It is used to display happened device self check events, mainly are self diagnose information of
important element on master CPU. Press up, down to turn over page. The event is listed by time,
and the number of latest event is 1.

6.8 Manual Print introduction


Choose Manual Print in main menu, and press Enter can enter the manual print page. There
are two options: Print Event and Print Set point. Note that, in order to print successfully the
communication rule must be set right before print (consult the setting introduction of series port 2
communication parameter), the connection with printer or SID-401PS be correct (consult the
introduction of CPU board connection in 7.4), and the estate of print server is normal. If the
connection with printer server is wrong or printer server is in abnormal, after 10 seconds you
pressed the Enter key, it will display N on the below right corner to indicate Printer server
connect error; otherwise it will display Y to indicate Printer server connect normal.
Print Event:

Used to printing different types of events. Enter into manual print page, select print event, then it
will go into the print event page as shown in Figure 24. Press up, down, left, right to move the
cursor, press + / - key to modify the cursor line. The event type, paper type, starting time, ending
time can be set respectively, and print out the event record which occurred between starting time
and ending time. Note the starting time must be less than or equal to the end time, then it can be
print correctly. After setting, press the Enter key to start printing the corresponding events.

Figure 24 Print Event

Print Set-point:

Used to printing set-points in different areas. Enter into the manual print page, select the print
25
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

set-point, then it will go into print set-point page as shown in Figure 25. Press up, down key to
move the cursor to select the set-point area, paper type or print type. Press + / - key to modify the
cursor line. After setting, it will come out the dialog box "confirm the implementation", press the
Enter key to execute the print options in the print set-point area, press exit key will not
implemented.

Figure 25 Print Event

6.9 Other Function introduction


Choose Other Function in main menu, press Enter to enter Other Function page. There are
six options in the page, as shown in figure 26.

Figure 26 Other Function introduction

6.9.1

Device Debug

Device Debug contains five items, which include: Drive Debug, Communication Debug, Record
Waveform Debug, Telecontrol Debug, and Breaker Time Test.

Drive Debug
This is used for output relay testing. Entering Drive Debug needs right password. When in

Drive Debug, the logic control function and the protection will quit. The drive debug page layout
is shown in figure 27, the number on the top right corner (12 is backup, 14 is control circuit board,
22 is output expansion board), the driving number changed as the output board altered, if it displays
1 on the top left corner, it means that its the first output circuit driving currently. Press Up/Down
to move cursor to choose output test circuit. If test item is Output, press Enter to control the
corresponding relay output, and then Output will become Return. Press Enter again will
control corresponding relay return. Note that, the cursor can be moved only when the relay is at
Return status.

26
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Figure 27 Device Debug

Communication Debug:

This is used for testing communication channel. It can transmit virtual input signal, virtual
measurement signal to background supervisory control softwarecheck the parameters of the
communication link and the background. Communication debug contains two options:
Telesignalling Debug, Telemetering Debug.
Enter Communication Debug to choose Telesignalling Debug, press enter to put in
Telesignalling Debug page, as shown in figure 28There are 120 channels of Telesignalling signal
(event virtual Telesignalling and input real Telesignalling) to dummy transmitted. Press +/- to
switch test option clear/setup. When it is clear, press Enter and then it will transmit 0.
When it is setup, press Enter and then it will transmit 1.
Enter Communication Debug, choose Telemetering Debug and enter Telemetering Debug
page which is shown in figure 29there are 13 channels of telemetering signal which can be dummy
transmitted. Press +/- to manual set telemetering value, press Enter to transmit telemetering
data to background.

Figure 28 Telesignalling Debug

Figure 29 Telemetering Debug

Record Waveform Debug


This is used for manual triggering a record wave event. Enter Record Waveform Debug, press

Enter to trigger a record wave event, as shown in figure 6.26And solidify record wave data needs
about 3 seconds.

27
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Figure 30 Record Waveform Debug

Telecontrol Debug

This function is used for simulating telecontrol switch on the spotand testing respond action to
telecontrol the device operation. The Telecontrol Debug page layout is shown in figure 31, 7on
the top right corner indicates that therere 7 circuits telecontrol objectives, 1on the top left corner
indicates that its the first circuit runningcurrently. Press +/- to switch test option off/ on.
After press Enter, dialog box Sure? appears, then press Enter again to perform corresponding
telecontrol operation, or press Exit to cancel corresponding telecontrol operation.

Figure 31 Telecontrol Debug

6.9.2

Time Adjust

This function is used for adjusting current run time, Time Adjust page is shown in figure 32.
Press Left, Right to move the cursor, press +/- to change the time value, press Enter to
confirm the time adjusted.

Figure 32 Time Adjust

6.9.3

Event Clear

This is used for clearing every kinds of event record and reset count. The Event Clear page is
shown in figure 33. Press Up Down to choose the option which to be cleared, press Enter to
execute it.

Figure 33 Event Clear


28
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

6.9.4

Password Set

Password Set page is shown in figure 34. This function is for setting new password. The
password is 0000 when the device leave factory, user can set new password by himself. Please pay
attention that when set new password, it need to input new password twice and they must be same.
Once the setting is successful, you must remember the new one in order to operate next time.

Figure 34 Password Set

6.9.5

Product Information

Product Information mainly contains current version, CRC verify code, contact phone and our
companys address, as shown in figure 35. If technique support is needed, you can contact with us
through contact manner.

Figure 35 Product Information

6.9.6

Manufactory Function

Factory Function contains eight functions: Revert Way, Measure Debug, Telemetering Cycle,
Resume Default Value, Reset Count, linkage Logic and Output Board Choose. They are mainly
provided for personnel of our company to use. The user neednt know.

29
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

7. Instruction of backboard terminals connection and installation


Device back view drawing as follow:

POWER
JK7

EDO
JK5


EDI
CPU
JK4

JK3

10

10

10

10

11

11

11

12

12

12

13

13

13

14

14

14

15

15

15

16

16

16

17
18
19
20

TV

TA

JK2

JK1

10

10

11

11

12

12

Figure 36 Device back view drawing

Device back terminals sketch map as follow:

30
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Figure 37 Back board terminals sketch map


31
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

7.1 Power board terminals instruction


Power board Jk7 back terminals sketch map 38:

Figure 38 Power board terminals instruction

7.2 TA board terminals instruction


Jk1 Back board terminal sketch map 39:

Figure 39 TA board terminals instruction

7.3 TV board terminals instruction


JK2 back board terminal sketch map 40:

32
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Figure 40 TV board terminals instruction

c d Note: If the reserve supply is double, connect incomer 3 voltage.


7.4 CPU board terminals instruction
CPU board terminals contain two types; there are phoenix connection terminals and RJ 45
terminal.
CPU JK4 back board terminal sketch map 41:
Code
Name
CANH
1
CANL
2
3
TXGND
4
485A-1
5
485B-1
6
485A-2
7
485B-2
Weak
Current
Reset +
8
9
Input Public 10
Backup Input 1
11
Backup Input 2
12
Backup Public 13
GPS Pulse+
14
GPS Pulse15
485A-GPS
16
485B-GPS
RJ45 Ethernet Interface

Instruction
CAN Communication
Interface
RS485 Communication
Interface 1
RS485 Communication
Interface 2
Signal Reset
24V
Weak
Backup
Current
Input
GPS Second Pulse
GPS485 Interface
Net Communicate Interface

Figure 41 CPU board terminals instruction

The definition of each pin in Ethernet interface:


Table 2
Code

Definition

Signification

TX+

Send signal+

33
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

TX-

Send signal-

RX+

Receive signal +

N/C

Vacancy

N/C

Vacancy

RX-

Receive signal -

N/C

Vacancy

N/C

Vacancy

The instruction of device printing function:


The connection between one device and one printer as follow:

Figure 42 Connection between one device and one printer

The connection between multi-device and one printer server as follow: (Two device adopt
RS485multi-device adopt Ethernet).

Figure 43 Connection between multi-device and one printer

Note: When device communicate with GPS, before connect corresponding terminals please turn
GPS communication signal to RS 485 communicate mode.
34
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

7.5 EDI heavy current input board terminals instruction


Device equipped one EDI board, heavy current input and heavy current telesignalling have
different definitions in different running scheme, please refer to input terminals instruction in
appendix 3 for detail. Heavy current input public negative pole and heavy current telesignalling
public negative pole are independent inside the device. If needed, you can short-circuit outside the
device, and use a 220V heavy current public negative.
EDI_B1 input JK3 back board sketch map 44:

Figure 44 EDI_B1 input board terminals definition

Note:
1 KM select DC 220V or 110V.
2 Device input signal uses electrical independent contact mode, so please connect public point with
negative pole of exterior input signal.

7.6 Output board terminals instruction


There are two output boards, one is EDO_JK5the other can be backup, control circuit board
TRIP_JK6 or expansion output board OUT_JK6 according to the local needed. The standard
collocate of the second output is backup board, for special needed, please indicate in the ordering
contract. The second output board is TRIP_JK6 when independent control circuit is needed; the
second output board is OUT_JK6 when extra output is needed. The definition of terminals as
follow:
35
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

EDO output JK5 back board terminals sketch map 45:

Figure 45 Output board terminals instruction

If the second output board is TRIP-Jk6, output board is control circuit, the terminals sketch map
46:

Figure 46 Control circuit board terminals instruction


36
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

If the second output board is OUT-JK6, output board is expansion output board the terminals
sketch map 47:
Code
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Name
Public Point
Expansion Output 1
Expansion Output 2
Public Point
Expansion Output 3
Expansion Output 4
Public Point
Expansion Output 5
Expansion Output 6
NC
Public Point
Expansion Alarm 1
Public Point
Expansion Alarm 2
Public Point
Expansion Alarm 3
Public Point
Expansion Alarm 4
NC
NC

Instruction
Expansion
Output 12
Expansion
Output 34
Expansion
Output 56
Not Connect
Expansion
Alarm 1
Expansion
Alarm 2
Expansion
Alarm 3
Expansion
Alarm 4
Not Connect

Figure 47 EDO_JK6 output expansion board terminals instruction

Note:
The six outputs of the breaker in EDO_JK5 have different definition in different scheme. Please
refer to terminals instructions in appendix 3 for detail.

37
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

8. Debug and dispose of abnormity


Device dont need debug basically, you have to complete several inspection as following, if OK,
namely the device going well.
Procedure and version checking
Other Function includes product information which gives device version, CRC correcting code
and etc. If the information content is not correspond with order sheet or following document, please
contact consumer service branch for updating.
Switch input checking
If the input of switch state is incorrect, please check the exterior connection; if connection is Ok
and problem still exist, please change the input board; if the above methods ineffectively, please
change the CPU board.
Output circuit checking
The record menu includes fault record. If the fault record prompts problem in the output circuit,
please check output circuit according to record.
Analog value input checking
Enter Parameter setting interface to check if AC parameter setting is correct. Enter Run
monitor interface to check if the measured value of primary side and secondary side is correct.
Note, in parameter set, secondary rated value is the primary rated values of device TV/TA ratio.
Whole group test

If all checking above are correct, the device is out of question. To be cautiously, you can renew
device set-point; observe the device action to confirm validity of set point.
Device fault alarm
If the device hardware went wrongLCD shows the fault information and send alarm, then lock
the output circuit of protection. The device will send alarm signal when lost power.
GPS time calibrating
The device receive information as year, month, date, hour, minute and second by communicate
with main automation transformer substation. Moreover, the device collocate a GPS time
calibrating communication interface and a second pulse input interface, which can connect to GPS
directly or connect to second pulse output in substation, time calibrating precision is less than 1 ms.
Net communication
The device can communicate with microcomputer monitor or protection manager, the
communicate interface can be RS-485 or Ethernet
Dispose of abnormity
38
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Table 3
Abnormal phenomenon

Solution

Line 1 TV disconnection

Check wire fuse of line 1 TV secondary

Line 2 TV disconnection

Check wire fuse of line 2 TV secondary

Line 3 TV disconnection

Check wire fuse of line 3 TV secondary

Bus 1 TV disconnection

Check wire fuse of bus 1 TV secondary

Bus 2 TV disconnection

Check wire fuse of line 2 TV secondary

A/D fault

Replace CPU or sampling board

Output fault

Replace corresponding output circuit board

Setp-oint fault

Reset point or replace CPU board

Set-point channel fault

Transfer channel

39
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

9. Commissioning instructions and notices


Check whether the device model, version and electric parameter are correspond with ordering
contract or not;
Check strictly before commissioning, confirm there is no wrong in device or external circuit;
Set point is strictly according to the set-point list, confirm that the not devoted protection are
set to off;
Confirm that group number and set-point are correct;
Check boards connection, cables connection and terminals connection are reliable;.
Check the polarity of DC supply correct;
Check the display of AC values and the net communication normal.

10. Storage and maintain


Product storage temperature range: -25+70, relative humidity less than 80%, the room
can defend rain and snow and atmosphere all round not include components as acidity, alkalescency,
causticity or explosiveness; Device will not be permanent damaged when energized under extreme
condition. If temperature back to normal, device will work well.
Device is only warranty in one year if you transport, install, storage and use absolutely abide
the instruction.

11. Whole set supplied


11.1 The document goes with device
A product certification.
A instruction enclosed wiring diagram.
A packing list.
11.2 The accessories go with product
According to the need of product construction that provides the supply of annex.

40
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Appendix 1: Set point table


Fixed value include: system set-point, manual switch set-point, fault switch set point, accident
switch set-point, switch criteria set-point, protection set-point. Device can store 10 groups set-point
show as 0~9. Each group can be set independently.
Table 4
Group number Instruction
Device can store 10 groups set-point show as 0~9. default 0

setting

System

Code Name [Item/range]

Default

set-point

Instruction
To choose Unidirectional Switch (only transfer from work

Switch Direction
01

[Unidirectional

Switch

Bi-directional Switch]

02

03

Check Time of Trip


[020 -- 999]ms

Pulse Of Trip
[020 -- 999]ms

Bi-directional

supply to backup supply) or Bi-directional Switch (switch

Switch

each other between work supply and backup supply) when


accident switch and fault switch.
The setting time used for check breaker status, failed

200ms

The fitted setting is 1.5--2 times real closing time


200ms

Volt. Type of Input Line


04

1 [Ua Ub Uc Uab

Ua

Ubc Uca]

05

Leading Angle of Input


Line 1 [0 +30 -30]

2 [Ua Ub Uc Uab

For setting output signal time, which can be applied by

user customize
For setting the type of incomer voltage, which can be

applied by user customize


For setting the leading angle between incomer and bus

0.0

voltage since star-delta convert work incomer voltage,


which can be applied by user customize

Volt. Type of Input Line


06

switch if the status not checked during the setting time.

Ua

Ubc Uca]

For setting the type of incomer voltage, which can be


applied by user customize
For setting the leading angle between incomer and bus

07

Leading Angle of Input


Line 2 [0 +30 -30]

0.0

voltage since star-delta convert work incomer voltage,


which can be applied by user customize which can be
applied by user customize

Volt. Type of Input Line


08

3 [Ua Ub Uc Uab

Ua

Ubc Uca]

09

10

Leading Angle of Input


Line 3

[0 +30 -30]

TA of Input Line 1
[None Having]

For setting the type of incomer voltage, which can be


applied by user customize
For setting the leading angle between incomer and bus

0.0

voltage since star-delta convert work incomer voltage,


which can be applied by user customize
To set TA connection between line 1 and device, for

None

distinguish switch abnormal and prevent mistrip since the


connection of auxiliary contacts mistake, which can be

41
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com


applied by user customize
To set TA connection between line 2 and device, for

11

TA of Input Line 2

None

[None Having]

distinguish switch abnormal and prevent mistrip since the


connection of auxiliary contacts mistake, which can be
applied by user customize
To set TA connection between line 3 and device, for

12

TA of Input Line 3

None

[None Having]

distinguish switch abnormal and prevent mistrip since the


connection of auxiliary contacts mistake, which can be
applied by user customize
For distinguish whether backup voltage normally for

Normal- Volt. Set of


13

90.0%Un

Line
[85.0 --100.0] %Un

14
15
16

customize

Normal- Volt. Set of Bus


[85.0 -- 100.0] %Un

Low- Volt.

Set of Line

[40.0 90.0] %Un

Low- Volt. Set of bus


[40.0 90.0] %Un

90.0%Un

80.0%Un

70.0%Un

0.20S

Volt.
[0.02 10.00]S

18

19

Mis-trip

Start

condition, which can be applied by user customize


Used for setting alarm of backup loss power, which can be
applied by user customize
Used for setting alarm of bus loss power, and accident
switch actuate, which can be applied by user customize

switch actuate for prevent mistrip, which can be applied


by user customize

Delay

[0.05 5.00]S

Un-volt.. Set of Bus


[0.05 5.00]S

The delay ids used for ensure loss power when accident
0.05S

Bus

switch actuate for prevent mistrip, which can be applied


by user customize

20.0%Un

Delay Set of Un-volt.


20

For distinguish whether bus voltage normally for charging

The delay ids used for ensure loss power when accident

Delay of Acing Low17

charging condition, which can be applied by user

1.00S

[40.0 90.0] %Un

Used for distinguishing the un-volt.. set of bus, which can


be applied by user customize
Used for distinguishing the delay set of un-volt.. bus,
which can be applied by user customize
Used for switching abnormity management (such as exit all
the switch criterion) , judge the time limit of switch

Allowable Delay Limit


21

of Switch

30.00S

[40.0 90.0] %Un

failure, if switch not succeed in the time limit, it will


report switch overtime failure, which can be applied by
user customize

Manual switch set-point


Manual Switch Way
01

[Off Series Switch Auto


Parallel Semi-auto Parallel

Auto Parallel

For choose manual switch way or exit manual switch,


which can be applied by user customize

Parallel & Series]

02

Parallel Max Volt. Diff.


[1.0 -- 20.0] %Un

For setting Vol. diff. allowed which refer to Sync. Catch


5.0%Un

Switch criteria when paralleling switch, which can be


applied by user customize

42
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com


03

04
05
06

07

08

09

10

11

Parallel Max Freq. Diff.


[0.1 -- 2.0]Hz

0.50Hz

Switch criteria when paralleling switch, which can be


applied by user customize

Parallel Max Angle Diff.


[0.0 -- 60.0]

Clamp of Decoupling
[Off, On]

Delay of Decoupling
[0.05 5.00]S

Bus

For setting Freq. diff. allowed which refer to Sync. Catch

Breaker

Closing

Time [020 -- 999]ms

10.0

On

0.20S

For setting Angle diff. allowed when paralleling switch,


which can be applied by user customize
The soft switch of decoupling function, which can be
applied by user customize
Delay of Decoupling, to prevent system power off , which
can be applied by user customize
For setting bus breaker real closing time, must be strictly in

100ms

accordance with the actual situation to ensure a good


closing angle.

1DL Breaker Closing


Time [020 -- 999]ms

For setting breaker 1DL real closing time, must be strictly


100ms

in accordance with the actual situation to ensure a good


closing angle.

2DL Breaker Closing


Time 2 [020 -- 999]ms

For setting breaker 2DL real closing time, must be strictly


100ms

in accordance with the actual situation to ensure a good


closing angle.

3DL Breaker Closing


Time [020 -- 999]ms

For setting breaker 3DL real closing time, must be strictly


100ms

in accordance with the actual situation to ensure a good


closing angle.

4DL Breaker Closing


Time [020 -- 999]ms

For setting breaker 4DL real closing time, must be strictly


100ms

in accordance with the actual situation to ensure a good


closing angle.

Protection set-point
01

Bus

Over

Current 1 [On, Off]


Bus

02

Breaker
Breaker

Current

Off

Over
Current

6.00A

[1.00 99.99]A

Bus
03

Breaker

Over

Current 1 Time [0.10

0.2S

10.00]S

04

Bus

Breaker

Current

Over

[On, Off]

Current 2
Bus

05

Breaker

Off

Over
Current

5.00A

[1.00 99.99]A

Bus
06

Breaker

Over

Current 2 Time [0.10

0.50S

10.00]S

07

Bus

Breaker

Over

Off

Bus breaker over current 1, which can be applied by user


customize
Bus breaker over current 1 current, which can be applied
by user customize

Bus breaker over current 1 time, which can be applied by


user customize
Bus breaker over current 2, which can be applied by user
customize
Bus breaker over current 2 current, which can be applied
by user customize

Bus breaker over current 2 time, which can be applied by


user customize
Bus breaker over current haste, which can be applied by

43
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com


Current haste
Bus
08

user customize

[On, Off]

Breaker

Over

Current Haste Current

5.00A

[1.00 99.99]A

Bus
09

Breaker

Current

Haste

Over
Time

0.20S

[0.10 3.00]S

10
11
12
13
14
15
16
17
18
19
20
21

Line Low-volt. Alarm


Delay [1.00 -- 99.99] S
Bus Low-volt. Alarm
Delay [1.00 -- 99.99] S
Bus 1 Low-volt. Alarm
[ On ,Off]

Bus 2 Low-volt. Alarm


[ On ,Off]

Line 1 Low-volt. Alarm


[ On ,Off]

Line 2 Low-volt. Alarm


[ On ,Off]

Line 3 Low-volt. Alarm


[ On ,Off]

Bus 1 TV Line-break
Alarm [ On ,Off]
Bus 2 TV Line-break
Alarm

[ On ,Off]

Line 1 TV Line-break
Alarm

[ On ,Off]

Line 2 TV Line-break
Alarm

[ On ,Off]

Line 3 TV Line-break
Alarm

[ On ,Off]

10.00S

10.00S

Bus breaker over current haste current, which can be


applied by user customize

Bus breaker over current haste time, which can be applied


by user customize
The delay setting of Line Un-volt.. Alarm, which can be
applied by user customize
The delay setting of Bus Un-volt.. Alarm, which can be
applied by user customize
The soft switch of Bus 1 Un-volt.. Alarm function, which

Off

can be applied by user customize


The soft switch of Bus 2 Un-volt.. Alarm function, which

Off

can be applied by user customize


The soft switch of Line 1 Un-volt.. Alarm function, which

Off

can be applied by user customize


The soft switch of Line 2 Un-volt.. Alarm function, which

Off

can be applied by user customize


The soft switch of Line 3 Un-volt.. Alarm function, which

Off

can be applied by user customize


The soft switch of Bus 1 TV disconnection Alarm function,

Off

which can be applied by user customize


The soft switch of Bus 2 TV disconnection Alarm function,

Off

which can be applied by user customize


The soft switch of Line 1 TV disconnection Alarm

Off

function, which can be applied by user customize


The soft switch of Line 2 TV disconnection Alarm

Off

function, which can be applied by user customize


The soft switch of Line 3 TV disconnection Alarm

Off

function, which can be applied by user customize

Scheme expand set-point


01

02

5DL Breaker Closing


Time [020 -- 999]ms
6DL Breaker Closing
Time [020 -- 999]ms

For setting breaker 5DL real closing time, must be strictly


100ms

in accordance with the actual situation to ensure a good


closing angle.
For setting breaker 6DL real closing time, must be strictly

100ms

in accordance with the actual situation to ensure a good


closing angle.
To set TA connection between line 4 and device, for

03

TA of Input Line 4
[None Having]

None

distinguish switch abnormal and prevent mistrip since the


connection of auxiliary contacts mistake, which can be
applied by user customize

44
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com


To set TA connection between line 5 and device, for

04

TA of Input Line 5
[None Having]

None

distinguish switch abnormal and prevent mistrip since the


connection of auxiliary contacts mistake, which can be
applied by user customize
To set TA connection between line 6 and device, for

05

TA of Input Line 6
[None Having]

None

distinguish switch abnormal and prevent mistrip since the


connection of auxiliary contacts mistake, which can be
applied by user customize
The soft switch of function which input all switches (or

Breaker Mis-trip Way


06

[All

switches,

incomer

Off

applied by user customize

switches, Off]

07
08
09
10
11
12
13

Zero
set-point 1
Zero
set-point 2
Zero
set-point 3
Zero
set-point 4
Zero
set-point 5
Zero
set-point 6
Zero
set-point 7

incomer switches) or exit all switches, which can be

dimension
[0000 - 9999]

dimension
[0000 - 9999]

dimension
[0000 - 9999]

dimension
[0000 - 9999]

dimension
[0000 - 9999]

dimension
[0000 - 9999]

dimension
[0000 - 9999]

0000

Backup

0000

Backup

0000

Backup

0000

Backup

0000

Backup

0000

Backup

0000

Backup

Remark:

System set-point
This is used for setting system value which is used in common.

Manual switch set-point


This is used for setting manual switch way and switch principle.
Protection set-point
This is used for setting set-point that is related to protection function.
Project expand set-point
This is used for setting set-point related to special project.

45
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Appendix 2: Parameter list


Type

Code

Name

Range

Default value

Telesignalling parameter
Anti-trill time

01 - 16

00-15 Input anti-disturb

[ 1-999 ]ms

10ms

[Open/Close]

Open

time
Input attribute

01 - 16

00-15 Input attribute

AC parameter
01

Bus 1 voltage

[1- 9999]

100

TV

02

Bus 2 voltage

[1- 9999]

100

Ratio

03

Line 1 voltage

[1- 9999]

100

04

Line 2 voltage

[1- 9999]

100

05

Line 3 voltage

[1- 9999]

100

06

Bus breaker current

[1- 9999]

100

TA

07

Line 1 current

[1- 9999]

100

Ratio

08

Line 2 current

[1- 9999]

100

09

Line 3 current

[1- 9999]

100

10

Bus 1 secondary rated vol.

[1- 999] V

100 V

11

Bus 2 secondary rated vol.

[1- 999] V

100 V

12

Line1 secondary rated vol.

[1- 999] V

100 V

Secondary

13

Bus2 secondary rated vol.

[1- 999] V

100 V

rated value

14

Bus3 secondary rated vol.

[1- 999] V

100 V

15

Bus

secondary

[1- 999] V

5A

16

Line 1 secondary rated cur

[1- 999] V

5A

17

Line 2 secondary rated cur

[1- 999] V

5A

18

Line 3 secondary rated cur

[1- 999] V

5A

breaker

rated current

Communication parameter

Network
communication

01

IP

[002 -- 255]

192.0.0.49

Mask

[-]

255.255.0.0

Gateway

[-]

192.0.0.1

Communication address

[0 - 127]

46
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com


Communication protocol
01

[IEC60870-5-103Modbus

SID-TEST

SID-TEST]
Communication velocity

[300 bps 19200 bps ]

9600 bps

Check way

[No check, odd parity, even

No check

RS 485

parity]

series

Communication address

[0 - 127]

communication

Communication protocol

[SID-401PSEPSON ESC/P SID-TEST

IEC60870-5-103Modbus
02

SID-TEST]
Communication velocity

[300bps -- 19200bps ]

9600 bps

Check way

[No check, odd parity, even

No check

parity]
Communication address

[0 - 127]

Communication protocol

[SID-TEST

IRIG-BRS485

03

1
SID-TEST

IRIG-BTTLWEIKOT]
Communication velocity

[300 bps 19200 bps ]

9600 bps

Check way

[No check, odd parity, even

No check

parity]
CAN Bus
communication

01

Communication address

[0 - 999]

001

Communication velocity

[20kbps50kbps125kbps]

125kbps

Language
Language

01

Chinese

[Chinese/English]

Chinese

Scheme
Scheme

01

Scheme

[1 -- 20]

Remark
Telesignalling parameter
This is used for setting input signal attribute and anti-disturb time, the default value: open,
10 ms
Ac parameter
This is used for setting AC current and voltage transformer ratios. The secondary rated
47
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

value is the value of TA or TV inside the device.


Communication parameter
This is used for setting the parameter of RS485 series communication, Ethernet
communication and CAN bus communication.
RS 485 series 1 is used for communication when the same background controlled. Users
can choose communication protocol between IEC 60870-5-103 and Modbus. The address,
velocity and check mode are according to parameter range.
RS 485 series 2 can use for printer communication when not used, baud rate: 9600 bps,
check mode: no check. The communication protocol is EPSON ESC/P when device and
printer connected directly; the communication protocol is SID-401 PS when printer server
connected with printer.
RS 485 series 3 is used for GPS communication; users can choose communication protocol
during IRIG-BRS485IRIG-BTTLWEIKOT.
Language
This is used for interface language setting (Chinese or English).
Scheme parameter
This is used for setting backup scheme that correspond with local primary electrical main
connection.

48
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Appendix 3: Back up scheme instruction


Note
Bus low-voltThe voltage is lower than low-volt set-point, keep over verifying delay of acking
low-volt., and delay of bus un-volt. switch, then protection startup.
Switch mis-trip: The work breaker is open and without current, keeps longer than verify
delay.
Scheme 1: Bus breaker or bridge switch control (Plural reserve)
Wiring diagram as figure 48:

Figure 48 Main connection

Control logic
Normal operating:
1 DL closedbus I energized by supply 1 through 1 DL.
2 DL closedbus II energized by supply 2 through 2 DL.
Bus breaker tripped, bus I, bus II backing for each other.
Device energized, if the voltage of bus I and bus II are both higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Backup switch logic:
When bus I voltage low or 1DL mis-trip, bus II voltage is higher than under-voltage set-point,
then trip 1DL, after the un-volt. test and delay condition of bus I are satisfied, close bus breaker.
When bus II voltage low or 2DL mis-trip, bus I voltage is higher than under-voltage set-point,
then trip 2DL, after the un-volt. test and delay condition of bus II are satisfied, close bus breaker.
(Only valid if bi-direction transfer is selected).
Manual transfer logic:
When bus breaker closed, 1DL or 2DL tripped, and the reserve supply has voltage; or 1DL and
49
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

2DL closed, bus breaker tripped, and the external input signal mode 1 or mode 2 closed, the manual
switch function of the device is available. The transfer logics in different transfer mode as follow:
[Series Switch]:
Both bus breaker and 2DL are closed, 1DL tripped, and incomer 1 voltage is higher than
under-voltage set-point, if manual switch signal presence, trip bus breaker and close 1DL when the
un-volt. test condition of bus I is satisfied.
Both bus breaker and 1DL are closed, 2DL tripped, and incomer 2 voltage is higher than
under-voltage set-point, if manual switch signal presence, trip bus breaker and close 2DL when the
un-volt. test condition of bus II is satisfied.
Both 1DL and 2DL are closed, bus breaker tripped, the external input signal mode 1 closed, mode
2 tripped, and incomer 1 voltage is higher than under-voltage set-point, if manual switch signal
presence, trip 2DL , close bus breaker when the un-volt. test condition of bus II is satisfied.
Both 1DL and 2DL closed, bus breaker tripped, the external input signal mode 2 closed, mode 1
tripped, and incomer 2 voltage is higher than under-voltage set-point, if manual switch signal
presence, trip 1DL and close bus breaker when the un-volt. test condition of bus I is satisfied.
[Auto Parallel]:
Both bus breaker and 2DL are closed, 1DL tripped, and incomer 1 voltage is higher than
under-voltage set-point, if manual switch signal presence, close 1DL when the parallel
synchronization condition is satisfied, trip bus breaker after closed successfully, if tripped
successfully, then the transfer process is over, otherwise decoupling and trip 1DL; (Note: The
decoupling function can be applied by user customize)
Both bus breaker and 1DL are closed, 2DL tripped, and incomer 2 voltage is higher than
under-voltage set-point, if manual switch signal presence, close 2DL when the parallel
synchronization condition is satisfied, trip bus breaker after closed successfully, if tripped
successfully then the transfer process is over, otherwise decoupling and trip 2DL; (Note: The
decoupling function can be applied by user customize)
Both 1DL and 2DL are closed, bus breaker tripped, and mode 1 closed, if manual switch signal
presence, close bus breaker when the parallel synchronization condition is satisfied, trip 2DL after
closed successfully, if tripped successfully then the transfer process is over, otherwise decoupling
and trip bus breaker; (Note: The decoupling function can be applied by user customize)
Both 1DL and 2DL are closed, bus breaker tripped, and mode 2 closed, if manual switch signal
presence, close bus breaker when the parallel synchronization condition is satisfied, trip 1DL after
closed successfully, if tripped successfully then the transfer process is over, otherwise decoupling
50
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

and trip bus breaker; (Note: The decoupling function can be applied by user customize)
[Semiauto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.

Terminal instruction:

Figure 49 Scheme 1 terminal instruction

Scheme 2: Incomer transfer control (Exclusive backup)


51
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Wiring diagram as figure 50:

Figure 50 Main connection

Control logic
Normal operating:
Bus energized by supply 1 through 1 DL, bus breaker. Power supply 2 is used for backing
through 2DL.
Device energized, if backup supply voltage and bus voltage are higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
System switches logic:
Bus breaker and 1DL are closed, 2DL tripped, if bus low-voltage or 1DL mis-tripped, voltage of
power supply 2 is higher than under-voltage set-point, then trip 1DL, after the un-volt. test and
delay condition of bus are satisfied, close 2DL.
Bus breaker and 2DL are closed, 1DL tripped, if bus low-voltage or 2DL mis-tripped, voltage of
power supply 1 is higher than under-voltage set-point, then trip 2DL, after the un-volt. test and
delay condition of bus are satisfied, close 1DL. (Only valid if bi-direction transfer is selected).
Manual transfer logic:
When bus breaker closed, 1DL or 2DL tripped, and the reserve supply has voltage, the manual
switch function of the device is available. The transfer logics in different transfer mode as follow:
[Series Switch]:
Both bus breaker and 2DL closed, 1DL tripped, and incomer 1 voltage is higher than
under-voltage set-point, if manual switch signal presence, trip 2DL, after the un-volt. test and delay
condition of bus are satisfied, close 1DL.
Both bus breaker and 1DL closed, 2DL tripped, and incomer 2 voltage is higher than
under-voltage set-point, if manual switch signal presence, trip 1DL, after the un-volt. test and delay
condition of bus are satisfied, close 2DL.
52
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

[Auto Parallel]:
Both bus breaker and 2DL closed, 1DL tripped, and incomer 1 voltage is higher than
under-voltage set-point, if manual switch signal presence, close 1DL when the parallel
synchronization condition is satisfied, trip 2DL after closed successfully, if tripped successfully then
the transfer process is over, otherwise decoupling and trip 1DL; (Note: The decoupling function can
be applied by user customize)
Both bus breaker and 1DL closed, 2DL tripped, and incomer 2 voltage is higher than
under-voltage set-point, if manual switch signal presence, close 2DL when the parallel
synchronization condition is satisfied, trip 1DL after closed successfully, if tripped successfully then
the transfer process is over, otherwise decoupling and trip 2DL; (Note: The decoupling function can
be applied by user customize)
[Semiauto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.

Terminal instruction:

53
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com


AC Current Value (JK1)
Code
Name
1
ML-Ia
2
ML-Ia'
3
ML-Ib
4
ML-Ib'
5
ML-Ic
6
ML-Ic'
7
1L-I1
8
1LI1'
9
2L-I2
10
2L-I2'
11
NC
12
NC
Output(Jk5)
Code
Name
1
Public Point
2
1DL Tripping
3
1DL Closing
4
Public Point
5
2DL Tripping
6
2DL Closing
7
Public Point
8
NC
Bus Breaker Tripping
9
10
Public Point
11
NC
Bus Breaker Closing
12
Signal Public Point
13
Backup Switch Act
14
External Fault Alarm
15
16
Device Alarm
17
NC
18
NC
19
Device Blocking
20

Instruction
Link Line Phase A
Current
Link Line Phase B
Current
Link Line Phase C
Current
Incomer 1 Current
Incomer 2 Current
Not Connected

Instruction
1DL Breaker
Transfer Output
2DL Breaker
Transfer Output
Bus Breaker
Tripping Output
Bus Breaker
Closing Output
Central Signal
Alarm Output

AC Voltage Value (JK2)


Code
Name
1
1M-Ua1
2
1M-Ub1
3
1M-Uc1
4
NC
5
NC
6
NC
7
1L-U1
8
1L-U1'
9
1L-U2
10
1L-U2'
11
NC
12
NC

Instruction
Bus Phase A Voltage
Bus Phase B Voltage
Bus Phase C Voltage
Not Connected
Not Connected
Not Connected
Incomer 1 Voltage
Incomer 2 Voltage
Not Connected

Input(JK3)
Code
Name
1
1DL Breaker Aux. Contact
2
2DL Breaker Aux. Contact
3
Bus Breaker Aux. Contact
4
NC
5
General Blocking
6
-KM
7
NC
8
NC
9
NC
10
NC
11
NC
12
NC
13
NC
14
NC
15
Signal Reset
16
Manual Switch Input

+KM Input Signal Supply 1

+KM Input Signal Supply 2


Signal Grounding

Not Connected
Central Signal
Alarm Output

Note: KM select DC 220V or 110V

Figure 51 Scheme 2 terminal instruction

Scheme 3: Line switch transfer control 1 (Exclusive backup)


Wiring diagram as figure 52:

Figure 52 Main connection


54
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Control logic
Normal operating:
Bus energized by supply 1 through 1 DL. Power supply 2 is used for backing through 2DL.
Or bus energized by supply 2 through 2DL. Power supply 1 is used for backing through 1DL.
(Only valid if bi-direction transfer is selected).
Device energized, if backup supply and bus voltage are higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Backup switch logic:
1DL closed, 2DL tripped, if bus low-voltage or 1DL mis-tripped, voltage of power supply 2 is
higher than under-voltage set-point, then trip 1DL, after the un-volt. test and delay condition of bus
are satisfied, close 2DL.
2DL closed, 1DL tripped, if bus low-voltage or 2DL mis-tripped, voltage of power supply 1 is
higher than under-voltage set-point, then trip 2DL, after the un-volt. test and delay condition of bus
are satisfied, close 1DL. (Only valid if bi-direction transfer is selected).
Manual transfer logic:
When 1DL or 2DL tripped, and the voltage of reserve supply is higher than under-voltage
set-point, the manual switch function of the device is available. The transfer logics in different
transfer mode as follow:
[Series Switch]:
2DL closed, 1DL tripped, and incomer 1 voltage is higher than under-voltage set-point, if manual
switch signal presence, trip 2DL, after the un-volt. test and delay condition of bus are satisfied,
close 1DL.
1DL closed, 2DL tripped, and incomer 2 voltage is higher than under-voltage set-point, if manual
switch signal presence, trip 1DL, after the un-volt. test and delay condition of bus are satisfied,
close 2DL.
[Auto Parallel]:
2DL closed, 1DL tripped, and incomer 1 voltage is higher than under-voltage set-point, if manual
switch signal presence, close 1DL when the parallel synchronization condition is satisfied, trip 2DL
after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL; (Note: The decoupling function can be applied by user customize)
1DL closed, 2DL tripped, and incomer 2 voltage is higher than under-voltage set-point, if manual
switch signal presence, close 2DL when the parallel synchronization condition is satisfied, trip 1DL
after closed successfully, if tripped successfully then the transfer process is over, otherwise
55
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

decoupling and trip 2DL; (Note: The decoupling function can be applied by user customize)
[Semiauto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.

Terminal instruction:
AC Current Value (JK1)
Code
Name
1
NC
2
NC
3
NC
4
NC
5
NC
6
NC
7
1L-I1
8
1L-I1'
9
2L-I2
10
2L-I2'
11
NC
12
NC
Output(Jk5)
Code
Name
1
Public Point
2
1DL Tripping
3
1DL Closing
4
Public Point
5
2DL Tripping
6
2DL Closing
7
Public Point
8
NC
9
NC
10
Public Point
11
NC
12
NC
13 Signal Public Point
14 Backup Switch Act
External Fault Alarm
15
16
Device Alarm
17
NC
18
NC
19 Device Blocking +
20
Device Blocking -

Instruction
Not Connected
Not Connected
Not Connected
Incomer 1 Current
Incomer 2 Current
Not Connected

Instruction
1DL Breaker
Transfer Output
2DL Breaker
Transfer Output
Not connected
Not connected

Central Signal
Alarm Output

AC Voltage Value (JK2)


Code
Name
1
1M-Ua1
2
1M-Ub1
3
1M-Uc1
4
NC
5
NC
6
NC
7
1L-U1
8
1L-U1'
9
2L-U2
10
2L-U2'
11
NC
12
NC

Instruction
Bus Phase A Voltage
Bus Phase B Voltage
Bus Phase C Voltage
Not Connected
Not Connected
Not Connected
Incomer 1 Voltage
Incomer 2 Voltage
Not Connected

Input(JK3)
Code
Name
1
1DL Breaker Aux. Contact
2
2DL Breaker Aux. Contact
3
NC
4
NC
5
General Blocking
6
-KM
7
NC
8
NC
9
NC
10
NC
11
NC
12
NC
13
NC
14
NC
15
Signal Reset
16
Manual Switch Input

+KM Input Signal Supply 1

+KM Input Signal Supply 2


Signal Grounding

Not connected
Central Signal
Alarm Output

Note: KM select DC 220V or 110V

Figure 53 Scheme 3 terminal instruction

Scheme 4: Line switch transfer control 2 (Exclusive backup)


56
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Wiring diagram as figure 54:

Figure 54 Main connection

Control logic
Normal operating:
Bus energized by supply 1 through 1DL. Power supply 2 is used for backing through 2DL.
Or bus energized by supply 2 through 2DL. Power supply 1 is used for backing through 1DL.
(Only valid if bi-direction transfer is selected).
Device energized, if bus voltage is higher than voltage set-point, the device begin to charge 10
s, then system enter fault monitor state.
Backup switch logic:
1DL closed, 2DL tripped, if bus I low-voltage or 1DL mis-tripped, then trip 1DL, after the
un-volt. test and delay condition of bus are satisfied, close 2DL.
2DL closed, 1DL tripped, if bus I low-voltage or 2DL mis-tripped, then trip 2DL, after the
un-volt. test and delay condition of bus are satisfied, close 1DL. (Only valid if bi-direction transfer
is selected).
Manual transfer logic:
When 1DL or 2DL tripped, the manual switch function of the device is available. For there has
no voltage transformer in this scheme, so only series switch is available, and parallel & series is
also valid. The series switch logic as follow:
[Series Switch]:
2DL closed, 1DL tripped, if manual switch signal presence, trip 2DL, after the un-volt. test and
delay condition of bus are satisfied, close 1DL.
1DL closed, 2DL tripped, if manual switch signal presence, trip 1DL, after the un-volt. test and
delay condition of bus are satisfied, close 2DL.
After manual switch, the device will return to normal operating mode.
57
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Terminal instruction:
AC Current Value (JK1)
Code
Name
1
NC
2
NC
3
NC
4
NC
5
NC
6
NC
7
1L-I1
8
1L-I1'
9
2L-I2
10
2L-I2'
11
NC
12
NC
Output(Jk5)
Code
Name
1
Public Point
2
1DL Tripping
3
1DL Closing
4
Public Point
5
2DL Tripping
6
2DL Closing
7
Public Point
8
NC
9
NC
10
Public Point
11
NC
12
NC
13 Signal Public Point
14 Backup Switch Act
External Fault Alarm
15
16
Device Alarm
17
NC
18
NC
19
Device Blocking
20

Instruction
Not Connected
Not Connected
Not Connected
Incomer 1 Current
Incomer 2 Current
Not Connected

Instruction
1DL Breaker
Transfer Output
2DL Breaker
Transfer Output
Not connected
Not connected

Central Signal
Alarm Output

AC Voltage Value (JK2)


Code
Name
1
1M-Ua1
2
1M-Ub1
3
1M-Uc1
4
NC
5
NC
6
NC
7
NC
8
NC
9
NC
10
NC
11
NC
12
NC

Instruction
Bus Phase A Voltage
Bus Phase B Voltage
Bus Phase C Voltage
Not Connected
Not Connected
Not Connected
Not Connected
Not Connected
Not Connected

Input(JK3)
Code
Name
1
1DL Breaker Aux. Contact
2
2DL Breaker Aux. Contact
3
NC
4
NC
5
General Blocking
6
-KM
7
NC
8
NC
9
NC
10
NC
11
NC
12
NC
13
NC
14
NC
15
Signal Reset
16
Manual Switch Input

+KM Input Signal Supply 1

+KM Input Signal Supply 2


Signal Grounding

Not connected
Central Signal
Alarm Output

Note: KM select DC 220V or 110V

Figure 55 Scheme 4 terminal instruction

Scheme 5: Hot backup transformer transfer control (Exclusive backup)


Wiring diagram as figure 56:

58
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Figure 56 Main connection

Control logic
Hot backup: The transformer of backup supply is in no-load status when normal operating, the
high-voltage side breaker connected with the backup supply when in closed status.
Normal operating:
Bus energized by supply 1 through 1DL and 3DL. Power supply 2 is used for backing through
2DL.
Or bus energized by supply 2 through 2DL and 4DL. Power supply 1 is used for backing
through 1DL. (Only valid if bi-direction transfer is selected).
Device energized, if backup supply voltage and bus voltage are higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Backup switch logic:
1DL, 3DL and 4DL are closed, 2DL tripped, if bus low-voltage or 1DL mis-tripped, voltage of
power supply 2 is higher than under-voltage set-point, then trip 1DL, after the un-volt. test and
delay condition of bus are satisfied, close 2DL.
2DL, 3DL and 4DL are closed, 1DL tripped, if bus low-voltage or 2DL mis-tripped, voltage of
power supply 1 is higher than under-voltage set-point, then trip 2DL, after the un-volt. test and
delay condition of bus are satisfied, close 1DL. (Only valid if bi-direction transfer is selected).
Manual transfer logic:
When 1DL, 3DL and 4DL are closed, 2DL tripped, or 2DL, 3DL and 4DL are closed, 1DL
tripped, voltage of backup supply is higher than under-voltage set-point, the manual switch function
of the device is available. The transfer logics in different transfer mode as follow:
[Series Switch]:
2DL, 3DL and 4DL are closed, 1DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip 2DL, after the un-volt. test and delay condition of
59
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

bus are satisfied, close 1DL when the bus un-volt. test conditions satisfied.
1DL, 3DL and 4DL are closed, 2DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip 1DL, after the un-volt. test and delay condition of
bus are satisfied, close 2DL.
[Auto Parallel]:
2DL, 3DL and 4DL are closed, 1DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 1DL when the parallel synchronization condition
is satisfied, trip 2DL after closed successfully, if tripped successfully then the transfer process is
over, otherwise decoupling and trip 1DL; (Note: The decoupling function can be applied by user
customize)
1DL, 3DL and 4DL are closed, 2DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 2DL when the parallel synchronization condition
is satisfied, trip 1DL after closed successfully, if tripped successfully then the transfer process is
over, otherwise decoupling and trip 2DL; (Note: The decoupling function can be applied by user
customize)
[Semiauto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.

Terminal instruction:

60
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com


AC Current Value (JK1)
Code
Name
1
NC
2
NC
3
NC
4
NC
5
NC
6
NC
7
1L-I1
8
1L-I1'
9
2L-I2
10
2L-I2'
11
NC
12
NC
Output(Jk5)
Code
Name
1
Public Point
2
1DL Tripping
3
1DL Closing
4
Public Point
5
2DL Tripping
6
2DL Closing
7
Public Point
8
NC
9
NC
10
Public Point
11
NC
12
NC
13 Signal Public Point
14 Backup Switch Act
External Fault Alarm
15
16
Device Alarm
17
NC
18
NC
19
Device Blocking
20

Instruction
Not Connected
Not Connected
Not Connected
Incomer 1 Current
Incomer 2 Current
Not Connected

Instruction
1DL Breaker
Transfer Output
2DL Breaker
Transfer Output
Not connected
Not connected

Central Signal
Alarm Output

AC Voltage Value (JK2)


Code
Name
1
1M-Ua1
2
1M-Ub1
3
1M-Uc1
4
NC
5
NC
6
NC
7
1L-U1
8
1L-U1'
9
2L-U2
10
2L-U2'
11
NC
12
NC

Instruction
Bus Phase A Voltage
Bus Phase B Voltage
Bus Phase C Voltage
Not Connected
Not Connected
Not Connected
Incomer 1 Voltage
Incomer 2 Voltage
Not Connected

Input(JK3)
Code
Name
1
1DL Breaker Aux. Contact
2
2DL Breaker Aux. Contact
3
3DL Breaker Aux. Contact
4
4DL Breaker Aux. Contact
5
General Blocking
6
-KM
7
NC
8
NC
9
NC
10
NC
11
NC
12
NC
13
NC
14
NC
15
Signal Reset
16
Manual Switch Input

+KM Input Signal Supply 1

+KM Input Signal Supply 2


Signal Grounding

Not connected
Central Signal
Alarm Output

Note: KM select DC 220V or 110V

Figure 57 Scheme 5 terminal instruction

Scheme 6: Cold backup transformer transfer control (Exclusive backup)


Wiring diagram as figure 58:

Figure 58 Main connection


61
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Control logic
Cold backup: The transformer of backup supply is in no-power status when normal operating,
the double side breakers are disconnected.
Normal operating:
Bus energized by supply 1 through 1DL and 3DL. Power supply 2 is used for backing through
2DL and 4DL.
Or bus energized by supply 2 through 2DL and 4DL. Power supply 1 is used for backing
through 1DL and 3DL. (Only valid if bi-direction transfer is selected).
Device energized, if backup supply voltage and bus voltage are higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Backup switch logic:
1DL and 3DL closed, 2DL and 4DL tripped, if bus low-voltage or 1DL (3DL) mis-tripped,
voltage of power supply 2 is higher than under-voltage set-point, then trip 1DL and 3DL, after the
un-volt. test and delay condition of bus are satisfied, close 4DL, if 4DL closed successfully, then
close 2DL, the transient exciting current generated by close the transformer with no-load through
4DL may cause 4DL close fail.
2DL and 4DL closed, 1DL and 3DL tripped, if bus low-voltage or 2DL (4DL) mis-tripped,
voltage of power supply 1 is higher than under-voltage set-point, then trip 2DL, 4DL, after the
un-volt. test and delay condition of bus are satisfied, close 3DL, if 3DL closed successfully, then
close 1DL. (Only valid if bi-direction transfer is selected). As mentioned above, close the
transformer with no-load through 3DL may cause 3DL close fail.
Manual transfer logic:
When 1DL and 3DL closed, 2DL and 4DL tripped, or 2DL and 4DL are closed, 1DL and 3DL
tripped, voltage of backup supply is higher than under-voltage set-point, the manual switch function
of the device is available. The transfer logics in different transfer mode as follow:
[Series Switch]:
2DL and 4DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip 2DL and 4DL, after the un-volt. test and delay
condition of bus are satisfied, close 3DL, if 3DL closed successfully, then close 1DL.
1DL and 3DL closed, 2DL and 4DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip 1DL and 3DL, after the un-volt. test and delay
condition of bus are satisfied, close 4DL, if 4DL closed successfully, then close 2DL.
[Auto Parallel]:
62
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

2DL and 4DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 3DL, then close 1DL when the parallel
synchronization condition is satisfied, trip 2DL and 4DL after closed successfully, if tripped
successfully then the transfer process is over, otherwise decoupling and trip 1DL and 3DL; (Note:
The decoupling function can be applied by user customize)
1DL and 3DL closed, 2DL and 4DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 4DL, then close 2DL when the parallel
synchronization condition is satisfied, trip 1DL and 3DL after closed successfully, if tripped
successfully then the transfer process is over, otherwise decoupling and trip 2DL and 4DL; (Note:
The decoupling function can be applied by user customize)
[Semi-auto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
For the transient exciting current generated by close the transformer with no-load may cause
transformer protection mis-trip, and re-trip the breaker in the supply side, this will lead the transfer
control fail. To solve this problem, we designed SID-3YL Inrush Suppresser. This device can
suppress the transient exciting current generated by close the transformer with no-load, and achieve
success at the first time. The suppresser can install on the operating box of 3DL and 4DL, and send
the control signal of 3DL or 4DL to the Inrush Suppresser, then the Suppresser will connect the
tripping, closing circuit to realize close successfully one time.

Terminal instruction:

63
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com


AC Current Value (JK1)
Code
Name
1
NC
2
NC
3
NC
4
NC
5
NC
6
NC
7
1L-I1
8
1L-I1'
9
2L-I2
10
2L-I2'
11
NC
12
NC
Output(Jk5)
Code
Name
1
Public Point
2
1DL Tripping
3
1DL Closing
4
Public Point
5
2DL Tripping
6
2DL Closing
7
Public Point
8
3DL Tripping
9
3DL Closing
10
Public Point
11
4DL Tripping
12
4DL Closing
13 Signal Public Point
14 Backup Switch Act
External Fault Alarm
15
16
Device Alarm
17
NC
18
NC
19
Device Blocking
20

Instruction
Not Connected
Not Connected
Not Connected
Incomer 1 Current
Incomer 2 Current
Not Connected

Instruction
1DL Breaker
Transfer Output
2DL Breaker
Transfer Output
3DL Breaker
Transfer Output
4DL Breaker
Transfer Output
Central Signal
Alarm Output

AC Voltage Value (JK2)


Code
Name
1
1M-Ua1
2
1M-Ub1
3
1M-Uc1
4
NC
5
NC
6
NC
7
1L-U1
8
1L-U1'
9
2L-U2
10
2L-U2'
11
NC
12
NC

Instruction
Bus Phase A Voltage
Bus Phase B Voltage
Bus Phase C Voltage
Not Connected
Not Connected
Not Connected
Incomer 1 Voltage
Incomer 2 Voltage
Not Connected

Input(JK3)
Code
Name
1
1DL Breaker Aux. Contact
2
2DL Breaker Aux. Contact
3
3DL Breaker Aux. Contact
4
4DL Breaker Aux. Contact
5
General Blocking
6
-KM
7
NC
8
NC
9
NC
10
NC
11
NC
12
NC
13
NC
14
NC
15
Signal Reset
16
Manual Switch Input

+KM Input Signal Supply 1

+KM Input Signal Supply 2


Signal Grounding

Not connected
Central Signal
Alarm Output

Note: KM select DC 220V or 110V

Figure 59 Scheme 6 terminal instruction

Scheme 7: Double backup transfer control (Exclusive backup, secondary backup supply has
no PT)
Wiring diagram as figure 60:

Figure 60 Main connection


64
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Normal operating:
Bus energized by supply 1 through 1DL, supply 2 and 3 is used for backup (supply 2 is primary
backup, 3 is secondary backup, 2 take precedence over 3), 1DL closed, 2DL and 3DL tripped;
Or bus energized by supply 2 through 2 DL, supply 1 and 3 is used for backup (supply 1 is
primary backup, 3 is secondary back up, 1 take precedence over 3, only valid if bi-direction transfer
be selected), 2DL closed, 1DL and 3DL tripped; bus I energized by supply 2 through 2 DL, supply 3
is used for backup (Only valid if single direction transfer be selected), 2DL closed, 3DL tripped.
Device energized, if backup supply voltage and bus voltage are higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Backup switch logic:
1DL closed, 2DL and 3DL tripped, if bus low-voltage or 1DL mis-tripped, voltage of power
supply 2 is higher than under-voltage set-point, then trip 1DL, after the un-volt. test and delay
condition of bus are satisfied, close 2DL, if 2DL closed fail, then close 3DL; if supply 2 is
low-voltage, then trip 1DL, after the un-volt. test and delay condition of bus are satisfied, close
3DL.
2DL closed, 1DL and 3DL tripped, if bus low-voltage or 2DL mis-tripped, voltage of power
supply 1 is higher than under-voltage set-point, then trip 2DL, after the un-volt. test and delay
condition of bus are satisfied, close 1DL (Only valid if bi-direction transfer is selected), if 1DL
closed fail, then close 3DL. If select single direction transfer or supply 2 is low-voltage, then trip
2DL, after the un-volt. test and delay condition of bus are satisfied, close 3DL.
Manual transfer logic:
When one of 1DL, 2DL and 3DL is closed, and the others are tripped, the manual switch function
of the device is available. The transfer logics in different transfer mode as follow:
[Series Switch]:
1DL closed, 2DL and 3DL tripped, and incomer 2 voltage is higher than under-voltage set-point,
if manual switch signal presence, trip 1DL, after the un-volt. test and delay condition of bus are
satisfied, close 2DL; if 2DL closed fail or incomer 2 is un-voltage, then close 1DL if manual switch
signal presence, after the un-volt. test and delay condition of bus are satisfied, close 3DL.
2DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, trip 2DL, after the un-volt. test and delay condition of bus are
satisfied, close 1DL, if 1DL closed fail or incomer 2 is un-voltage, then close 2DL if manual switch
signal presence, after the un-volt. test and delay condition of bus are satisfied, close 3DL .
3DL closed, 1DL and 2DL tripped, and manual switch signal presence, if incomer 1 and 2 voltage
65
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

are both or only incomer 1 voltage is higher than under-voltage set-point, , trip 3DL, after the
un-volt. test and delay condition of bus are satisfied, close 1DL, if 1DL closed fail or incomer 1 is
un-voltage and incomer 2 voltage is higher than under-voltage set-point, then trip 3DL and close
2DL
[Auto Parallel]:
1DL closed, 2DL and 3DL tripped, and incomer 2 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 2DL when the parallel synchronization condition is satisfied,
trip 1DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 2DL. (Note: The decoupling function can be applied by user customize)
2DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 2DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize)
3DL closed, 1DL and 2DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 3DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize); if 1DL
closed fail or incomer 1 is un-voltage and incomer 2 voltage is higher than under-voltage set-point,
close 2DL when the parallel synchronization condition is satisfied, trip 3DL after closed
successfully, if tripped successfully then the transfer process is over, otherwise decoupling and trip
2DL. (Note: The decoupling function can be applied by user customize)
[Semi-auto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
Note: When supply 3 used as work supply to energize the bus, the device only open the manual
switch function, and backup supply 1 take precedence over backup supply 2.
Terminal instruction:

66
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com


AC Current Value (JK1)
Code
Name
1
NC
2
NC
3
NC
4
NC
5
NC
6
NC
7
1L-I1
8
1L-I1'
9
2L-I2
10
2L-I2'
11
3L-I3
12
3L-I3'
Output(Jk5)
Code
Name
1
Public Point
2
1DL Tripping
3
1DL Closing
4
Public Point
5
2DL Tripping
6
2DL Closing
7
Public Point
8
NC
9
3DL Tripping
10
Public Point
11
NC
12
3DL Closing
13 Signal Public Point
14 Backup Switch Act
External Fault Alarm
15
16
Device Alarm
17
NC
18
NC
19
Device Blocking
20

Instruction
Not Connected
Not Connected
Not Connected
Incomer 1 Current
Incomer 2 Current
Incomer 3 Current

Instruction
1DL Breaker
Transfer Output
2DL Breaker
Transfer Output
3DL Breaker
Tripping Output
3DL Breaker
Closing Output
Central Signal
Alarm Output

AC Voltage Value (JK2)


Code
Name
Instruction
1
1M-Ua1
Bus I Phase A Voltage
2
1M-Ub1
Bus I Phase B Voltage
3
1M-Uc1
Bus I Phase C Voltage
4
NC
Not Connected
5
NC
Not Connected
6
NC
Not Connected
Incomer 1 Voltage
7
1L-U1
8
1L-U1'
9
2L-U2
Incomer 2 Voltage
10
2L-U2'
11
NC
Not Connected
12
NC
Input(JK3)
Code
Name
1
1DL Breaker Aux. Contact
2
2DL Breaker Aux. Contact
3
3DL Breaker Aux. Contact
4
NC
5
General Blocking
6
-KM
7
NC
8
NC
9
NC
10
NC
11
NC
12
NC
13
NC
14
NC
15
Signal Reset
16
Manual Switch Input

+KM Input Signal Supply 1

+KM Input Signal Supply 2


Signal Grounding

Not connected
Central Signal
Alarm Output

Note: KM select DC 220V or 110V

Figure 61 Scheme 7 terminal instruction

Scheme 8: Exclusive backup and plural reserve interconversion


Wiring diagram as figure 62:

Figure 62 Main connection

Control logic
67
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

The specialty of the scheme is that backup supply will convert to exclusive backup after
switching successfully. Exclusive backup still keep exclusive backup mode to run after switching
successfully, the device will return to plural reserve mode after manual switch successfully only.
Normal operating:
Plural reserve:
1DL closedbus I energized by supply 1 through 1DL.
2DL closedbus II energized by supply 2 through 2DL.
Bus breaker tripped, bus I, bus II backing for each other.
Device energized, if the voltage of bus I and bus II are both higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Exclusive backup:
1DL and bus breaker closed2DL tripped, bus I and bus II energized by supply 1 through 1DL
and bus switch, supply 2 is used for backup through 2DL;
2DL and bus breaker closed1DL tripped, bus I and bus II energized by supply 2 through 2DL
and bus switch, supply 1 is used for backup through 1DL (Only valid if bi-direction transfer is
selected).
Device energized, if backup supply voltage and bus voltage are higher than voltage set-point
respectively, the device begin to charge 10 s, then system enter fault monitor state.
Backup switch logic:
Plural reserve:
When bus I voltage low or 1DL mis-trip, bus II voltage is higher than under-voltage set-point,
then trip 1DL, after the un-volt. test and delay condition of bus I are satisfied, close bus breaker.
When bus II voltage low or 2DL mis-trip, bus I voltage is higher than under-voltage set-point,
then trip 2DL, after the un-volt. test and delay condition of bus II are satisfied, close bus breaker.
(Only valid if bi-direction transfer is selected)
Exclusive backup:
1DL and bus breaker closedWhen bus I and bus II voltage low or 1DL mis-trip or bus breaker
mis-trip(Only valid if switch mis-trip monitor set-point select all the switches), supply 2 voltage is
higher than under-voltage set-point, then trip 1DL or bus breaker, after the un-volt. test and delay
condition of bus I and bus II are satisfied, close 2DL.
2DL and bus breaker closedWhen bus I and bus II voltage low or 2DL mis-trip or bus breaker
mis-trip(Only valid if switch mis-trip monitor set-point select all the switches), supply 1 voltage is
higher than under-voltage set-point, then trip 2DL or bus breaker, after the un-volt. test and delay
68
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

condition of bus I and bus II are satisfied, close 1DL. (Only valid if bi-direction transfer is selected)
Manual transfer logic:
When bus breaker closed, 1DL or 2DL tripped, backup supply voltage is higher than
under-voltage set-point, the manual switch function of the device is available. The transfer logics in
different transfer mode as follow:
[Series Switch]:
2DL and bus breaker closed, 1DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip bus breaker, after the un-volt. test and delay
condition of bus I are satisfied, close 1DL;
1DL and bus breaker closed, 2DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, trip bus breaker, after the un-volt. test and delay
condition of bus II are satisfied, close 2DL;
1DL and 2DL closed, bus breaker tripped, external input signal mode 1 closed, mode 2 tripped
and bus I voltage is higher than under-voltage set-point, if manual switch signal presence, trip 2DL,
after closing delay of reserve supply switch, and close bus breaker when the bus II un-volt. test
conditions satisfied;
1DL and 2DL closed, bus breaker tripped, external input signal mode 2 closed, mode 1 tripped
and bus II voltage is higher than under-voltage set-point, if manual switch signal presence, trip 1DL,
after closing delay of reserve supply switch, and close bus breaker when the bus I un-volt. test
conditions satisfied;
[Auto Parallel]:
2DL and bus breaker closed, 1DL tripped, and incomer 1 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 1DL when the parallel synchronization condition
is satisfied, trip bus breaker after closed successfully, if tripped successfully then the transfer
process is over, otherwise decoupling and trip 1DL. (Note: The decoupling function can be applied
by user customize)
1DL and bus breaker closed, 2DL tripped, and incomer 2 voltage is higher than under-voltage
set-point, if manual switch signal presence, close 2DL when the parallel synchronization condition
is satisfied, trip bus breaker after closed successfully, if tripped successfully then the transfer
process is over, otherwise decoupling and trip 2DL. (Note: The decoupling function can be applied
by user customize)
1DL and 2DL closed, bus breaker tripped, and mode 1 voltage closed, if manual switch signal
presence, close bus breaker when the parallel synchronization condition is satisfied, trip 2DL after
69
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

closed successfully, if tripped successfully then the transfer process is over, otherwise decoupling
and trip bus breaker. (Note: The decoupling function can be applied by user customize);
1DL and 2DL closed, bus breaker tripped, and mode 2 voltage closed, if manual switch signal
presence, close bus breaker when the parallel synchronization condition is satisfied, trip 1DL after
closed successfully, if tripped successfully then the transfer process is over, otherwise decoupling
and trip bus breaker. (Note: The decoupling function can be applied by user customize);
[Semi-auto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the transfer
process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.

Terminal instruction:

70
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Figure 63 Scheme 8 terminal instruction

Scheme 9: Double backup transfer control (Exclusive backup, secondary backup supply has
PT)
Wiring diagram as figure 64:

Figure 64 Main connection


71
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

Control logic
Characteristics:
If the status of the external input value mode 1 and mode 2 are different, the work supply is
incomer 1, backup supply is determined by mode selection status. When mode 1 closed, mode 2
tripped, incomer 2 is the backup supply; When mode 2 closed, mode 1 tripped, incomer 3 is the
backup supply.
If the status of the external input value mode 1 and mode 2 are same, the close sequence of
backup supply is determined by quality of the voltage, the priority level of the voltage from high to
low isincomer 1incomer 2incomer 3the principle of backup switch is as follows:
: Incomer 2 and 3 are backup supplies, if only the voltage of incomer 2 is qualified, close 2DL;

if only the voltage of incomer 3 is qualified, close 3DL; if both the voltage of incomer 2 and 3 are
qualified, close 2DL; if close 2DL failed, then close 3DL;
: Incomer 1 and 3 are backup supplies, if only the voltage of incomer 1 is qualified, close 1DL;

if only the voltage of incomer 3 is qualified, close 3DL; if both the voltage of incomer 1 and 3 are
qualified, close 1DL; if close 1DL failed, then close 3DL;
: Incomer 3 is backup supply, if the voltage of incomer 3 is qualified, close 3DL;
: Incomer 1 and 2 are backup supplies, if only the voltage of incomer 1 is qualified, close 1DL;

if only the voltage of incomer 2 is qualified, close 2DL; if both the voltage of incomer 1 and 2 are
qualified, close 1DL.
Normal operating:
When mode 1 and mode 2 are both closed or tripped:
1DL closed, 2DL and 3DL tripped, bus energized by supply 1 through 1DL, supply 2 and 3 is
used for backup (supply 2 is primary backup, 3 is secondary backup, 2 take precedence over 3);
2DL closed, 1DL and 3DL tripped, bus energized by supply 2 through 2DL, supply 1 and 3 is
used for backup (supply 1 is primary backup, 3 is secondary back up, 1 take precedence over 3,
(Only valid if bi-direction transfer be selected); bus energized by supply 2 through 2DL, supply 3 is
used for backup (Only valid if single direction transfer be selected).
When mode 1 closed, mode 2 tripped:
1DL closed, 2DL and 3DL tripped, bus energized by supply 1 through 1DL, supply 2 is used for
backup;
2DL closed, 1DL and 3DL tripped, bus energized by supply 2 through 2DL, supply 1 is used for
backup (Only valid if bi-direction transfer be selected).
When mode 2 closed, mode 1 tripped:
72
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

1DL closed, 2DL and 3DL tripped, bus energized by supply 1 through 1DL, supply 3 is used for
backup;
3DL closed, 1DL and 2DL tripped, bus energized by supply 3 through 3DL, supply 1 is used for
backup (Only valid if bi-direction transfer be selected).
Device energized, if the voltage of bus and any backup supplies are qualified, the device begin to
charge 10 s, then system enter fault monitor state.
Backup switch logic:
When mode 1 and mode 2 are both closed or tripped:
1DL closed, 2DL and 3DL tripped, if bus low-voltage or 1DL mis-tripped, then trip 1DL, after
the un-volt. test and delay condition of bus are satisfied, close backup supply according to backup
close principle .
2DL closed, 1DL and 3DL tripped, if bus low-voltage or 2DL mis-tripped, then trip 2DL. If
bi-direction transfer is effective, after the un-volt. test and delay condition of bus are satisfied, close
backup supply according to backup close principle . If single direction transfer is effective, close
backup supply according to backup close principle .
When mode 1 closed, mode 2 tripped:
1DL closed, 2DL and 3DL tripped, if bus low-voltage or 1DL mis-tripped, then trip 1DL, after
the un-volt. test and delay condition of bus are satisfied, close 2DL.
2DL closed, 1DL and 3DL tripped, if bus low-voltage or 2DL mis-tripped, then trip 2DL, after
the un-volt. test and delay condition of bus are satisfied, close 1DL. (Only valid if bi-direction
transfer be selected)
When mode 2 closed, mode 1 tripped:
1DL closed, 2DL and 3DL tripped, if bus low-voltage or 1DL mis-tripped, then trip 1DL, after
the un-volt. test and delay condition of bus are satisfied, close 3DL.
3DL closed, 1DL and 2DL tripped, if bus low-voltage or 3DL mis-tripped, then trip 3DL, after
the un-volt. test and delay condition of bus are satisfied, close 1DL. (Only valid if bi-direction
transfer be selected)
Manual transfer logic:
When mode 1 and mode 2 are both closed or tripped:
[Series Switch]:
1DL closed, 2DL and 3DL tripped, if manual switch signal presence, trip 1DL, after the un-volt.
test and delay condition of bus are satisfied, close backup supply according to backup close
principle .
73
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

2DL closed, 1DL and 3DL tripped, if manual switch signal presence, trip 2DL, after the un-volt.
test and delay condition of bus are satisfied, close backup supply according to backup close
principle .
3DL closed, 1DL and 2DL tripped, if manual switch signal presence, trip 3DL, after the un-volt.
test and delay condition of bus are satisfied, close backup supply according to backup close
principle .
[Auto Parallel]:
1DL closed, 2DL and 3DL tripped, and incomer 2 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 2DL when the parallel synchronization condition is satisfied,
trip 1DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 2DL. (Note: The decoupling function can be applied by user customize); if
close 2DL fail, or incomer 2 un-voltage and incomer 3 voltage is higher than under-voltage
set-point, close 3DL when the parallel synchronization condition is satisfied, trip 1DL after closed
successfully, if tripped successfully then the transfer process is over, otherwise decoupling and trip
3DL. (Note: The decoupling function can be applied by user customize).
2DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 2DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize); if
close 1DL fail, or incomer 1 un-voltage and incomer 3 voltage is higher than under-voltage
set-point, close 3DL when the parallel synchronization condition is satisfied, trip 2DL after closed
successfully, if tripped successfully then the transfer process is over, otherwise decoupling and trip
3DL. (Note: The decoupling function can be applied by user customize).
3DL closed, 1DL and 2DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 3DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize); if 1DL
closed fail or incomer 1 is un-voltage and incomer 2 voltage is higher than under-voltage set-point,
close 2DL when the parallel synchronization condition is satisfied, trip 3DL after closed
successfully, if tripped successfully then the transfer process is over, otherwise decoupling and trip
2DL. (Note: The decoupling function can be applied by user customize)
[Semiauto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
74
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

transfer process is over.


[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
When mode 1 closed, mode 2 tripped:
[Series Switch]:
1DL closed, 2DL and 3DL tripped, and incomer 2 voltage is higher than under-voltage set-point,
if manual switch signal presence, trip 1DL, after the un-volt. test and delay condition of bus are
satisfied, close 2DL.
2DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, trip 2DL, after the un-volt. test and delay condition of bus are
satisfied, close 1DL when the bus un-volt. test conditions satisfied.
[Auto Parallel]:
1DL closed, 2DL and 3DL tripped, and incomer 2 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 2DL when the parallel synchronization condition is satisfied,
trip 1DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 2DL. (Note: The decoupling function can be applied by user customize).
2DL closed, 1DL and 3DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 2DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize).
[Semi-auto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.
When mode 2 closed, mode 1 tripped:
[Series Switch]:
1DL closed, 2DL and 3DL tripped, and incomer 3 voltage is higher than under-voltage set-point,
if manual switch signal presence, trip 1DL, after the un-volt. test and delay condition of bus are
75
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

satisfied, close 3DL.


3DL closed, 1DL and 2DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, trip 3DL, after the un-volt. test and delay condition of bus are
satisfied, close 1DL.
[Auto Parallel]:
1DL closed, 2DL and 3DL tripped, and incomer 3 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 3DL when the parallel synchronization condition is satisfied,
trip 1DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 3DL. (Note: The decoupling function can be applied by user customize).
3DL closed, 1DL and 2DL tripped, and incomer 1 voltage is higher than under-voltage set-point,
if manual switch signal presence, close 1DL when the parallel synchronization condition is satisfied,
trip 3DL after closed successfully, if tripped successfully then the transfer process is over, otherwise
decoupling and trip 1DL. (Note: The decoupling function can be applied by user customize).
[Semi-auto Parallel]:
The parallel closing process is the same as [Auto Parallel], if closing successfully then the
transfer process is over.
[Parallel & Series]:
Detect the parallel synchronization conditions as the [Auto Parallel] logic, if the synchronization
conditions can not satisfied in the detect delay then choose [Series Switch].
After manual switch, the device will return to normal operating mode.

Terminal instruction:

76
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com


AC Current Value (JK1)
Code
Name
1
NC
2
NC
3
NC
4
NC
5
NC
6
NC
7
1L-I1
8
1L-I1'
9
2L-I2
10
2L-I2'
11
3L-I3
12
3L-I3'
Output(Jk5)
Code
Name
1
Public Point
2
1DL Tripping
3
1DL Closing
4
Public Point
5
2DL Tripping
6
2DL Closing
7
Public Point
8
NC
9
3DL Tripping
10
Public Point
11
NC
12
3DL Closing
13 Signal Public Point
14 Backup Switch Act
External Fault Alarm
15
16
Device Alarm
17
NC
18
NC
19
Device Blocking
20

Instruction
Not Connected
Not Connected
Not Connected
Incomer 1 Current
Incomer 2 Current
Incomer 3 Current

Instruction
1DL Breaker
Transfer Output
2DL Breaker
Transfer Output
3DL Breaker
Tripping Output
3DL Breaker
Closing Output
Central Signal
Alarm Output

AC Voltage Value (JK2)


Code
Name
Instruction
1
1M-Ua1
Bus I Phase A Voltage
2
1M-Ub1
Bus I Phase B Voltage
3
1M-Uc1
Bus I Phase C Voltage
4
3L-U3
Incomer 3 Voltage
5
3L-U3'
6
NC
Not Connected
Incomer 1 Voltage
7
1L-U1
8
1L-U1'
9
2L-U2
Incomer 2 Voltage
10
2L-U2'
11
NC
Not Connected
12
NC
Input(JK3)
Code
Name
1
1DL Breaker Aux. Contact
2
2DL Breaker Aux. Contact
3
3DL Breaker Aux. Contact
4
NC
5
General Blocking
6
-KM
7
Mode 1
8
Mode 2
9
NC
10
NC
11
NC
12
NC
13
NC
14
NC
15
Signal Reset
16
Manual Switch Input

+KM Input Signal Supply 1

+KM Input Signal Supply 2


Signal Grounding

Not connected
Central Signal
Alarm Output

Note: KM select DC 220V or 110V

Figure 65 Scheme 9 terminal instruction

77
Tel (0755)83416189 ,83663989
Fax (0755)83663603
website http://www.szidd.com

You might also like