You are on page 1of 221

Note Submitted :

Sir,

Sub:- Construction of Post Matric Hostel for girls at Paloncha (V&M) in Khammam District- Detailed
Estimate - Technical Sanction - Rs 128.81 Lakhs - Reg.
Ref :- 1. GO Rt No. 345 dated 06-07-2012 of School Education (SE-PROG 1) Dept, Andhra Pradesh, Hyd,
2. Lr. No: AE1/SE/APEWIDC/HYD/MS-GH/WGL, Dtd 18.9.2012 of the Superintending Engineer,
APEWIDC.
*******
*******
The Principal Secratary to Government, Education(SE-PROG.I) Dept., Government of Andhra Pradesh,
Hyderabad have accorded Administrative Sanction for Construction of (355) Girls hostel Buildings in the
premises of Model Schools through G.O.Rt. No. 345, Dated 06-07-2012 with a unit cost of Rs. 1.288 Crores in
various Places in Andhra Pradesh, includingConstruction of Post Matric Hostel for girls at Paloncha (V&M) in
Khammam District

The Funding Pattern is : 90% of the capital cost will be borne by the Central Government and the
balance 10 % will be provided by the State Government. While planning and designing the building and other
infrastructure for the model school attached Girls hostel buildings all standard norms were adopted thous
altogether 32 rooms are to be constructed with following provisions:

Description
Living rooms with sit-out
Bath rooms with WCs

No of
Rooms
25
16

6.22

Room
Size
x
3.65

1.38

2.31

Area in
Sqm
567.58
51.00

Bath rooms with WCs for


differently able students

2.38

1.51

3.59

Kitchen with Store

6.10

5.08

30.99

Dining Hall

6.10

6.10

37.21

(a). Office Room & Kitchen

6.10

3.65

22.27

(b). Bed Room

3.55

3.76

13.35

1
1

6.10
6.10
3.05

x
x
x

Generator Room

3.05

Medical Check-up -CumVisitors Room

2.43

Wardens room - cumOffice

Mini Library-cum- Reading


Room
Recreation Room
Security Room

3.05
3.05
3.05

18.61
18.61
9.30

3.05

9.30

3.65

8.87
790.68

The total plinth area of the builidng including walls & circulation area is arrived as 1097.00 Sqmt
are 11803.00 Sft.

Civil works include construction of security room , Generator room, compound wall and gate, septic tank,
drinking water facilities, electrification including fixtures. This estimate is prepared adopting the type design
communicated . The total plinth area is 1117.14 Sft
Vide reference 2nd cited the Superintending Engineer has submitted the detailed estimate duly adopting
the type design.

The Detailed Estimate is prepared with the following common provisions:


A)

Foundations and Sub-Structure:

SBC is adopted @200KN/SQMT as per recommendation of the Superintending Engineer based on


field inspection.
1. Earth work excavation in all types of soils for open foundations
2. P.C.C (1:5:10) prop: nominal mix for levelling course in foundations and as bed

concrete for flooring.

3. P.C.C (1:4:8) prop: nominal mix for foundations for columns.


4. VRCC M 20 grade design mix ( by weigh batching), using 20mm HBG machine

crushed graded metal for Footings, Pedestals, Plinth beams and Columns up to plinth level.

5. Random Rubble Stone masonry in CM(1:8) prop, for basement.


6. Filling with useful available excavated earth in trenches, sides of foundations and for basement filling.
7. Flush pointing to RRS masonry in CM (1:3) for basement.
B)

Superstructure:

1. VRCC M 20 grade design mix ( by weigh batching), using 20mm HBG machine crushed graded metal

for Columns, Roof Beams, Roof Slabs.

2. Providing HYSD bars Fe 415 for all diameters more than 6mm for VRCC & RCC work.
3. Providing Mild Steel Fe 250 for 6mm bars for VRCC & RCC work.
4. P.C.C (1:3:6) prop: nominal mix for Bed Blocks and Hold Fasts.
5. RCC (1:2:4) prop. Nominal mix using 12mm HBG machine crushed graded metal for Lintels, 50mm

thick platforms.

6. RCC M 25 grade design mix ( by weigh batching), using 20mm HBG machine crushed graded metal

for sun shades, 7.5cm thick at fixed end and 5.0 cm thick at free end, of any width as per approved
plan.
7. PCC M20 grade Design Mix ( by weigh batching), using 20mm HBG machine crushed graded metal
for steps .
8. Brick masonry in CM(1:8) prop. using 2nd class traditional bricks for Superstructure.
9. Reinforced Brick masonry 115mm thick in CM(1:4) prop. using 2nd class traditional bricks for

Partition walls.

10. Plastering 12 mm thick in two coats, base coat 8mm thick in CM(1:6) and top coat 4mm thick in

CM(1:4) for even face of walls.

11. Plastering 20 mm thick in two coats, base coat 16mm thick in CM(1:6) and top coat 4mm thick in

CM(1:4) for uneven face of walls.

12. Ornamental Plastering to ceiling, 12 mm thick in single coat in CM(1:4).


13. Providing impervious coat over RCC roof slab, in side of septic tank to required slopes with CM (1:3)

prop. 20 mm thick (average) mixed with water proofing compound.

14. Flooring with Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) set over a

base coat of CM (1:8), 12mm thick over already laid C.C. bed or R.C.C. roof slabs.

15. Flooring with Ceramic non-skid tiles of 7.3 mm thick 1st. quality of any shade set over a base coat of

CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab.

16. Providing Skirting to internal walls to 12.5 cm height with Rough Kadapa slabs of minimum 40 mm

thick, size not less than (0.457 x 457M) slabs 15mm to 18mm thick.

17. Dadooing to walls with coloured glazed tiles 1st. quality of size not less than 300mm x 200mm.
18. Flooring with 15 to 18mm thick high polished granite stone slabs of blue colour.
19. Whiting to new walls and ceiling in two coats with Birla white or equavalent quality for internal walls.
20. Painting with Plastic emulsion grade -1 paint to exterior faces of new walls with 3 coats of approved

make shade and colour.

21. Painting to wood work, flush shutters with luppam finish.


22. Painting two coats with synthetic enamel paint 1st grade to new iron work.
23. Supply and Fixing of Door with Double leaf shutter, Door Size 2.00x2.13 mtrs with Sal wood Frame

of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with
commercial ply on both faces of 35mm thick including all fixtures.

24. Supply and Fixing of Door with Double leaf shutter, Door Size 1.22x2.13 mtrs with Sal wood Frame

of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with
commercial ply on both faces of 35mm thick including all fixtures.

25. Supply and Fixing of Door with Double leaf shutter, Door Size 1.00x2.13 mtrs with Sal Wood Frame

of sections size 75mm x 100mm with Flush Door Shutters Solid Bond Wood black board type with
commercial ply on both faces of 35mm thick including all fixtures.

26. #REF!

27. #REF!

28. NCL or Equivalent Eco 3000 Series Windows with Galvalume Corrugated sheet with

i) Centre fixed both side openable shutter (1500 mm x 1350mm ) (W1)


ii) Double shutter 900 mm x 1350 mm outer frame (W3).
Supply
and fixing of MS Ventilators with sections made of MS angles of 25mm X 25mm X 3mm and
29.
10mm X 10mm square rods ( Sizes: 1200 mm x 450 mm & 900 mm x 450 mm).

AMENITIES:

1. The Superintending Engineer has submitted the sub-estimate for Water supply and Sanitary

Arrangements as per the requirements based on approved plan and the same may be allowed.

2. The Superintending Engineer has submitted the sub-estimate for Internal Electrification as per

the requirements based on approved plan and the same may be allowed.

DATAS & RATES:

The Data of all the items are adopted as per the Revised Standard Data Part-III (Buildings) and
the rates are worked out based on current SSR i.e Building SSR 2011-2012. Cement and Steel rates are
adopted as approved by the committee of the Chief Engineers for the month of August 2012.

SPECIFICATIONS:
The Standard specifications as per APSS are adopted and the work will be carried out true to the
relevant standard specification of APSS and as per the agreement conditions.
Quarries:
The Superintending Engineer has proposed 20 % on labour charges towards Agency area allowence and
necessaey certificate is enclosed in the lead chart, hence the same may be allowed on the responsibilty of the SE,
APEWIDC Guntur
Overhead Charges & Contractors Profit:
14% towards overhead charges and contractors profit put together has been proposed by the SE
APEWIDC Guntur in the estimates which is as per the Revised Standard Data - Part-III (Buildings),
ordered by the Government of A.P vide G.O.Ms.No.49, IRRIGATION & CAD (PW-REFORMS)
DEPARTMENT Dated: 2-3-2009, for adoption by all Engineering /Public Works Departments and
other organizations. Hence the same may be allowed.
VAT:
Lump sum amounts at the rate of 5% towards VAT has been added in the Abstracts of all the estimates
by the SE APEWIDC,Guntur, which is as per the Revised Standard Data - Part-III (Buildings), and the
same will be allowed at 5% of ECV.
The SE has proposed following other provisions in the estimate
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

:
:
:
:
:
:

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

The SE has proposed following Lumpsum provisions in the estimate


The estimate is submitted for according technical sanction.
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

:
:

#REF!

#REF!

#REF!

#REF!

The Estimate is scrutinized and here-with put up for kind perusal and for according technical sanction for
Rs128.81 Lakhs. The Draft 'Bill of Quantites' and BID document is also here-with put for kind perusal and
approval.

AE/AEE

Dy. EE

EE

SE

CE

Estimate

Name of the Work

Construction of Post Matric Hostel for girls at


Paloncha (V&M) in Khammam District

Estimate Cost Rs. 128.81 Lakhs

Section

: Badangi

Sub-Division

: Vizianagaram

Division

: Vizianagaram

Circle

: Guntur

A.P.E.& W.I.D.C: Engineering Department

SPECIFICATION REPORT
Estimated cost Rs. 128.81 Lakhs.
Name of work:

Construction of Post Matric Hostel for girls at Paloncha


(V&M) in Khammam District

Authority:
The Principal Secratary to Government, Education(SE-PROG.I) Dept., Government of
Andhra Pradesh, Hyderabad have accorded Administrative Sanction for Construction of
(355) Girls Hostels attached to Model Schools vide G.O.Rt. No. 345, Dated 06-07-2012
with a unit cost of Rs. 1.288 Crores

in various Places in Andhra Pradesh,

includingConstruction of Post Matric Hostel for girls at Paloncha (V&M) in Khammam


District, with a funding pattern of 90% of Central Share and 10% of State Share
While planning and designing the building and other infrastructure for the model
schools specification as stipulated by GOI, specified norms are adopted. A
Model Plan is preprared as per the scheme norms of Girls Hostel. The hostel is
proposed to accommodate 100 students in G+1 with following accommadation.
As per the Girls hostel norms, altogether, 34 rooms are to be constructed as
follows:
Living Rooms with sitout &drying space
Library cumReading room

:
:

25 nos
1 nos

Recreation room

1 nos

Medical checkup Room


Kitchen
Dining hall
Residential accomdation for warden
Security room
Generator room
Office Room
Toilets with bath
Toilets for specially need students

:
:
:
:
:
:
:
:
:

1 nos
1 no.
1 no.
1 no.
1 no.
1 no.
1 no.
16 no.
1 no.

The estimate is prepared dully adopting the type design prepared by the
APEWIDC and approved by the Govt. of India. The required accomdation is
propoaed in Ground floor and first floor

Civil works include construction of security room , Generator room, compound


wall and gate, septic tank, drinking water facilities, electrification including
fixtures. This estimate is prepared adopting the type design communicated .
The total plinth area is 1117.14 Sft

Provisions:
The Detailed Estimates are prepared with the following common provisions:
A)

Foundations and Sub-Structure:


SBC is adopted @200KN/SQMT as per recommendation of the Superintending
Engineer based on field inspection and sbc report.

1. Earth work excavation in all types of soils for open foundations


2. P.C.C (1:5:10) prop: nominal mix for levelling course in foundations and as bed
concrete for flooring.
3. P.C.C (1:4:8) prop: nominal mix for foundations for columns.
4. VRCC M 20 grade design mix ( by weigh batching), using 20mm HBG machine
crushed graded metal for Footings, Pedestals, Plinth beams and Columns up to
plinth level.
5. Random Rubble Stone masonry in CM(1:8) prop, for basement.
6. Filling with useful available excavated earth in trenches, sides of foundations
and for basement.
7. Flush pointing to RRS masonry in CM (1:3) for basement.
B)

Superstructure:
1. VRCC M 20 grade design mix ( by weigh batching), using 20mm HBG machine
crushed graded metal for Columns, Roof Beams, Roof Slabs.
2. Providing HYSD bars Fe 415 for all diameters more than 6mm for VRCC & RCC
work.
3. Providing Mild Steel Fe 250 for 6mm bars for VRCC & RCC work.
4. P.C.C (1:3:6) prop: nominal mix for Bed Blocks and Hold Fasts.
5. RCC (1:2:4) prop. Nominal mix using 12mm HBG machine crushed graded
metal for Lintels, 50mm thick platforms.

6. RCC M 25 grade design mix ( by weigh batching), using 20mm HBG machine
crushed graded metal for sun shades, 7.5cm thick at fixed end and 5.0 cm thick
at free end, of any width as per approved plan .
7. PCC M20 grade Design Mix ( by weigh batching), using 20mm HBG machine
crushed gradedmetal for steps .
8. Brick masonry
Superstructure.

in

CM(1:8)

prop.

using

2nd

class

traditional

bricks

for

9. Reinforced Brick masonry 115mm thick in CM(1:4) prop. using 2 nd class


traditional bricks for Partition walls.
10. Plastering 12 mm thick in two coats, base coat 8mm thick in CM(1:6) and top
coat 4mm thick in CM(1:4) for even face of walls.
11. Plastering 20 mm thick in two coats, base coat 16mm thick in CM(1:6) and top
coat 4mm thick in CM(1:4) for uneven face of walls.
12. Ornamental Plastering to ceiling, 12 mm thick in single coat in CM(1:4).
13. Providing impervious coat over RCC roof slab, in side of septic tank to required
slopes with CM (1:3) prop. 20 mm thick (average) mixed with water proofing
compound.
14. Flooring with Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x
0.457M) set over a base coat of CM (1:8), 12mm thick over already laid C.C.
bed or R.C.C. roof slabs.
15. Flooring with Ceramic non-skid tiles of 7.3 mm thick 1st. quality of any shade
set over a base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C.
slab.
16. Providing Skirting to internal walls to 12.5 cm height with Rough Kadapa slabs
of minimum 40 mm thick, size not less than (0.457 x 457M) slabs 15mm to
18mm thick.
17. Dadooing to walls with coloured glazed tiles 1st. quality of size not less than
300mm x 200mm.
18. Flooring with 15 to 18mm thick high polished granite stone slabs of blue colour.
19. Providing Green Chalk Board of size 3.00 x 1.2 mm including border with
palstering in CM (1:2) 12 mm thick as base coat and 3 mm thick top coat with
cement green oxide powder in (1:1) prop.
20. Whiting to new walls and ceiling in two coats with Birla white or equavalent
quality for internal walls.
21. Painting with Plastic emulsion grade -1 paint to exterior faces of new walls with
3 coats of approved make shade and colour.

22. Painting to wood work, flush shutters with luppam finish.


23. Painting two coats with synthetic enamel paint 1st grade to new iron work.
24. Supply and Fixing of Medium Teak Wood Main Door with Double leaf shutter and
grilled & Glazed side panel is proposed. Door Size is 4.00x2.13 mtrs with
Medium teak wood Frame and Medium teak wood Shutters. Fixtures are of
brass metal for elegant look and q
25. Supply and Fixing of Door with Single leaf shutter, Door Size 1.22x2.13 mtrs
with Sal Wood Frame of sections size 75mm x 100mm with Flush Door Shutter
Solid Bond Wood black board type with commercial ply on both faces of 35mm
thick.
26. Supply and Fixing of Door with Single leaf shutter, Door Size 1.00x2.13 mtrs
with Sal Wood Frame of sections size 75mm x 100mm with Flush Door Shutter
Solid Bond Wood black board type with commercial ply on both faces of 35mm
thick.
27. #REF!

28. #REF!

29. NCL or Equivalent Eco 3000 Series Windows with Galvalume Corrugated sheet
with
i) Centre fixed both side openable shutter (1500 mm x 1350mm ) (W1)
ii) Double shutter 900 mm x 1350 mm outer frame (W3).
30. Supply and fixing of MS Ventilators with sections made of MS angles of 25mm
X 25mm X 3mm and 10mm X 10mm square rods ( Sizes: 1200 mm x 450 mm
& 900 mm x 450 mm).
AMENITIES:
1) Sub-Estimate is prepared for Water supply and Sanitary Arrangements as per
the requirements based on approved plan.
2) Sub-Estimate is prepared for Internal Electrification as per the requirements
based on approved plan.

DATAS & RATES:


The Data of all the items are adopted as per the Revised Standard Data Part-III
(Buildings) and the rates are worked out based on current SSR i.e Building SSR 20112012. Cement and Steel rates are adopted as approved by the Committee of the Chief
Engineers for 0
SPECIFICATIONS:
The Standard specifications as per APSS are adopted and the work will be
carried out true to the relevant standard specification of APSS and as per the agreement
conditions.
Quarries:
The nearest leads, quarries are adopted while preparing the Datas, and as per
the location of the site 20 % allowance on labour is proposed towards Agency area
allowence
Overhead Charges & Contractors Profit:
14% towards overhead charges and contractors profit put together has been
proposed in the estimates which is as per the Revised Standard Data - Part-III
(Buildings), ordered by the Government of A.P vide G.O.Ms.No.49, IRRIGATION
& CAD (PW-REFORMS) DEPARTMENT Dated: 2-3-2009, for adoption by all
Engineering /Public Works Departments and other organizations.

Lump sum amounts at the rate of 5% towards VAT has been added in the
Abstracts of all the estimates by the SE APEWIDC,Guntur, which is as per the
Revised Standard Data - Part-III (Buildings), and the same will be provided at
5% of ECV.
LUMP SUM PROVISIONS:
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

The estimate is submitted for according technical sanction.

AEE/AE

Dy. Executive Engineer

Executive Engineer

TW/ Gundala

TW/SD/ Sudimalla

TW/Division/
Bhadrachalam

0
0

SPECIFICATION REPORT
Specification Report accompanying the work " Special Repairs to ZPHS in Tekulapalli (V) and
Tekulapalli (M) in Khammam District " Was administratively sanctioned for Rs. 12.00Lakhs vide
proceedings RC No. 767/C4/2012 Dt: 16.04.2013 by DEO Khammam Maintenance of High schools in
Khammama District.
The estimate is prepared with following provisions
1

DISMANTLING clearing away and carefully stacking materials useful for reuse. Brick Masonary including
Cost and conveyence of all charges for clearing away the debris etc.,

DISMANTLING clearing away and carefully stacking materials useful for reuse old cement plastering
including Cost and conveyence of all charges for clearing away the debris etc.,

Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed
hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials
like cement, fine aggregate (sand) coarse aggregate, water etc., complete for Lintels

Lintels
Sunshades
Roof Beams
Roof Slab 115 mm Thick
Roof Slab 100 mm Thick
Wearing Coat 50 mm Thick

5
6
7
8
9
10

Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11 x 7 Cm from
approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all
materials etc., complete for finished item of work.

11

Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in
CM (1:4) dubara sponge finish including cost and conveyance of all materials , etc., for Uneven Surfaces
of Brick Wall complete for finished item of work. (APSS 901,903 & 904)

12

Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size
Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and
conveyance of all materials like etc., complete for finished item of work. (APSS No. 402).

13

Flooring with Polished Black Kadapa slabs minimum of 15 mm thick (0.457M x 0.457M) set over a base
coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof
slab only after it is properly cured, etc., complete for finished item of work.(APSS No.703 & 701)

14

Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1979) of different
diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and
shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with
binding wire of 18 SWG, etc., complete for finished item of work in all floors. (APSS No.126)

15

Supply and Fixing of non teak wood door of size 1.05 x 1.95 with fully pannealed including cost and
conveyence of all charges
Supply and Fixing of non teak wood Window of size 0.45 x 1.06 with fully pannealed including cost and
conveyence of all charges
Supply and Fixing of non teak wood Window of size 0.40x1.22 m with fully pannealed including cost and
conveyence of all charges

16
17
18

L.S. Provision for unforseen items


The Detailed Estimate is Prepared with Current SSR 2013-14
Eartly Technical Sanction is solicited

Asst. Engineer
TW/ Gundala

Dy. Executive Engineer


TW/ SD/Sudimalla

Executive Engineer
TW/ Division/Bhadrachalam

Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem,
Khammam District

GENERAL ABSTRACT
Sl. No.

As per Working
Estimate

Description of Item

01

Construction of Sub division Office (GF )

4646573.00

02

Construction of Division Office (FF )

3305345.00

03

Construction of Superintending Engineer


Camp Office (SF )

1730785.00

04

Septic Tank

05

Compound wall

181370.00
1232679.00
11096752.00

06

Water supply & Sanitary at 12%

1331610.00

07

Electrification at 12%

1331610.00
Sub-Total ::

13759972.00
13759972.00

08

VAT @ 5%

687999.00

09

QC charges @ 0.50%

10

Price Adjustment

11

Inauguaration and foundation stone And


Name board

10000.00

12

Power connection charges

15000.00

13

Unforeseen & rounding off

108229.00

68800.00
350000.00

TOTAL ::

Asst. Engineer
PR Kothagudem

Dy.Executive Engineer
PR.SD Kothagudem

15000000.00

Executive Engineer
PR Division Kothagudem

Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem, Khammam District
Construction of Sub division Office (GF )
Sl.
No.
1
1

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

2
3
4
5
6
7
Earth work excavation for foundations and depositing on bank for all lifts and with an initial
lead of 10m including all operational, incidental, seigniorage charges, labour charges such as
shoring ,sheeting, planking, strutting, dewatering etc. complete for finished item of work as
per SS - 20 B (APSS 308). for Building Foundation

F1
F2

PEDASTALS
F1
F2

1
1

1
1

24
8

24
8

2.40
2.00

24
8

24
8

2.40
2.00

2.40
2.00

2.20
1.80

0.60
0.60

2.40
2.00

2.20
1.80

0.90
0.90

Amount
2013-14

2.40
2.00

253.90

100488

3524.40

89999

69.696
11.664
81.36 cum

7721.50

628221

9.720
3.240
12.96 cum

8038.70

104182

12.395
2.484
6.458
1.130
0.828
23.30 cum

9719.05

226405

20.736
4.800
25.54 cum
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement content
@ 380Kgs/Cum from standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Footings, Pedastal, Plinth beam

FOOTINGS
F1
F2

1
1

Rate

331.776
64.000
395.78 cum
Plain Cement Concrete (1:4:8) proportion (cement: fine aggregate: Coarse aggregate) using
40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry
including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc.
to site, mixing concrete in concrete mixer including seigniorage charges, sales & other taxes
on all materials, all operational, incidental, and labour charges such as laying and ramming
concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc.,
complete for finished item of work. (APSS No. 402).

F1
F2

1
1

UNIT

0.15
0.15

0.600
0.450

0.750
0.750

PLINTH BEAMS
Long walls
Cross walls

294427110.xls

1
1
1
1
1

6
5
13
2
2

19.960
4.800
4.800
5.460
4.000

- GF

0.230
0.230
0.230
0.230
0.230

0.450
0.450
0.450
0.450
0.450

17 of 221

Sl.
No.
1
3

DESCRIPTION OF ITEM

D/H

Quantity

2
3
4
5
6
7
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement content
@ 380Kgs/Cum from standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Columns

Upto GL
C1
C2
Above GL up to plinth
C1
C2
up to roof
C1
C2

NO'S

UNIT

Rate

1
1

24
8

0.23
0.23

0.575
0.375

1.050
0.650

3.333
0.449

1
1

24
8

0.23
0.23

0.575
0.375

0.900
0.900

2.857
0.621

1
1

24
8

0.23
0.23

0.575
0.375

3.000
3.000

9.522
2.070
18.85 cum

Amount
2013-14

9807.85

184898

9980.85

13085

Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost
and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including
all operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering, shuttering, laying
concrete, curing etc. complete for Lintels

Ground Floor
Over doors
Over windows

1
1

7
12

1.5
1.5

0.23
0.23

0.200
0.200

0.483
0.828
1.31 Cu.M.

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement content
@ 380Kgs/Cum from standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Beams

Long walls

Cross walls

Portico
294427110.xls

1
1
2
2
2
1
1

4
2
3
5
2
10
2

19.960
4.800
2.000
4.800
8.920
2.000
4.000
- GF

0.23
0.23
0.23
0.23
0.23
0.23
0.23

0.450
0.450
0.450
0.450
0.450
0.300
0.450

8.260
0.990
1.240
4.970
3.690
1.380
0.830
18 of 221

Sl.
No.

DESCRIPTION OF ITEM

NO'S

3
1

4
5.000

5
0.23

D/H
6
0.450

Quantity
7

UNIT

8
0.520
21.88 Cu.M.

Rate

Amount
2013-14

9
9150.25

200207

1
1

1
2

4.80
4.60

2.20
1.50

10.560
13.800
24.36 Sqm

1382.30

33673

1100.40

855759

786.15

14434

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement content
@ 380Kgs/Cum from standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm thick

Ground Floor Slab


Ground Floor Slab
Portico

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement content
@ 380Kgs/Cum from standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Slab of 175mm thick

Landing
Flights

2
1

1
1

19.96
5.00

18.98
4.00

757.680
20.000
777.68 Sqm

Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost
and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including
all operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering, shuttering, laying
concrete, curing etc. complete for Sunshades / Chajjas for 75mm thick at Fixed end and 50mm
thick at Free end and for a width of 0.60 Mts. etc complete for finished item of work.

Ground Floor
1
1
1

294427110.xls

10
2
2

1.50
5.00
2.80

- GF

0.60
0.60
0.60

9.00
6.00
3.36
18.36 Sqm

19 of 221

Sl.
No.
1
9

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

2
3
4
5
6
7
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11
x 7 Cm from approved source having minimum crushing strength of 40 Kg/Sqcm. including
cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges,
curing, etc., complete for finished item of work.

294427110.xls

- GF

UNIT

Rate

Amount
2013-14

20 of 221

Sl.
No.
1

DESCRIPTION OF ITEM
2
Ground Floor
Up to Basement
Long walls
cross walls
cross walls

Super structure
Long walls
cross walls
cross walls

NO'S

D/H

Quantity

UNIT

Rate

1
2
2
1
1

1
2
2
1
1
1
1

4
5
2
2
2

19.96
4.8
6.46
5.46
4

0.23
0.23
0.23
0.23
0.23

0.90
0.90
0.90
0.90
0.90

4
5
2
2
2
7
11

19.96
4.80
6.46
5.46
4.00
1.20
1.20

0.23
0.23
0.23
0.23
0.23
0.23
0.23

3.00
3.00
3.00
3.00
3.00
2.10
1.35

0.900
9.940
5.350
2.260
1.660
20.11 Cu.M.

0.900
33.120
17.830
7.530
5.520
Deduction doors
-4.060
Deduction windows
-4.100
56.74 Cu.M.
76.85 Cu.M.
Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using second class bricks of size 23 x
11 x 7 Cm having a crushing strength of not less than 35.00kg/cm2 and using two mild steel
bars of 6m dia in every third layer of brick masory, with free joints of the main block work
including cost and seignorage charges and conveyance of all materials and water from
approved sources to work site and all operational, incidental, labour charges such as
scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but
excluding the cost of steel and its fabrication charges
Ground floor
Toilet

10

2
2
2
2

5.760
3.600
Railing
7.380
Deduction
-2.930
13.81 Cum
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 17861979) of different diameters for RCC works, including labour charges for straightening,
cutting, bending to required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming
grills for reinforcement work as per approved designs and drawings, including cost and
conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer
bars including cost and conveyance of binding wire, cover blocks and all incidental,
operational, laour charges such as cutting, bending placing in position, tying including sales
and other taxes on all materials etc., complete for finished item of work in all floors. (APSS
No.126)

1
1
1
1

1.44
0.90
4.10
0.75

Amount
2013-14

4415.80

339354

554.20

7654

61763.00

1111734

2.00
2.00
0.90
1.95

Ground Floor ::
18.00 Mts
11

Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials
like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all
materials, all operational, incidental and labour charges such as mixing mortar,scaffolding
charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for
finished item of work. (APSS 901,903 & 904)
Ground Floor
DE Room

294427110.xls

2 (7.03+4.8)

- GF

3.60

85.180

21 of 221

Sl.
No.
1

DESCRIPTION OF ITEM
2
Anti room
Computer Room
Staff Room
SO Room
Toilets Room

294427110.xls

NO'S
3
1
1
1
1
2

2
2
2
2
2

4
(2.4+4.8)
(4.8+4.8)
(4.8+6.23)
(4.8+7.03)
(2.2+4.8)

- GF

D/H
6
3.60
3.60
3.60
3.60
3.60

Quantity
7
51.840
69.120
79.420
85.180
103.680

UNIT

Rate

Amount
2013-14

22 of 221

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

UNIT

Rate

2.00
1.35
0.45

-16.800
-17.820
-1.080
438.72 Sqm

Deductions Doors
Windows.
Ventilator

12

Portico

1.20
1.20
0.60

317.40

139250

1
1
1
1
1
2
1
1
1
1

1
1
1
1
1
1
1
1
2
1

7.03
2.54
4.80
4.80
4.80
2.20
14.49
9.46
2.00
5.00

4.80
4.80
4.80
6.23
7.03
4.80
2.00
2.00
4.46
4.00

33.740
12.190
23.040
29.900
33.740
21.120
28.980
18.920
17.840
20.000
239.47 Sq.M.

146.10

34987

215.15

75401

1026.68

225325

Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials
like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all
materials,all operational, incidental and labour charges such as mixing mortar, scaffolding
charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer
- in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of
work. (APSS 901,903 & 904)

long wall
cross walls
14

1
1
2

Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost
and conveyance of all materials like cement, sand, water etc., to site, including seigniorage
charges, sales & other taxes on all materials, all operational, incidental charges and labour
charges such as mixing mortar, finishing, curing, etc., complete for finished item of work.
(APSS 901,906)
Ground Floor
DE Room
Anti room
Computer Room
Staff Room
SO Room
Toilets Room
Corrider

13

7
11
2

Amount
2013-14

179.640
170.820
350.46 Sqm
Flooring and Treads with Polished shabad / Tandur stone minimum 15 to 18 mm thick of size
(0.254M x0.254M) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab,
including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed
with neat cement to full depth including cost of all materials like cement, sand, and water and
flooring stones etc., complete, including seigniorage charges, labour charges for dressing of
flooring stones etc., complete for finished item of work, .
DE Room
Anti room
Computer Room
Staff Room
SO Room
Toilets Room
Corrider

294427110.xls

1
1

1
1
1
1
1
2
1
1
1

2
2

1
1
1
1
1
1
1
1
2

19.96
18.98

7.03
2.54
4.80
4.80
4.80
2.20
14.49
9.46
2.00

- GF

4.50
4.50

4.80
4.80
4.80
6.23
7.03
4.80
2.00
2.00
4.46

33.740
12.190
23.040
29.900
33.740
21.120
28.980
18.920
17.840
219.47 Sq.M.

23 of 221

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

UNIT

Rate

15

Providing Skirting to internal walls and Risers of Steps to 15 cm height with Polished
shabad / Tandur stone minimum 15 to 18 mm thick of size (0.254M x0.254M) length equal to
flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like
consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed
with pigment of matching shade to full depth, including cost of all materials like tiles, cement,
sand and water etc., complete including seigniorage charges, etc., complete for finished item
of work,
Ground Floor
DE Room
Anti room
Computer Room
Staff Room
SO Room
Toilets Room

16

1
1
1
1
1
2

2
2
2
2
2
2

(7.03+4.8)
(2.4+4.8)
(4.8+4.8)
(4.8+6.23)
(4.8+7.03)
(2.2+4.8)

0.10
0.10
0.10
0.10
0.10
0.10

2.370
1.440
1.920
2.210
2.370
2.880
13.19 Sqmt

994.30

13115

8843.04

61901

6737.86

74116

DOORS AND WINDOWS


Supply and fixing of Door size 1.05 x 2.00 M Single Leaf with Door Frame of Medium Teak
wood Section 100 mm x 75 mm and shutter of 35mm thick of solid bond wood block board
type with commercial play on both faces, Hardware fixtures ie., MSPC Butt Hinges 150mm
Long 6 nos, MSPC Handles 150 mm Long 2 Nos MSPC Tower Bolt 300mm long 1
Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos including Including Labour
charges for making of door, fixing of fixtures etc., and cost and conveyance of all materials to
site, taxes extra for finished item of work.

Ground Floor
Ground Floor for Door

17

Amount
2013-14

1 X 7

7.00
7.00 Sqm

Supply and fixing of Window of Size 1.20 x 1.35 M shutter with window frame of
Medium Teak wood of Section 100 mm x 75 mm and shutter frame 3 verticals of Medium
Teak wood of section 100mm x 32 mm thick and BISON PANEL CEMENT BONDED
PARTICLE BOARD CONFORMING TO IS 14276 and safety bars of 10 mm square bars at
100mm center to center distance horizantally and Hardware fixtures ie., MSPC Butt Hinges
100mm Long 12nos, MSPC Handles 125 mm Long 6 Nos MSPC Tower Bolt 150mm long 6
Nos, MS Hold Fast 4 Nos Including Labour charges for making Window frame and shutter,
fixing of Fixtures etc., and cost and conveyance of all materials to site, taxes extra complete
for finished item of work.

Ground Floor
Ground Floor
18

11.00
11.00 Sqm
Supply and fixing of Door size 0.75 x 2.00 M Single Leaf with Door Frame of Medium Teak
wood Section 100 mm x 75 mm and shutter of 35mm thick of solid bond wood block board
type with commercial play on both faces, Hardware fixtures ie., MSPC Butt Hinges 150mm
Long 6 nos, MSPC Handles 150 mm Long 2 Nos MSPC Tower Bolt 300mm long 1
Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos including Including Labour
charges for making of door, fixing of fixtures etc., and cost and conveyance of all materials to
site, taxes extra for finished item of work.

Ground Floor
Ground Floor for Door
294427110.xls

1 X 11

1 X 2

2.00
- GF

24 of 221

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

19

8
2.00 Sqm
Supply and fixing of medium teak wood Ventilators of size 0.60x0.40M with safety bars of
10mm square rods at 100mm centre to centre horizontally and vertically as per approved
drawing of Engineer-in-charge including red oxide primer of grade-I quality, sales and other
taxes, cost and conveyance of all materials to site, all labour charges etc., complete for
finished item of work.

21

22

Rate

Amount
2013-14

9
5965.03

11930

1783.95

7136

239.47 Sqm
Painting to new walls with two coats of ready mixed oil bound washable distemper of
approved brand and shade over a base coat of appropriate primer of approved brand, making
three coats in all to give an even shade after thoroughly brushing the surface to remove all dirt
and reminds of loose powedered materials including cost and conveyance of alla materials to
work site and all operational, incidental, labour charges etc.. complete for finished item of
work as per SS911 for internal walls and ceiling.

29.30

7016

438.72 Sqm
Painting to New External Walls with two coats of Polymer Plastic Emulsion paint of Asian /
Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as
approved by the Engineer - in - Charge over base coat of cement primer water base grade -II
exterior making three coats in all to give an even shade after thoroughly brushing the surface
to remove all loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to site, etc., sales &
other taxes, all operational, incidental and labour charges such as scaffolding charges, lift
charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS
No. 911)

92.31

40498

350.46 Sqm

130.70

45805

Ground Floor
for G.F

20

UNIT

2 X 2

4.00
4.00
4.00 each

White washing two coats with paint grade white lime for wash or equivalent quality to give an
even shade after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials including cost of all materials, labour charges and incidental such as
scaffolding, lift charges etc., complete for finished item of work in all floors for walls

TOTAL AMOUNT

Asst. Engineer
PR Kothagudem

294427110.xls

Dy.Executive Engineer
PR.SD Kothagudem

- GF

4646573

Executive Engineer
PR Division Kothagudem

25 of 221

Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem, Khammam District
Construction of Division Office (FF )
Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

2
3
4
5
6
7
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Columns

UNIT

Rate

Amount
2013-14

COLUMNS FIRST FLOOR


C1
C2

24
8

0.23
0.23

0.575
0.375

3.000
3.000

9.522
2.070
11.59 cum

10212.40

118382

10324.30

17809

9434.50

193690

Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering, laying concrete, curing
etc. complete for Lintels

Over doors
Over windows

1
1

1
1

10
15

1.5
1.5

0.23
0.23

0.200
0.200

0.690
1.035
1.73 Cu.M.

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Beams

BEAMS FIRST FLOOR


Long walls

Cross walls

294427110.xls

1
1
2
2
2
1

4
2
3
5
2
10

19.960
4.800
2.000
4.800
8.920
2.000

- FF MAIN

0.23
0.23
0.23
0.23
0.23
0.23

0.450
0.450
0.450
0.450
0.450
0.300

8.260
0.990
1.240
4.970
3.690
1.380
20.53 Cu.M.

26 of 221

Sl.
No.

DESCRIPTION OF ITEM

1
1

D/H

Quantity

19.96

18.98

UNIT

Rate

757.680
757.68 Sqm

10.560
13.800
24.36 Sqm
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering, laying concrete, curing
etc. complete for Sunshades / Chajjas for 75mm thick at Fixed end and 50mm thick at Free end
and for a width of 0.60 Mts. etc complete for finished item of work.

4
16

Amount
2013-14

1133.85

859095

1421.65

34631

816.00

33097

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 175mm thick FF

FIRST FLOOR
Landing
Flights
6

2
3
4
5
6
7
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including all
operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard
suppliers approved by the department including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 125mm thick

FIRST FLOOR
Ground Floor Slab

NO'S

1
2

294427110.xls

1
2
2

4
5
2

5.45
1.5

2.20
1.50

26.16
14.40
40.56
40.56 Sqm
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11
x 7 Cm from approved source having minimum crushing strength of 40 Kg/Sqcm. including
cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges,
curing, etc., complete for finished item of work.
FIRST FLOOR
Super structure
Long walls
cross walls
cross walls

2
1

4.80
4.60

19.96
4.80
6.46

- FF MAIN

0.60
0.60

0.23
0.23
0.23

3.00
3.00
3.00

0.900
33.120
17.830

27 of 221

Sl.
No.

DESCRIPTION OF ITEM

NO'S

3
1
1
1
1

Deduction doors
Deduction windows

2
2
10
11

4
5.46
4.00
1.20
1.20

B
5
0.23
0.23
0.23
0.23

D/H
6
3.00
3.00
2.10
1.35

Quantity

UNIT

7
8
7.530
5.520
-5.800
-4.100
55.00 Cu.M.

Rate

Amount
2013-14

4635.05

254928

596.55

8238

62447.00

749364

5039.30

3825

Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using second class bricks of size 23 x
11 x 7 Cm having a crushing strength of not less than 35.00kg/cm2 and using two mild steel
bars of 6m dia in every third layer of brick masory, with free joints of the main block work
including cost and seignorage charges and conveyance of all materials and water from approved
sources to work site and all operational, incidental, labour charges such as scaffolding mixing
mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel
and its fabrication charges
FIRST FLOOR
Toilet

2
2
2
2

1
1
1
1

5.760
3.600
Railing
7.380
Deduction
-2.930
13.81 Sqm
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 17861979) of different diameters for RCC works, including labour charges for straightening, cutting,
bending to required sizes and shapes, placing in position with cover blocks of approved
materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost and conveyance of
steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost
and conveyance of binding wire, cover blocks and all incidental, operational, laour charges
such as cutting, bending placing in position, tying including sales and other taxes on all
materials etc., complete for finished item of work in all floors. (APSS No.126)

1.44
0.90
4.10
0.75

2.00
2.00
0.90
1.95

First Floor
12.00 Mts
8

Plain Cement Concrete corresponding to M15 grade as per IS 456 equivalent to (1:2:4)
proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG
(SS5) metal from approved quarry including cost and conveyance of all materials like cement,
sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on
all materials, all operational, incidental, and labour charges such as mixing, laying and
ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing
concrete, etc., complete for finished item of work (APSS No. 402)

Bed blocks

0.166
0.552
0.041
0.76
0.76 Cu.M.
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like
cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all
materials, all operational, incidental and labour charges such as mixing mortar,scaffolding
charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished
item of work. (APSS 901,903 & 904)
EE Room
Anti room

294427110.xls

4
20
2

1
1

6
4
6

0.20
0.20
0.20

2 (7.03+4.8)
2 (2.4+4.8)

- FF MAIN

0.23
0.23
0.12

0.15
0.15
0.15

3.60
3.60

85.180
51.840

28 of 221

Sl.
No.

DESCRIPTION OF ITEM
2
Computer Room
DAO Room
DB Room
Toilets Room
Supdt Room
Xerox Room
Deductions Doors
Windows.
Ventilator

10

2
2
2
2
2
2
1
1
2

4
5
(4.8+4.8)
(4.8+6.23)
(4.8+7.03)
(2.2+4.8)
(4.8+6.23)
(4.8+3.05)
1.20
1.20
0.60

D/H
6
3.60
3.60
3.60
3.60
3.60
3.60
2.00
1.35
0.45

Quantity

UNIT

7
8
69.120
79.420
85.180
103.680
79.420
56.520
-24.000
-17.820
-1.080
567.46 Sqm

179.640
170.820
350.46 Sq.M.
Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost
and conveyance of all materials like cement, sand, water etc., to site, including seigniorage
charges, sales & other taxes on all materials, all operational, incidental charges and labour
charges such as mixing mortar, finishing, curing, etc., complete for finished item of work.
(APSS 901,906)
First Floor
EE Room
Anti room
Computer Room
DAO Room
DB Room
Toilets Room
Supdt Room
Xerox Room

12

3
1
1
1
2
1
1
10
11
2

Rate

Amount
2013-14

340.80

193390

238.60

83620

154.65

61124

Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like
cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all
operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift
charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge,
finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS
901,903 & 904)
First Floor
long wall
cross walls

11

NO'S

1
1

1
1
1
1
1
2
1
1

2
2

2
2
2
2
2
2
2
2

19.96
18.98

7.03
2.40
4.80
4.80
4.8
2.20
4.80
4.80

4.50
4.50

4.8
4.8
4.8
6.23
7.03
4.8
6.23
3.05

67.490
23.040
46.080
59.810
67.490
42.240
59.810
29.280
395.24 Sq.M.

Flooring and Treads with Polished shabad / Tandur stone minimum 15 to 18 mm thick of size
(0.254M x0.254M) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab,
including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed
with neat cement to full depth including cost of all materials like cement, sand, and water and
flooring stones etc., complete, including seigniorage charges, labour charges for dressing of
flooring stones etc., complete for finished item of work, .
First Floor
EE Room
Anti room
Computer Room
DAO Room
DB Room
Toilets Room
Supdt Room
Xerox Room

294427110.xls

1
1
1
1
1
2
1
1

2
2
2
2
2
2
2
2

7.03
2.40
4.80
4.80
4.8
2.20
4.80
4.80
- FF MAIN

4.8
4.8
4.8
6.23
7.03
4.8
6.23
3.05

67.490
23.040
46.080
59.810
67.490
42.240
59.810
29.280
29 of 221

Sl.
No.

13

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

UNIT

7
8
395.24 Sq.M.

Rate

Amount
2013-14

9
1046.87

Providing Skirting to internal walls and Risers of Steps to 15 cm height with Polished shabad /
Tandur stone minimum 15 to 18 mm thick of size (0.254M x0.254M) length equal to flooring
stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like
consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed
with pigment of matching shade to full depth, including cost of all materials like tiles, cement,
sand and water etc., complete including seigniorage charges, etc., complete for finished item of
work,
Ground Floor
EE Room
Anti room
Computer Room
DAO Room

294427110.xls

1
1
1
1

2
2
2
2

(7.03+4.8)
(2.4+4.8)
(4.8+4.8)
(4.8+6.23)

- FF MAIN

0.10
0.10
0.10
0.10

2.370
1.440
1.920
2.210

30 of 221

413765

Sl.
No.

DESCRIPTION OF ITEM

NO'S

3
1
2
1
1

DB Room
Toilets Room
Supdt Room
Xerox Room

14

17

4
5
(4.8+7.03)
(2.2+4.8)
(4.8+6.23)
(4.8+3.05)

D/H
6
0.10
0.10
0.10
0.10

Quantity

UNIT

7
8
2.370
2.880
2.210
1.570
7.94 Sqmt

Rate

Amount
2013-14

8073

8843.04

88430

6737.86

74116

395.24 Sqm
Painting to new walls with two coats of ready mixed oil bound washable distemper of approved
brand and shade over a base coat of appropriate primer of approved brand, making three coats
in all to give an even shade after thoroughly brushing the surface to remove all dirt and reminds
of loose powedered materials including cost and conveyance of alla materials to work site and
all operational, incidental, labour charges etc.. complete for finished item of work as per SS911
for internal walls and ceiling.

29.30

11581

567.46 Sqm
Painting to New External Walls with two coats of Polymer Plastic Emulsion paint of Asian /
Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as
approved by the Engineer - in - Charge over base coat of cement primer water base grade -II
exterior making three coats in all to give an even shade after thoroughly brushing the surface to
remove all loose powdered materials, including cost and conveyance of all materials, including
cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all
operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc.,
complete for finished item of work in all floors for external Walls.(APSS No. 911)

92.31

52382

350.46 Sqm

130.70

45805

DOORS AND WINDOWS


Supply and fixing of Door size 1.20 x 2.00 M Single Leaf with Door Frame of Medium Teak
wood Section 100 mm x 75 mm and shutter of 35mm thick of solid bond wood block board
type with commercial play on both faces, Hardware fixtures ie., MSPC Butt Hinges 150mm
Long 6 nos, MSPC Handles 150 mm Long 2 Nos MSPC Tower Bolt 300mm long 1
Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos including Including Labour
charges for making of door, fixing of fixtures etc., and cost and conveyance of all materials to
site, taxes extra for finished item of work.

1 X 10

10.00
10.00
10.00 Sqm

Supply and fixing of Window of Size 1.20 x 1.35 M Six Leaf shutter with window frame of
Medium Teak wood of Section 100 mm x 75 mm and shutter frame of Medium Teak wood of
section 100mm x 32 mm thick and window planks of medium fiber board exterior both sides
laminated 12mm thick and safety bars of 10 mm square bars at 100mm center to center
distance horizantally and Hardware fixtures ie., MSPC Butt Hinges 100mm Long 12nos,
MSPC Handles 125 mm Long 6 Nos MSPC Tower Bolt 150mm long 6 Nos, MS Hold Fast 4
Nos Including Labour charges for making Window frame and shutter, fixing of Fixtures etc.,
and cost and conveyance of all materials to site, taxes extra complete for finished item of
work.

First Floor
16

2
2
2
2

1016.75

Ground Floor for Door

15

11.00
11.00 Sqm
White washing two coats with paint grade white lime for wash or equivalent quality to give an
even shade after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials including cost of all materials, labour charges and incidental such as
scaffolding, lift charges etc., complete for finished item of work in all floors for walls

294427110.xls

1 X 11

- FF MAIN

31 of 221

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Asst. Engineer
PR Kothagudem

294427110.xls

Dy.Executive Engineer
PR.SD Kothagudem

- FF MAIN

Quantity

UNIT

Rate

7
8
9
TOTAL AMOUNT

Amount
2013-14
3305345

Executive Engineer
PR Division Kothagudem

32 of 221

Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem, Khammam District
Construction of Superintending Engineer Camp Office (SF )
DESCRIPTION OF ITEM

Sl.
No.

D/H

Quantity

12

0.23

0.58

3.000

UNIT

Rate

Amount
2013-14

10

4.761
4.76 Cu.M.

10667.70

50789

9718.75

199526

1167.35

145461

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh batching, machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402) with minimum cement content @
380Kgs/Cum from standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Beams

Long walls

Cross walls

2
3
4
5
6
7
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh batching, machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402) with minimum cement content @
380Kgs/Cum from standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Columns

C1

NO'S

1
1
2
2
2
1

4
2
3
5
2
10

19.960
4.800
2.000
4.800
8.920
2.000

0.23
0.23
0.23
0.23
0.23
0.23

0.450
0.450
0.450
0.450
0.450
0.300

8.260
0.990
1.240
4.970
3.690
1.380
20.53 Cu.M.

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry including
cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate,
water etc., to site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh batching, machine
mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402) with minimum cement content @
380Kgs/Cum from standard suppliers approved by the department including centering,
shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm thick

Second Floor Slab


1
1

294427110.xls

1
1

14.93
8.76

- SF

5.26
5.26

78.530
46.078
124.61 Sqm

33 of 221

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

2
3
4
5
6
7
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost
and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water
etc., to site and including Seigniorage charges, sales & other taxes on all materials including
all operational, incidental and labour charges such as weigh batching, machine mixing, laying
concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering, shuttering, laying
concrete, curing etc. complete for Sunshades / Chajjas for 75mm thick at Fixed end and 50mm
thick at Free end and for a width of 0.60 Mts. etc complete for finished item of work.

UNIT

Rate

Amount
2013-14

10

845.85

10658

4854.20

284699

596.55

8590

Second Floor
1
1

5
9

1.5
1.5

0.60
0.60

4.50
8.10
12.60 Sqm

Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11
x 7 Cm from approved source having minimum crushing strength of 40 Kg/Sqcm. including
cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges,
curing, etc., complete for finished item of work.

Second Floor
Long walls
cross walls
cross walls

0.900
33.120
17.830
7.530
5.520
Deduction doors
-2.900
Deduction windows
-3.350
58.65 Cu.M.
Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using second class bricks of size 23 x
11 x 7 Cm having a crushing strength of not less than 35.00kg/cm2 and using two mild steel
bars of 6m dia in every third layer of brick masory, with free joints of the main block work
including cost and seignorage charges and conveyance of all materials and water from
approved sources to work site and all operational, incidental, labour charges such as
scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but
excluding the cost of steel and its fabrication charges

Second Floor
Toilet

294427110.xls

1
2
2
1
1
1
1

1
2

4
5
2
2
2
5
9

1
1

19.96
4.80
6.46
5.46
4.00
1.20
1.20

2.40
2.40

- SF

0.23
0.23
0.23
0.23
0.23
0.23
0.23

3.00
3.00
3.00
3.00
3.00
2.10
1.35

2.00
2.00

4.800
9.600
14.40 Sqm

34 of 221

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

2
3
4
5
6
7
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 17861979) of different diameters for RCC works, including labour charges for straightening,
cutting, bending to required sizes and shapes, placing in position with cover blocks of
approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming
grills for reinforcement work as per approved designs and drawings, including cost and
conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer
bars including cost and conveyance of binding wire, cover blocks and all incidental,
operational, laour charges such as cutting, bending placing in position, tying including sales
and other taxes on all materials etc., complete for finished item of work in all floors. (APSS
No.126)

UNIT

Rate

Amount
2013-14

10

First Floor
6

5.00 Mts
Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost
and conveyance of all materials like cement, sand, water etc., to site, including seigniorage
charges, sales & other taxes on all materials, all operational, incidental charges and labour
charges such as mixing mortar, finishing, curing, etc., complete for finished item of work.
(APSS 901,906)

Rooms
Rooms
Passage
Staircase
Landing
Staircase room

4
4
1
2
1
1

1
2
1
1
1
1

5.45
5.45
19.30
4.10
3.00
3.00

7.90
0.45
2.20
1.50
1.50
1.27

172.220
19.620
42.460
12.300
4.500
3.810
254.91 Sq.M.
254.91 Sq.M.

63131.00

315655

365.10

93068

262.05

Plasterin
62889

Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials
like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all
materials,all operational, incidental and labour charges such as mixing mortar, scaffolding
charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer
- in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of
work. (APSS 901,903 & 904)

Second Floor
Rear long wall
Front wall
Darf wall

1
2
1
2
2

109.380
41.650
17.420
58.450
Toilet room cross wall
13.090
239.99 Sqm
239.99 Sqm
Plastering to even surfaces of wall with CM (1:4) Prop: 12mm thick in single coat including
cost and conveyance of all materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental charges
and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of
work. (APSS 901,906)

1
1
1
1
1

31.25
5.95
19.35
8.35
1.87

3.50
3.50
0.90
3.50
3.50

Second Floor
Hand railing

294427110.xls

4.10

- SF

0.90

7.380

35 of 221

Sl.
No.

DESCRIPTION OF ITEM
2

NO'S
3
2

5
0.12

D/H

Quantity

UNIT

8
0.980
8.36
8.36 Sqm
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials
like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all
materials, all operational, incidental and labour charges such as mixing mortar,scaffolding
charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for
finished item of work. (APSS 901,903 & 904)
1

4
4.10

Rate

Amount
2013-14

10

262.05

Second Floor
Halls
Staircase Room
Passage
Toilet Room

294427110.xls

4
2
1
2

2 (5.45+7.90)
1
5.70
1
19.30
2 (0.9+1.44)

- SF

3.50
3.50
3.50
3.50

373.800
39.900
67.550
32.760

36 of 221

Plasterin
2191

DESCRIPTION OF ITEM

Sl.
No.

2
Lobby
Deduction Door
Windows
Ventilators
OP

for Railing wall sides

NO'S
3
1
4
20
8
2
1

2 X 1

4
5
2 (0.9+1.44)
1
1.05
1
0.90
1
0.60
1
0.75
1
0.90

4.10

D/H
6
3.50
2.00
1.20
0.45
2.00
2.00

0.90

Quantity

UNIT

7
8
16.380
-8.400
-21.600
-2.160
-3.000
-1.800
493.43 Sqm
7.38
7.38 Sqm
500.81 Sqm

Rate

Amount
2013-14

10

Plaste

364.25

Plaste
182420

369.50

Impe
90105

Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with
1kg of water proof compound per bag of cement laid over roof when it is green including cost
of all materials, seigniorage charges, excluding conveyance charges of materials and including
all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and
thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item
of work SF
Second Floor
M Top of roof slab

10

30.79

7.92

243.86
243.86 Sq.M.
243.86 Sq.M.

DOORS AND WINDOWS


Supply and fixing of Door size 1.05x2.00 M Single Leaf with Door Frame of Medium Teak
wood Section 100 mm x 75 mm and shutter of 35mm thick of solid bond wood block board
type with commercial play on both faces, Hardware fixtures ie., MSPC Butt Hinges 150mm
Long 6 nos, MSPC Handles 150 mm Long 2 Nos MSPC Tower Bolt 300mm long 1
Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos including Including Labour
charges for making of door, fixing of fixtures etc., and cost and conveyance of all materials to
site, taxes extra for finished item of work.

Ground Floor for Door

11

1 X 1

1 X 4

4.00
4.00
4.00 Sqm

8843.04

35372

6737.86

134757

Supply and fixing of Window of Size 0.90 x 1.22 M Six Leaf shutter with window frame
of Medium Teak wood of Section 100 mm x 75 mm and shutter frame of Medium Teak
wood of section 100mm x 32 mm thick and window planks of medium fiber board exterior
both sides laminated 12mm thick and safety bars of 10 mm square bars at 100mm center to
center distance horizantally and Hardware fixtures ie., MSPC Butt Hinges 100mm Long
12nos, MSPC Handles 125 mm Long 6 Nos MSPC Tower Bolt 150mm long 6 Nos, MS Hold
Fast 4 Nos Including Labour charges for making Window frame and shutter, fixing of
Fixtures etc., and cost and conveyance of all materials to site, taxes extra complete for
finished item of work.

First Floor

294427110.xls

4 X 5

20.00
20.00 Sqm

- SF

37 of 221

Sl.
No.

12

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

2
3
4
5
6
7
Painting to New External Walls with two coats of Polymer Plastic Emulsion paint of Asian /
Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as
approved by the Engineer - in - Charge over base coat of cement primer water base grade -II
exterior making three coats in all to give an even shade after thoroughly brushing the surface
to remove all loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to site, etc., sales &
other taxes, all operational, incidental and labour charges such as scaffolding charges, lift
charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS
No. 911)

Rear long wall

13

294427110.xls

1
4
1
2
1
1

X
X
X
X
X
X
X
X
X
X

1
1
1
1
1
1

X
X
X
X
X
X

2
1
1
2
2
1
1
1
1
1

31.27
5.95
19.35
19.35
1.85
8.35

Amount
2013-14

10

130.70

31938

92.31

45590

29.30

7469

3.50
3.50
0.90

373.80
39.90
67.55
32.76
16.38
Deductions :Doors
-8.40
Windows
-21.60
Ventilators
-2.16
Toilet room
-3.00
-1.35
493.88 Sqm
White washing two coats with paint grade white lime for wash or equivalent quality to give an
even shade after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials including cost of all materials, labour charges and incidental such as
scaffolding, lift charges etc., complete for finished item of work in all floors for walls

For ceiling dormitory


beam sides
Passage
Staircase
Landing
Toilets

4
2
1
2
1
4
20
8
2
1

X
X
X
X
X
X

Rate

109.45
41.65
Dawrf wall
17.42
0.23
4.45
Toilets
3.50
12.95
C/W
3.50
58.45
244.36 Sqm
Painting to new walls with two coats of ready mixed oil bound washable distemper of
approved brand and shade over a base coat of appropriate primer of approved brand, making
three coats in all to give an even shade after thoroughly brushing the surface to remove all dirt
and reminds of loose powedered materials including cost and conveyance of alla materials to
work site and all operational, incidental, labour charges etc.. complete for finished item of
work as per SS911 for internal walls and ceiling.

Hall
Stair case room
Passage
Toilet room

1
2
1
1
2
2

UNIT

4
2
1
1
1
1

(5.45+7.90)
5.70
19.30
(0.90+1.44)
(0.90+1.44)
1.05
0.90
0.60
0.75
0.90

5.45
5.45
19.30
4.10
3.00
3.00

- SF

3.50
3.50
3.50
3.50
3.50
2.00
1.20
0.45
2.00
1.50

7.90
0.45
2.20
1.50
1.50
1.27

172.22
19.62
42.46
12.30
4.50
3.81
254.91 Sqm

38 of 221

Sl.
No.

14

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

2
3
4
5
6
7
Painting to New wood work with two coats of ready mixed synthetic enamel paint first
quality all shades to give an even shade over base coatof wood Primer finishing with putty
for wood work after thouroughly brushing the surface to remove all remains including cost
and conveyance of all materials to site, sales & other taxes, all operational, incidental and
labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in
All Floors
Windows

60 X 2.75

0.90

1.20

UNIT

Rate

Amount
2013-14

10

166.15

29608

178.20
178.20 Sqm

1730785

Asst. Engineer
PR Kothagudem

294427110.xls

Dy.Executive Engineer
PR.SD Kothagudem

- SF

Executive Engineer
PR Division Kothagudem

39 of 221

Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem, Khammam
District
DETAIL CUM ABSTRACT ESTIMATE - THIRD FLOOR
Sl.
No.

DESCRIPTION OF ITEM

D/H

Quantity

4 X 1

0.300

0.38

UNIT

Rate

Amount
2013-14

10

3.05

1.39
1.39 cum
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement
content @ 380Kgs/Cum from standard suppliers approved by the department including
centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams

L/B
C/B

2
3
4
5
6
7
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement
content @ 380Kgs/Cum from standard suppliers approved by the department including
centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns

for Head room columns


2

NO'S

2 x 1
2 x 1

5.45
3.00

0.23
0.23

0.45
0.30

1.13
0.41
1.54 Cu.M.
1.54 Cu.M.

11021.50

15320

10003.00

15405

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm
size graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all
materials including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402) with minimum cement
content @ 380Kgs/Cum from standard suppliers approved by the department including
centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm
thick

Third Floor Slab


Head room slab

1 X 1

5.90

3.45

Total qty 2013-14

294427110.xls

DORMITORY -TF

20.36
20.36 Sqm
20.36 Sqm

M2
1200.85

40 of 221

24443

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

2
3
4
5
6
7
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23
x 11 x 7 Cm from approved source having minimum crushing strength of 40 Kg/Sqcm.
including cost and conveyance of all materials like cement, sand, bricks, water etc., to
site, including seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing cement mortar, constructing masonry,
scaffolding charges, lift charges, curing, etc., complete for finished item of work.

UNIT

Rate

Amount
2013-14

10

Third Floor
Parapet wall
Parapetwall L/W
Deduct columns

Head room L/W


C/W
Deduct opening
Grill

2 x 1
2 x 1
14 x 1

2
2
1
1

x
x
x
x

1
1
1
1

31.25
7.90
0.30

0.23
0.23
0.23

0.90
0.90
0.90

12.94
3.27
-0.87
15.34 Cu.M.

5.45
3.05
1.05
0.90

0.23
0.23
0.23
0.23

3.10
3.10
2.00
1.20

7.77
4.35
-0.48
-0.25
11.39
Cu.M.

5149.95

Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS
1786-1979) of different diameters for RCC works, including labour charges for
straightening, cutting, bending to required sizes and shapes, placing in position with cover
blocks of approved materials and size and tying and lapsplicing with binding wire of 18
SWG, forming grills for reinforcement work as per approved designs and drawings,
including cost and conveyance of steel bars, including all wastages such as overlaps,
couplings, chairs, spacer bars including cost and conveyance of binding wire, cover
blocks and all incidental, operational, laour charges such as cutting, bending placing in
position, tying including sales and other taxes on all materials etc., complete for finished
item of work in all floors. (APSS No.126)

769.000 Kgs
0.769 Mts
0.77 Mts

63815.00

49074

Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top
coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all
materials like cement, screened sand, water etc., to site, seigniorage charges, sales &
other taxes on all materials, all operational, incidental and labour charges such as mixing
mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever
necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of
Brick Wall complete for finished item of work. (APSS 901,903 & 904)

Third Floor
1
1
1
1

294427110.xls

2
2
2
2

(7.03+4.8)
(2.4+4.8)
(4.8+4.8)
(4.8+6.23)

DORMITORY -TF

3.60
3.60
3.60
3.60

85.180
51.840
69.120 Sqm
79.420

Pla

41 of 221

Sl.
No.

DESCRIPTION OF ITEM
2

NO'S
3
1

4
5
2 (4.8+7.03)

D/H
6
3.60

Quantity

UNIT

7
8
85.180
370.74 Sqm

Rate

Amount
2013-14

10

3808.20

Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including
cost and conveyance of all materials like cement, sand, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental
charges and labour charges such as mixing mortar, finishing, curing, etc., complete for
finished item of work. (APSS 901,906)
Third Floor
1
1
1
1
1

1
1

7.03
2.54
4.80
4.80
4.80

4.80
4.80
4.80
6.23
7.03

33.740
12.190
23.040
29.900
33.740

57.100
51.520
108.62 Sq.M.
Supply and fixing of Door size 1.20 x 2.00 M Single Leaf with Door Frame of Medium
Teak wood Section 100 mm x 75 mm and shutter of 35mm thick of solid bond wood
block board type with commercial play on both faces, Hardware fixtures ie., MSPC Butt
Hinges 150mm Long 6 nos, MSPC Handles 150 mm Long 2 Nos MSPC Tower Bolt
300mm long 1 Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos including
Including Labour charges for making of door, fixing of fixtures etc., and cost and
conveyance of all materials to site, taxes extra for finished item of work.

1 X 5

1
1
1
1
1

132.61 Sq.M.
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat
of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all
materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on
all materials,all operational, incidental and labour charges such as mixing mortar,
scaffolding charges, lift charges, including cutting of Grooves wherever necessary as
directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of
Wall for finished item of work. (APSS 901,903 & 904)
Second Floor
Hand railing

2
2

7.93
7.36

1.20

3.60
3.50

2.00

294427110.xls

DORMITORY -TF

285.45

5.00

5.00 Sqm
Supply and fixing of Window of Size 0.90 x 1.22 M Six Leaf shutter with window
frame of Medium Teak wood of Section 100 mm x 75 mm and shutter frame of Medium
Teak wood of section 100mm x 32 mm thick and window planks of medium fiber board
exterior both sides laminated 12mm thick and safety bars of 10 mm square bars at 100mm
center to center distance horizantally and Hardware fixtures ie., MSPC Butt Hinges
100mm Long 12nos, MSPC Handles 125 mm Long 6 Nos MSPC Tower Bolt 150mm
long 6 Nos, MS Hold Fast 4 Nos Including Labour charges for making Window frame
and shutter, fixing of Fixtures etc., and cost and conveyance of all materials to site, taxes
extra complete for finished item of work.
1 X 9

1733.35

9.00
9.00 Sqm

3486.00

6737.86

42 of 221

60641

Sl.
No.

10

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

2
3
4
5
6
7
Painting to new walls with two coats of ready mixed oil bound washable distemper of
approved brand and shade over a base coat of appropriate primer of approved brand,
making three coats in all to give an even shade after thoroughly brushing the surface to
remove all dirt and reminds of loose powedered materials including cost and conveyance
of alla materials to work site and all operational, incidental, labour charges etc.. complete
for finished item of work as per SS911 for internal walls and ceiling.

UNIT

Rate

Amount
2013-14

10

92.31

370.74 Sqm

11

White washing two coats with paint grade white lime for wash or equivalent quality to
give an even shade after thoroughly brushing the surface to remove all dirt and remains of
loose powdered materials including cost of all materials, labour charges and incidental
such as scaffolding, lift charges etc., complete for finished item of work in all floors for
walls

29.30

108.62 Sqm

TOTAL AMOUNT

Asst. Engineer
TW: Manuguru

294427110.xls

Dy.Executive Engineer
TW : Palvancha

DORMITORY -TF

164883

Executive Engineer
TW : Bhadrachalam

43 of 221

Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem, Khammam
District
DETAIL CUM ABSTRACT ESTIMATE - THIRD FLOOR - PART B
Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

2
3
4
5
6
7
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of
size 23 x 11 x 7 Cm from approved source having minimum crushing strength of 40
Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks,
water etc., to site, including seigniorage charges, sales & other taxes on all materials,
all operational, incidental and labour charges such as mixing cement mortar,
constructing masonry, scaffolding charges, lift charges, curing, etc., complete for
finished item of work.
Third Floor
Vide page No 88 of MB No 7506/B/TW Dt: 20.12.2013
2 x 1
31.25
Parapet wall
2 x 1
7.90
Parapetwall L/W
14 x 1
0.30
Deduct columns

0.23
0.23
0.23

0.90
0.90
0.90

Vide page No 8 of MB No 7617/B/TW Dt 12.3.2014


2 x 1
5.45
Head room L/W
2
x
1
3.05
C/W
1 x 1
1.05
Deduct opening
1 x 1
0.90
Grill

0.23
0.23
0.23
0.23

3.10
3.10
2.00
1.20

UNIT

Rate

Amount
2013-14

10

12.94
3.27
-0.87
15.34 Cu.M.

7.77
4.35
-0.48
-0.25
11.39
26.73 Cu.M.
Total qty 2013-14
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and
top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, screened sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials, all operational, incidental
and labour charges such as mixing mortar,scaffolding charges, lift charges,
finishing,including cutting of Grooves wherever necessary as directed by Engineer in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished
item of work. (APSS 901,903 & 904)
Third Floor
Vide page No 11 of MB No 7617/B/TW Dt 4.4.2014
05+5.45)
Head room out side
1 X 2
Vide page No 18 of MB No 7617/B/TW Dt 13.5.2014
31.75
Parapet wall
2 X 1
2 x 1
7.90
Sides

3.50

0.90
0.90

Total qty 2013-14


6

Quantity

5149.95

59.50
59.50 Sqm

Plas

57.15
14.22
71.37 Sqm
130.87 Sqm

3808.20

Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish
including cost and conveyance of all materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing, curing, etc.,
complete for finished item of work. (APSS 901,906)
Third Floor

294427110.xls

DORMITORY -TF Part B

137658

44 of 221

498379

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

UNIT

Rate

Amount
2013-14

2
3
4
Vide page No 11 of MB No 7617/B/TW Dt 4.4.2014
3.05
Head room
1 X 1

10

5.45

16.62
16.62 Sqm
16.62 Sq.M.
Total qty 2013-14
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top
coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance
of all materials like cement, sand, water etc., to site, seigniorage charges, sales &
other taxes on all materials,all operational, incidental and labour charges such as
mixing mortar, scaffolding charges, lift charges, including cutting of Grooves
wherever necessary as directed by Engineer - in - charge, finishing, curing, etc.,
complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 &
904)
Second Floor
Vide page No 17 of MB No 7617/B/TW Dt 13.5.2013
2
1
5.90
3.50
41.300
Hand railing
2
1
3.45
3.50
24.150
2
1
30.75
0.90
55.350
2
1
7.90
0.90
14.220
2
1
31.75
0.23
14.610
2
1
7.90
0.23
3.630
153.26 Sq.M.
Supply and fixing of Door size 1.05 x 2.00 M Single Leaf with Door Frame of
Medium Teak wood Section 100 mm x 75 mm and shutter of 35mm thick of solid
bond wood block board type with commercial play on both faces, Hardware fixtures
ie., MSPC Butt Hinges 150mm Long 6 nos, MSPC Handles 150 mm Long 2 Nos
MSPC Tower Bolt 300mm long 1 Nos,MSPC Aldrop 300 mm long 1 no, MS Hold
Fast 6 Nos including Including Labour charges for making of door, fixing of fixtures
etc., and cost and conveyance of all materials to site, taxes extra for finished item of
work.
Vide page No 10 of MB No 7617/B/TW Dt 20.3.2014
for Head room doors
13 X 1
1.05

2.00

28813

285.45

43748

3486.00

95168

92.31

5492

29.30

487

27.30

Total qty 2013-14


27.30 Sqm
Painting to new walls with two coats of ready mixed oil bound washable distemper
of approved brand and shade over a base coat of appropriate primer of approved
brand, making three coats in all to give an even shade after thoroughly brushing the
surface to remove all dirt and reminds of loose powedered materials including cost
and conveyance of alla materials to work site and all operational, incidental, labour
charges etc.. complete for finished item of work as per SS911 for internal walls and
ceiling.
Vide page No 27 of MB No 7617/B/TW Dt 6.2.2014
1 X 2
(5.45+3.05)
3.50
Total qty 2013-14

1733.35

59.50
59.50 Sqm

White washing two coats with paint grade white lime for wash or equivalent quality
to give an even shade after thoroughly brushing the surface to remove all dirt and
remains of loose powdered materials including cost of all materials, labour charges
and incidental such as scaffolding, lift charges etc., complete for finished item of
work in all floors for walls
Head room ceiling

294427110.xls

1 X 1

5.45
3.05
Total qty 2013-14

DORMITORY -TF Part B

16.62
16.62 Sqm

45 of 221

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

UNIT

Rate

Amount
2013-14

10

245.20

111206

In - situ - Granolithic Concrete Flooring 20mm thick with CC(1:1:2) Prop: using
6mm to 12mm size HBG machine crushed metal laid monolithically over slabs/ CC
flooring bed (1:5:10) with 40mm HBG metal in alternate panels of size not
exceeding 1.50m x 1.50m and finishing the top surface to required smoothness and
slopes, thread lining as directed by the Engineer - in - charge including cost and
conveyance of all materials like cement, sand, water, etc. to site, seigniorage charges,
sales and other taxes on all materials, all operational, incidental and labour charges
such as mixing of cement concrete, laying, curing, lift charges etc., complete for
finished item of work (APSS No.701 & 710)

First Floor
Rooms
Front side
Passage
Staircase room
Second Floor
Rooms
Front side
Passage
Staircase room

4
1
1
1

X 1
X 1
X 1

5.50
3.50
19.30
5.70

7.9
1.70
1.55
3.00

173.80
5.95
29.92
17.10

4
1
1
1

X 1
X 1
X 1

5.50
3.50
19.30
5.70

7.9
1.70
1.55
3.00

173.80
5.95
29.92
17.10

Total qty 2013-14

453.53 Sq.M.

Supplying and wiring with 2 runs of 14/0.3m (1.00 Sq.mm) FRLS / HFFR P.V.C.
insulated
ISI
Copper
Cable
GM/L&T/RPG/Havells/V-Guard/Power
Flex/Polycab/Gold Medal/ Standard /Milion / Vimal/ Suncab/ Paragaon / FortuneArt
make in the existing metallic / non-metallic conduct pipe with 6A 1 Way flush type
switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box
including cost and conveyance of all materials to site, labour charges and sales tax
etc. complete for finished item of work for light, bell, fan and exhaust fan points in
Non-Residential Buildings
(SSR-2012-13, item No.
2.1.1)ing cost and conveyance of all materials to site, labour charges and sales tax
etc. complete for finished item of work

V . P. No 3 of 5282/C/TW
26.4.14
Ground floor 1
1
1
1
1
1
1
1
1
1
1
1
First Floor 1
2
1
3

294427110.xls

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

10
10
2
3
10
3
10
8
29
5
13
6
10
2
4
10

DORMITORY -TF Part B

10.00
10.00
2.00
3.00
10.00
3.00
10.00
8.00
29.00
5.00
13.00
6.00
10.00
4.00
4.00
30.00

46 of 221

Sl.
No.

DESCRIPTION OF ITEM

NO'S

2
Second Floor 4
2
1

3
x 10
x 2
x 1

D/H

Total

Quantity

UNIT

7
8
40.00
4.00
1.00
202 each

Rate

Amount
2013-14

10

349.2

70538

each

476.70

24312.00

each

60.25

3374.00

each

6152.12

49217.00

each

6880.12

6880.00

Supply and fixing of 6A 3/2 pin flush type socket with 6A switch control of Anchor /
make with ISI mark on a common switch board with earth continuity including wire
leads, earth connections including cost and conveyance of all materials to site,
labour charges and sales tax etc. complete for finished item of work
V . P. No 4 of 5282/C/TW
26.4.14
Ground floor
Verandah
First Floor
Second Floor
Dining Hall
Kitchen

14.00
1.00
14.00
14.00
6.00
2.00
Total
51.00
Supply and fixing of Batton Holder/Slanting holder in lieu of ceiling rose of light
point complete with allconnetions and all labour charges with 40Watt bulb etc.,
complete for new installation. Anchor Make
V . P. No 5 of 5282/C/TW
26.4.14
Ground floor
Dining Hall
Kitchen
Bathroom
Bathroom

1
1
1
1
1
1

3
1
1
1
1

x
x
x
x
x
x

33.00
2.00
2.00
13.00
6.00
Total
56.00
Supply and fixing of 8 way SPN type distribution board with IP-20 protection of
make Standard / Havells suitable for single phase 40A DP isolator and 6 Nos. 6-32 A
MCB's make Standard / Havells as out going with internal connections including
cost and conveyance of all materials to site, labour charges for surface / flush
mounting etc., sales tax complete for finished item of work.
V . P. No 5 of 5282/C/TW
26.4.14
Ground floor 3
Dining Hall 1

x
x
x
x
x

14
1
14
14
6
2

6.00
2.00
Total
8.00
Supply and fixing of 4 way TPN type distribution board with IP-20 protection of
make Standard / Havells suitable for single phase 40A DP isolator and 6 Nos. 6-32 A
MCB's make Standard / Havells as out going with internal connections including
cost and conveyance of all materials to site, labour charges for surface / flush
mounting etc., sales tax complete for finished item of work.
V . P. No 6 of 5282/C/TW
26.4.14
Ground floor 1

x
x

11
2
2
13
6

2
2

1
Total

294427110.xls

DORMITORY -TF Part B

1.00
1.00

47 of 221

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

2
3
4
5
6
7
Supply and run of 2 of 36/0.3mm (2.5 Sqmm) FRPVC insulated flexible copper cable
of make finolex/ Havells / in existing PVC conduit pipe circuits, MV Lamp/Security
light points including laboiur charges (Phase, Neutral and earth) and run of 1 of 1.0
sqmm copper cable.
V . P. No 6 of 5282/C/TW
26.4.14
Ground floor 3
Dining Hall 1

150.00
450.00
100.00
100.00
Total
550.00
Supply of 1x40W weather proof flourescent streetlight fitting comprising canopy of
sheet Aluminium in stove enamel finish with copper / VPIT ballast, capacitor, tube
and starter etc., complete. Makes: Phillips / GE / Wipro /Thorn
V . P. No 7 of 5282/C/TW
26.4.14
Ground floor
First Floor
Second Floor
Dining Hall
Kitchen

1
1
1
1
1

x
x

10

Rmt

80.85

44468.00

each

1974.90

163917.00

each

4017.25

8035.00

each

476.70

1430.00

1
1

2.00

1.00
3.00

Total

294427110.xls

Amount
2013-14

19
22
22
18
2

1.00
1.00
Total
2.00
Supply and fixing of 16A 3/2 pin flush type socket with 16A switch control of
Anchor / make with ISI mark on a common switch board with earth continuity
including wire leads, earth connections including cost and conveyance of all
materials to site, labour charges and sales tax etc. complete for finished item of work

V . P. No 9 of 5282/C/TW
26.4.14
Kitchen
1
V . P. No 10 of 5282/C/TW
14.5.2014
Dining 1

x
x

Rate

1
1

19.00
22.00
22.00
18.00
2.00
Total
83.00
Providing independent earthing for sophisticated electronic equipment with
600mmx600mmx3.15mm thick copper plate rigidly fixed to 40mm dia G.I pipe of
0.3mtr.length connected with reducer providing G.I funnel with wiremesh as per
national electric code including c.c.chamber of size 400mmx400mmx400mm
covered with r.c.c slab filling with salt and charcoal giving earth connection from
electrode G.I strip of 25mmx6mmx200mm length with all accessories and labour
charges complete as per IS specification 732/1982(part ||)

V . P. No 8 of 5282/C/TW
26.4.14
Ground floor 1
Dining Hall 1

x
x
x
x
x

UNIT

DORMITORY -TF Part B

48 of 221

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

2
3
4
5
6
7
Supply and fixing of 1 X 36/40 W patty tubet light luminaire comprising canopy of
sheet alluminium housing and UV stablised acrylic cover of makes Cromption / Bajaj
/ Surya /HPL/ Havells with copper / VPIT ballast capacitor , 40W tube and starter
with 1.00 meter 25 mm dia GI pipe medium grade with bracket and anti titling MS
flat etc., including cost and conveyance of all materials to site, labour charges and
sales tax etc., complete for finished item of work.

UNIT

Rate

Amount
2013-14

10

V . P. No 9 of 5282/C/TW
26.4.14
4
6

x
x

1
1

4.00
6.00
10.00

Total

each

1974.90

19749.00

each

80.85

9702.00

each

3314.78

3315.00

each

3749.00

3749.00

Rmt

380.20

15968.00

Rmt

998.75

245392.00

Supply and run of 2 of 2.5 Sq mm PVC insulated flexible copper cable and 1 run of
1.00 Sq mm flexible PVC insulated flexible copper cable in the existing conduit
pipe for run of mains from main panel board to TPN DB'S to swithc boards
connections etc.,
V . P. No 11 of 5282/C/TW
16.5.2014
4 x 1
30.00
120.00
Total
120.00
Supply of 12" (300mm) Light duty exhaust fan with wire guard etc complete of
makes Crompton / Bajaj Bahar WG / Havells Ventil Air-DB / Orient hill air.
1
V . P. No 10 of 5282/C/TW
16.5.2014
ELEC-5.1.12 1 x 1
1.00
Total

1.00

Supply of 150W MH Flood light luminaire with integral weather proof diecast
alluminium housing with IP66 protection with all standard accessories etc of makes
Elton / Style Lamp / Mahita Electro / Capart / Akhil.
V . P. No 10 of 5282/C/TW
16.5.2014
ELEC-3.1.21 1 x 1
1.00
Total

1.00

Supply and Fixing of MS Hallow square pipe purlin of 40mmX40mmX4mm as


required no. of sheets of size 120mmX50mmX6mm welded to the ends of the purlin
for fixing purlins including cost and conveyance of all materials and all labour
charges etc complete
2

21

42.00

Total
42.00
Labour charges for roofing of provided with 0.5mm thick galvanized/prepaint
profied sheet fixed to the purlins with 14 size self drilling screws with neopreme
washers are stiched with self tapping/drilling screws end laps are to be sealed with
25X3mm duty tape unit-184.518m2
2

5.85

21.00

Total

294427110.xls

DORMITORY -TF Part B

245.70
245.70

49 of 221

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

2
3
4
5
6
7
Labour charges for roofing of provided with 0.5mm thick galvanized/prepaint
profied sheet fixed to the purlins with 14 size self drilling screws with neopreme
washers are stiched with self tapping/drilling screws end laps are to be sealed with
25X3mm duty tape unit-184.518m2
1

21

UNIT

Rate

Amount
2013-14

10

Rmt

350.00

7350.00

21.00
Total

21.00

TOTAL AMOUNT

Asst. Engineer
TW: Manuguru

294427110.xls

Dy.Executive Engineer
TW : Palvancha

DORMITORY -TF Part B

1598347

Executive Engineer
TW : Bhadrachalam

50 of 221

Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem, Khammam
District
GENERAL ABSTRACT PART B
Sl. No.
04

As per Sanctioned
Estimate

Description of Item
Post Matric Hostel (TF )

1598347.00
Sub-Total ::

10

As per Working Estimate

1598347.00

TP @ 5.85% Less

-93503.00
1504844.00

11

VAT @ 5%

75242.00

12

QC charges @ 0.25%

17

Unforeseen & rounding off

3762.00
17321.00
TOTAL ::

Asst. Engineer
TW: Manuguru

1601169.00

Dy.Executive Engineer
TW : Palvancha

Name of the work : Construction of Post Matric Hostel for Boys at Burgampadu (V&M) in Khammam District
TOILET BLOCK
DETAIL CUM ABSTRACT ESTIMATE
Sl.
No.
1

DESCRIPTION OF ITEM

NO'S

D/H

2
3
4 5
6
7
Earth work excavation for foundations and depositing on bank for all lifts and with
an initial lead of 10m including all operational, incidental, seigniorage charges,
labour charges such as shoring ,sheeting, planking, strutting, dewatering etc.
complete for finished item of work as per SS - 20 B (APSS 308). for Building
Foundation
5262/C/TW, 1
05-01-2014
Bath room L/W
Bath room C/W
Toilet L/W
Toilet C/W

5262/C/TW, 1
05-01-2014
For Septic tank

2
8
2
6
2

X
X
X
X
X

1
1
1
1
1

9.80
1.13
7.27
0.83
1.95

0.60
0.60
0.60
0.60
0.45

0.90
0.90
0.90
0.90
0.30

10.58
4.88
7.85
2.69
0.53
26.53 cum

1X1

5.50

3.00

1.80

29.70
29.70
56.23 cum

Total qty 2013-14


2

Quantity UNIT

Rate

Amount
2013-14

10

253.90

14278

#REF!

#REF!

Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse


aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed
metal from approved quarry including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete
mixer including seigniorage charges, sales & other taxes on all materials, all
operational, incidental, and labour charges such as laying and ramming concrete in
layers in position not exceeding 15cm, finishing top surface, curing concrete, etc.,
complete for finished item of work. (APSS No. 402).

5262/C/TW, 2
10-01-2014
Bath room L/W
Bath room C/W
Toilet L/W
Toilet C/W

2
8
2
6
2

X
X
X
X
X

1
1
1
1
1

9.80
1.13
7.27
0.83
1.95

0.60
0.60
0.60
0.60
0.45

0.15
0.15
0.15
0.15
0.15

1.76
0.81
1.31
0.45
0.26
4.60 cum

1X1

5.50

3.00

0.15

2.48
2.48 cum
7.07 cum

5262/C/TW, 14
24-04-2014

Total qty 2013-14

294427110.xls

TOILET bala

52 of 221

Sl.
No.
4

DESCRIPTION OF ITEM

NO'S

D/H

2
3
4 5
6
7
Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using
20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all operational, incidental and
labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item
of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering, shuttering,
laying concrete, vibrating, curing etc. complete for Footings, Pedestals, Plinth Beam

5262/C/TW, 5
30-01-2014
Bath room L/W
Bath room C/W
Toilet L/W
Toilet C/W

2
8
2
6
2

X
X
X
X
X

1
1
1
1
1

9.40
1.50
7.10
1.20
1.95

0.23
0.23
0.23
0.23
0.23

0.15
0.15
0.15
0.15
0.15

Total qty 2013-14


5

0.65
0.41
0.49
0.25
0.13
1.94
1.94 Cum

Rate

Amount
2013-14

10

7721.50

M25 P
14945

Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other
taxes on all materials including all operational, incidental and labour charges such
as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS
No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers
approved by the department including centering, shuttering, laying concrete, curing
etc. complete for Lintels

5262/C/TW, 9
06-02-2014
Lintels

Quantity UNIT

11 X 1

1.05 0.23
0.15
Total qty 2013-14

0.40
0.40 Cum

9980.85

Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other
taxes on all materials including all operational, incidental and labour charges such
as weigh batching, machine mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for finished item of work (APSS
No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers
approved by the department including centering, shuttering, laying concrete, curing
etc. complete for Sunshades / Chajjas for 75mm thick at Fixed end and 50mm thick
at Free end and for a width of 0.60 Mts. etc complete for finished item of work.

294427110.xls

TOILET bala

53 of 221

3977

Sl.
No.

DESCRIPTION OF ITEM
2
Slab 300mm depth
5262/C/TW, 9
06-02-2014
Toilet Block

NO'S

D/H

1X1

1.20

0.60

Total qty 2013-14


8

0.72
0.72 Sqm
0.72 Sqm

Rate

Amount
2013-14

10

786.15

M25 s
566

1100.40

M25 s
45430

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using


20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all operational, incidental and
labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item
of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering, shuttering,
laying concrete, vibrating, curing etc. complete for Slab of 125mm thick

125mm Thk Slab


Ground Floor Slab
5262/C/TW, 13
21-04-2014
Toilet Block
Bath room

1X1
1X1

7.70
10.00

2.05
2.55

Total qty 2013-14


9

Quantity UNIT

15.79
25.50
41.29 Sqm
41.29 Sqm

Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from
approved source having minimum crushing strength of 40 Kg/Sqcm. including cost
and conveyance of all materials like cement, sand, bricks, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing cement mortar, constructing masonry,
scaffolding charges, lift charges, curing, etc., complete for finished item of work.
Ground Floor
5262/C/TW, 2
10-01-2014
Bath room L/W
Bath room C/W
Toilet L/W
Toilet C/W
Bath room L/W
Bath room C/W

2
8
2
6
2
8

X
X
X
X
X
X

1
1
1
1
1
1

9.80
1.33
7.07
1.03
9.40
1.50

0.40
0.40
0.40
0.40
0.23
0.23

0.60
0.60
0.60
0.60
0.40
0.40

5262/C/TW, 7
30-01-2014
Bath room L/W
Bath room C/W
Toilet L/W
Toilet C/W

2
2
2
2

X
X
X
X

1
1
1
1

9.40
1.50
7.10
1.20

0.23
0.23
0.23
0.23

2.10
2.10
2.10
2.10

294427110.xls

TOILET bala

4.70
2.55
3.39
1.48
1.73
1.10
14.97 Cu.M.

9.08
1.45
6.86
1.16

54 of 221

Sl.
No.

DESCRIPTION OF ITEM

NO'S

2
Deduct door

5262/C/TW, 7
04-04-2014
Bath room L/W
Bath room C/W
Toilet L/W
Toilet C/W
Deduct

D/H

Quantity UNIT

2
6
1
5
11

3
X
X
X
X
X

1
1
1
1
6

4
1.95
0.75
0.80
0.75
0.20

5
0.23
0.23
0.23
0.23
0.23

6
2.40
1.85
1.85
1.85
0.15

7
8
2.15
-1.91
-0.34
-1.60
-0.46
16.39 Cu.M.

2
2
2
2
12
11

X
X
X
X
X
X

1
1
1
1
1
1

9.40
1.50
7.10
1.20
1.05
0.60

0.23
0.23
0.23
0.23
0.23
0.23

0.40
0.40
0.40
0.40
0.15
0.30

1.73
0.28
1.31
0.22
-0.43
-0.46
2.64 Cu.M.

2
2
2
2

X
X
X
X

1
1
1
1

5.40
5.20
2.10
2.10

0.40
0.35
0.40
0.12

0.90
0.90
1.80
1.05

3.89
3.28
3.02
0.53
10.72 Cu.M.

Rate

Amount
2013-14

10

5262/C/TW, 14
20-04-2014
Septic L/W
Septic L/W
Septic C/W

5262/C/TW, 7
30-01-2014

10

6X1
4X1

1.50 0.12
2.50
1.20 0.12
2.50
Total qty 2013-14

2.59
1.38
3.97

48.69 Cu.M.
Total qty 2013-14
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS
1786-1979) of different diameters for RCC works, including labour charges for
straightening, cutting, bending to required sizes and shapes, placing in position with
cover blocks of approved materials and size and tying and lapsplicing with binding
wire of 18 SWG, forming grills for reinforcement work as per approved designs and
drawings, including cost and conveyance of steel bars, including all wastages such
as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and other taxes on all materials
etc., complete for finished item of work in all floors. (APSS No.126)

4415.80

5262/C/TW, 4
10-01-2014
242.92 Kgs
0.24 Mts
5262/C/TW, 8
07-02-2014
270.860 Kgs
0.271 Mts
5262/C/TW, 12
19-04-2014
296.480 Kgs
294427110.xls

TOILET bala

55 of 221

215002

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Quantity UNIT

Rate

Amount
2013-14

7
8
0.296 Mts
0.81 Mts

10

Total qty 2013-14


12

5262/C/TW, 16
04-04-2014
Toilet

Bathroom

1X2
1X1
2X2

(4.6+2
.1)
4.60
2.10

24.12
2.10
9.66
1.05
8.82
42.60 Sqm
42.60 Sqm
Total qty 2013-14
Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish
including cost and conveyance of all materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing, curing, etc.,
complete for finished item of work. (APSS 901,906)
Septic tank

5
2
2
7
1
2
2

X
X
X
X
X
X
X

1
1
1
1
1
1
1

1.25
7.20
2.20
1.50
1.20
9.40
2.55

1.80

1.20
0.30
0.30
1.20
1.20
0.30
0.30

Total qty 2013-14


12

50044

Plastering to even surfaces of wall with CM (1:3) Prop: 20mm thick in single coat
including cost and conveyance of all materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing, curing, etc.,
complete for finished item of work. (APSS 901,906)
5262/C/TW, 15
04-04-2014

11

61763.00

7.50
4.32
1.32
12.60
1.44
5.64
1.53
34.35 Sqm
34.35 Sqm

196.75

Plaste
8382

146.10

Plast
5019

121.85

Plast
13226

Plastering to even surfaces of wall with CM (1:4) Prop: 12mm thick in single coat
including cost and conveyance of all materials like cement, sand, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing, curing, etc.,
complete for finished item of work. (APSS 901,906)

5262/C/TW, 18
04-04-2014
Bath room L/W
Bath room C/W
Toilet L/W
Toilet C/W

2
2
2
2

X
X
X
X

1
1
1
1

9.40
1.95
7.10
1.65

2.70
2.70
2.70
2.70

Total qty 2013-14

294427110.xls

TOILET bala

50.76
10.53
38.34
8.91
108.54 Sqm
108.54 Sqm

56 of 221

Sl.
No.
13

DESCRIPTION OF ITEM

NO'S

D/H

Quantity UNIT

2
3
4 5
6
7
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and
top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, screened sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials, all operational, incidental
and labour charges such as mixing mortar,scaffolding charges, lift charges,
finishing,including cutting of Grooves wherever necessary as directed by Engineer in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished
item of work. (APSS 901,903 & 904)

Rate

Amount
2013-14

10

5262/C/TW, 17
04-04-2014

7X2

(1.25+
1.20)
(1.20+
1.50)

1X2

(1.20+
1.20)

2.40

11.52

12 X 1

0.75

1.95

-17.55

12 X 1

0.60

0.30

5X2

Deductions

14

58.80

2.40

90.72

-2.16
141.33 Sqm
141.33 Sqm
Total qty 2013-14
Supply and fixing of Door size 0.75 x 2.00 M Single Leaf with Door Frame of
Medium Teak wood Section 100 mm x 75 mm and shutter of 35mm thick of solid
bond wood block board type with commercial play on both faces, Hardware
fixtures ie., MSPC Butt Hinges 150mm Long 6 nos, MSPC Handles 150 mm Long
2 Nos MSPC Tower Bolt 300mm long 1 Nos,MSPC Aldrop 300 mm long 1 no,
MS Hold Fast 6 Nos including Including Labour charges for making of door, fixing
of fixtures etc., and cost and conveyance of all materials to site, taxes extra for
finished item of work.
Ground Floor
5262/C/TW, 19
04-04-2014
For Bathroom Doors
For Toilet Doors

16

2.40

7.00
5.00
Total qty 2013-14
12.00 Sqm
Painting to New External Walls with two coats of Polymer Plastic Emulsion paint of
Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand
and shade as approved by the Engineer - in - Charge over base coat of cement
primer water base grade -II exterior making three coats in all to give an even shade
after thoroughly brushing the surface to remove all loose powdered materials,
including cost and conveyance of all materials, including cost and conveyance of all
materials, cost of brushes, water to site, etc., sales & other taxes, all operational,
incidental and labour charges such as scaffolding charges, lift charges, curing etc.,
complete for finished item of work in all floors for external Walls.(APSS No. 911)

317.40

7X1
5X1

5965.03

5262/C/TW, 20
04-04-2014

294427110.xls

Plaste
44858

TOILET bala

57 of 221

71580

Sl.
No.

16

DESCRIPTION OF ITEM

NO'S

D/H

Quantity UNIT

4 5
6
7
8
(1.25+
5X2
1.20)
2.40
58.80
(1.20+
7X2
1.50)
2.40
90.72
(1.20+
1X2
1.20)
2.40
11.52
12 X 1
0.75
1.95
-17.55
Deductions
12 X 1
0.60
0.30
-2.16
Total qty 2013-14
141.33 Sqm
Painting to New Internal Walls with two coats of Polymer Plastic Emulsion paint of
Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand
and shade as approved by the Engineer - in - Charge over base coat of cement
primer water base grade -II exterior making three coats in all to give an even shade
after thoroughly brushing the surface to remove all loose powdered materials,
including cost and conveyance of all materials, including cost and conveyance of all
materials, cost of brushes, water to site, etc., sales & other taxes, all operational,
incidental and labour charges such as scaffolding charges, lift charges, curing etc.,
complete for finished item of work in all floors for external Walls.(APSS No. 911)

Rate

Amount
2013-14

10

130.70

18472

50.76
10.53
38.34
8.91
108.54 Sqm
108.54 Sqm
130.70
TOTAL AMOUNT

14186
#REF!

5262/C/TW, 18
04-04-2014
Bath room L/W
Bath room C/W
Toilet L/W
Toilet C/W

2
2
2
2

X
X
X
X

1
1
1
1

9.40
1.95
7.10
1.65

2.70
2.70
2.70
2.70

Total qty 2013-14

Asst. Engineer
TW: Manuguru

294427110.xls

Dy.Executive Engineer
TW : Palvancha

TOILET bala

Executive Engineer
TW : Bhadrachalam

58 of 221

Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem, Khammam District
Construction of Compound wall
Sl.
No.
1
1

DESCRIPTION OF ITEM

NO'S

250.00

1
1

1
1

250.00
250.00

0.60

UNIT

Rate

1
2

1
84

0.60
0.45

2
84

250
0.4

250
0.4

0.23
0.15

253.90

28564

3524.40

495619

4415.80

414246

215.15

183050

130.70

111200

0.60
0.45

1.50
1.50

750.000
100.800
850.80 Sqm
Painting to New External Walls with two coats of Polymer Plastic Emulsion paint of Asian /
Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as
approved by the Engineer - in - Charge over base coat of cement primer water base grade -II
exterior making three coats in all to give an even shade after thoroughly brushing the surface
to remove all loose powdered materials, including cost and conveyance of all materials,
including cost and conveyance of all materials, cost of brushes, water to site, etc., sales &
other taxes, all operational, incidental and labour charges such as scaffolding charges, lift
charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS
No. 911)

1.50
1.50

850.80 Sqm

TOTAL AMOUNT
294427110.xls

Compound wall

Amount
2013-14

0.75

86.250
7.560
93.81 Cu.M.
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of
4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials
like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all
materials,all operational, incidental and labour charges such as mixing mortar, scaffolding
charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer
- in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of
work. (APSS 901,903 & 904)

Pillers
5

Quantity

90.000
50.625
140.63 cum
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11
x 7 Cm from approved source having minimum crushing strength of 40 Kg/Sqcm. including
cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges,
curing, etc., complete for finished item of work.

Pillers
4

D/H

112.500
112.50 cum
Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted Granite
stones from approved quarry including cost and conveyance of all materials like Granite
stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on
all materials, all operational, incidental, and labour charges such as cutting stones to required
size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for
finished item of work for foundation and basement (APSS No. 601 & 615)

1
1

2
3
4
5
6
7
Earth work excavation for foundations and depositing on bank for all lifts and with an initial
lead of 10m including all operational, incidental, seigniorage charges, labour charges such as
shoring ,sheeting, planking, strutting, dewatering etc. complete for finished item of work as
per SS - 20 B (APSS 308). for Building Foundation
1

1232679
59 of 221

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

UNIT

Rate

Asst. Engineer
PR Kothagudem

294427110.xls

Dy.Executive Engineer
PR.SD Kothagudem

Compound wall

Amount
2013-14

Executive Engineer
PR Division Kothagudem

60 of 221

Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem,
Khammam District
SEPTIC TANK
DETAIL CUM ABSTRACT ESTIMATE
Sl.
No.
1

DESCRIPTION OF ITEM

NO'S

D/H

Quantity UNIT

5.85

3.70

1X1

5.85

3.70

294427110.xls

1X1
1X1

5.15 3.00
0.05
5.85 1.80
0.05
Total qty 2013-14

SEPTIC TANK bala

Amount
2013-14

10

253.90

11541

3259.09

21163

3670.06

4767

0.30

6.49
6.49 cum
6.49 cum
Plain Cement Concrete corresponding to M15 grade as per IS 456 equivalent to
(1:2:4) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using
40mm size HBG (SS5) metal from approved quarry including cost and conveyance
of all materials like cement, sand, coarse aggregate, water etc. to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental,
and labour charges such as mixing, laying and ramming concrete in layers in
position not exceeding 15cm, finishing top surface, curing concrete, etc., complete
for finished item of work (APSS No. 402)

7610/B/TW, 25
19-04-2014
for septic tank Ist side
plotform

Rate

2.10

45.45
45.45 cum
45.45 cum
Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse
aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed
metal from approved quarry including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete
mixer including seigniorage charges, sales & other taxes on all materials, all
operational, incidental, and labour charges such as laying and ramming concrete in
layers in position not exceeding 15cm, finishing top surface, curing concrete, etc.,
complete for finished item of work. (APSS No. 402).

for septic tank

2
3
4 5
6
7
Earth work excavation for foundations and depositing on bank for all lifts and with
an initial lead of 10m including all operational, incidental, seigniorage charges,
labour charges such as shoring ,sheeting, planking, strutting, dewatering etc.
complete for finished item of work as per SS - 20 B (APSS 308). for Septic Tank

1X1

0.77
0.53
1.30 cum

61of221

Sl.
No.
4

DESCRIPTION OF ITEM

D/H

Quantity UNIT

1X1

5.85

Rate

Amount
2013-14

3.70

21.65
21.65 Sqm
21.65 Sqm
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from
approved source having minimum crushing strength of 40 Kg/Sqcm. including cost
and conveyance of all materials like cement, sand, bricks, water etc., to site,
including seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing cement mortar, constructing masonry,
scaffolding charges, lift charges, curing, etc., complete for finished item of work.

Ground Floor
for Septic tank L/W
for septic tank C/W

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using


20mm size graded machine crushed hard granite metal (coarse aggregate) from
approved quarry including cost and conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage
charges, sales & other taxes on all materials including all operational, incidental and
labour charges such as weigh batching, machine mixing, laying concrete, curing
etc.,complete but excluding cost of steel and its fabrication charges for finished item
of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department including centering, shuttering,
laying concrete, vibrating, curing etc. complete for Slab of 125mm thick

125mm Thk Slab


Ground Floor Slab
Setpci tank slab

NO'S

10.24
5.25
15.49 Cu.M.
3.00 0.115
1.20
0.83
Septic tank Baffle wall
1X2
X
2
1.80
0.23
1.20
1.99
for water sump L/w
2
1.34 0.23
1.20
1.48
C/w
2X2
5.85 0.23
1.50
2.02
for Taper wall on septic L/w
1X1
3.47 0.23
1.50
1.20
for Taper wall on septic L/w
1X1
7.51 Cu.M.
23.00 Cu.M.
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS
1786-1979) of different diameters for RCC works, including labour charges for
straightening, cutting, bending to required sizes and shapes, placing in position with
cover blocks of approved materials and size and tying and lapsplicing with binding
wire of 18 SWG, forming grills for reinforcement work as per approved designs and
drawings, including cost and conveyance of steel bars, including all wastages such
as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and other taxes on all materials
etc., complete for finished item of work in all floors. (APSS No.126)

294427110.xls

1X2
1X2

5.85
3.00

0.35
0.35

SEPTIC TANK bala

1100.40

M25 slab 1
23818

2.50
2.50

4415.80

101552

62of221

Sl.
No.

DESCRIPTION OF ITEM

NO'S

D/H

Quantity UNIT
0.300 Mts

Rate
61763.00

TOTAL AMOUNT

294427110.xls

SEPTIC TANK bala

Amount
2013-14
18529
181370

63of221

Name of the work : Construction of PR Division Office anf Sub Division Office in Kothagudem, Khammam
District
KITCHEN CUM DINING
DETAIL CUM ABSTRACT ESTIMATE
Sl.
No.
1
1

DESCRIPTION OF ITEM

NO'S

D/H

Quantity

2
3
4
5
6
7
Earth work excavation for foundations and depositing on bank for all lifts and with an
initial lead of 10m including all operational, incidental, seigniorage charges, labour
charges such as shoring ,sheeting, planking, strutting, dewatering etc. complete for
finished item of work as per SS - 20 B (APSS 308). for Building Foundation

UNIT

Rate

Amount
2013-14

10

7510/B/TW/PVC, 1
24-12-2013
2X7
3X1

1.50
1.50

1.50
1.50

1.50
1.50

47.25
10.13
57.38 cum

2X5
2X1
3X1

3.06
3.58
6.03

0.40
0.40
0.40

0.25
0.25
0.25

3.06
0.72
1.81
5.59 cum

1X1
1X1

3.65
6.10

0.40
0.40

0.25
0.25

0.37
0.61
0.98 cum

2X1

1.35

1.00

0.40

1.08
1.08 cum

7510/B/TW/PVC, 5
31-12-2013

7510/B/TW/PVC, 9
09-01-2013

7510/B/TW/PVC, 21
09-04-2014

Total qty 2013-14


65.02 cum
Plain Cement Concrete (1:4:8) proportion (cement: fine aggregate: Coarse aggregate)
using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from
approved quarry including cost and conveyance of all materials like cement, sand,
coarse aggregate, water etc. to site, mixing concrete in concrete mixer including
seigniorage charges, sales & other taxes on all materials, all operational, incidental, and
labour charges such as laying and ramming concrete in layers in position not exceeding
15cm, finishing top surface, curing concrete, etc., complete for finished item of work.
(APSS No. 402).

253.90

16507

3524.40

1427

7510/B/TW/PVC, 22
16-05-2014
2X1

294427110.xls

1.35

K&D

1.00

0.15

0.41
0.41 cum

64of221

Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate)
using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from
approved quarry including cost and conveyance of all materials like cement, sand,
coarse aggregate, water etc. to site, mixing concrete in concrete mixer including
seigniorage charges, sales & other taxes on all materials, all operational, incidental, and
labour charges such as laying and ramming concrete in layers in position not exceeding
15cm, finishing top surface, curing concrete, etc., complete for finished item of work.
(APSS No. 402).
7510/B/TW/PVC, 2
24-12-2013
2X7
3X1

1.50
1.50

1.50
1.50

0.10
0.10

3.15
0.68
3.83 cum

2X5
2X1
3X1

3.06
3.58
6.03

0.40
0.40
0.40

0.08
0.08
0.08

0.98
0.23
0.58
1.79 cum

1X1
1X1

3.65
6.10

0.40
0.40

0.08
0.08

0.12
0.20
0.31 cum

1
1
1
1
1

6.10 10.65
6.10 3.10
2.45 6.10
2.55 3.65
3.35 3.65

0.08
0.08
0.08
0.08
0.08

5.20
1.51
1.20
0.74
0.98
9.63 cum
15.55 cum

7510/B/TW/PVC, 6
24-12-2013

7510/B/TW/PVC, 9
09-01-2013

7510/B/TW/PVC, 9
09-01-2013
X
X
X
X
X

1
1
1
1
1

Total qty 2013-14


3

#REF!

#REF!

#REF!

#REF!

Filling with useful available excavated earth (excluding rock) in trenches, sides of
foundations and basement with initial lead in layers not exceeding 15 cm thick,
consolidating each deposited layer by watering and ramming including cost and
conveyance of water to work site and all operational, incidental, labour charges, hire
charges of T & P etc., complete for finished item of work. APSS No.309 & 310

7510/B/TW/PVC, 9
09-01-2013
1
1
1
1
1

X
X
X
X
X

1
1
1
1
1

6.10 10.65
6.10 3.10
2.45 6.10
2.55 3.65
3.35 3.65

0.40
0.40
0.40
0.40
0.40

Total qty 2013-14

294427110.xls

K&D

25.99
7.56
5.98
3.72
4.89
48.14
48.14 cum

65of221

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm
size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other
taxes on all materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding
cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the
department including centering, shuttering, laying concrete, vibrating, curing etc.
complete for Footings, Pedestals, Plinth Beam

7510/B/TW/PVC, 4
24-12-2013
FOOTINGS
7X2
3X1

1.50
1.50

1.50
1.50

0.33
0.33

10.40
2.23
12.62 Cum

7721.50

97465

3.67
3.67 Cum

8038.70

29518

7510/B/TW/PVC, 4
24-12-2013
PEDASTALS
17 X 1

0.60

0.60

0.60

7510/B/TW/PVC, 8
06-01-2014
PLINTH BEAM
2X1
3X1
14 X 1

20.95
6.10
0.07

0.23
0.23
0.23

0.30
0.30
0.30

2.89
1.26
0.07
4.22 Cum

M25 Plin

0.25
0.25 Cum
4.47 Cum

M25 Plin
43476

7510/B/TW/PVC, 11
31-01-2014
PLINTH BEAM
1X1

3.65

0.23

0.30

Total qty 2013-14


6

9719.05

Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm
size graded machine crushed hard granite metal (coarse aggregate) from approved
quarry including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and including Seigniorage charges, sales & other
taxes on all materials including all operational, incidental and labour charges such as
weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding
cost of steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the
department including centering, shuttering, laying concrete, vibrating, curing etc.
complete for Columns

7510/B/TW/PVC, 4
24-12-2013
Columns upto GL

17 X 1

0.30

0.30

0.50

0.77
0.77 Cum

M25 Co

2.84
2.84 Cum

M25 Co

7510/B/TW/PVC, 11
31-01-2014
Columns

294427110.xls

14 X 1

0.30

K&D

0.30

2.25

66of221

7510/B/TW/PVC, 17
06-02-2014
Columns

0.30

0.30

0.45

0.57
0.57 Cum
4.17 Cum
Total qty 2013-14
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
all materials including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the
department including centering, shuttering, laying concrete, curing etc. complete for
Lintels

7510/B/TW/PVC, 16
07-02-2014
Lintels beam

14 X 1

2X1
1X1

21.00
3.35

0.23
0.23

9807.85

M25 Co
40869

0.20
0.20

1.93
0.15
2.09 Cum
2.09 Cum
Total qty 2013-14
Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size
graded machine crushed hard granite metal (coarse aggregate) from approved quarry
including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on
all materials including all operational, incidental and labour charges such as weigh
batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of
steel and its fabrication charges for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from standard suppliers approved by the
department including centering, shuttering, laying concrete, curing etc. complete for
Sunshades / Chajjas for 75mm thick at Fixed end and 50mm thick at Free end and for a
width of 0.60 Mts. etc complete for finished item of work.

M25 L
9980.85

20821

7510/B/TW/PVC, 16
07-02-2014
2X1
1X1

21.00
3.35

0.60
0.60

25.20
2.01
27.21 Sqm
27.21 Sqm
Total qty 2013-14
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS
1786-1979) of different diameters for RCC works, including labour charges for
straightening, cutting, bending to required sizes and shapes, placing in position with
cover blocks of approved materials and size and tying and lapsplicing with binding wire
of 18 SWG, forming grills for reinforcement work as per approved designs and
drawings, including cost and conveyance of steel bars, including all wastages such as
overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire,
cover blocks and all incidental, operational, laour charges such as cutting, bending
placing in position, tying including sales and other taxes on all materials etc., complete
for finished item of work in all floors. (APSS No.126)

786.15

M25 Sun
21391

5271/C/TW, 3 to 4
24-12-2013

294427110.xls

K&D

67of221

1263.97 Kgs
1.264 Mts
5271/C/TW, 7
15-01-2014

510.882
0.511
344.780
0.345
2.12
Total qty 2013-14
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size
23 x 11 x 7 Cm from approved source having minimum crushing strength of 40
Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks,
water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing cement mortar, constructing
masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of
work.

Kgs
Mts
Kgs
Mts
Mts

61763.00

130915

4415.80

88802

7510/B/TW/PVC, 18
21-04-2014
2
2
3
1
1

Deduct lintels

x
x
x
x
x

5
1
1
1
1

3 x 1
2 x 1
1 x 1

3.050
3.580
6.030
3.650
6.030

0.230
0.230
0.230
0.230
0.230

1.250
1.250
1.250
1.250
0.950

(0.00+1.
6.500 0.230 20)/2
21.000 0.230
0.200
3.350 0.230
0.200

8.77
2.06
5.20
1.05
1.32
2.69
-1.93
-0.15
19.01 Cu.M.

7510/B/TW/PVC, 22
16-05-2014
2 x 1
2 x 1
2 x 1

1.350 1.000
1.350 0.700
1.350 0.350

0.250
0.150
0.150

Plastering to even surfaces of wall with CM (1:4) Prop: 12mm thick in


including cost and conveyance of all materials like cement, sand, water
including seigniorage charges, sales & other taxes on all materials, all
incidental charges and labour charges such as mixing mortar, finishing,
complete for finished item of work. (APSS 901,906)

0.68
0.28
0.14
1.10 Cu.M.
20.11 Cu.M.
single coat
etc., to site,
operational,
curing, etc.,

7510/B/TW/PVC, 20
17-04-2014
2X1
2X1
2X1

21.00
6.50
6.50

3.50
3.50
(0.00+1.20/2)

Total qty 2013-14

294427110.xls

K&D

147.00
45.50
7.80
200.30 Sqm
200.30 Sqm

121.85

Plasterin
24407

68of221

10

Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top
coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of
all materials like cement, screened sand, water etc., to site, seigniorage charges, sales &
other taxes on all materials, all operational, incidental and labour charges such as
mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves
wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven
Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904)

7510/B/TW/PVC, 20
17-04-2014
127.73
15.73
11.50
23.73
21.78
16.58
14.52
-3.29
-2.20
-17.29
-2.07
-8.40
198.30 Sqm
Supply and fixing of Door size 0.98 x 2.00 M Single Leaf with Door Frame of Medium
Teak wood Section 100 mm x 75 mm and shutter of 35mm thick of solid bond wood
block board type with commercial play on both faces, Hardware fixtures ie., MSPC
Butt Hinges 150mm Long 6 nos, MSPC Handles 150 mm Long 2 Nos MSPC Tower
Bolt 300mm long 1 Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos
including Including Labour charges for making of door, fixing of fixtures etc., and cost
and conveyance of all materials to site, taxes extra for finished item of work.
1
1
1
1
2
2
2
2
2
7
1
4

10

X
x
x
x
x
x
x
x
x
x
x
x

2
2
2
2
1
1
2
1
1
1
1
1

(13.60+6.05)
3.25
6.05
1.30
6.05
0.95
3.65
3.25
3.35
3.25
2.55
3.25
6.05
(0.00+1.20)/2
1.22
1.35
1.83
0.60
1.83
1.35
1.53
1.35
1.05
2.00

317.40

62939

8843.04

35372

1026.68

90533

7510/B/TW/PVC, 23
16-05-2014
4X1

10

4.00
4.00
Total qty 2013-14
4.00 each
Flooring and Treads with Polished shabad / Tandur stone minimum 15 to 18 mm thick of
size (0.254M x0.254M) set over base coat of CM (1:8) over already laid CC bed / RCC
Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per
sqm. & Jointed with neat cement to full depth including cost of all materials like cement,
sand, and water and flooring stones etc., complete, including seigniorage charges, labour
charges for dressing of flooring stones etc., complete for finished item of work, .

7510/B/TW/PVC, 24
16-05-2014
1X1
1X1
1X1

294427110.xls

6.10 10.60
6.10 2.30
2.60 3.65
Total qty 2013-14

K&D

64.66
14.03
9.49
88.18 each

69of221

10

Providing Skirting to internal walls and Risers of Steps to 15 cm height with Polished
shabad / Tandur stone minimum 15 to 18 mm thick of size (0.254M x0.254M) length
equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry
of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white
cement paste mixed with pigment of matching shade to full depth, including cost of all
materials like tiles, cement, sand and water etc., complete including seigniorage charges,
etc., complete for finished item of work,
7510/B/TW/PVC, 25
16-05-2014
(6.10+10.60)
0.10
3.34
(6.10+2.30)
0.10
1.68
(2.60+3.65)
0.10
1.25
1.35
0.45
3.65
1.05
Deduct
0.10
-0.32
Total qty 2013-14
9.60 each
Flooring with ceramic tiles 7.3mm thick of 1st quality all shades of makes Jhonson &
Jhonson, Kajaria, Nitco and Marbonite, set over base coat of cement mortar (1:8), 12
mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of
honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement
paste to full depth mixed with pigment of matching shade, including cost of all materials
like cement, sand water and tiles etc., complete, including seigniorage charges, etc.,
complete for finished item of work.
1
1
1
3
3

10

X
X
X
X
X

2
2
2
2
1

994.30

9545

869.25

16177

524.35

5280

7510/B/TW/PVC, 25
16-05-2014
6.10 3.05
18.61
Total qty 2013-14
18.61 each
Dadooing to walls with Decorated white back ground glazed tiles 200mm x 152mm 1st.
quality of any bramd as approved by Engineer - in - charge and set over a base coat of
CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed
with white cement paste mixed with pigment of matching shade including cost and
conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage
charges, sales and other taxes on all materials, C921 such as mixing of cement mortar,
laying in position, curing, lift charges etc., complete for finished item of work
1X1

10

7510/B/TW/PVC, 26
16-05-2014
6.10
1.65
10.07
Total qty 2013-14
10.07 each
Painting to New External Walls with two coats of Polymer Plastic Emulsion paint of
Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and
shade as approved by the Engineer - in - Charge over base coat of cement primer water
base grade -II exterior making three coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered materials, including cost and
conveyance of all materials, including cost and conveyance of all materials, cost of
brushes, water to site, etc., sales & other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges, curing etc., complete for finished item
of work in all floors for external Walls.(APSS No. 911)
1X1

10

7510/B/TW/PVC, 27
17-04-2014
1
1
1
1

294427110.xls

X
x
x
x

2
2
2
2

(13.60+6.05)
6.05
6.05
3.65

K&D

3.25
1.30
0.95
3.25

127.73
15.73
11.50
23.73

70of221

2
2
2
2
2
7
1
4

x
x
x
x
x
x
x
x

1
1
2
1
1
1
1
1

3.35
2.55
6.05
1.22
1.83
1.83
1.53
1.05

3.25
3.25
(0.00+1.20)/2
1.35
0.60
1.35
1.35
2.00

21.78
16.58
14.52
-3.29
-2.20
-17.29
-2.07
-8.40
198.30 Sqm
Painting to New Internal Walls with two coats of Polymer Plastic Emulsion paint of
Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and
shade as approved by the Engineer - in - Charge over base coat of cement primer water
base grade -II exterior making three coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered materials, including cost and
conveyance of all materials, including cost and conveyance of all materials, cost of
brushes, water to site, etc., sales & other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges, curing etc., complete for finished item
of work in all floors for external Walls.(APSS No. 911)

130.70

25917

130.70

26179

166.15

4129

7510/B/TW/PVC, 28
17-04-2014
2X1
2X1
2X1

30

21.00
6.50
6.50

147.00
45.50
7.80
200.30 Sqm
Total qty 2013-14
200.30 Sqm
Painting to New Iron work with two coats of ready mixed synthetic enamel paint first
quality all shades to give an even shade over base coatof wood Primer finishing with
putty for wood work after thouroughly brushing the surface to remove all remains
including cost and conveyance of all materials to site, sales & other taxes, all
operational, incidental and labour charges etc., complete for finished item of work.(3
coats) (APSS No. 1201 & 1212).in All Floors
2
2
7
1

X
X
X
X

1
1
1
1

3.50
3.50
(0.00+1.20/2)

1.22
1.35
1.83
0.60
1.83
1.35
1.53
1.35
Total qty 2013-14

3.29
2.20
17.29
2.07
24.85 Sqm

TOTAL AMOUNT

Asst. Engineer
TW: Manuguru

294427110.xls

Dy.Executive Engineer
TW : Palvancha

K&D

#REF!

Executive Engineer
TW : Bhadrachalam

71of221

Name of the work : Construction of Post Matric Hostel for Girls at Palvancha (V&M) in Khammam
District
WATER SUPPLY AND SANITARY ARRANAGEMENTS- KITCHEN CUM DINNING (2013-14)
TRIBAL WELFARE BUILDING
Sl.
No.

Description of Work

Amount
(Rs.)

Total Qty

Unit

Rate

3.00

Each Nos

5488.00

16464

12

Each No

1553.40

18641

TOTAL :

35105.00

Constructing 904.0 mm (30) dia brick masonry


inspection chamber as per IS - 4111: Part-1:1986 with
cement mortar (1:6) prop using 2nd Class Clay Bricks
of 225 mm thick from approved source having a
minimum crushing strength of 5 N/sq.mm including
plastering with cement mortar 1:3 prop; thick both
inside and outside fitted with 20 dia RCC manhole
covers and frames including excavating pits up to a
depth of 904 mm (3'-0") in all sorts of soils (exculding
rock) and laying cement conrete (1:4:8) 150 mm thick
using 40 mm HBG Metal and P.C.C. 1:2:4 benching
and channel 100 mm thick as per Standard
specification and including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site,
cost of seigniorage charges on all materials and all
incidental and operational, labour charges like mixing
cement mortar, constructing masonry, lift charges,
curing, sales and other taxes on all materials etc.,
complete for finished item of work. (A.P.S.S. No.
1325).
7610/B/TW, 25, 19-04-2014

Supplying & Fixing Orissa Pan 580 mm x 440 mm


white glazed W.C 1st quality ISI marked conforming
to IS:2556-Part-3-1981 with
"P" or "S" trap
Hindware/ Parryware/ Neycer - ISI mark 580 mm x
440mm as approved by the Engineer-in-charge fixed
in brick masonry with necessary S trap of water
closet, shall be encased in C.C. (1:2:4) 6" alround
well above the joint, to stop leakage at the joint, cost
& conveyance of all materials and labour charges etc.,
including sales and other taxes on all materials
complete for finished item of work for all floors.

7610/B/TW, 25, 19-04-2014

294427110.xls

KD-WS

72 of 221

Name of the work : Construction of PR Division Office anf Sub Division Office in
Kothagudem, Khammam District
WATER SUPPLY AND SANITARY ARRANAGEMENTS- TOILET BLOCK (2013-14)
TRIBAL WELFARE BUILDING
Sl. No.

Description of Work

Total Qty

Unit

Rate

Amount
(Rs.)

Supplying, laying, jointing and testing 152.4 mm SWG pipes


of ISI make conforming to ISI 651 & 4127 with airtight
cement joints in CM 1:5:1 prop. including excavation of
trenches and socket pits in any soil (except rock requiring
blasting) upto 914.4 mm (3'0") depth and refilling with
watering and tamping including cost and conveyance of all
materials to site, all labour charges, sales and other taxes on
all materials etc., complete for finished item of work.
(A.P.S.S.No. 1301 & 1318)
5281/C/TW, P.1
1
1

x
x

1
1

95.00
90.00

95
90

2
1

x
x

1
1

10.00
15.00

20
15
220.00

m Rmt

386.95

85129

5.00
3.00
4.50
2.30
8.30
5.00
28.10

Each Nos

243.30

6837

Each Nos

175.00

3045

5281/C/TW, P.10

Supplying, laying, jointing and testing 101.6 mm SWG pipes


of ISI make conforming to ISI 651 & 4127 with airtight
cement joints in CM 1:5:1 prop. including excavation of
trenches and socket pits in any soil (except rock requiring
blasting) upto 914.4 mm (3'0") depth and refilling with
watering and tamping including cost and conveyance of all
materials to site, all labour charges, sales and other taxes on
all materials etc., complete for finished item of work.
(A.P.S.S.No. 1301 & 1318)
5281/C/TW, P.2
1
1
1
1
1
1

x
x
x
x
x
x

1
1
1
1
1
1

5.00
3.00
4.50
2.30
8.30
5.00

Supplying, laying, jointing and testing 63 mm SWG pipes of


ISI make conforming to ISI 651 & 4127 with airtight cement
joints in CM 1:5:1 prop. including excavation of trenches and
socket pits in any soil (except rock requiring blasting) upto
914.4 mm (3'0") depth and refilling with watering and
tamping including cost and conveyance of all materials to
site, all labour charges, sales and other taxes on all materials
etc., complete for finished item of work. (A.P.S.S.No. 1301
& 1318)
5281/C/TW, P.3
1
1

x
x

1
1

8.60
4.80

8.6
4.8

4
17.40

5281/C/TW, P.11

294427110.xls

294427110.xls

73 of 221

Sl. No.
4

Description of Work

Total Qty

Unit

Rate

Amount
(Rs.)

Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or


equivalent CPVC Pipes and Fittings to meet the requirement
of ASTM-D 2846 and are produced in CTS (Copper Tube
Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR
13.5 pipes are made from idential CPVC compounds having
the same physical Properties for Hot and Cold Water (IS
15778:2007

5281/C/TW, P.3
1
1

x
x

1
1

26.55
17.00

26.55
17

5.80

17.4
60.95

5281/C/TW, P.9

Each Nos

225.75

13759

Supplying & fixing CI Nahany traps 1st quality ISI marked


conforming to IS:1729-1979 with C.P. Grating fixing with
white cement as per site requirements with standard practice
100 mm dia Inlet- 75 mm (3") outlet pipe - 4 Kgs with N.P.
Cover for all floors, including cost and conveyance of all
materials to site, all labour charges, sales and other taxes on
all materials etc., complete for finished item of work. (APSS
No 1326) for All Floors. (BMW-C.41)

5281/C/TW, P.4
7
3
5

x
x
x

1
1
1

7
3
5

4
19.00

Each Nos

361.45

6868

9
9.00

Each Nos

5488.00

49392

5281/C/TW, P.11

Constructing 904.0 mm (30) dia brick masonry inspection


chamber as per IS - 4111: Part-1:1986 with cement mortar
(1:6) prop using 2nd Class Clay Bricks of 225 mm thick from
approved source having a minimum crushing strength of 5
N/sq.mm including plastering with cement mortar 1:3 prop;
thick both inside and outside fitted with 20 dia RCC
manhole covers and frames including excavating pits up to a
depth of 904 mm (3'-0") in all sorts of soils (exculding rock)
and laying cement conrete (1:4:8) 150 mm thick using 40
mm HBG Metal and P.C.C. 1:2:4 benching and channel 100
mm thick as per Standard specification and including cost
and conveyance of all materials like cement, sand, bricks,
water etc., to site, cost of seigniorage charges on all materials
and all incidental and operational, labour charges like
mixing cement mortar, constructing masonry, lift charges,
curing etc., complete for finished item of work as per
Standard specification.

5281/C/TW, P.4
9
7

Constructing 457.2mm x 457.2mm (1'-6" x 1'-6") brick in


CM (1:6) prop. Masonry inspection chamber upto 914.4mm
(3'-0") and fitted with light weight 457.2mm x 457.2mm (1'6" x 1"-6") frame and cover of 20kg., including cost and
convenyance of all materials to site, all labour charges, sales
and otehr taxes on all materials etc., complete for finished
item of work
5281/C/TW, P.5
15 x

294427110.xls

294427110.xls

15

74 of 221

Sl. No.

Description of Work

Amount
(Rs.)

Total Qty

Unit

Rate

2
17.00

Each Nos

3442.80

58528

5281/C/TW, P.11
2
8

Supplying and fixing 580 mm x 440 mm long Orissa pan


white glazed Water Closet 1st qualityISI marked confirming
to IS:2556-Part-3-1981 with "P" or "S" trap Hindware /
Parryware / Neycer with brick masonry seat, CC squatting
plate and fixing 12.70mm dia NP Push cock 1st quality , P
trap or S trap of Indian W.C. shall be encased on CC (1:2:4)
150mm alround well above the joint to stop leakage at the
joint etc., complete including cost and conveyance of all
materials to site, cost of CC bed, labour charges and
seigniorage charges etc., complete for finished item of work.

5281/C/TW, P.5
1

11 x

11
17.00

Each Nos

1553.40

26408

1
1.00

Each Nos

174.50

175

3
1
4.00

Each Nos

812.85

3251

5281/C/TW, P.6

Supply and Fixing European Water Closet of 1st quality


conforming to IS:2556-part-2-1973 of Hindustan / Neycer or
Parryware make white glazed with 'S' trap including cost of
plastic sheet and lid for European Water Closet with rubber
or plastic buffers as per IS:2548-1996 and PVC low level
single flush 10 litere capacity system with internal
components and short bend of make Parryware slim line
including cost and conveyance of all materials to site, labour
charges for fixing etc., complete for finished item of work.
for all floors(BMW-D.13)

5281/C/TW, P.7
1
10

Supplying & Fixing 550 x 400 mm Indian make Flat Back


Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality
conforming to IS:2556-Part-4:1972 with waste fittings like
rubber plug, chain, 32 mm nominal size C.P. Fitting with
parallel pipe thread conforming to IS:2963-1979 and fitted
with 15 mm nominal bore single Chromium Plated Pillar Tap
of 1st quality Indian make 400 grams Seiko/
Esso/Nice/Senior or equivalent complete with standard CI
brackets including wooden block, 12.7mm PVC connection
with Brass union nut CP coated, 12.7mm dia first qualifty NP
angle stop cock, 38.1mm CP waste coupling , 31.75mm dia
PVC flexible waste pipe of 914.4mm length of first quality
including cost and conveyance of all materials to site, all
labour charges, sales and other taxes on all materials etc.,
complete for finished item of work. for All Floors (.BMWG.08)

5281/C/TW, P.8
3
1
11

x
x

1
1

Supplying and fixing NP bib taps of size 12.70mm dia of


Indian make Seiko or equivalent including cost and
conveyance of all materials, labour charges etc., complete for
finished item of work in all floors.
5281/C/TW, P.8
6 x 1
- -

294427110.xls

294427110.xls

75 of 221

Sl. No.

Description of Work
11 x
16 x

12

1
1

Amount
(Rs.)

Total Qty

Unit

Rate

11
16
33.00

Each Nos

254.90

8412

14
26
30
13.4
24.4
107.80

Rmt Nos

329.50

35520

Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or


equivalent CPVC Pipes and Fittings to meet the requirement
of ASTM-D 2846 and are produced in CTS (Copper Tube
Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR
13.5 pipes are made from idential CPVC compounds having
the same physical Properties for Hot and Cold Water (IS
15778:2007
5281/C/TW, P.9
32mm Dia

1
1
1
1
1

x
x
x
x
x

2
2
2
2
2

7.00
13.00
15.00
6.70
12.20

TOTAL :

294427110.xls

294427110.xls

297324.00

76 of 221

Name of the work : Construction of Post Matric Hostel for Girls at Palvancha (V&M) in Khammam
District
DETAILED CUM ABSTRACT ELECTRICAL ESTIMATE
GROUND FLOOR
SL.
NO

Description of Item.

No.

Length

Qty.

Unit

Rate

per

Amount
2013-14

GROUND FLOOR
1 Supply and fixing of ISI mark 25mm dia
2.2mm thick PVC conduit pipe Sudhakar /
Macoplast / Modimake concealed in roof
slab with all required acessories including
No.14 SWG GI wire for earth continuity
including chiseling the wall wherever
necessary , including necessary masonery
work for light/fan point and seperate plug
point with teak wood deep box including
cost and conveyance of all materials to site
and labour charges, sales tax etc., complete
for finished item of work.
(SSR
2012-13, item No.1.4.1)

GROUND FLOOR
Vide page No 34 of MB No7506/B/TW Dt 4.112013

30 x

3.05

183.00
183.00

3.05

183.00
183.00

60 x

3.05

183.00
183.00

Ground Floor
First Floor
Second Floor
Dining Hall
Toilet

40
40
40
20
2

x
x
x
x
x

1
1
1
1
5

3.05
3.05
3.05
3.05
3.05

122
122
122
61
30.5
457.50

Toilet
Toilet
Toilet

9x
10 x

1
1

3.05
3.05

27.45
30.5
57.95

FIRST FLOOR
Vide page No 52 of MB No7506/B/TW Dt 20.112013

60 x
SECOND FLOOR
Vide page No 72 of MB No7506/B/TW Dt 3.12.2013

P. No. 1. 5282/C/TW
17.5.14

Total qty 2013-14

1064.45 Mt.

70.35 1Rmt

74884
74884.00

294427110.xls

Ele.Dor.GF bala

77

Sl.
No.
1

As per sanctioned estimate

Description
UNIT
GF Earth work excavation for foundations and depositing
on bank for all lifts and with an initial lead of 10m
including all operational, incidental, seigniorage
charges, labour charges such as shoring ,sheeting, 1
planking, strutting, dewatering etc. complete for
finished item of work as per SS - 20 B (APSS 308).
for Building Foundation
GF Plain Cement Concrete (1:5:10) proportion (cement:
fine aggregate: Coarse aggregate) using 40mm size
Hard Broken Granite (IS383, 1970) machine crushed
metal from approved quarry including cost and
conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, mixing concrete in
concrete mixer including seigniorage charges, sales &
other taxes on all materials, all operational, incidental, 1
and labour charges such as laying and ramming
concrete in layers in position not exceeding 15cm,
finishing top surface, curing concrete, etc., complete
for finished item of work (APSS No. 402) for Levelling
Course and Flooring Bed

1
Cu
m

QTY

485.00

RATE

Excess

AMOUNT

224.3

GF

108786

FF

SF

395.78

TF

TB

KD

ST

QTY

56.23

65.02

45.45

562.48

RATE

Less

Remarks

AMOUNT

253.90

142813

34027

###

1
Cu
m

69.00

3060.35

211164

#REF!

7.07

15.55

6.49

#REF!

#REF!

#REF!

#REF!

#REF!

###
3

GF Filling with useful available excavated earth (excluding


rock) in trenches, sides of foundations and basement
with initial lead in layers not exceeding 15 cm thick,
consolidating each deposited layer by watering and
ramming including cost and conveyance of water to 1
work site and all operational, incidental, labour
charges, hire charges of T & P etc., complete for
finished item of work. APSS No.309 & 310

1
Cu
m

456.00

17.7

8071

#REF!

48.14

#REF!

#REF!

#REF!

#REF!

#REF!

###
4

GF Filling with Gravel in trenches, sides of foundations


and basement with initial lead in layers not exceeding
15cm thick, consolidating each deposited layer by
watering and ramming including all operational,
incidental, labour charges, seignorage charges, hire 1
charges of T & P etc., complete for finished item of
work. APSS No.309 & 310

1
Cu
m

202.00

252.65

51035

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

###
5

GF Plain Cement Concrete M15 grade nominal mix


(1:2.5:5) proportion (cement: fine aggregate: Coarse
aggregate) using 20mm size Hard Broken Granite
(IS383, 1970) Machine Crushed graded metal from
from approved quarry including cost and conveyance
of all materials like cement, sand, coarse aggregate,
water etc. to site, including seigniorage charges, sales
& other taxes on all materials, all operational, 1
incidental and labour charges such as mixing, laying,
curing concrete, etc., complete for finished item of
work for Bed Blocks and Hold Fasts (APSS No. 402)
GROUND FLOOR

1
Cu
m

2.30

4579.45

10533

#REF!

1.30

#REF!

#REF!

#REF!

#REF!

#REF!

###

294427110.xls

CS

78of221

Sl.
No.
6

As per sanctioned estimate

Description
UNIT
FF Plain Cement Concrete M15 grade nominal mix
(1:2.5:5) proportion (cement: fine aggregate: Coarse
aggregate) using 20mm size Hard Broken Granite
(IS383, 1970) Machine Crushed graded metal from
from approved quarry including cost and conveyance
of all materials like cement, sand, coarse aggregate,
water etc. to site, including seigniorage charges, sales
& other taxes on all materials, all operational, 1
incidental and labour charges such as mixing, laying,
curing concrete, etc., complete for finished item of
work for Bed Blocks and Hold Fasts (APSS No. 402)
FIRST FLOOR

1
Cu
m

QTY

1.00

RATE

4743.3

Excess

AMOUNT

GF

4743

FF

SF

TF

TB

KD

0.76

ST

QTY

0.76

RATE

Less

Remarks

AMOUNT

5039.30

3825

918

###
7

SF Plain Cement Concrete M15 grade nominal mix


(1:2.5:5) proportion (cement: fine aggregate: Coarse
aggregate) using 20mm size Hard Broken Granite
(IS383, 1970) Machine Crushed graded metal from
from approved quarry including cost and conveyance
of all materials like cement, sand, coarse aggregate,
water etc. to site, including seigniorage charges, sales
& other taxes on all materials, all operational, 1
incidental and labour charges such as mixing, laying,
curing concrete, etc., complete for finished item of
work for Bed Blocks and Hold Fasts (APSS No. 402)
SECOND FLOOR

1
Cu
m

1.00

5215.85

5216

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

###
5

GF Plain Cement Concrete (1:4:8) proportion (cement:


fine aggregate: Coarse aggregate) using 40mm size
Hard Broken Granite (IS383, 1970) machine crushed
metal from approved quarry including cost and
conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, mixing concrete in
concrete mixer including seigniorage charges, sales &
other taxes on all materials, all operational, incidental, ###
and labour charges such as laying and ramming
concrete in layers in position not exceeding 15cm,
finishing top surface, curing concrete, etc., complete
for finished item of work. (APSS No. 402).

25.54

0.41

25.94

3524.40

91426

91426

###
8

GF Plain Cement Concrete M25 Grade of Concrete


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Steps GROUND FLOOR

1
Cu
m

1.00

6513.6

6514

0.00

6514

##

294427110.xls

CS

79of221

Sl.
No.
9

As per sanctioned estimate

Description
UNIT
FF Plain Cement Concrete M25 Grade of Concrete
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Steps FIRST FLOOR

1
Cu
m

QTY

1.00

RATE

6751.2

Excess

AMOUNT

GF

FF

SF

6751

TF

TB

KD

ST

QTY

0.00

RATE

Less

Remarks

AMOUNT

6751

###
10

SF Plain Cement Concrete M25 Grade of Concrete


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Steps SECOND FLOOR

1
Cu
m

1.00

7333.3

7333

0.00

7333

##
11

TF Vibrated Reinforced Cement Concrete


(1:5:10)
proportion nominal mix (cement: fine aggregate:
Coarse aggregate) using 20mm size Hard Broken
Granite (IS383, 1970) Machine Crushed Graded
metal from approved quarry including cost and
conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage
charges, sales & other taxes on all materials, all 1
operational, incidental, and labour charges such as
mixing, laying concrete, finishing top surface, curing
concrete, etc., complete for finished item of work for
(APSS No. 402) Dummy Columns THIRD FLOOR

1
Cu
m

2.00

6360.9

12722

0.00

12722

##

294427110.xls

CS

80of221

Sl.
No.
12

As per sanctioned estimate

Description
UNIT
GF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Footings,

1
Cu
m

QTY

61.50

RATE

6715.25

Excess

AMOUNT

412988

GF

FF

SF

81.36

TF

TB

KD

1.94

12.62

ST

QTY

95.92

RATE

7721.50

Less

Remarks

AMOUNT

740630

327642

###
GF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Pedastal

1
Cu
m

8.00

6715.25

53722

12.96

3.67

16.63

8038.70

133700

79978

###
GF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Plinth beam

1
Cu
m

18.50

6715.25

124232

23.30

4.47

27.77

9719.05

269881

145649

###

294427110.xls

CS

81of221

Sl.
No.
13

As per sanctioned estimate

Description
UNIT
GF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Columns GROUND
FLOOR

1
Cu
m

QTY

16.00

RATE

7703

Excess

AMOUNT

123248

GF

FF

SF

18.85

TF

TB

KD

4.17

ST

QTY

23.02

RATE

Less

Remarks

AMOUNT

9807.85

225767

102519

###
14

FF Vibrated Reinforced Cement Concrete M25 Grade


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Columns FIRST
FLOOR

1
Cu
m

8.00

8084.25

64674

11.59

11.59

10212.40

118382

53708

###
15

SF Vibrated Reinforced Cement Concrete M25 Grade


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Columns SECOND
FLOOR

1
Cu
m

8.00

8808.65

70469

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

###

294427110.xls

CS

82of221

Sl.
No.
16

As per sanctioned estimate

Description
UNIT
TF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Columns THIRD
FLOOR

1
Cu
m

QTY

1.50

RATE

9534.4

Excess

AMOUNT

GF

FF

SF

14302

TF

TB

KD

1.39

ST

QTY

1.39

RATE

11021.50

Less

Remarks

AMOUNT

15320

1018

###
17

GF Reinforced
Cement
Concrete
M25
Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Lintels GROUND FLOOR

1
Cu
m

4.80

7772.7

37309

1.31

0.40

2.09

3.80

9980.85

37883

574

###
18

FF Reinforced
Cement
Concrete
M25
Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Lintels FIRST FLOOR

1
Cu
m

2.00

8093.75

16188

1.73

1.73

10324.30

17809

1621

###

294427110.xls

CS

83of221

Sl.
No.
19

As per sanctioned estimate

Description
UNIT
SF Reinforced
Cement
Concrete
M25
Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Lintels SECOND FLOOR

1
Cu
m

QTY

2.00

RATE

8757.95

Excess

AMOUNT

GF

FF

SF

17516

4.76

TF

TB

KD

ST

QTY

4.76

RATE

10667.70

Less

Remarks

AMOUNT

50789

33273

###
20

GF Vibrated Reinforced Cement Concrete M25 Grade


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Beams GROUND
FLOOR

1
Cu
m

15.00

6868.25

103024

21.88

21.88

9150.25

200207

97183

###
21

FF Vibrated Reinforced Cement Concrete M25 Grade


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Beams FIRST
FLOOR

1
Cu
m

15.00

7138.35

107075

20.53

20.53

9434.50

193690

86615

###

294427110.xls

CS

84of221

Sl.
No.
22

As per sanctioned estimate

Description
UNIT
SF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Beams SECOND
FLOOR

1
Cu
m

QTY

15.00

RATE

7753

Excess

AMOUNT

GF

116295

FF

SF

TF

20.53

TB

KD

ST

QTY

20.53

RATE

9718.75

Less

Remarks

AMOUNT

199526

83231

###
23

TF Vibrated Reinforced Cement Concrete M25 Grade


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Beams THIRD
FLOOR

1
Cu
m

1.50

8367.6

12551

1.54

1.54

10003.00

15405

2854

###
24

GF Vibrated Reinforced Cement Concrete M25 Grade


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete ###
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 175mm
thick GROUND FLOOR

24.36

24.36

1382.30

33673

33673

###

294427110.xls

CS

85of221

Sl.
No.
24

As per sanctioned estimate

Description
UNIT
GF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
1
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1 Sqm
t
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 125mm
thick GROUND FLOOR

QTY

295.00

RATE

809.45

Excess

AMOUNT

238788

GF

FF

SF

777.68

TF

TB

41.29

KD

ST

QTY

21.65

840.61

RATE

Less

Remarks

AMOUNT

1100.40

925007

686219

###
21

FF Vibrated Reinforced Cement Concrete M25 Grade


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 140mm
thick FIRST FLOOR

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

##
25

FF Vibrated Reinforced Cement Concrete M25 Grade


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
1
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1 Sqm
t
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 125mm
thick FIRST FLOOR

245.00

841.2

206094

757.68

757.68

1133.85

859095

653001

###

294427110.xls

CS

86of221

Sl.
No.
26

As per sanctioned estimate

Description
UNIT
SF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
1
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1 Sqm
t
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 125mm
thick SECOND FLOOR

QTY

245.00

RATE

916.05

Excess

AMOUNT

GF

224432

FF

SF

TF

124.61

TB

KD

ST

QTY

124.61

RATE

Less

Remarks

AMOUNT

1167.35

145461

78971

###
27

TF Vibrated Reinforced Cement Concrete M25 Grade


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
1
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1 Sqm
t
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 125mm
thick THIRD FLOOR

19.00

990.85

18826

20.36

20.36

1200.85

24443

5617

###
24

GF Vibrated Reinforced Cement Concrete M25 Grade


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete ###
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 140mm
thick GROUND FLOOR

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

###

294427110.xls

CS

87of221

Sl.
No.
28

As per sanctioned estimate

Description
UNIT
GF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
1
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1 Sqm
t
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 100mm
thick GROUND FLOOR

QTY

6.00

RATE

Excess

AMOUNT

712

GF

FF

SF

4272

TF

TB

KD

ST

QTY

RATE

0.00

Less

Remarks

AMOUNT

4272

##
25

FF Vibrated Reinforced Cement Concrete M25 Grade


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 125mm
thick FIRST FLOOR

24.36

24.36

1421.65

34631

34631

##
29

FF Vibrated Reinforced Cement Concrete M25 Grade


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
1
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1 Sqm
t
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 100mm
thick FIRST FLOOR

6.00

741.4

4448

0.00

4448

###

294427110.xls

CS

88of221

Sl.
No.
26

As per sanctioned estimate

Description
UNIT
SF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 140mm
thick SECOND FLOOR

QTY

RATE

Excess

AMOUNT

GF

204.09

FF

SF

#REF!

TF

TB

KD

ST

QTY

#REF!

RATE

Less

Remarks

AMOUNT

#REF!

#REF!

#REF!

#REF!

###
26

SF Vibrated Reinforced Cement Concrete M25 Grade


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 175m thick
SECOND FLOOR

59.86

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

###
30

SF Vibrated Reinforced Cement Concrete M25 Grade


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
1
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1 Sqm
t
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 100mm
thick SECOND FLOOR

6.00

805.25

4832

0.00

4832

##

294427110.xls

CS

89of221

Sl.
No.
31

As per sanctioned estimate

Description
UNIT
GF Vibrated Reinforced Cement Concrete M25 Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
1
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1 Sqm
t
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 150mm
thick GROUND FLOOR

QTY

23.00

RATE

954.15

Excess

AMOUNT

GF

FF

SF

21945

TF

TB

KD

ST

QTY

0.00

RATE

Less

Remarks

AMOUNT

21945

##
32

FF Vibrated Reinforced Cement Concrete M25 Grade


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
1
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1 Sqm
t
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 150mm
thick FIRST FLOOR

23.00

988.25

22730

0.00

22730

###
33

SF Vibrated Reinforced Cement Concrete M25 Grade


corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
1
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1 Sqm
t
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including centering, shuttering, laying concrete,
vibrating, curing etc. complete for Slab of 150mm
thick SECOND FLOOR

23.00

1074.05

24703

0.00

24703

##

294427110.xls

CS

90of221

Sl.
No.
34

As per sanctioned estimate

Description
UNIT
GF Reinforced
Cement
Concrete
M25
Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete
1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with 1 Sqm
t
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Sunshades / Chajjas for
75mm thick at Fixed end and 50mm thick at Free end
and for a width of 0.60 Mts. etc complete for finished
item of work GROUND FLOOR

QTY

20.00

RATE

Excess

AMOUNT

563.3

11266

GF

FF

SF

18.36

TF

TB

KD

0.72

27.21

ST

QTY

46.29

RATE

786.15

Less

Remarks

AMOUNT

36391

25125

###
35

FF Reinforced
Cement
Concrete
M25
Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete
1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with 1 Sqm
t
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Sunshades / Chajjas for
75mm thick at Fixed end and 50mm thick at Free end
and for a width of 0.60 Mts. etc complete for finished
item of work FIRST FLOOR

20.00

592

11840

40.56

40.56

816.00

33097

21257

###
36

SF Reinforced
Cement
Concrete
M25
Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete
1
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with 1 Sqm
t
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Sunshades / Chajjas for
75mm thick at Fixed end and 50mm thick at Free end
and for a width of 0.60 Mts. etc complete for finished
item of work SECOND FLOOR

20.00

620.7

12414

12.60

12.60

845.85

10658

1756

###

294427110.xls

CS

91of221

Sl.
No.
37

As per sanctioned estimate

Description
UNIT
GF Reinforced
Cement
Concrete
M25
Grade
corresponding to IS 456 using 20mm size graded
machine crushed hard granite metal (coarse
aggregate) from approved quarry including cost and
conveyance of all materials like cement, fine
aggregate (sand) coarse aggregate, water etc., to site
and including Seigniorage charges, sales & other
taxes on all materials including all operational,
1
incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete 1 Sqm
t
but excluding cost of steel and its fabrication charges
for finished item of work (APSS No. 402) with
minimum cement content @ 380Kgs/Cum from
standard suppliers approved by the department
including
centering, shuttering, laying concrete,
curing etc. complete for Shelves of 25mm thick
GROUND FLOOR

QTY

10.00

RATE

380.3

Excess

AMOUNT

GF

FF

SF

TF

TB

KD

ST

3803

QTY

RATE

0.00

Less

Remarks

AMOUNT

3803

##
38

GF Brick Masonry in superstructure with CM (1:8) prop:


using second class bricks from approved source
having minimum crushing strength of 40 Kg/Sqcm.
including cost and conveyance of all materials like
cement, sand, bricks, water etc., to site, including
seigniorage charges, sales & other taxes on all
1
materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing
masonry, scaffolding charges, lift charges, curing, etc.,
complete for finished item of work. GROUND FLOOR

1
Cu
m

158.00

4020.55

635247

76.85

48.69

20.11

23.00

168.65

4415.80

744710

109463

###
39

FF Brick Masonry in superstructure with CM (1:8) prop:


using second class bricks of size 23 x 11 x 7 Cms
from approved source having minimum crushing
strength of 40 Kg/Sqcm. including cost and
conveyance of all materials like cement, sand, bricks,
water etc., to site, including seigniorage charges,
1
sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing cement
mortar, constructing masonry, scaffolding charges, lift
charges, curing, etc., complete for finished item of
work. FIRST FLOOR

1
Cu
m

56.00

4241.55

237527

55.00

55.00

4635.05

254928

17401

###
40

SF Brick Masonry in superstructure with CM (1:8) prop:


using second class bricks from approved source
having minimum crushing strength of 40 Kg/Sqcm.
including cost and conveyance of all materials like
cement, sand, bricks, water etc., to site, including
seigniorage charges, sales & other taxes on all
1
materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing
masonry, scaffolding charges, lift charges, curing, etc.,
complete for finished item of work. SECOND FLOOR

1
Cu
m

56.00

4462.45

249897

58.65

58.65

4854.20

284699

34802

###
41

TF Brick Masonry in superstructure with CM (1:8) prop:


using second class bricks from approved source
having minimum crushing strength of 40 Kg/Sqcm.
including cost and conveyance of all materials like
cement, sand, bricks, water etc., to site, including
seigniorage charges, sales & other taxes on all
1
materials, all operational, incidental and labour
charges such as mixing cement mortar, constructing
masonry, scaffolding charges, lift charges, curing, etc.,
complete for finished item of work. THIRD FLOOR

1
Cu
m

5.00

4683.4

23417

0.00

0.00

5149.95

23417

##

294427110.xls

CS

92of221

Sl.
No.
42

As per sanctioned estimate

Description
UNIT
GF Reinforced Brick Masonary walls of 11.5cm in CM(1:6)
using second class bricks of size 23 x 11 x 7 Cm
having a crushing strength of not less than
35.00kg/cm2 and using two mild steel bars of 6m dia
in every third layer of brick masory, with free joints of
the main block work including cost and seignorage
10
charges and conveyance of all materials and water
from approved sources to work site and all 10 Sqm
ts
operational, incidental, labour charges such as
scaffolding mixing mortor constructing masonary lift
charges, curing etc. complete but excluding the cost
of steel and its fabrication charges. GROUND FLOOR

QTY

217.00

RATE

4917.55

Excess

AMOUNT

106711

GF

FF

SF

13.81

TF

TB

KD

ST

QTY

13.81

RATE

554.20

Less

Remarks

AMOUNT

7654

99057

###
43

FF Reinforced Brick Masonary walls of 11.5cm in CM(1:6)


using second class bricks of size 23 x 11 x 7 Cm
having a crushing strength of not less than
35.00kg/cm2 and using two mild steel bars of 6m dia
in every third layer of brick masory, with free joints of
the main block work including cost and seignorage
10
charges and conveyance of all materials and water
from approved sources to work site and all 10 Sqm
ts
operational, incidental, labour charges such as
scaffolding mixing mortor constructing masonary lift
charges, curing etc. complete but excluding the cost
of steel and its fabrication charges. FIRST FLOOR

168.00

5359.65

90042

13.81

13.81

596.55

8238

81804

###
44

SF Reinforced Brick Masonary walls of 11.5cm in CM(1:6)


using second class bricks of size 23 x 11 x 7 Cm
having a crushing strength of not less than
35.00kg/cm2 and using two mild steel bars of 6m dia
in every third layer of brick masory, with free joints of
the main block work including cost and seignorage
10
charges and conveyance of all materials and water
from approved sources to work site and all 10 Sqm
ts
operational, incidental, labour charges such as
scaffolding mixing mortor constructing masonary lift
charges, curing etc. complete but excluding the cost
of steel and its fabrication charges. SECOND FLOOR

168.00

5801.65

97468

14.40

14.40

596.55

8590

88878

###
45

TF Reinforced Brick Masonary walls of 11.5cm in CM(1:6)


using second class bricks of size 23 x 11 x 7 Cm
having a crushing strength of not less than
35.00kg/cm2 and using two mild steel bars of 6m dia
in every third layer of brick masory, with free joints of
the main block work including cost and seignorage
10
charges and conveyance of all materials and water
from approved sources to work site and all 10 Sqm
ts
operational, incidental, labour charges such as
scaffolding mixing mortor constructing masonary lift
charges, curing etc. complete but excluding the cost
of steel and its fabrication charges. THIRD FLOOR

79.00

6243.75

49326

0.00

49326

##

294427110.xls

CS

93of221

Sl.
No.

As per sanctioned estimate

Description
UNIT

STEELG

46

STEELF

46

Providing High Yield Strength Deformed (HYSD) steel


bars (Fe 500 grade as per IS 1786-1979) of different
diameters for RCC works, including labour charges for
straightening, cutting, bending to required sizes and
shapes, placing in position with cover blocks of
approved materials and size and tying and lapsplicing
with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and
drawings, including cost and conveyance of steel
bars, including all wastages such as overlaps, 1
couplings, chairs, spacer bars including cost and
conveyance of binding wire, cover blocks and all
incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and
other taxes on all materials etc., complete for finished
item of work in all floors. (APSS No.126)

Providing High Yield Strength Deformed (HYSD) steel


bars (Fe 500 grade as per IS 1786-1979) of different
diameters for RCC works, including labour charges for
straightening, cutting, bending to required sizes and
shapes, placing in position with cover blocks of
approved materials and size and tying and lapsplicing
with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and
drawings, including cost and conveyance of steel
bars, including all wastages such as overlaps, 1
couplings, chairs, spacer bars including cost and
conveyance of binding wire, cover blocks and all
incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and
other taxes on all materials etc., complete for finished
item of work in all floors. (APSS No.126)

QTY

RATE

Excess

AMOUNT

1
MT

17.20

63293.55

1088649

1
MT

6.50

63293.55

411408

GF

FF

SF

18.00

12.00

TF

RATE

Less

Remarks

TB

KD

ST

QTY

AMOUNT

0.81

2.12

0.3

21.23

61763.00

1311222

222573

12.00

62447.00

749364

337956

###

STEELS

46

Providing High Yield Strength Deformed (HYSD) steel


bars (Fe 500 grade as per IS 1786-1979) of different
diameters for RCC works, including labour charges for
straightening, cutting, bending to required sizes and
shapes, placing in position with cover blocks of
approved materials and size and tying and lapsplicing
with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and
drawings, including cost and conveyance of steel
bars, including all wastages such as overlaps, 1
couplings, chairs, spacer bars including cost and
conveyance of binding wire, cover blocks and all
incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and
other taxes on all materials etc., complete for finished
item of work in all floors. (APSS No.126)

294427110.xls

1
MT

6.50

63293.55

411408

5.00

CS

5.00

63131.00

315655

95753

94of221

Sl.
No.
46

47

As per sanctioned estimate

Description
UNIT
ST Providing High Yield Strength Deformed (HYSD) steel
EEL bars (Fe 500 grade as per IS 1786-1979) of different
T diameters for RCC works, including labour charges for
straightening, cutting, bending to required sizes and
shapes, placing in position with cover blocks of
approved materials and size and tying and lapsplicing
with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and
drawings, including cost and conveyance of steel
bars, including all wastages such as overlaps, 1
couplings, chairs, spacer bars including cost and
conveyance of binding wire, cover blocks and all
incidental, operational, laour charges such as cutting,
bending placing in position, tying including sales and
other taxes on all materials etc., complete for finished
item of work in all floors. (APSS No.126)

1
MT

GF Plastering 20mm thick in two coats with base coat of


16mm thick in CM (1:6) and top coat of 4mm thick in
CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, screened
sand, water etc., to site, seigniorage charges, sales &
other taxes on all materials, all operational, incidental
10
and labour charges such as mixing mortar,scaffolding
charges, lift charges, finishing,including cutting of 10 Sqm
ts
Grooves wherever necessary as directed by Engineer
- in - charge, curing, etc., for Uneven Surfaces of
Brick Wall complete for finished item of work. (APSS
901,903 & 904) GROUND FLOOR

QTY

0.30

634.00

RATE

Excess

AMOUNT

63293.55

18988

2755

174667

GF

FF

SF

TF

TB

KD

0.77

438.72

ST

QTY

0.77

141.33

198.30

778.35

RATE

Less

Remarks

AMOUNT

63815.00

49074

30086

317.40

247047

72380

###
48

FF Plastering 20mm thick in two coats with base coat of


16mm thick in CM (1:6) and top coat of 4mm thick in
CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, screened
sand, water etc., to site, seigniorage charges, sales &
other taxes on all materials, all operational, incidental
10
and labour charges such as mixing mortar,scaffolding
charges, lift charges, finishing,including cutting of 10 Sqm
ts
Grooves wherever necessary as directed by Engineer
- in - charge, curing, etc., for Uneven Surfaces of
Brick Wall complete for finished item of work. (APSS
901,903 & 904) FIRST FLOOR

380.00

2968.75

112813

567.46

567.46

340.80

193390

80577

###
44

SF RCC (1:5:10) corresponding to M15 grade as per IS


456 equivalent to proportion nominal mix (cement:
fine aggregate: Coarse aggregate) using 40mm size
HBG (SS5) metal from approved quarry including
cost and conveyance of all materials like cement,
sand, coarse aggregate, water etc. to site, including
seigniorage charges, sales & other taxes on all
materials, all operational, incidental,
and labour
charges such as mixing, laying and ramming concrete
in layers in position not exceeding 15cm, finishing top
surface, curing concrete, etc., complete for finished
item of work (APSS No. 402) for dummy columns.
SECOND FLOOR

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

###

294427110.xls

CS

95of221

Sl.
No.
49

As per sanctioned estimate

Description
UNIT
SF Plastering 20mm thick in two coats with base coat of
16mm thick in CM (1:6) and top coat of 4mm thick in
CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, screened
sand, water etc., to site, seigniorage charges, sales &
other taxes on all materials, all operational, incidental
10
and labour charges such as mixing mortar,scaffolding
charges, lift charges, finishing,including cutting of 10 Sqm
ts
Grooves wherever necessary as directed by Engineer
- in - charge, curing, etc., for Uneven Surfaces of
Brick Wall complete for finished item of work. (APSS
901,903 & 904) SECOND FLOOR

QTY

380.00

RATE

3182.7

Excess

AMOUNT

GF

FF

120943

SF

TF

TB

500.81

KD

ST

QTY

500.81

RATE

364.25

Less

Remarks

AMOUNT

182420

61477

###
50

TF Plastering 20mm thick in two coats with base coat of


16mm thick in CM (1:6) and top coat of 4mm thick in
CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, screened
sand, water etc., to site, seigniorage charges, sales &
other taxes on all materials, all operational, incidental
10
and labour charges such as mixing mortar,scaffolding
charges, lift charges, finishing,including cutting of 10 Sqm
ts
Grooves wherever necessary as directed by Engineer
- in - charge, curing, etc., for Uneven Surfaces of
Brick Wall complete for finished item of work. (APSS
901,903 & 904) THIRD FLOOR

50.00

3396.45

16982

370.74

370.74

3808.20

1411852

1394870

###
.

GF Plastering to even surfaces of wall with CM (1:3)


Prop: 20mm thick in single coat including cost and
conveyance of all materials like cement, sand, water
etc., to site, including seigniorage charges, sales &
other taxes on all materials, all operational, incidental ###
charges and labour charges such as mixing mortar,
finishing, curing, etc., complete for finished item of
work. (APSS 901,906) GROUND FLOOR

42.60

42.60

196.75

8382

8382

###
51

GF Ceiling Plastering with CM(1:3) Prop: 12mm thick in


single coat spong finish
including cost and
conveyance of all materials like cement, sand, water
etc., to site, including seigniorage charges, sales &
10
other taxes on all materials, all operational, incidental 10 Sqm
charges and labour charges such as mixing mortar,
ts
finishing, curing, etc., complete for finished item of
work. (APSS 901,906) GROUND FLOOR

290.00

1104.55

32032

239.47

34.35

273.82

146.10

40005

7973

###
48

FF Plastering 12mm thick in two coats with base coat of


8mm thick in CM (1:6) and top coat of 4mm thick in
CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, sand, water
etc., to site, seigniorage charges, sales & other taxes
on all materials,all operational, incidental and labour
charges such as mixing mortar, scaffolding charges,
lift charges, including cutting of Grooves wherever
necessary as directed by Engineer - in - charge,
finishing, curing, etc., complete for Even Surfaces of
Wall for finished item of work. (APSS 901,903 &
904) ) FIRST FLOOR

350.46

350.46

238.60

83620

83620

##

294427110.xls

CS

96of221

Sl.
No.
52

As per sanctioned estimate

Description
UNIT
FF Ceiling Plastering with CM(1:3) Prop: 12mm thick in
single coat spong finish
including cost and
conveyance of all materials like cement, sand, water
etc., to site, including seigniorage charges, sales &
10
other taxes on all materials, all operational, incidental 10 Sqm
charges and labour charges such as mixing mortar,
ts
finishing, curing, etc., complete for finished item of
work. (APSS 901,906) FIRST FLOOR

QTY

240.00

RATE

1153.45

Excess

AMOUNT

GF

27683

FF

SF

TF

395.24

TB

KD

ST

QTY

395.24

RATE

154.65

Less

Remarks

AMOUNT

61124

33441

###
53

SF Ceiling Plastering with CM(1:3) Prop: 12mm thick in


single coat spong finish
including cost and
conveyance of all materials like cement, sand, water
etc., to site, including seigniorage charges, sales &
10
other taxes on all materials, all operational, incidental 10 Sqm
charges and labour charges such as mixing mortar,
ts
finishing, curing, etc., complete for finished item of
work. (APSS 901,906) SECOND FLOOR

240.00

1202.35

28856

254.91

254.91

365.10

93068

64212

###
50

TF Ceiling Plastering with CM(1:) Prop: 12mm thick in


single coat spong finish
including cost and
conveyance of all materials like cement, sand, water
etc., to site, including seigniorage charges, sales &
other taxes on all materials, all operational, incidental
charges and labour charges such as mixing mortar,
finishing, curing, etc., complete for finished item of
work. (APSS 901,906) THITD FLOOR

42.00

1275.75

5358

5358

##
50

TF Ceiling Plastering with CM(1:3) Prop: 12mm thick in


single coat spong finish
including cost and
conveyance of all materials like cement, sand, water
etc., to site, including seigniorage charges, sales &
other taxes on all materials, all operational, incidental
charges and labour charges such as mixing mortar,
finishing, curing, etc., complete for finished item of
work. (APSS 901,906) THITD FLOOR

16.00

1265.85

2025

132.61

132.61

1733.35

229860

227835

###
50

TF Plastering 12mm thick in two coats with base coat of


8mm thick in CM (1:6) and top coat of 4mm thick in
CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, sand, water
etc., to site, seigniorage charges, sales & other taxes
on all materials,all operational, incidental and labour
charges such as mixing mortar, scaffolding charges,
lift charges, including cutting of Grooves wherever
necessary as directed by Engineer - in - charge,
finishing, curing, etc., complete for Even Surfaces of
Wall for finished item of work. (APSS 901,903 & 904)
THITD FLOOR

108.62

108.62

285.45

31006

31006

###
50

TF Supply and fixing of Door size 1.05 x 2.00 M Single


Leaf with Door Frame of Medium Teak wood
Section 100 mm x 75 mm and shutter of 35mm thick
of solid bond wood block board type with commercial
play on both faces, Hardware fixtures ie., MSPC Butt
Hinges 150mm Long 6 nos, MSPC Handles 150 mm
Long 2 Nos MSPC Tower Bolt 300mm long 1
Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast
6 Nos including Including Labour charges for making
of door, fixing of fixtures etc., and cost and
conveyance of all materials to site, taxes extra for
finished item of work. THITD FLOOR

3.00

3011.00

9033

5.00

5.00

3486.00

17430

8397

###

294427110.xls

CS

97of221

Sl.
No.
50

As per sanctioned estimate

Description
UNIT
TF Painting to new Wood with two coats of ready mixed
oil bound washable distemper of approved brand and
shade over a base coat of appropriate primer of
approved brand, making three coats in all to give an
even shade after thoroughly brushing the surface to
remove all dirt and reminds of loose powedered
materials including cost and conveyance of alla
materials to work site and all operational, incidental,
labour charges etc.. complete for finished item of work
as per SS911 for internal walls and ceiling.k. THITD
FLOOR

10
Sqm
ts

QTY

2.00

RATE

1295.1

Excess

AMOUNT

GF

FF

SF

TF

TB

KD

ST

QTY

RATE

Less

Remarks

AMOUNT

259

259

##
50

50

TF Supply and Fixing of 110mm dia PVC pipe for


rainwater spouts complete for finished item of work
including cost and conveyance of all materials to site,
all labour charges, sales and other taxes on all
materials etc., complete for finished item of work..
THITD FLOOR
TF Painting to New External Walls with two coats of
Polymer Plastic Emulsion paint of Asian / Berger /
Nerolac / Saicoat / Endocem or equalent quality of
approved brand and shade as approved by the
Engineer - in - Charge over base coat of cement
primer water base grade -II exterior making three
coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered
materials, including cost and conveyance of all
materials, including cost and conveyance of all
materials, cost of brushes, water to site, etc., sales &
other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges,
curing etc., complete for finished item of work in all
floors for external Walls.(APSS No. 911) THITD
FLOOR

10
Sqm
ts

100.00

257.65

25765

25765
##

10
Sqm
ts

42.00

1066.8

4481

4481

##
50

TF Painting to new walls with two coats of ready mixed oil


bound washable distemper of approved brand and
shade over a base coat of appropriate primer of
approved brand, making three coats in all to give an
even shade after thoroughly brushing the surface to
remove all dirt and reminds of loose powedered
materials including cost and conveyance of alla
materials to work site and all operational, incidental,
labour charges etc.. complete for finished item of work
as per SS911 for internal walls and ceiling.k. THITD
FLOOR

10
Sqm
ts

50.00

816.4

4082

370.74

370.74

92.31

34223

30141

###
54

TF White washing two coats with paint grade white lime


for wash or equivalent quality to give an even shade
after thoroughly brushing the surface to remove all dirt
10
and remains of loose powdered materials including
cost of all materials, labour charges and incidental 10 Sqm
ts
such as scaffolding, lift charges etc., complete for
finished item of work in all floors for walls THITD
FLOOR

294427110.xls

16.00

238.8

382

108.62

108.62

29.30

3183

2801

###

CS

98of221

Sl.
No.
51

As per sanctioned estimate

Description
UNIT

QTY

RATE

Excess

AMOUNT

GF

GF Plastering 12mm thick in two coats with base coat of


8mm thick in CM (1:6) and top coat of 4mm thick in
CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, sand, water
etc., to site, seigniorage charges, sales & other taxes
on all materials,all operational, incidental and labour
charges such as mixing mortar, scaffolding charges,
lift charges, including cutting of Grooves wherever
necessary as directed by Engineer - in - charge,
finishing, curing, etc., complete for Even Surfaces of
Wall for finished item of work. (APSS 901,903 & 904)
GROUND FLOOR

FF

SF

TF

TB

KD

350.46

ST

QTY

350.46

RATE

Less

Remarks

AMOUNT

215.15

75401

75401

###
55

GF Plastering to even surfaces of wall with CM(1:4) Prop:


12mm thick in single coat
including cost and
conveyance of all materials like cement, sand, water
etc., to site, including seigniorage charges, sales &
10
other taxes on all materials, all operational, incidental 10 Sqm
charges and labour charges such as mixing mortar,
ts
finishing, curing, etc., complete for finished item of
work. (APSS 901,906) GROUND FLOOR

589.00

1059.8

62422

#REF!

108.54

200.30

#REF!

#REF!

#REF!

#REF!

#REF!

###
56

FF Plastering to even surfaces of wall with CM(1:4) Prop:


12mm thick in single coat
including cost and
conveyance of all materials like cement, sand, water
etc., to site, including seigniorage charges, sales &
10
other taxes on all materials, all operational, incidental 10 Sqm
charges and labour charges such as mixing mortar,
ts
finishing, curing, etc., complete for finished item of
work. (APSS 901,906) FIRST FLOOR

380.00

1131.75

43007

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

###
57

SF Plastering 12mm thick in two coats with base coat of


8mm thick in CM (1:6) and top coat of 4mm thick in
CM (1:4) dubara sponge finish including cost and
conveyance of all materials like cement, sand, water
etc., to site, seigniorage charges, sales & other taxes
on all materials,all operational, incidental and labour
10
charges such as mixing mortar, scaffolding charges,
lift charges, including cutting of Grooves wherever 10 Sqm
ts
necessary as directed by Engineer - in - charge,
finishing, curing, etc., complete for Even Surfaces of
Wall for finished item of work. (APSS 901,903 & 904))
SECOND FLOOR

0.00

1173.25

239.99

239.99

262.05

62889

62889

###
58

GF Plastering to even surfaces of wall with CM (1:3)


Prop: 20mm thick in single coat including cost and
conveyance of all materials like cement, sand, water
10
etc., to site, including seigniorage charges, sales &
other taxes on all materials, all operational, incidental 10 Sqm
ts
charges and labour charges such as mixing mortar,
finishing, curing, etc., complete for finished item of
work. (APSS 901,906)

294427110.xls

126.00

1684.45

21224

0.00

0.00

21224

##

CS

99of221

Sl.
No.
60

As per sanctioned estimate

Description
UNIT
GF Flooring and Treads with Polished shabad / Tandur
stone minimum 15 to 18 mm thick of size (0.254M
x0.254M) set over base coat of CM (1:8) over already
laid CC bed / RCC Roof Slab, including neat cement
slurry of honey like consistency spread @ 3.3 kgs per
sqm. & Jointed with neat cement to full depth
10
including cost of all materials like cement, sand, and 10 Sqm
water and flooring stones etc., complete, including
ts
seigniorage charges, labour charges for dressing of
flooring stones etc., complete for finished item of
work. GROUND FLOOR

QTY

399.00

RATE

5458.15

Excess

AMOUNT

217780

GF

FF

SF

219.47

TF

TB

KD

88.18

ST

QTY

307.65

RATE

Less

Remarks

AMOUNT

1026.68

315858

98078

###
61

FF Flooring and Treads with Polished shabad / Tandur


stone minimum 15 to 18 mm thick of size (0.254M
x0.254M) set over base coat of CM (1:8) over already
laid CC bed / RCC Roof Slab, including neat cement
slurry of honey like consistency spread @ 3.3 kgs per
10
sqm. & Jointed with neat cement to full depth
10 Sqm
including cost of all materials like cement, sand, and
ts
water and flooring stones etc., complete, including
seigniorage charges, labour charges for dressing of
flooring stones etc., complete for finished item of
work. FIRST FLOOR

250.00

5629.7

140743

395.24

395.24

1046.87

413765

273022

###
57

SF Plastering to even surfaces of wall with CM (1:4)


Prop: 12mm thick in single coat including cost and
conveyance of all materials like cement, sand, water
etc., to site, including seigniorage charges, sales &
10
other taxes on all materials, all operational, incidental 10 Sqm
charges and labour charges such as mixing mortar,
ts
finishing, curing, etc., complete for finished item of
work. (APSS 901,906) ) SECOND FLOOR

380.00

1203.8

45744

8.36

8.36

262.05

2191

43553

###
57

SF Flooring and Treads with Polished shabad / Tandur


stone minimum 15 to 18 mm thick of size (0.254M
x0.254M) set over base coat of CM (1:8) over already
laid CC bed / RCC Roof Slab, including neat cement
slurry of honey like consistency spread @ 3.3 kgs per
10
sqm. & Jointed with neat cement to full depth
10 Sqm
including cost of all materials like cement, sand, and
ts
water and flooring stones etc., complete, including
seigniorage charges, labour charges for dressing of
flooring stones etc., complete for finished item of
work, .

250.00

5801.3

145033

0.00

0.00

0.00

145033

##
57

SF Providing Skirting to internal walls and Risers of Steps


to 15 cm height with Polished shabad / Tandur stone
minimum 15 to 18 mm thick of size (0.254M x0.254M)
length equal to flooring stones, set over base coat of
CM (1:3) 12 mm thick with cement slurry of honey like
consistency spread at the rate of 3.30 kgs per sqm
10
and jointed with white cement paste mixed with 10 Sqm
pigment of matching shade to full depth, including
ts
cost of all materials like tiles, cement, sand and water
etc., complete including seigniorage charges, etc.,
complete for finished item of work,

20.00

6220.55

12441

0.00

0.00

0.00

12441

##

294427110.xls

CS

100of221

Sl.
No.
57

As per sanctioned estimate

Description
UNIT

QTY

RATE

Excess

AMOUNT

SF Providing impervious coat to exposed RCC roof slab


surface with CM(1:3), 20mm thick with 1kg of water
proof compound per bag of cement laid over roof
when it is green including cost of all materials,
seigniorage charges, excluding conveyance charges
of materials and including all operational, incidental
and labour charges for mixing mortar, laying,
rendering smooth and thread lining, curing, rounding
off junctions of wall and slab etc,, complete for
finished item of work) SECOND FLOOR

GF

FF

SF

243.86

TF

TB

KD

ST

QTY

243.86

RATE

Less

Remarks

AMOUNT

369.50

90105

90105

###
57

SF Supply and fixing of Door size 1.05x2.00 M Single


Leaf with Door Frame of Medium Teak wood
Section 100 mm x 75 mm and shutter of 35mm thick
of solid bond wood block board type with commercial
play on both faces, Hardware fixtures ie., MSPC Butt
Hinges 150mm Long 6 nos, MSPC Handles 150 mm
Long 2 Nos MSPC Tower Bolt 300mm long 1
Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast
6 Nos including Including Labour charges for making
of door, fixing of fixtures etc., and cost and
conveyance of all materials to site, taxes extra for
finished item of work. SECOND FLOOR

8.00

3011.00

24088

4.00

4.00

8843.04

35372

11284

###
57

SF Supply and fixing of Door size 0.75x2.00 M Single


Leaf with Door Frame of Medium Teak wood
Section 100 mm x 75 mm and shutter of 35mm thick
of solid bond wood block board type with commercial
play on both faces, Hardware fixtures ie., MSPC Butt
Hinges 150mm Long 6 nos, MSPC Handles 150 mm
Long 2 Nos MSPC Tower Bolt 300mm long 1
Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast
6 Nos including Including Labour charges for making
of door, fixing of fixtures etc., and cost and
conveyance of all materials to site, taxes extra for
finished item of work. SECOND FLOOR

8.00

3369.00

26952

0.00

0.00

0.00

26952

##
57

SF Supply and fixing of Window of Size 0.90 x 1.22 M


Six Leaf shutter with window frame of Medium Teak
wood
of Section 100 mm x 75 mm and shutter
frame of Medium Teak wood of section 100mm x 32
mm thick and window planks of medium fiber board
exterior both sides laminated 12mm thick and safety
bars of 10 mm square bars at 100mm center to
center distance horizantally and Hardware fixtures
ie., MSPC Butt Hinges 100mm Long 12nos, MSPC
Handles 125 mm Long 6 Nos MSPC Tower Bolt
150mm long 6 Nos, MS Hold Fast 4 Nos Including
Labour charges for making Window frame and
shutter, fixing of Fixtures etc., and cost and
conveyance of all materials to site, taxes extra
complete for finished item of work.. SECOND FLOOR

20.00

4253.00

85060

20.00

20.00

6737.86

134757

49697

###

294427110.xls

CS

101of221

Sl.
No.
57

As per sanctioned estimate

Description
UNIT
SF Painting to New External Walls with two coats of
Polymer Plastic Emulsion paint of Asian / Berger /
Nerolac / Saicoat / Endocem or equalent quality of
approved brand and shade as approved by the
Engineer - in - Charge over base coat of cement
primer water base grade -II exterior making three
coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered
materials, including cost and conveyance of all
materials, including cost and conveyance of all
materials, cost of brushes, water to site, etc., sales &
other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges,
curing etc., complete for finished item of work in all
floors for external Walls.(APSS No. 911).. SECOND
FLOOR

QTY

320.00

RATE

1066.80

Excess

AMOUNT

GF

34138

FF

SF

TF

TB

KD

244.36

ST

QTY

244.36

RATE

Less

Remarks

AMOUNT

130.70

31938

2200

###
57

SF Painting to new walls with two coats of ready mixed oil


bound washable distemper of approved brand and
shade over a base coat of appropriate primer of
approved brand, making three coats in all to give an
even shade after thoroughly brushing the surface to
remove all dirt and reminds of loose powedered
materials including cost and conveyance of alla
materials to work site and all operational, incidental,
labour charges etc.. complete for finished item of work
as per SS911 for internal walls and ceiling. SECOND
FLOOR

440.00

816.40

35922

493.88

493.88

92.31

45590

9668

###
57

62

63

SF White washing two coats with paint grade white lime


for wash or equivalent quality to give an even shade
after thoroughly brushing the surface to remove all dirt
and remains of loose powdered materials including
cost of all materials, labour charges and incidental
such as scaffolding, lift charges etc., complete for
finished item of work in all floors for walls. SECOND
FLOOR
SF Painting to New wood work with two coats of ready
mixed synthetic enamel paint first quality all shades
to give an even shade over base coatof wood Primer
finishing with putty for wood work after thouroughly
10
brushing the surface to remove all remains including
cost and conveyance of all materials to site, sales & 10 Sqm
ts
other taxes, all operational, incidental and labour
charges etc., complete for finished item of work.(3
coats) (APSS No. 1201 & 1212).in All Floors
SECOND FLOOR
GF Providing Skirting to internal walls and Risers of Steps
to 15 cm height with Polished shabad / Tandur stone
minimum 15 to 18 mm thick of size (0.254M x0.254M)
length equal to flooring stones, set over base coat of
CM (1:3) 12 mm thick with cement slurry of honey like
consistency spread at the rate of 3.30 kgs per sqm
10
and jointed with white cement paste mixed with 10 Sqm
pigment of matching shade to full depth, including
ts
cost of all materials like tiles, cement, sand and water
etc., complete including seigniorage charges, etc.,
complete for finished item of work. GROUND FLOOR

240.00

238.80

5731

254.91

254.91

29.30

7469

1738

###

90.00

1295.1

11656

178.20

178.20

166.15

29608

17952

###

20.00

5829.35

11659

13.19

9.60

22.79

994.30

22660

11001

###

294427110.xls

CS

102of221

Sl.
No.
61

As per sanctioned estimate

Description
UNIT
FF Providing Skirting to internal walls and Risers of Steps
to 15 cm height with Polished shabad / Tandur stone
minimum 15 to 18 mm thick of size (0.254M x0.254M)
length equal to flooring stones, set over base coat of
CM (1:3) 12 mm thick with cement slurry of honey like
consistency spread at the rate of 3.30 kgs per sqm
and jointed with white cement paste mixed with
pigment of matching shade to full depth, including
cost of all materials like tiles, cement, sand and water
etc., complete including seigniorage charges, etc.,
complete for finished item of work. FIRST FLOOR

QTY

20.00

RATE

Excess

AMOUNT

6024.95

GF

12050

FF

SF

7.94

TF

TB

KD

ST

QTY

7.94

RATE

Less

Remarks

AMOUNT

1016.75

8073

3977

###
61

FF Supply and fixing of Door size 1.05 x 2.00 M Single


Leaf with Door Frame of Medium Teak wood
Section 100 mm x 75 mm and shutter of 35mm thick
of solid bond wood block board type with commercial
play on both faces, Hardware fixtures ie., MSPC Butt
Hinges 150mm Long 6 nos, MSPC Handles 150 mm
Long 2 Nos MSPC Tower Bolt 300mm long 1
Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast
6 Nos including Including Labour charges for making
of door, fixing of fixtures etc., and cost and
conveyance of all materials to site, taxes extra for
finished item of work.. FIRST FLOOR

8.00

3011

24088

10.00

10.00

8843.04

88430

64342

###
61

FF Supply and fixing of Door size 0.75 x 2.00 M Single


Leaf with Door Frame of Medium Teak wood
Section 100 mm x 75 mm and shutter of 35mm thick
of solid bond wood block board type with commercial
play on both faces, Hardware fixtures ie., MSPC Butt
Hinges 150mm Long 6 nos, MSPC Handles 150 mm
Long 2 Nos MSPC Tower Bolt 300mm long 1
Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast
6 Nos including Including Labour charges for making
of door, fixing of fixtures etc., and cost and
conveyance of all materials to site, taxes extra for
finished item of work.. FIRST FLOOR

8.00

3369

26952

0.00

0.00

0.00

26952

###
61

FF Supply and fixing of Window of Size 0.90 x 1.22 M


Six Leaf shutter with window frame of Medium Teak
wood
of Section 100 mm x 75 mm and shutter
frame of Medium Teak wood of section 100mm x 32
mm thick and window planks of medium fiber board
exterior both sides laminated 12mm thick and safety
bars of 10 mm square bars at 100mm center to
center distance horizantally and Hardware fixtures
ie., MSPC Butt Hinges 100mm Long 12nos, MSPC
Handles 125 mm Long 6 Nos MSPC Tower Bolt
150mm long 6 Nos, MS Hold Fast 4 Nos Including
Labour charges for making Window frame and
shutter, fixing of Fixtures etc., and cost and
conveyance of all materials to site, taxes extra
complete for finished item of work. FIRST FLOOR

20.00

4305

86100

11.00

11.00

6737.86

74116

11984

###
61

FF White washing two coats with paint grade white lime


for wash or equivalent quality to give an even shade
after thoroughly brushing the surface to remove all dirt
and remains of loose powdered materials including
cost of all materials, labour charges and incidental
such as scaffolding, lift charges etc., complete for
finished item of work in all floors for walls. FIRST
FLOOR

294427110.xls

240.00

238.8

5731

395.24

395.24

29.30

11581

5850

###

CS

103of221

Sl.
No.
61

As per sanctioned estimate

Description
UNIT
FF Painting to new walls with two coats of ready mixed oil
bound washable distemper of approved brand and
shade over a base coat of appropriate primer of
approved brand, making three coats in all to give an
even shade after thoroughly brushing the surface to
remove all dirt and reminds of loose powedered
materials including cost and conveyance of alla
materials to work site and all operational, incidental,
labour charges etc.. complete for finished item of work
as per SS911 for internal walls and ceiling.. FIRST
FLOOR

QTY

440.00

RATE

816.4

Excess

AMOUNT

GF

35922

FF

SF

TF

TB

KD

567.46

ST

QTY

567.46

RATE

Less

Remarks

AMOUNT

92.31

52382

16460

###
61

61

FF Painting to New Iron work with two coats of ready


mixed synthetic enamel paint first quality all shades
to give an even shade over base coatof wood Primer
finishing with putty for wood work after thouroughly
brushing the surface to remove all remains including
cost and conveyance of all materials to site, sales &
other taxes, all operational, incidental and labour
charges etc., complete for finished item of work.(3
coats) (APSS No. 1201 & 1212).in All Floors FIRST
FLOOR
FF Painting to New External Walls with two coats of
Polymer Plastic Emulsion paint of Asian / Berger /
Nerolac / Saicoat / Endocem or equalent quality of
approved brand and shade as approved by the
Engineer - in - Charge over base coat of cement
primer water base grade -II exterior making three
coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered
materials, including cost and conveyance of all
materials, including cost and conveyance of all
materials, cost of brushes, water to site, etc., sales &
other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges,
curing etc., complete for finished item of work in all
floors for external Walls.(APSS No. 911) .. FIRST
FLOOR

90.00

1295.1

11656

0.00

11656

###

320.00

1066.8

34138

350.46

350.46

130.70

45805

11667

###
63

GF Supply and fixing of Door size 1.05 x 2.00 M Single


Leaf with Door Frame of Medium Teak wood
Section 100 mm x 75 mm and shutter of 35mm thick
of solid bond wood block board type with commercial
play on both faces, Hardware fixtures ie., MSPC Butt
Hinges 150mm Long 6 nos, MSPC Handles 150 mm
Long 2 Nos MSPC Tower Bolt 300mm long 1
Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast ###
6 Nos including Including Labour charges for making
of door, fixing of fixtures etc., and cost and
conveyance of all materials to site, taxes extra for
finished item of work.. GROUND FLOOR

12.00

3011

36132

7.00

4.00

11.00

8843.04

97273

61141

###

294427110.xls

CS

104of221

Sl.
No.
63

As per sanctioned estimate

Description
UNIT
GF Supply and fixing of Window of Size 0.90 x 1.22 M
shutter with window frame of Medium Teak wood of
Section 100 mm x 75 mm and shutter frame 3
verticals of Medium Teak wood of section 100mm x
32 mm thick and BISON PANEL CEMENT BONDED
PARTICLE BOARD CONFORMING TO IS 14276 and
safety bars of 10 mm square bars at 100mm center
to center distance horizantally and Hardware fixtures
ie., MSPC Butt Hinges 100mm Long 12nos, MSPC
Handles 125 mm Long 6 Nos MSPC Tower Bolt ###
150mm long 6 Nos, MS Hold Fast 4 Nos Including
Labour charges for making Window frame and
shutter, fixing of Fixtures etc., and cost and
conveyance of all materials to site, taxes extra
complete for finished item of work.. GROUND FLOOR

QTY

20.00

RATE

4253

Excess

AMOUNT

85060

GF

FF

SF

TF

TB

KD

11.00

ST

QTY

11.00

RATE

Less

Remarks

AMOUNT

6737.86

74116

10944

###
63

GF Supply and fixing of Door size 0.75 x 2.00 M Single


Leaf with Door Frame of Medium Teak wood
Section 100 mm x 75 mm and shutter of 35mm thick
of solid bond wood block board type with commercial
play on both faces, Hardware fixtures ie., MSPC Butt
Hinges 150mm Long 6 nos, MSPC Handles 150 mm
Long 2 Nos MSPC Tower Bolt 300mm long 1
Nos,MSPC Aldrop 300 mm long 1 no, MS Hold Fast ###
6 Nos including Including Labour charges for making
of door, fixing of fixtures etc., and cost and
conveyance of all materials to site, taxes extra for
finished item of work.. GROUND FLOOR

33.00

3369.00

111177

2.00

12.00

14.00

5965.03

83510

27667

###
63

GF Supply and fixing of medium teak wood Ventilators of


size 0.60x0.40M with safety bars of 10mm square
rods at 100mm centre to centre horizontally and
vertically as per approved drawing of Engineer-incharge including red oxide primer of grade-I quality, ###
sales and other taxes, cost and conveyance of all
materials to site, all labour charges etc., complete for
finished item of work.. GROUND FLOOR

4.00

4.00

1783.95

7136

7136

###
63

GF Supply and fixing of M.S Grill of Size 1..83x1.37m with


outer angular frame rollef sheet horizontally and
vertically as per approved drawing of Engineer-incharge including red oxide primer of grade-I quality,
sales and other taxes, cost and conveyance of all ###
materials to site, all labour charges etc., complete for
finished item of work.. GROUND FLOOR

25.00

1143.00

28575

0.00

0.00

0.00

28575

##
63

GF Flooring with ceramic tiles 7.3mm thick of 1st quality


all shades of makes Jhonson & Jhonson, Kajaria,
Nitco and Marbonite, set over base coat of cement
mortar (1:8), 12 mm thick over CC bed already laid or
RCC roof slab, including neat cement slurry of honey
like consistency spread @ 3.3.kgs per sqm & jointed
neatly with white cement paste to full depth mixed ###
with pigment of matching shade, including cost of all
materials like cement, sand water and tiles etc.,
complete, including seigniorage charges, etc.,
complete for finished item of work. GROUND FLOOR

64.00

7873.55

50391

#REF!

18.61

#REF!

#REF!

#REF!

#REF!

#REF!

###

294427110.xls

CS

105of221

Sl.
No.
63

As per sanctioned estimate

Description
UNIT
GF Dadooing to walls with Decorated white back ground
glazed tiles 200mm x 152mm 1st. quality of any
bramd as approved by Engineer - in - charge and set
over a base coat of CM (1:5), 12mm thick and neat
cement paste at the rate of 3.3 Kg/Sqmt. and jointed
with white cement paste mixed with pigment of
matching shade including cost and conveyance of all
materials like cement, sand, water, tiles, etc. to site, ###
seigniorage charges, sales and other taxes on all
materials, C921 such as mixing of cement mortar,
laying in position, curing, lift charges etc., complete for
finished item of work . GROUND FLOOR

QTY

153.00

RATE

9077.75

Excess

AMOUNT

138890

GF

FF

SF

TF

TB

#REF!

KD

10.07

ST

QTY

#REF!

RATE

Less

Remarks

AMOUNT

#REF!

#REF!

#REF!

#REF!

###
63

63

GF White washing two coats with paint grade white lime


for wash or equivalent quality to give an even shade
after thoroughly brushing the surface to remove all dirt
and remains of loose powdered materials including
cost of all materials, labour charges and incidental ###
such as scaffolding, lift charges etc., complete for
finished item of work in all floors for walls . GROUND
FLOOR
GF Painting to new walls with two coats of ready mixed oil
bound washable distemper of approved brand and
shade over a base coat of appropriate primer of
approved brand, making three coats in all to give an
even shade after thoroughly brushing the surface to
remove all dirt and reminds of loose powedered
###
materials including cost and conveyance of alla
materials to work site and all operational, incidental,
labour charges etc.. complete for finished item of work
as per SS911 for internal walls and ceiling. .
GROUND FLOOR

533.00

238.80

12728

239.47

239.47

29.30

7016

5712

###

535.00

816.40

43677

438.72

438.72

92.31

40498

3179

###
63

GF Painting to New Internal Walls with two coats of


Polymer Plastic Emulsion paint of Asian / Berger /
Nerolac / Saicoat / Endocem or equalent quality of
approved brand and shade as approved by the
Engineer - in - Charge over base coat of cement
primer water base grade -II exterior making three
coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered
materials, including cost and conveyance of all ###
materials, including cost and conveyance of all
materials, cost of brushes, water to site, etc., sales &
other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges,
curing etc., complete for finished item of work in all
floors for external Walls.(APSS No. 911) . GROUND
FLOOR

108.54

200.30

308.84

130.70

40365

40365

###
63

GF Painting to New Wood work with two coats of ready


mixed synthetic enamel paint first quality all shades
to give an even shade over base coatof wood Primer
finishing with putty for wood work after thouroughly
brushing the surface to remove all remains including
cost and conveyance of all materials to site, sales & ###
other taxes, all operational, incidental and labour
charges etc., complete for finished item of work.(3
coats) (APSS No. 1201 & 1212).in All Floors .
GROUND FLOOR

294427110.xls

165.00

1295

21368

21368

##

CS

106of221

Sl.
No.
63

66

As per sanctioned estimate

Description
UNIT
GF Painting to New Iron work with two coats of ready
mixed synthetic enamel paint first quality all shades
to give an even shade over base coatof wood Primer
finishing with putty for wood work after thouroughly
brushing the surface to remove all remains including
cost and conveyance of all materials to site, sales &
other taxes, all operational, incidental and labour
charges etc., complete for finished item of work.(3
coats) (APSS No. 1201 & 1212).in All Floors .
GROUND FLOOR
GF Painting to New External Walls with two coats of
Polymer Plastic Emulsion paint of Asian / Berger /
Nerolac / Saicoat / Endocem or equalent quality of
approved brand and shade as approved by the
Engineer - in - Charge over base coat of cement
primer water base grade -II exterior making three
coats in all to give an even shade after thoroughly
brushing the surface to remove all loose powdered
10
materials, including cost and conveyance of all 10 Sqm
materials, including cost and conveyance of all
ts
materials, cost of brushes, water to site, etc., sales &
other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges,
curing etc., complete for finished item of work in all
floors for external Walls.(APSS No. 911) . GROUND
FLOOR

QTY

21.00

RATE

723.60

Excess

AMOUNT

GF

FF

SF

TF

TB

1520

KD

24.85

ST

QTY

24.85

RATE

166.15

Less

Remarks

AMOUNT

4129

2609

###

574.00

1066.8

61234

350.46

141.33

198.30

690.09

130.70

90194

28960

###
67 ALL Dadooing to walls with Decorated white back ground
glazed tiles 200mm x 152mm 1st. quality of any
bramd as approved by Engineer - in - charge and set
over a base coat of CM (1:5), 12mm thick and neat
cement paste at the rate of 3.3 Kg/Sqmt. and jointed
with white cement paste mixed with pigment of
10
matching shade including cost and conveyance of all
materials like cement, sand, water, tiles, etc. to site, 10 Sqm
ts
seigniorage charges, sales and other taxes on all
materials, C921 such as mixing of cement mortar,
laying in position, curing, lift charges etc., complete for
finished item of work. ALL FLOORS

68 ALL Painting to new internal walls with two (2) coats of


ready mixed oil bound washable distemper acrylic
base of approved brand and shade over a base coat
of cement primer water base interior Grade-I of
approved brand, makind three (3) coats in all to give
an even shade after thourughly brushing the surface
10
to remove all dirt and remains of loose powdered 10 Sqm
materials, including cost and conveyance of all
ts
materials to work site and all operational, incidental,
labour charges etc., complete for finished item of work
in all floors for internal walls (SS 911)

69 ALL White washing two coats with paint grade white lime
for wash or equivalent quality to give an even shade
after thoroughly brushing the surface to remove all dirt
10
and remains of loose powdered materials including
cost of all materials, labour charges and incidental 10 Sqm
ts
such as scaffolding, lift charges etc., complete for
finished item of work in all floors for walls

294427110.xls

9136.25

0.00

837.9

0.00

247.2

0.00

CS

279.10

107of221

Sl.
No.

As per sanctioned estimate

Description
UNIT

70 ALL Painting to New External Walls with two coats of


Polymer Plastic Emulsion paint of Asian / Berger /
Nerolac / Saicoat / Endocem or equalent quality of
approved brand and shade as approved by the
Engineer - in - Charge over base coat of cement
primer water base grade -II exterior making three
coats in all to give an even shade after thoroughly
10
brushing the surface to remove all loose powdered
materials, including cost and conveyance of all 10 Sqm
ts
materials, including cost and conveyance of all
materials, cost of brushes, water to site, etc., sales &
other taxes, all operational, incidental and labour
charges such as scaffolding charges, lift charges,
curing etc., complete for finished item of work in all
floors for external Walls.(APSS No. 911)
71 ALL Supply and fixing of Door size 0.98 x 1.98 M Single
Leaf with Door Frame of Medium Teak wood
Section 100 mm x 65 mm, and Single flush door
shutter solid bond wood block board type with
commercial ply on both faces 35mm thick with
Lamination 1mm thick on both faces, Hardware
fixtures ie., MSPC Butt Hinges 150mm Long 3 nos,
1
MSPC Handles 125 mm Long 1 No, MSPC Tower Bolt 1 Sqm
150mm long 2 Nos, MSPC Aldrop 300 mm long 1
t
no, MS Hold Fast 6 Nos, and Heavy Duty Door
Stopper 1 Nos., Including Labour charges for making
of door, fixing of fixtures etc., and cost and
conveyance of all materials to site, taxes extra for
finished item of work.
72 ALL Supply and fixing of Door size 0.75 x 1.98 M Single
Leaf with Door Frame of Medium Teak wood
Section 100 mm x 65 mm, and Single flush door
shutter solid bond wood block board type with
commercial ply on both faces 35mm thick with
Lamination 1mm thick on one side (outside) and PVC
sheet on other side (inside) , Hardware fixtures ie.,
1
MSPC Butt Hinges 150mm Long 3 nos, MSPC
Handles 125 mm Long 1 No, MSPC Tower Bolt 1 Sqm
t
150mm long 1 Nos, MSPC Aldrop 300 mm long 1
no, MS Hold Fast 6 Nos, , including Including Labour
charges for making of door, fixing of fixtures etc., and
cost and conveyance of all materials to site, taxes
extra for finished item of work.

73 ALL Supply and fixing of Window of Size 0.90 x 1.22 M


Two Leaf shutter with window frame of Medium
Teak wood of Outer Section of size 100 mm x 65 mm
and shutter frame of Medium Teak wood of section
70mm x 35 mm thick and window planks of BISON
PANEL CEMENT BONDED PARICLE BOARD
CONFORMING TO IS 14276 - 12mm thick and safety
bars of 10 mm square bars at 150mm center to
center distance horizantally & vertically welded to Flat
1
of Size 25mm x 4mm, and Hardware fixtures ie.,
1 Sqm
MSPC Butt Hinges 125mm Long
4nos, MSPC
t
Handles 125 mm Long 2 Nos, MSPC Tower Bolt
150mm long 4 Nos, MS Hold Fast 6 Nos and Window
Stopper 2 Nos. including Labour charges for making
Window frame and shutter, fixing of Fixtures etc., and
cost and conveyance of all materials to site, taxes
extra complete for finished item of work.

294427110.xls

QTY

RATE

Excess

AMOUNT

GF

FF

SF

TF

TB

KD

ST

QTY

RATE

Less

Remarks

AMOUNT

1099.9

0.00

1240.45

3023

0.00

3486.00

3380

0.00

3786.00

4266

0.00

4681.00

CS

108of221

Sl.
No.

As per sanctioned estimate

Description
UNIT

74 ALL Painting to New Iron work with two coats of ready


mixed synthetic enamel paint first quality all shades
over red oxide primer Grade-I making three (3) coats
in all to given and even shade after thourughly
10
brushing the surface to remove all dirt and remains of
loose powered materials, including cost and 10 Sqm
ts
conveyance of all materials to site, sales & other
taxes, incidental, operational and all labour charges
etc., complete for finished item of work. (APSS No.
1201, 1207 & 1212).in All Floors
75 ALL Painting to New wood work with two coats of ready
mixed synthetic enamel paint first quality all shades
to give an even shade over base coatof wood Primer
finishing with putty for wood work after thouroughly
10
brushing the surface to remove all remains including
cost and conveyance of all materials to site, sales & 10 Sqm
ts
other taxes, all operational, incidental and labour
charges etc., complete for finished item of work.(3
coats) (APSS No. 1201 & 1212).in All Floors

76 ALL Supply and fixing of 110mm dia ISI mark PVC rain
water spouts of 2.5mm thick including
cost of
necessary PVC bends, shoes and pipe clips and all
other accessories and fixing in position including cost
and conveyance of all materials to site sales and
other taxes on all materials, all operational, incidental
and labour charges for laying, fixing and
1
commissioning the PVC pipes including couplers/ 1
Rmt
bends/ tees etc any diameter including fixing
necessary fittings like bends, plugs, couplers,
junctions, tees, etc with solvent jointing as per
standard practicesuch as fixing in alignment etc.,
complete for finished item of work. (APSS NO. 1328)

77 ALL Supply and fixing of M.S.Grill of size 1.83m x 1.37m


with outer angular frame of rolled steel equal angle of
ISA 2525 of size 25mm x 25mm x 4mm welded with
safety bars of 10mm square rods at 100mm centre to
10
centre horizontally and verticlally including red oxide
primer of grade-I quality, sales and other taxes, cost 10 Sqm
ts
and conveyance of all materials to site, all labour
charges and fixing in position etc., complete for
finished item of work.

294427110.xls

QTY

RATE

Excess

AMOUNT

GF

FF

SF

TF

TB

KD

ST

QTY

743.35

0.00

1329.2

0.00

257.65

1143

CS

RATE

Less

Remarks

AMOUNT

0.00

0.00

1481.50

109of221

Sl.
No.

As per sanctioned estimate

Description

KD-WS

UNIT

QTY

RATE

Excess

AMOUNT

Constructing 904.0 mm (30) dia brick masonry


inspection chamber as per IS - 4111: Part-1:1986 with
cement mortar (1:6) prop using 2nd Class Clay Bricks
of 225 mm thick from approved source having a
minimum crushing strength of 5 N/sq.mm including
plastering with cement mortar 1:3 prop; thick both
inside and outside fitted with 20 dia RCC manhole
covers and frames including excavating pits up to a
depth of 904 mm (3'-0") in all sorts of soils (exculding
rock) and laying cement conrete (1:4:8) 150 mm thick
using 40 mm HBG Metal and P.C.C. 1:2:4 benching
Eac
and channel 100 mm thick as per Standard 1
h
specification and including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site,
cost of seigniorage charges on all materials and all
incidental and operational, labour charges like mixing
cement mortar, constructing masonry, lift charges,
curing, sales and other taxes on all materials etc.,
complete for fi

GF

FF

SF

TF

TB

KD

3.00

ST

QTY

3.00

RATE

5488.00

Less

Remarks

AMOUNT

16464

16464

KD-WS

###
Supplying & Fixing Orissa Pan 580 mm x 440 mm
white glazed W.C 1st quality ISI marked conforming to
IS:2556-Part-3-1981 with "P" or "S" trap Hindware/
Parryware/ Neycer - ISI mark 580 mm x 440mm as
approved by the Engineer-in-charge fixed in brick
masonry with necessary S trap of water closet, shall
be encased in C.C. (1:2:4) 6" alround well above the 1 Eac
h
joint, to stop leakage at the joint, cost & conveyance
of all materials and labour charges etc., including
sales and other taxes on all materials complete for
finished item of work for all floors

12

12.00

1553.40

18641

18641

TB-WS

TB-WS

TB-WS

###
Supplying, laying, jointing and testing 152.4 mm SWG
pipes of ISI make conforming to ISI 651 & 4127 with
airtight cement joints in CM 1:5:1 prop. including
excavation of trenches and socket pits in any soil
(except rock requiring blasting) upto 914.4 mm (3'0")
depth and refilling with watering and tamping including 1 Rmt
cost and conveyance of all materials to site, all labour
charges, sales and other taxes on all materials etc.,
complete for finished item of work. (A.P.S.S.No. 1301
& 1318)
Supplying, laying, jointing and testing 101.6 mm SWG
pipes of ISI make conforming to ISI 651 & 4127 with
airtight cement joints in CM 1:5:1 prop. including
excavation of trenches and socket pits in any soil
(except rock requiring blasting) upto 914.4 mm (3'0")
Eac
depth and refilling with watering and tamping including 1
h
cost and conveyance of all materials to site, all labour
charges, sales and other taxes on all materials etc.,
complete for finished item of work. (A.P.S.S.No. 1301
& 1318)
Supplying, laying, jointing and testing 63 mm SWG
pipes of ISI make conforming to ISI 651 & 4127 with
airtight cement joints in CM 1:5:1 prop. including
excavation of trenches and socket pits in any soil
(except rock requiring blasting) upto 914.4 mm (3'0")
Eac
depth and refilling with watering and tamping including 1
h
cost and conveyance of all materials to site, all labour
charges, sales and other taxes on all materials etc.,
complete for finished item of work. (A.P.S.S.No. 1301
& 1318)

294427110.xls

10.00

363.7

3637

220.00

220.00

386.95

85129

81492

###

40.00

220

8800

28.10

28.10

243.30

6837

1963

###

17.40

17.40

175.00

3045

3045

###

CS

110of221

Sl.
No.

TB-WS

UNIT

TB-WS

As per sanctioned estimate

Description

QTY

RATE

Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard


or equivalent CPVC Pipes and Fittings to meet the
requirement of ASTM-D 2846 and are produced in
CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad
Eac
Flowgurard SDR 11 and SDR 13.5 pipes are made 1
h
from idential CPVC compounds having the same
physical Properties for Hot and Cold Water (IS
15778:2007
Supplying & fixing CI Nahany traps 1st quality ISI
marked conforming to IS:1729-1979 with C.P. Grating
fixing with white cement as per site requirements with
standard practice 100 mm dia Inlet- 75 mm (3") outlet
pipe - 4 Kgs with N.P. Cover for all floors, including
Eac
cost and conveyance of all materials to site, all labour 1
h
charges, sales and other taxes on all materials etc.,
complete for finished item of work. (APSS No 1326)
for All Floors. (BMW-C.41)

Excess

AMOUNT

GF

FF

SF

TF

TB

60.95

KD

ST

QTY

60.95

RATE

225.75

Less

Remarks

AMOUNT

13759

13759

###

16.00

318.1

5090

19.00

19.00

361.45

6868

1778

TB-WS

###
Constructing 904.0 mm (30) dia brick masonry
inspection chamber as per IS - 4111: Part-1:1986 with
cement mortar (1:6) prop using 2nd Class Clay Bricks
of 225 mm thick from approved source having a
minimum crushing strength of 5 N/sq.mm including
plastering with cement mortar 1:3 prop; thick both
inside and outside fitted with 20 dia RCC manhole
covers and frames including excavating pits up to a
depth of 904 mm (3'-0") in all sorts of soils (exculding
rock) and laying cement conrete (1:4:8) 150 mm thick
using 40 mm HBG Metal and P.C.C. 1:2:4 benching
Eac
and channel 100 mm thick as per Standard 1
h
specification and including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site,
cost of seigniorage charges on all materials and all
incidental and operational, labour charges like mixing
cement mortar, constructing masonry, lift charges,
curing etc., complete for finished item of work as per
Standard specification.

3.00

4669.5

14009

9.00

9.00

5488.00

49392

35383

TB-WS

###
Supplying and fixing 150.00mmx100.00mm SWG
gully trap 1st class confirming to ISI 651 & 4127with
CI grating and constructing single brick masonry wall
chamber of size 20" x 14" x 12 in CM (1:6) prop.
Over a CC (1:5:10)prop. bed, and plastering 12mm
thk. in CM (1:4) prop. both inside and outside
surfaces and fitted with 304.8MM X 288.6 MM
(12"X9") CI frame and hinged cover including labour 1 Eac
h
for fixing and laying the SWG junctions/plugs/bends
with air tightcement joints etc., complete including
cost and conveyance of all materials to site, labour
charges etc., complete for finished item of work as
directed by Engineer-in-charge.

2.00

604.2

1208

1208

TB-WS

##
Constructing 457.2mm x 457.2mm (1'-6" x 1'-6") brick
in CM (1:6) prop. Masonry inspection chamber upto
914.4mm (3'-0") and fitted with light weight 457.2mm
x 457.2mm (1'-6" x 1"-6") frame and cover of 20kg.,
Eac
including cost and convenyance of all materials to 1
h
site, all labour charges, sales and otehr taxes on all
materials etc., complete for finished item of work

17.00

17.00

3442.80

58528

58528

###

294427110.xls

CS

111of221

Sl.
No.

UNIT

TB-WS

As per sanctioned estimate

Description
Supplying and fixing 580 mm x 440 mm long Orissa
pan white glazed Water Closet 1st qualityISI marked
confirming to IS:2556-Part-3-1981 with "P" or "S" trap
Hindware / Parryware / Neycer with brick masonry
seat, CC squatting plate and fixing 12.70mm dia NP
Push cock 1st quality , P trap or S trap of Indian W.C.
Eac
1
shall be encased on CC (1:2:4) 150mm alround well
h
above the joint to stop leakage at the joint etc.,
complete including cost and conveyance of all
materials to site, cost of CC bed, labour charges and
seigniorage charg

QTY

6.00

RATE

Excess

AMOUNT

1487.7

GF

FF

SF

8926

TF

TB

17.00

KD

ST

QTY

17.00

RATE

1553.40

Less

Remarks

AMOUNT

26408

17482

TB-WS

###

Supply and Fixing European Water Closet of 1st


quality conforming to IS:2556-part-2-1973 of
Hindustan / Neycer or Parryware make white glazed
with 'S' trap including cost of plastic sheet and lid for
European Water Closet with rubber or plastic buffers
as per IS:2548-1996 and PVC low level single flush
10 litere capacity system with internal components 1 Eac
h
and short bend of make Parryware slim line including
cost and conveyance of all materials to site, labour
charges for fixing etc., complete for finished item of
work. for all floors(BMW-D.13)

2.00

3593.3

7187

1.00

1.00

174.50

175

7012

10

TB-WS

###
Supplying & Fixing 550 x 400 mm Indian make Flat
Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st
quality conforming to IS:2556-Part-4:1972 with waste
fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
single Chromium Plated Pillar Tap of 1st quality Indian
make 400 grams Seiko/ Esso/Nice/Senior or
equivalent complete with standard CI brackets
Eac
including wooden block, 12.7mm PVC connection with
1
h
Brass union nut CP coated, 12.7mm dia first qualifty
NP angle stop cock, 38.1mm CP waste coupling ,
31.75mm dia PVC flexible waste pipe of 914.4mm
length of first quality including cost and conveyance
of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished
item of work. for All Floors (.BMW-G.08)

8.00

2321.05

18568

4.00

4.00

812.85

3251

15317

11

Supplying and fixing TV shape mirror with plastic


frame of size 609.6mm x 457.2mm , plywood back
with NP screws 1st quality including cost and 1 Eac
h
conveyance of all materials, labour charges etc.,
complete for finished item of work in all floors.

8.00

Supplying and fixing of 25.4mm


aluminium anodized towel rods
aluminium screws including cost
all materials, labour charges
finished item of work.

8.00

TB-WS

10

TB-WS

10

16.00

TB-WS

10

TB-WS

###
Supplying and fixing NP soap dish heavy type of
approved make ISI quality with NP screws etc.,
complete including cost and conveyance of all
Eac
materials, labour charges for fixing etc., complete for 1
h
finished item of work in all floors as per ssr item no
598

dia , 609.6mm long


with brackets and
and conveyance of 1 Eac
h
etc., complete for

Supplying and fixing NP bib taps of size 12.70mm dia


of Indian make Seiko or equivalent including cost and
conveyance of all materials, labour charges etc., 1 Eac
h
complete for finished item of work in all floors.

234.8

3757

3757
##

496

3968

3968
##

158.5

1268

1268
##

12.00

249.7

2996

33.00

33.00

254.90

8412

5416

0
###

294427110.xls

CS

112of221

Sl.
No.

UNIT
TB-WS

11

As per sanctioned estimate

Description
Supplying and fixing NP bib taps of size 12.70mm dia
of Indian make Seiko or equivalent including cost and
conveyance of all materials, labour charges etc., 1 Eac
h
complete for finished item of work in all floors.

QTY

12.00

RATE

393.3

Excess

AMOUNT

GF

FF

SF

4720

TF

TB

KD

ST

QTY

RATE

Less

Remarks

AMOUNT

4720

11

TB-WS

##
Supplying & fixing GI pipe Medium Grade properties
& weight as per IS 1239 ISI mark with GI fittings in
ground or on wall including cost of tees, elbows,
bends, reducers, couplings, running joints, union
flanges, unions etc. with necessary excavation in all
types of soils except rock requiring blasting, refilling,
chiselling masonry walls and making good the walls & 1 Eac
h
floors to the original surface and fixing MS clamps on
TW blocks on walls including cost and conveyance of
all materials and labour charges complete for finished
item of work.(15mm Dia)

44.00

172.2

7577

7577

11

TB-WS

##
Supplying & fixing GI pipe Medium Grade properties
& weight as per IS 1239 ISI mark with GI fittings in
ground or on wall including cost of tees, elbows,
bends, reducers, couplings, running joints, union
flanges, unions etc. with necessary excavation in all
types of soils except rock requiring blasting, refilling,
chiselling masonry walls and making good the walls & 1 Eac
h
floors to the original surface and fixing MS clamps on
TW blocks on walls including cost and conveyance of
all materials and labour charges complete for finished
item of work.(20mm Dia)

24.00

191.6

4598

4598

11

TB-WS

##
Supplying & fixing GI pipe Medium Grade properties
& weight as per IS 1239 ISI mark with GI fittings in
ground or on wall including cost of tees, elbows,
bends, reducers, couplings, running joints, union
flanges, unions etc. with necessary excavation in all
types of soils except rock requiring blasting, refilling,
chiselling masonry walls and making good the walls & 1 Eac
h
floors to the original surface and fixing MS clamps on
TW blocks on walls including cost and conveyance of
all materials and labour charges complete for finished
item of work.(25mm Dia)

32.00

250.82

8026

8026

11

TB-WS

##
Supplying & fixing GI pipe Medium Grade properties
& weight as per IS 1239 ISI mark with GI fittings in
ground or on wall including cost of tees, elbows,
bends, reducers, couplings, running joints, union
flanges, unions etc. with necessary excavation in all
types of soils except rock requiring blasting, refilling,
chiselling masonry walls and making good the walls & 1 Eac
h
floors to the original surface and fixing MS clamps on
TW blocks on walls including cost and conveyance of
all materials and labour charges complete for finished
item of work.(32mm Dia)

4.00

352.3

1409

1409

11

TB-WS

##
Supplying and fixing Gunmetal Gate ( GM peet ) valve
as per IS-778 Class - I , Indian make heavy type
including cost and conveyance of all materials , labour 1 Eac
h
charges etc. complete for finished item of work.

4.00

695.4

2782

2782
##

294427110.xls

CS

113of221

Sl.
No.

TB-WS

UNIT

TB-WS

11

11

As per sanctioned estimate

Description
Providing and placing on terrace (at all floor levels)
polyetheylene water storage tank with double layer
approved brand and manufacture with cover and
suitable locking arrangement and making necessary
holes for inlet and outlets and over flow pipes but 1 Eac
h
without fittings and base support for tanks including
cost and conveyance of all materials and labour
charges for placing and fixing in position as directed
by Engineer-in-Charge.
Supply and fixing of stainless steel sink with drain
board of size 914.4 mm x 457.2 mm 1 mm thick of
indian make on cantilever brackets including 32 mm
CP waste coupling including supply & fixing of 31.75
mm dia PVC flexible waste pipe of 914.4 mm length
of 1st quality, chasing brick masonry wall and making
Eac
1
good after construction i.e., restoring to original
h
srufaces etc., complete including cost and
conveyance of all materials and labour charges for all
operations etc., complete for finished item of work in
all floors

QTY

3000.00

RATE

Excess

AMOUNT

5.7

GF

FF

SF

TF

TB

KD

ST

QTY

RATE

Less

Remarks

AMOUNT

17100

17100

##

1.00

5237

5237

5237

Elec

12

TB-WS

##
Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard
or equivalent CPVC Pipes and Fittings to meet the
requirement of ASTM-D 2846 and are produced in
CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad
Eac
Flowgurard SDR 11 and SDR 13.5 pipes are made 1
h
from idential CPVC compounds having the same
physical Properties for Hot and Cold Water (IS
15778:2007
Supply and fixing of ISI mark 25mm dia 2.2mm thick
PVC conduit pipe Sudhakar / Macoplast / Modimake
concealed in roof slab with all required acessories
including No.14 SWG GI wire for earth continuity
including chiseling the wall wherever necessary ,
including necessary masonery work for light/fan point
1 Rmt
and seperate plug point with teak wood deep box
including cost and conveyance of all materials to site
and labour charges, sales tax etc., complete for
finished item of work.
(SSR 2012-13,
item No.1.4.1)

107.80

107.80

329.50

35520

35520

###

755.00

59.78

45134 1064.45

1064.45

70.35

74884

29750

Elec

Elec

###
Supply and Fixing of 25mm dia 1.5mm thick P.V.C.
pipe (ISI MARK) concealed in wall with all required
accessories including masonary work for light, fan and
separate plug point with well seasoned TW box 1 Rmt
including all labour charges etc., complete. Make :
Sudhakar/ Maco Plast / Modi
Supplying and wiring with 2 runs of 14/0.3m (1.00
Sq.mm) FRLS / HFFR P.V.C. insulated ISI Copper
Cable
GM/L&T/RPG/Havells/V-Guard/Power
Flex/Polycab/Gold Medal/ Standard /Milion / Vimal/
Suncab/ Paragaon / FortuneArt make in the existing
metallic / non-metallic conduct pipe with 6A 1 Way
flush type switch, Ceiling rose and 3mm thick hylam
sheet covering to switch control box including cost
and conveyance of all materials to site, labour 1 Rmt
charges and sales tax etc. complete for finished item
of work for light, bell, fan and exhaust fan points in
Non-Residential Buildings
(SSR-2012-13, item No. 2.1.1)ing cost and
conveyance of all materials to site, labour charges
and sales tax etc. complete for finished item of work

535.00

70.24

37578

0.00

37578
##

197.00

357.96

70518

0.00

349.20

70518

##

294427110.xls

CS

114of221

Sl.
No.

UNIT

Elec

As per sanctioned estimate

Description
Supply and fixing of 6A 3 pin wall plug socket with 6A
switch control on a common switch board with earth
continuity including wire leads, earth connections
Eac
1
along with all labour charges etc., complete.
h
Makes : Anchor / Gold Medal Olive /Million Zoom

QTY

32.00

RATE

Excess

AMOUNT

100.18

GF

3206

FF

SF

TF

TB

KD

ST

QTY

RATE

Less

Remarks

AMOUNT

3206

Elec

##
Supply and Fixing of 16A 3pin and 6A 3pin plug
socket with and 16A switch control duly recessed in
wall with MS switch deep box of 6" x8" x2 1/2" size
covered with hylam sheet including earth connections
Eac
1
and all labour charges etc., complete. Plug Socket.
h
Makes : Gold Medal / ANCHOR/ OLIVE/Million
ZOOM.

2.00

332.08

664

664

Elec

62.00

Supply and fixing SPN - Vertical type Distribution


board with IP -20 Protection with 125A, 4 Pole 25 kA
MCCB as incomer with 6Nos 63A TP MCBs and 12
Eac
Nos. 10 kA SPMCBs as outgoing including internal 1
h
connection and labour charges for flush mounting
etc.

9.00

Elec

Elec

##
Supply and fixing of batten holder / slanting holder in
lieu of ceiling rose of light point complete with all
connections and all labour charges with 40W bulb (for 1 Eac
h
new installation).
Makes : Gold Medal /Million / Vimal

Supply and fixing TPN Distribution board with IP-43


protection (Metal Door) suitable for 3 phase ELCB /
RCCB / FP Isolator as incomer and 10kA SP MCBs as
outing going including internal connection and labour
Eac
charges for flush mounting etc., complete. 63 A FP 1
h
Isolater 1 No, 6-32 A SPMCB's 8 Nos .Make
:MDS/GE/L&T Hanger/SIEMANS/SCHNEIDERS.

71.82

4453

4453
##

2863.91

25775

25775
##

1.00

5662

5662

5662

Elec

##
Supply and 2 runs of 2.5 sq mm PVC insulated
flexible copper cable and 1 run of 2.5 sq.mm flexible
PVC insulated copper cable for earthing in the
existing conduit pipe for power point including labour 1 Rmt
charges for 16A sockets. Make: Finolex / L&T

150.00

74.73

11210

11210

Elec

Elec

Providing independent earthling by excavating a


trench to a depth of 2.1 M in all soils, as per size
specified in the Data, using 40mm dia 'B' class GI 1 Eac
h
pipe of 2.5 Mtrs length with necessary accessories
with hume pipe ring duly providing staggered holes

4.00

Elec

91.00

Supply and erecting Exaust fan Makes: Phillips / GE /


Eac
Wipro /Thornes tax etc. complete for finished item of 1
h
work

2.00

Elec

Supply and erecting Exaust fan Makes: Phillips / GE /


Eac
Wipro /Thornes tax etc. complete for finished item of 1
h
work

1.00

Elec

##
Supply, Transportation and fixing of 4' - 40 Watt box
type flourescent single Tube Light fitting with Energy
saving electronic ballast, consuming 28 W suitable
Eac
for 40 Watt tube on varnished teak wood round blocks 1
h
with flexible 3 core wire etc.,, complet Makes :
Chowk: Trinic , tube : Philips / crompton

Supply of 1x40W weather proof flourescent streetlight


fitting comprising canopy of sheet Aluminium in stove
enamel finish with copper / VPIT ballast, capacitor,
Eac
tube and starter etc., complete. Makes: Phillips / 1
h
GE / Wipro /Thornes tax etc. complete for finished
item of work

10.00

294427110.xls

448

40768

40768
##

2593.5

10374

10374
##

3314.72

6629

6629
##

1838.42

1838

1838
##

2035.38

20354

20354
##

CS

115of221

Sl.
No.

UNIT

Elec

As per sanctioned estimate

Description
Supply of 1x40W Flood light fitting comprising canopy
of sheet Aluminium in stove enamel finish with copper
/ VPIT ballast, capacitor, tube and starter etc.,
Eac
complete. Makes: Phillips / GE / Wipro /Thornes tax 1
h
etc. complete for finished item of work

QTY

1.00

RATE

Excess

AMOUNT

7894.61

GF

FF

SF

TF

TB

KD

ST

QTY

RATE

Less

Remarks

AMOUNT

7895

7895
##

Supply & fixing of 50mm dia MS Pipe including cost


and conveyance of all labour charges etc. complete 1 Rmt
for finished item of work.
78

79

80

81

Supplying and laying, filling, jointing and testing SWG


SP-1 101.6MM pipe conforming to ISI 651 & 4127
with air tight Cement joints in CM (1.5:1) prop.
including excavation of trenches and socket pits in
any soil (except rock requiring blasting) and refilling
1
with watering and tamping to the required slope 1
Rmt
including cost and conveyance of all materials to site
and all labour charges , Overheads & Contractor profit
etc., complete for finished item of work (APSS NO
1301 & 1318)
Supplying, laying, jointing and testing 152.4 mm SWG
pipes of ISI make conforming to ISI 651 & 4127 with
airtight cement joints in CM 1.5:1 prop. including
excavation of trenches and socket pits in any soil
(except rock requiring blasting) up to 914.4 mm(3'0")
1
depth and refilling with watering and tamping including 1
Rmt
cost and conveyance of all materials to site, all labour
charges, sales and other taxes on all materials etc.,
complete for finished item of work. (A.P.S.S.No. 1301
& 1318)
Constructing 904.0 mm (30) dia brick masonry
inspection chamber as per IS - 4111: Part-1:1986 with
cement mortar (1:6) prop using 2nd Class Clay Bricks
of 225 mm thick from approved source having a
minimum crushing strength of 5 N/sq.mm including
plastering with cement mortar 1:3 prop; thick both
inside and outside fitted with 20 dia RCC manhole
covers and frames including excavating pits up to a
depth of 904 mm (3'-0") in all sorts of soils (exculding
rock) and laying cement conrete (1:4:8) 150 mm thick
using 40 mm HBG Metal and P.C.C. 1:2:4 benching
and channel 100 mm thick as per Standard 1 Eac
h
specification and including cost and conveyance of all
materials like cement, sand, bricks, water etc., to site,
cost of seigniorage charges on all materials and all
incidental and operational, labour charges like mixing
cement mortar, constructing masonry, lift charges,
curing, sales and other taxes on all materials etc.,
complete for finished item of work. (A.P.S.S. No.
1325).

Supplying and fixing 150.00mm x 100.00mm gully


trap conforming to ISI 651 & 4127 with CI grating and
constructing brick masonry intermediate chamber in
CM (1:6) prop. and fitted with RCC cover 3" thick as
Eac
directed by Engineer-in-charge including cost and 1
h
conveyance of all materials to site, labour charges ,
Overheads & Contractors profit etc., complete for
finished item of work.

294427110.xls

0.00

220

0.00

363.7

0.00

4669.5

0.00

604.2

0.00

CS

5698.90

116of221

Sl.
No.
82

83

84

85

86

87

As per sanctioned estimate

Description
UNIT
Supplying & fixing CI Nahani traps 1st quality ISI
marked conforming to IS:1729-1979 with C.P. Grating
fixing with white cement as per site requirements with
standard practice 100 mm dia Inlet- 75 mm (3") outlet
pipe - 4 Kgs with N.P. Cover for all floors, including
Eac
cost and conveyance of all materials to site, all labour 1
h
charges, sales and other taxes on all materials etc.,
complete for finished item of work. (APSS No 1326)
for All Floors.

Supply and Fixing European Water Closet of 1st


quality conforming to IS:2556-part-2-1973 of
Hindustan / Neycer or Parryware make white glazed
with 'S' trap including cost of plastic sheet and lid for
European Water Closet with rubber or plastic buffers
as per IS:2548-1996 and PVC low level single flush
Eac
1
10 litere capacity system with internal components
h
and short bend of make Parryware slim line including
cost and conveyance of all materials to site, labour
charges for fixing etc., complete for finished item of
work. for all floors
Supplying & Fixing 550 x 400 mm Indian make Flat
Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st
quality conforming to IS:2556-Part-4:1972 with waste
fittings like rubber plug, chain, 32 mm nominal size
C.P. Fitting with parallel pipe thread conforming to
IS:2963-1979 and fitted with 15 mm nominal bore
single Chromium Plated Pillar Tap of 1st quality Indian
make 400 grams Seiko/ Esso/Nice/Senior or
equivalent complete with standard CI brackets
Eac
including wooden block, 12.7mm PVC connection with
1
h
Brass union nut CP coated, 12.7mm dia first qualifty
NP angle stop cock, 38.1mm CP waste coupling ,
31.75mm dia PVC flexible waste pipe of 914.4mm
length of first quality including cost and conveyance
of all materials to site, all labour charges, sales and
other taxes on all materials etc., complete for finished
item of work. for All Floors.

Supplying and fixing NP Soap Dish heavy type with


NP SCREWS duly embedded in the Brick Masonry
wall complete for finished item of work for all floors,
including cost and conveyance of all materials to site, 1 Eac
h
all labour charges, sales and other taxes on all
materials etc., complete for finished item of work for
All Floors.
Supplying and fixing TV shape mirror with plastic
frame size 609.6 x 457.20mm including cost and
conveyance of all materials to site, all labour charges,
Eac
sales and other taxes on all materials etc., complete 1
h
for finished item of work for All Floors.
Supplying and fixing of 25.4mm dia and 609.6mm
long alluminium anodized towel rods with brackets
and alluminium screwes fixed into the wall over
wooden gutties etc., including cost and conveyance
Eac
of all materials to site, all labour charges, sales and 1
h
other taxes on all materials etc., complete for finished
item of work for All Floors.

294427110.xls

QTY

RATE

Excess

AMOUNT

GF

FF

SF

TF

TB

KD

ST

QTY

RATE

Less

Remarks

AMOUNT

318.1

0.00

3593.3

0.00

2321.05

0.00

234.8

0.00

496

0.00

158.5

0.00

CS

258.80

174.50

117of221

Sl.
No.
88

89

90

91

92

As per sanctioned estimate

Description
UNIT
Supplying & Fixing 12.7mm N.P bib tap Indian make
300 grams Seiko / Nice/ Senior or equivalent including
cost and conveyance of all materials to site, all labour
Eac
charges, sales and other taxes on all materials etc., 1
h
complete for finished item of work for All Floors.
Supplying & Fixing 12.7mm N.P bib tap Indian make
400 grams Seiko / Nice/ Senior or equivalent including
cost and conveyance of all materials to site, all labour
Eac
charges, sales and other taxes on all materials etc., 1
h
complete for finished item of work for All Floors.
Supplying & fixing 15mm nominal bore GI pipe
Medium Grade properties & weight as per IS 1239 ISI
mark in ground or on wall including cost of tees,
elbows, bends, reducers, couplings, running joints,
union flanges, unions etc. with necessary excavation
in all types of soils except rock requiring blasting,
refilling, chiselling masonry walls and making good the
1
walls & floors to the original surface and fixing MS 1 Rmt
clamps on TW blocks on walls including cost and
conveyance of all materials and labour charges ,
Overheads & Contractors profit complete for finished
item of work.

Supplying & fixing 20mm nominal bore GI pipe


Medium Grade properties & weight as per IS 1239 ISI
mark in ground or on wall including cost of tees,
elbows, bends, reducers, couplings, running joints,
union flanges, unions etc. with necessary excavation
in all types of soils except rock requiring blasting,
refilling, chiselling masonry walls and making good the
1
walls & floors to the original surface and fixing MS 1 Rmt
clamps on TW blocks on walls including cost and
conveyance of all materials and labour charges ,
Overheads & Contractors profit complete for finished
item of work.

Supplying & fixing 25mm nominal bore GI pipe


Medium Grade properties & weight as per IS 1239 ISI
mark in ground or on wall including cost of tees,
elbows, bends, reducers, couplings, running joints,
union flanges, unions etc. with necessary excavation
in all types of soils except rock requiring blasting,
refilling, chiselling masonry walls and making good the
1
walls & floors to the original surface and fixing MS 1 Rmt
clamps on TW blocks on walls including cost and
conveyance of all materials and labour charges ,
Overheads & Contractors profit complete for finished
item of work.

294427110.xls

QTY

RATE

Excess

AMOUNT

GF

FF

SF

TF

TB

KD

ST

QTY

249.7

0.00

393.3

172.2

RATE

Remarks

0.00

0.00

191.6

0.00

250.8

0.00

CS

274.75

Less

AMOUNT

118of221

Sl.
No.
93

94

95

96

97

As per sanctioned estimate

Description
UNIT
Supplying & fixing 32mm nominal bore GI pipe
Medium Grade properties & weight as per IS 1239 ISI
mark in ground or on wall including cost of tees,
elbows, bends, reducers, couplings, running joints,
union flanges, unions etc. with necessary excavation
in all types of soils except rock requiring blasting,
refilling, chiselling masonry walls and making good the
1
walls & floors to the original surface and fixing MS 1 Rmt
clamps on TW blocks on walls including cost and
conveyance of all materials and labour charges ,
Overheads & Contractors profit complete for finished
item of work.

Supplying & fixing tested gun metal peet valve of


25mm DIA Gunmetal Gate (GM peet) valve as per IS 778 Class - I, Indian make heavy type - make or
equivalent screwed type 1st quality of approved type
Eac
including cost and conveyance of all materials to site, 1
h
all labour charges, sales and other taxes on all
materials etc., complete for finished item of work for
All Floors.
Providing and placing on terrace (at all floor
levels)polyetheylene water storage tank with double
layer approved brand and manufacture with cover and
suitable locking arrangement and making necessary
holes for inlet and outlets and over flow pipes but
1
without fittings and base support for tanks including 1
Litre
cost and conveyance of all materials and labour
charges , Overheads & Contractors profit complete for
finished item of work.

Supplying & Fixing Orissa Pan 580 mm x 440 mm


white glazed W.C 1st quality ISI marked conforming to
IS:2556-Part-3-1981 with "P" or "S" trap Hindware/
Parryware/ Neycer - ISI mark 580 mm x 440mm as
approved by the Engineer-in-charge fixed in brick
masonry with necessary S trap of water closet, shall
be encased in C.C. (1:2:4) 6" alround well above the 1 Eac
h
joint, to stop leakage at the joint, cost & conveyance
of all materials and labour charges etc., including
sales and other taxes on all materials complete for
finished item of work for all floors.

Supplying & fixing SINGLE BOWL stainless steel sink


size 24" x18" x 8 " (609.6x457.2x203.2mm) 1 mm
thick with accessories complete for finished item of
work for all floors, including cost and conveyance of
Eac
all materials to site, all labour charges, sales and 1
h
other taxes on all materials etc., complete for finished
item of work for All Floors.
Supplty and fixing of 110mm dia SWR PVC pipe
Ashirvad make including cost of materials and labour
Eac
1
charges etc., complete for finished item of work
h
Supplty and fixing of 63mm dia SWR PVC pipe
Ashirvad make including cost of materials and labour
Eac
1
charges etc., complete for finished item of work
h
Supplty and fixing of CPVC pipe (1 1/4") 32mm dia
pipe Ashirvad make including cost of materials and
Eac
labour charges etc., complete for finished item of work 1
h

294427110.xls

QTY

RATE

Excess

AMOUNT

GF

FF

SF

TF

TB

KD

ST

QTY

RATE

Less

Remarks

AMOUNT

352.3

0.00

695.4

0.00

5.7

0.00

1487.7

0.00

5237.2

0.00

0.00

1635.90

163.00

0.00

CS

85.00

119of221

Sl.
No.

As per sanctioned estimate

Description
UNIT

QTY

RATE

Supplty and fixing of CPVC pipe (1 1/4") 32mm dia


Gate value Ashirvad make including cost of materials
Eac
and labour charges etc., complete for finished item of 1
h
work
98

99

100

101

102

103

Supply and fixing of ISI mark 25mm dia 2.2mm thick


PVC conduit pipe Sudhakar / Macoplast / Modimake
concealed in roof slab with all required acessories
including No.14 SWG GI wire for earth continuity
including chiseling the wall wherever necessary ,
1
including necessary masonery work for light/fan point 1
Rmt
and seperate plug point with teak wood deep box
including cost and conveyance of all materials to site
and labour charges, sales tax etc., complete for
finished item of work.
Supply and fixing of ISI mark 25mm dia 2.2mm thick
PVC conduit pipe Sudhakar / Macoplast / Modimake
concealed on surfarce with all required acessories
including No.14 SWG GI wire for earth continuity
including chiseling the wall wherever necessary ,
1
including necessary masonery work for light/fan point 1
Rmt
and seperate plug point with teak wood deep box
including cost and conveyance of all materials to site
and labour charges, sales tax etc., complete for
finished item of work.
Supply and fixing of ISI mark 25mm dia 2.2mm thick
PVC conduit pipe Sudhakar / Macoplast / Modi make
concealed in wall with all required acessories
including No.14 SWG GI wire for earth continuity
including chiseling the wall wherever necessary ,
1
including necessary masonery work for light/fan 1
Rmt
pointand seperate plug point with teak wood deep box
including cost and conveyance of all materials to site
and labour charges, sales tax etc., complete for
finished item of work.
Supplying and wiring with 2 runs of 14/0.3m (1.00
Sq.mm) FRLS / HFFR P.V.C. insulated ISI Copper
Cable
GM/L&T/RPG/Havells/V-Guard/Power
Flex/Polycab/Gold Medal/ Standard /Milion / Vimal/
Suncab/ Paragaon / FortuneArt make in the existing
metallic / non-metallic conduct pipe with 6A 1 Way
flush type switch, Ceiling rose and 3mm thick hylam 1 Poin
t
sheet covering to switch control box including cost
and conveyance of all materials to site, labour
charges and sales tax etc. complete for finished item
of work for light, bell, fan and exhaust fan points in
Non-Residential Buildings.
Supply and fixing of 6A 3/2 pin flush type socket with
6A switch control of Anchor / Gold medal olive / Million
zoom make with ISI mark on a common switch board
with earth continuity including wire leads, earth
Eac
connections including cost and conveyance of all 1
h
materials to site, labour charges and sales tax etc.
complete for finished item of work
Supply and fixing of Batton Holder/Slanting holder in
lieu of ceiling rose of light point complete with
Eac
allconnetions and all labour charges with 40Watt bulb 1
h
etc., complete for new installation. Maru Make

294427110.xls

Excess

AMOUNT

GF

FF

SF

59.78

0 1064.45

TF

TB

KD

ST

QTY

RATE

Less

Remarks

AMOUNT

0.00

90.00

1064.45

70.35

74884

74884

59.80

59

0.00

70.24

0.00

357.96

0.00

357.96

100.18

0.00

100.20

71.82

0.00

71.85

CS

120of221

Sl.
No.
104

105

106

107

108

109

As per sanctioned estimate

Description
UNIT
Supply and fixing of 8 way SPN type distribution
board with IP-20 protection of make Standard /
Havells /HPL / Toyoma suitable for single phase 40A
DP isolator and 6 Nos. 6-32 A MCB's make Standard /
Havells / HPL / Toyoma / C &S as out going with 1 Eac
h
internal connections including cost and conveyance of
all materials to site, labour charges for surface / flush
mounting etc., sales tax complete for finished item of
work.
Supply and fixing 4 way TPN Distribution board
horizontal with IP-20 protection of make Standard /
Havells / HPL/Toyoma/ C &S suitable for three phase
63A Four pole Isolator of make Standard / Havells /
HPL/Toyoma/ C &S as incomer and 10kA single pole
miniature circuit breakers twelve numbers(12Nos ) as
Eac
1
out going with internal connections including cost and
h
conveyance of all materials to site, labour charges for
surface / flush mounting etc., sales tax complete for
finished item of work.

Supply and run of 2 of 36/0.3mm (2.5 Sqmm) PVC


insulated flexible copper cable of make Standard /
Havells /HPL / Toyoma in existing PVC conduit pipe
1
circuits, MV Lamp/Security light points including 1
Rmt
laboiur charges (Phase, Neutral and earth) and run of
1 of 1.0 sqmm copper cable for earthing.
Supply and fixing of 1 X 36/40W Patty type Tube light
luminire powder coated CRCA sheet steel housing
with copper chokes and all standard accessories
including giving connection and all labour chrges etc., 1 Eac
h
complete for finished item of work. Make :
Cromption /Bajaj / Surya /Hpl /Havells.
Providing independent earthing for main switches
integrated circuit cutouts and moters with 40mm dia
'B' class GI Pipe of TATA/Zenith/GST make of 2.5 m
length duly providing 12mm dia 16 Nos. holes and
rewired bolts, nuts and washers, checknuts,
Humepipe ring etc., as per IS specifications with
necessary double GI earth wire NO. 8 SWG 1 Eac
h
inclkuding filling with equal preparation of salt and
charcoal in layers including cost and conveyance of
all materials to site, labour charges and sales tax etc.,
complete for finished item of work.

Supply and fixing of 150 W MH Flood light luminaire


with integral weather proof diecast Alluminium
housing with IP65 protection of makes Surya /HPL/
Havells/ Venture with 150W MH lamp of makes
HPL/Surya/ Havells /Venture 40 mm dia GI Pipe
Eac
Medium Grade with bracket and anti-titling MS flat, 1
h
2.5 Sq.mm flexible copper cable including cost and
conveyance of all materials to site, labour charges
and sales tax etc., complete for finished item of work.

294427110.xls

QTY

RATE

Excess

AMOUNT

GF

FF

SF

TF

TB

KD

ST

QTY

2863.91

0.00

5662

0.00

74.73

0.00

448

0.00

2593.5

0.00

7894.61

0.00

CS

RATE

Less

Remarks

AMOUNT

2863.95

74.75

2593.5

121of221

Sl.
No.
110

111

112

113

As per sanctioned estimate

Description
UNIT
Supply and fixing of 16A 3pin / 6A 3pin plug socket
with indicator lamp and 16Amps fuse unit and 16
Amps switch control (5 in one) of Milltec / Vimal opel /
Maru mantero / Starex smil / CPL make with ISI mark
duly recessed in wall with wooden deep box of 8" X 6"
Eac
X 2 1/2" size covered with hylam sheet including 1
h
earth continuity including cost and conveyance of all
materials to site, labour charges and sales tax etc.
complete for finished item of work

Supply and fixing of 1 X 36/40 W weather proof


fluorescent street light luminaire comprising canopy of
sheet alluminium housing and UV stablised acrylic
cover of makes Cromption / Bajaj / Surya /HPL/
Havells with copper / VPIT ballast capacitor , 40W
Eac
tube and starter with 1.00 meter 25 mm dia GI pipe 1
h
medium grade with bracket and anti titling MS flat etc.,
including cost and conveyance of all materials to site,
labour charges and sales tax etc., complete for
finished item of work.
Supply and erecting 12" (300mm) ISI, Light duty
Exhaust fan with wire guard of makes Crompton /
Bajaj Bahar WG / Havells Ventil Air-DB / Orient Hill air
V AC 50 C/S wire mesh, duly erected in an approved
manner and painted with lettering by enamel paint
Eac
including masonry work and making the hole and 1
h
finishing including cost and conveyance of all
materials to site, labour charges and sales tax etc.,
complete for finished item of work.

Supply and erecting Heavy duty exhaust fan of


Crompton/Almounard/Havells Turbo Force make of
250v AC 50 C/S 300 mm size (12") 900 RPM metallic
blades duly erected in an approved manner and
painted with lettering by enamel paint the Sr. No. and
Eac
date of erection including masonry work and making 1
h
the hole and finishing including cost and conveyance
of all materials to site, labour charges and sales tax
etc., complete for finished item of work.

Supply and errecting ceiling fan of Crompton high


speed plus / Bajaj electra50 /orient energy star with 3
blades and double ball bearings and with condenser
AC 250V 50 C/S of 48" 1200mm sweep completely
erected in position with out regulator, canopy down
rod up to 301.80 mm in length is provided with
hook/clamps nuts and bolts and 24/02 flexible copper 1 Eac
h
wire etc., complete and pointed with lettering by
enamil paint the Sl. No. and date of errection
including cost and conveyance of all materials and
labour chargers etc., complete.

294427110.xls

QTY

RATE

Excess

AMOUNT

GF

FF

SF

TF

TB

KD

ST

QTY

332.08

0.00

2035.38

0.00

1838.42

3314.72

RATE

Less

Remarks

AMOUNT

0.00

0.00

0.00

CS

2035.40

2205.00

122of221

Sl.
No.

As per sanctioned estimate

Description
UNIT

QTY

RATE

Excess

AMOUNT

Supply and fixing of TRINIC / ELLIOT or its equivalent


make 1x28W Box type powder coated energy
conserving tube light luminaire with Electronic ballast
operating voltage range of 90 volts to 350 volts power
factor>0.98 current less than 130ma crest factor and
total hormonic distortion shall be as per IS
specification with auto cut off at high voltage and auto 1 Eac
h
restart at normal voltage suitable for 36/40W tube on
teak wood round blocks with all accessories including
giving connection and all labour chrges etc., complete
for finished item of work.

Supply and run of 4 of 10 sqmm wsc alluminium wire


of makes FINOLEX GOLDMEDAL along with 14swg
gi bearer wire through vc cleats with all accesseries
Eac
includig cost and conveyance of all materials to site 1
h
labour charges and sales tax etc comlete

TO

TOTAL ::

GF

FF

SF

TF

TB

KD

ST

QTY

RATE

Less

Remarks

AMOUNT

0.00

1248.30

0.00

110.50

#REF!

#REF!

#REF!

8676213

S
U
B
T
O
T
A
L

###
###
STEEL
Sanctioned Estimate ::
Working Estimate ::

#REF!

Difference ::

#REF!

Asst. Engineer
TW: Manuguru

294427110.xls

8676213

Excess ::

#REF!

###

Less ::

#REF!

###

#REF!

###

Dy.Executive Engineer
TW : Palvancha

Executive Engineer
TW : Bhadrachalam

CS

Executive Engineer
TW : Bhadrachalam

123of221

LEAD CHART
Construction of Post Matric Hostel for girls at Paloncha (V&M) in Khammam District
RATES AS PER COMMON SSR OF 2013-14 with cement and steel rates of
Lead in KM
Sl. No.

(1)
1

Description

Avg.
SSR Sl.No. Thickness
in mm

Total

Convence
Charges

Initial Cost
including
Add
Stacking
Differenc in 1% towards Loading
Charges
Seigniostorage
charges
wherever rage Charges
necesssary

Area
allowence on
unloading loading &
charges
unloading
charges @
25 %

Total

Unit per

MR

CT

(5)
Bhadrachalam

(6)
39.00

(7)
0.00

(8)
39.00

(9)
412.28

(10)
385.00

(11)
45.00

(12)
0.00

(13)
0.00

(14)
7.60

(15)
1.90

(16)
851.78

(17)
Cum.

(2)
Sand for Mortar

(3)
M-005

Sand for filling& blindage

M-004

Bhadrachalam

39.00

0.00

39.00

412.28

285.00

45.00

0.00

0.00

7.60

1.90

751.78

Cum.

Sand for plastering works

M-006

Bhadrachalam

39.00

0.00

39.00

412.28

505.00

45.00

0.00

0.00

7.60

1.90

971.78

Cum.

Gravel

M-008

Local

10.00

0.00

10.00

122.81

98.00

22.00

0.00

15.20

7.60

1.90

267.51

Cum.

R.R. Stone(Granite,
Dolamite &Trap variety)

M-148

Thoggudem

21.00

0.00

21.00

238.60

245.00

50.00

0.00

30.35

15.17

3.79

582.91

Cum.

C.R. Stone(Granite,
Dolamite &Trap variety)

CSSR-A.14

Thoggudem

21.00

0.00

21.00

238.60

407.41

50.00

0.00

30.35

15.17

3.79

745.32

Cum.

trough stones25 x25x45 to


60 cms

CSSR-A.76

Thoggudem

21.00

0.00

21.00

238.60

933.33

50.00

0.00

30.35

15.17

3.79

1271.24

Cum.

Thoggudem

21.00

0.00

21.00

238.60

805.00

50.00

0.00

0.00

0.00

0.00

1093.60

Cum.

Thoggudem

21.00

0.00

21.00

238.60

1300.00

50.00

0.00

0.00

0.00

0.00

1588.60

Cum.

Thoggudem

21.00

0.00

21.00

238.60

1045.00

50.00

0.00

0.00

0.00

0.00

1333.60

Cum.

Thoggudem

21.00

0.00

21.00

238.60

890.00

50.00

0.00

0.00

0.00

0.00

1178.60

Cum.

Thoggudem

21.00

0.00

21.00

238.60

700.00

50.00

0.00

0.00

0.00

0.00

988.60

Cum.

Gondigudem

40.00

0.00

40.00

673.95

3707.00

0.00

0.00

41.72

41.72

10.43

4474.82

1000 Nos

Local

1.00

0.00

1.00

96.72

10000.00

0.00

0.00

95.64

95.64

23.91

10311.92

1000 Nos

Local

1.00

0.00

1.00

217.62

19000.00

0.00

0.00

215.20

215.20

53.80

19701.81

1000 Nos

Bethamcherla

400.00

0.00

400.00

257.30

257.30

7.00

0.00

0.76

0.38

0.09

522.83

1Sqm.

Thandur

400.00

0.00

400.00

210.41

90.00

4.00

0.00

1.21

0.61

0.15

306.38

1Sqm.

8
9
10
11
12
13

(4)

Source of Material

40mm HBG Metal


M-055
(IS383-1970)
20mm M/c chips
M-053
(IS383-1970)
13.2/12.5 mm M/c chips
M-052
(IS383-1970)
10mm M/c chips
M-051
(IS383-1970)
6mm M/c chips
M-050
(IS383-1970)
2nd Class Bricks of size BMT-A.01
23x11x7cm

14

Fly Ash Bricks of size 290 BMT-A.13


x100 x140 mm with
compressive strength of 50
Kg /sq.cm

15

Fly Ash Bricks of size 290 BMT-A.10 5.158103


x225 x 140 mm with
compressive strength of 50
Kg/sq .cm

16

Polished Shabad/Tandur blue


Slabas 15 to 18 mm thick
(0.457M x 0.457M)

17

LEAD

BMT-b08

BMT-B.01
Rough Kadapa slabs of
minimum 40 mm thick, size
not less than (0.457 x 457M)

2.29249

25

40

124

Lead in KM
Sl. No.

Description

Avg.
SSR Sl.No. Thickness
in mm

18

18

Polished Marble Slabs of any BMT-B.12


variety 16 to 20 mm thick
(size 0.457 x 0.457 M / 0.6 x
0.6 M)
High polished Granite 16 to
18 mm thick up to 8' 00"
(2.43M) black

BMT-B.11

17

19
20

water

21

Cement

22

Source of Material
MR

CT

Total

Convence
Charges

Initial Cost
including
Add
Stacking
Differenc in 1% towards Loading
Charges
Seigniostorage
charges
wherever rage Charges
necesssary

Local

1.00

0.00

1.00

0.67

681.00

0.00

0.00

Local

5.00

0.00

5.00

1.76

2033.00

0.00

M-189

Local

0.50

0.00

0.50

0.00

100.00

CSSR-A.05

At Site

0.00

0.00

0.00

0.00

4500.00

0.00

0.00

36.89

Mild Steel Bars (Fe 250) for


6mm

M-126

At Site

0.00

0.00

0.00

0.00

44000.00

0.00

0.00

23

High Yield Strength


Deformed Bars (Fe 415) for
8mm to 40mm dia

CSSR-A.62

At Site

0.00

0.00

0.00

0.00

44000.00

0.00

24

Mild Steel, Structural steel,


I,e, Angles, Channels & ISections

CSSR-A.68

At Site

0.00

0.00

0.00

0.00

44500.00

25

M.S. Plates

CSSR-A.69

At Site

0.00

0.00

0.00

0.00

43000.00

Area
allowence on
unloading loading &
charges
unloading
charges @
25 %

Total

Unit per

0.55

0.27

0.07

682.56

1Sqm.

0.52

0.26

0.06

2035.59

1Sqm.

0.00

100.00

KL

7.38

1.85

4546.12

M.T

0.00

0.00

0.00

44000.00

M.T

0.00

44.23

8.84

2.21

44055.29

M.T

0.00

0.00

0.00

0.00

0.00

44500.00

M.T

0.00

0.00

0.00

0.00

0.00

43000.00

M.T

CERTIFICATES:1 Certified that the above leads are true and correct to the best of my knowledge
2 Certified that the quarry requries blasting for RR, CRS, 6mm, 10mm, 12mm, 20mm & 40mm Metal
3 Certified that the 20mm, 12mm, 10mm, 6mm Metal requires Machine Crushing
4 Certified that the work site does not falls within 12 Kms belt of any municipality/ Corporation Limits and hence no extra allowence is required

AEE/AE
TW/ Gundala

LEAD

Dy. Executive Engineer


TW/SD/ Sudimalla

Executive Engineer
TW/Division/ Bhadrachalam

125

DATA
Construction of Post Matric Hostel for girls at Paloncha (V&M) in Khammam District
Overheads
14%
COMMON STANDARD SCHEDULE OF RATES FOR THE YEAR 2013-14
25%

Sl.No

Description

CEMENT MORTAR (1:2)


Material
Cost of Sand
Cost of Cement
Man Power
Light Mazdoor
Add Agency area allowence
Rate per cu.m.
CEMENT MORTAR (1:3)
Material
Cost of Sand
Cost of Cement
Man Power
Light Mazdoor
Add Agency area allowence
Rate per cu.m.
CEMENT MORTAR (1:4)
Material
Cost of Sand
Cost of Cement
Man Power
Light Mazdoor
Add Agency area allowence
Rate per cu.m.
CEMENT MORTAR (1:5)
Material
Cost of Sand
Cost of Cement
Man Power
Light Mazdoor
Add Agency area allowence
Rate per cu.m.
CEMENT MORTAR (1:6)
Material
Cost of Sand
Cost of Cement
Man Power
Light Mazdoor
Add Agency area allowence
Rate per cu.m.
CEMENT MORTAR (1:8)
Material
Cost of Sand
Cost of Cement
Man Power
Light Mazdoor
Add Agency area allowence
Rate per cu.m.

Agency area allowence

LABOUR CHARGES
SSR
Initial Final Rate
Sl.No.
Rate

Unit

1.05 Cum
720 Kgs

971.78
4546.12

1 Cum
1000 Kgs

1020.37
3273.21

0.20 Nos
25%

280.00
56.00

1 Day

56.00
14.00
4363.58

1.05 Cum
480 Kgs

971.78
4546.12

1 Cum
1000 Kgs

1020.37
2182.14

0.20 Nos
25%

280.00
56.00

1 Day

56.00
14.00
3272.51

1.05 Cum
360 Kgs

971.78
4546.12

1 Cum
1000 Kgs

1020.37
1636.60

0.20 Nos
25%

280.00
56.00

1 Day

56.00
14.00
2726.97

1.05 Cum
288 Kgs

971.78
4546.12

1 Cum
1000 Kgs

1020.37
1309.28

0.20 Nos
25%

280.00
56.00

1 Day

56.00
14.00
2399.65

1.05 Cum
240 Kgs

971.78
4546.12

1 Cum
1000 Kgs

1020.37
1091.07

0.20 Nos
25%

280.00
56.00

1 Day

56.00
14.00
2181.44

1.05 Cum
180 Kgs

971.78
4546.12

1 Cum
1000 Kgs

1020.37
818.30

0.20 Nos
25%

280.00
56.00

1 Day

56.00
14.00
1908.67

Page 126

C-data

Cost andConvenyance of 20mm to


6mm HBG Graded Metal / (Trap
20mm
Metal)
12mm
10mm
6mm

0.6
0.15
0.15
0.10

Cum
Cum
Cum
Cum

1588.60
1333.60
1178.60
988.60

1
1
1
1

Rate per 1 cu.m.


SL.
No

Description of machinery

Units

Cum
Cum
Cum
Cum

953.16
200.04
176.79
98.86

Total

1428.85

Hire charges of machinery


Hire
fuel
crew
charges
charges
charges

total

1 concrete mixer300/200 (diesel)


Hour
54.60
74.30
174.20
303.10
2 Batchingplant 0.5 cum
Hour
120.30
114.10
269.50
503.90
3 needle vibrator 40 mm (petrol)
Hour
7.80
19.00
125.40
152.20
4
0.00
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey
Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour
charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour
charges etc., complete for finished item of work including seignerage charges excluding dewatering charges etc.,
complete for Foundation of Building.(APSS No. 308)
Light Mazdoor
Add Agency area allowence
Add 75% for excavation of foundation
of
addbuilding
seigniorage charges
Add 14% over heads
Rate per 1 cu.m.
a) Earth work excavation and depositing
on bank with initial lead of 10m and
initial lift of 3m in Loamy & Clayey
Soils like BC Soils, Red Earth &
Ordinary Gravelly Soils ( SS 20-B)
including all operational incidental
labour charges such as
shoring,
strutting, sheeting, planking and
dewatering including cost of hire
charges of T & P, labour charges etc.,
complete for finished item of work
including seignerage charges excluding
dewatering charges etc., complete for
Pipe line where the depth is more
than 1.5 times width.(APSS No. 308)
Light Mazdoor
Add 120 % for excavation of Pipe line
add seigniorage charges
Add 14% over heads
Rate per 1 cu.m.

0.364
25%
1
1
200.36

Nos
cu.m.
cum
cu.m.

280.00
101.92
76.440
22.00
0.14

0.364
1
1
246.22

Nos
cu.m.
cum
cu.m.

280.00
122.304
22.00
0.14

1 Day
1 cu.m.
1 cum
1 cu.m.
Total

1
1
1
1

Day
cu.m.
cum
cu.m.
Total

101.92
25.48
76.44
22.00
28.05
253.90

101.92
122.30
22.00
34.47
280.70

C) Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey
Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour
charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour
charges etc., complete for finished item of work including seignerage charges excluding dewatering charges etc.,
complete for Septic tank soak pit and sump.(APSS No. 308)
Light Mazdoor
Add Agency area allowence
add seigniorage charges

0.364 nos
25%
1 cum

280.00

1 nos

101.92

101.92
22.00

25.48
1 cum

22.00
149.40

Add 14% over heads

149.40

Page 127

0.14

20.92

C-data

Rate per 1 cu.m.


2

Total

170.35

Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with
initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including
cost and conveyence of water to work site and all operational, incidental, labour charges, hire charges of T & P etc.,
complete for finished item of work. (APSS NO. 309 & 310)
Light Mazdoor
0.052 Nos
280.00
1 Nos
14.56
Add Agency area allowence
25%
14.56
3.64
Add 14% over heads
14.56
0.14
1
2.04
Rate per 1 cu.m.
Total
20.25
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm
thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to the
work site and all operational, incidental, labour charges, seignorage charges, hire charges of T & P etc., complete for
finished item of work. (APSS NO. 309 & 310)
Cost of Gravel
Light Mazdoor
Add Agency area allowence
Add 14% over heads
Rate per Cu.m.
Filling with Sand Cushion under
footings with initial lead in layers not
exceeding 15cm thick, consolidating
each deposited layer by watering and
ramming including cost and conveyence
of water to the work site and all
operational & incidental charges, labour
charges, seignorage charges, hire and
opertaional charges of T & P etc.,
complete for finished item of work.
(APSS NO. 309 & 310)

1 cu.m.
0.052 Nos
25%
282.07 cu.m.

267.51
280.00
14.56
0.14

Cost of Sand
Light Mazdoor
Add 14% over heads

1 cu.m.
0.052 Nos
766.34 cu.m.

751.78
280.00
0.14

1 cu.m.
1 Nos

267.51
14.56
3.64
39.49
325.20

1 cu.m.
Total

1 cu.m.
751.78
1 Nos
14.56
1 cu.m.
107.29
Rate per Cu.m.
Total
873.65
Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved
quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as
mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete,
etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)

material
Metal 40mm
Sand
Cement
Water
Machinery
concrete mixer300/200 (diesel)
LA oncrew charges
Labour
1st class mason
Light Mazdoor
Add Agency area allowence
Add 14% over heads

0.9
0.45
129.6
1.2

cu.m.
cu.m.
Kgs.
KL

1093.60
851.78
4546.12
100.00

1 Hour
25%

cu.m.
cu.m.
Kgs.
KL

984.24
383.30
589.18
120.00

303.10
174.20

1 Hour
1

303.10
43.55

0.1 Nos.
1.39 Nos.

380.00
280.00

1 Each
1 Each

38.00
389.20

25%

427.20

2850.57 cu.m.
Rate per Cu.m.

0.14

1
1
1000
1

106.80
1 cu.m.
Total

Page 128

399.08
3356.45

C-data

Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved
quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including
seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as
mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete,
etc., complete for finished item of work for Foundations (APSS No. 402)
material
Metal 40mm
0.9 cu.m.
1093.60
1 cu.m.
984.24
Sand
0.45 cu.m.
851.78
1 cu.m.
383.30
Cement
162 Kgs.
4546.12
1000 Kgs.
736.47
Water
1.2 KL
100.00
1 KL
120.00
Machinery
concrete mixer300/200 (diesel)
1 Hour
303.10
1 Hour
303.10
LA oncrew charges
25%
174.20
1
43.55
Labour
1st class mason
0.1 cu.m.
380.00
1 cu.m.
38.00
Light Mazdoor
1.39 Nos.
280.00
1 Each
389.20
Add Agency area allowence
25%
427.20
106.80
Add 14% over heads
2997.86 cu.m.
0.14
1 cu.m.
419.70
Rate per Cu.m.
Total
3524.40
Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed
graded metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational,
incidental, and labour charges such as mixing, laying concrete, finishing top surface, curing concrete, etc., complete
for finished item of work for Dummy Columns. (APSS No. 402)
materal
Graded Metal 20mm to 6mm
Sand
Cement
Water
Machinery
concrete mixer300/200 (diesel)
LA oncrew charges
Labour
1st class mason
Light Mazdoor
Add Agency area allowence

0.9
0.45
129.6
1.2

cu.m.
cu.m.
Kgs.
KL

1428.85
851.78
4546.12
100.00

1 Hour
25%
0.1 cu.m.
1.39 Nos.
25%

1
1
1000
1

cu.m.
cu.m.
Kgs.
KL

1285.97
383.30
589.18
120.00

303.10
174.20

1 Hour
1

303.10
43.55

380.00
280.00
427.20

1 cu.m.
1 Each

38.00
389.20
106.80
3259.09

Total
GF
FF
SF
TF
3259.09
3259.09 3259.09
3259.09
296.00
296.00
296.00
296.00
1491.00
1640.10 1789.20
1938.30
25%
372.75
410.03
447.30
484.58
0.00
42.72
85.44
128.16
5418.84
5647.94 5877.03
6106.13
Add 14% over heads
0.14
758.64
790.71
822.78
854.86
Rate per cu.m.
Total
6177.50
6438.70 6699.85
6961.00
Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed
graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for
Bed Blocks and Hold Fasts (APSS No. 402)
Rate for other Floors
Basic Rate of P.C.C(1:5:10) per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift Charges per Cum.

10

Material
Graded Metal 20 to 6 mm
Sand

0.9 cu.m.
0.45 cu.m.

Page 129

1428.85
851.78

1 cu.m.
1 cu.m.

1285.97
383.30

C-data

Cement
Water
Machinery
concrete mixer300/200 (diesel)
LA oncrew charges
Labour
1st class mason
Light Mazdoor
Add Agency area allowence
Basic rate per Cum.
Rate for other Floors
Basic Rate of P.C.C(1:3:6) per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift Charges per Cum.
Add 14% over heads
Rate per cu.m.
11

4546.12
100.00

1000 Kgs.
1 KL

1000.15
120.00

1 Hour
25%

303.10
174.20

1 Hour
1

303.10
43.55

0.1 cu.m.
1.39 Nos.
25%

380.00
280.00
427.20

1 Each
1 Each

38.00
389.20
106.80
3670.06

GF
3670.06
137.00
415.00
103.75
0.00
4325.81
605.61
4931.45

25%

0.14
Total

FF
3670.06
137.00
456.50
114.13
42.72
4420.41
618.86
5039.30

SF
3670.06
137.00
498.00
124.50
85.44
4515.00
632.10
5147.15

Total
TF
3670.06
137.00
539.50
134.88
128.16
4609.60
645.34
5254.95

Plain Cement Concrete corresponding to M15 grade as per IS 456 equivalent to (1:2:4) proportion nominal mix
(cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed
graded metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work (APSS
No. 402)
Material
Graded Metal 20mm to 6mm
Sand
Cement
Water
Machinery
concrete mixer300/200 (diesel)
LA oncrew charges
Labour
1st class mason
men &women Mazdoor
Add Agency area allowence
Basic rate per Cum.
Rate for other Floors
Basic Rate of P.C.C(1:2:4) per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift Charges per Cum.

10

220 Kgs.
1.2 KL

0.9
0.45
331.2
1.2

cu.m.
cu.m.
Kgs.
KL

1428.85
851.78
4546.12
100.00

1 Hour
25%
0.1 cu.m.
1.39 Nos.
25%

1
1
1000
1

cu.m.
cu.m.
Kgs.
KL

1285.97
383.30
1505.68
120.00

303.10
174.20

1 Hour
1

303.10
43.55

380.00
280.00
427.20

1 cu.m.
1 Each

38.00
389.20
106.80
4175.59

Total
GF
FF
SF
TF
4175.59
4175.59 4175.59
4175.59
137.00
137.00
137.00
137.00
415.00
456.50
498.00
539.50
25%
103.75
114.13
124.50
134.88
0.00
42.72
85.44
128.16
4831.34
4925.94 5020.53
5115.13
Add 14% over heads
0.14
676.39
689.63
702.87
716.12
Rate per cu.m.
Total
5507.75
5615.60 5723.45
5831.30
Plain Cement Concrete M20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine
crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per
1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse
aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering, shuttering,
machine mixing, laying concrete, lift charges, curing etc., complete for finished item of work for steps (APSS No. 402
)
Material
Graded Metal 20mm to 6mm
Sand

0.8 cu.m.
0.4 cu.m.

Page 130

1428.85
851.78

1 cu.m.
1 cu.m.

1143.08
340.71

C-data

Cement
Water
Machinery
Batchingplant 0.5 cum
needle vibrator 40 mm (petrol)
LA on crew charges
Labour
1st class Masons
Man and Mazdoor
Add Agency area allowence
Basic rate per Cum.
Rate for other Floors
Basic Rate of P.C.C(1:1.5:3) per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift Charges per Cum.
Add 14% over heads
Rate per cu.m.
11

380 kgs
1.2 KL

4546.12
100.00

1.333 Hour
1.333 Hour
25%

503.90
152.20
526.40

1 Hour
1 Hour
1

671.70
202.88
131.60

0.1 Nos.
1.39 Nos.
25%

380.00
280.00
427.20

1 Each
1 Each

38.00
389.20
106.80
4871.50

GF
4871.50
137.00
415.00
103.75
0.00
5527.25
773.81
6301.10

25%

0.14
Total

FF
4871.50
137.00
456.50
114.13
42.72
5621.85
787.06
6408.95

1000 kgs
1 KL

SF
4871.50
137.00
498.00
124.50
85.44
5716.44
800.30
6516.75

1727.53
120.00

TF
4871.50
137.00
539.50
134.88
128.16
5811.04
813.55
6624.60

Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted Granite stones from
approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site
including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such
as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for
finished item of work for foundation and basement (APSS No. 601 & 615)
cost of cement

59.4 Kgs

4546.12

1000 Kgs

RR Stone
CR
Through stones 25 x 25x 45 to 60
cms
Sand
1st Class Mason
Light Mazdoor
Add Agency area allowence

0.5
0.44
0.16
0.33
1.2
2.0
25%

Cum
Cum
Cum
cu.m.
Nos
Nos

582.91
745.32
1271.24
851.78
380.00
280.00
1016.00

1
1
1
1
1
1

2389.92 cu.m.

0.14

Add 14% over heads

Cum
Cum
Cum
cu.m.
Each
Each

1 cu.m.

Rate per cu.m.


12

270.04
291.46
327.94
203.40
281.09
456.00
560.00
254.00
2643.92
334.59
2978.55

Coursed Rubble stone masonry 2nd sort, in CM (1:8) prop: (Cement: Sand) using hard blasted granite stones from
approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site
including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such
as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for
finished item of work for foundation and basement (APSS No. 601 & 612)
cost of cement

57.6 Kgs

4546.12

1000 Kgs

CR Stone
Through stones 25 x 25x 45 to 60
cms
Sand
1st Class Mason
Light Mazdoor
Add Agency area allowence

0.94
0.16
0.32
1.5
2.32
25%

Cum
Cum
cu.m.
Nos
Nos

745.32
1271.24
851.78
380.00
280.00
1219.60

1
1
1
1
1

2658.03 cu.m.

0.14

Add 14% over heads


Rate per cu.m.

Page 131

Cum
Cum
cu.m.
Each
Each

1 cu.m.

261.86
700.60
203.40
272.57
570.00
649.60
304.90
2962.93
372.12
3335.10

C-data

13

Flush Pointing to CRS Masonry in CM(1:3) Prop: including cost and conveyance of all materials like cement, sand,
water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental
charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS
901,906)
cost of cement
Sand
1st Class Mason
Man mazdoor
Add Agency area allowence

14

1.44
0.003
0.05
0.074
25%

Kgs
cu.m.
Nos.
Nos.

4546.12
971.78
320.00
280.00
36.72

Material
Graded Metal 20mm to 6mm
Sand
Cement

0.8 cu.m.
0.4 cu.m.
380 kgs

1428.85
851.78
4546.12

Water

1.2 KL

100.00

1 KL

120.00

Batchingplant 0.5 cum

1.333 Hour

503.90

1 Hour

671.70

needle vibrator 40 mm (petrol)

1.333 Hour

152.20

1 Hour

202.88

526.40

131.60

1000
1
1
1

Kgs
cu.m.
Each
Each

6.55
2.92
16.00
20.72
9.18
3762.59
Add 14% over heads
46.18 cu.m.
0.14
1 sqm
6.47
3769.10
Rate per 1 Sqmt.
Or say
Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard
blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of
380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using
Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine
mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and its fabrication
charges for finished item of work for foundation, plinth , pedastals(below plinth)(APSS No. 402 & 403)

1 cu.m.
1 cu.m.
1000 kgs

1143.08
340.71
1727.53

Machinery

LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor
Add Agency area allowence
Basic rate per Cum.
a) VRCC M20 grade design mix for foot
Basic Rate per Cum.
Centering Charges per Cum.
Add La charges on labour on centering
Add 14% over heads
Rate per cu.m.

25%
0.133 Nos.
0.267 Nos.
4.6 Nos.
25%

380.00
320.00
280.00
1423.98

1 Each
1 Each
1 Each
Total

50.54
85.44
1288.00
356.00
6117.47

1 cu.m.

6117.47

1 cu.m.

6117.47

1 cu.m.
25%
6773.22 cu.m.

552.00
415.00
0.14

1 cu.m.

Say

552.00
103.75
948.25
7721.50

Say

6117.47
2158.00
250.00
1193.57
9719.05

1 cu.m.

b) VRCC M25 design mix for plinth bea


Basic Rate per Cum.
Centering Charges per Cum.
Add La charges on labour on centering
Add 14% over heads
Rate per cu.m.
c) VRCC M25 for pedestals
Basic Rate per Cum.
Centering Charges per Cum.
Add La charges on labour on centering
Add 14% over heads
Rate per cu.m.

1 cu.m.
1 cu.m.
25%
8525.47 cu.m.

6117.47
2158.00
1000.00
0.14

1 cu.m.
1 cu.m.
1 cu.m.

1 cu.m.

6117.47

1 cu.m.

6117.47

1 cu.m.

769.00

1 cu.m.

769.00

25%
7051.47 cu.m.

660.00
0.14

1 cu.m.

165.00
987.21
8038.70

Say

Page 132

C-data

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5)
hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of
380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using
Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine
mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402 & 403) For coloumns , Lintels, Water tanks, Rcc walls in
building
Material
Graded Metal 20mm to 6mm
Sand
Cement
Water
Machinery
Batchingplant 0.5 cum
needle vibrator 40 mm (petrol)
LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor
Add Agency area allowence
Basic rate per Cum.
a) For columns / RCC walls and Water tank
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per cu.m.

0.8
0.4
380
1.2

cu.m.
cu.m.
kgs
KL

1428.85
851.78
4546.12
100.00

1.333 Hour
1.333 Hour
25%
0.167 Nos.
0.167 Nos.
5.6 Nos.
25%

1
1
1000
1

cu.m.
cu.m.
kgs
KL

1143.08
340.71
1727.53
120.00

503.90
152.20
526.40

1 Hour
1 Hour
1

671.70
202.88
131.60

380.00
320.00
280.00
1684.90

1 Each
1 Each
1 Each

63.46
53.44
1568.00
421.23
6443.62

Total

25%

GF
6443.62
296.00
1491.00
372.75

0.14

8603.37
1204.47

Total

9807.85

FF
6443.62
296.00
1640.10
410.03
168.49
8958.24
1254.15

SF
6443.62
296.00
1789.20
447.30
336.98
9313.10
1303.83

TF
6443.62
296.00
1938.30
484.58
505.47
9667.97
1353.52

10212.40 10616.95

11021.50

b) For Lintels
Rate for other Floors

GF

FF

Rate as worked out above per Cum.


Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor

25%

6443.62
984.00
1062.00
265.50

6443.62
984.00
1168.20
292.05
168.49

0.14
Total

8755.12
1225.72
9980.85

Add 14% over heads


Rate per cu.m.
9

SF

TF

6443.62
984.00
1274.40
318.60
336.98

6443.62
984.00
1380.60
345.15
505.47

9056.36 9357.60
1267.89 1310.06
10324.30 10667.70

9658.84
1352.24
11011.10

Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard
blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of
380 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate
(Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using
Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine
mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402 & 403) For beams and slabs

Material

Page 133

C-data

Graded Metal 20mm to 6mm


Sand
Cement
Water
Machinery
Batchingplant 0.5 cum
needle vibrator 40 mm (petrol)
LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor
Add Agency area allowence
Basic rate per Cum.
a) For Roof Beams
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per cu.m.

0.8
0.4
380
1.2

cu.m.
cu.m.
kgs
KL

1428.85
851.78
4546.12
100.00

0.308 Hour
0.308 Hour
25%
0.067 Nos.
0.133 Nos.
3.077 Nos.
25%

1
1
1000
1

cu.m.
cu.m.
kgs
KL

1143.08
340.71
1727.53
120.00

503.90
152.20
121.63

1 Hour
1 Hour
1

155.20
46.88
30.41

380.00
320.00
280.00
929.58

1 Each
1 Each
1 Each

25.46
42.56
861.56
232.40
4725.78

Total

25%

GF
4725.78
1737.00
1251.00
312.75

0.14
Total

8026.53
1123.71
9150.25

FF
4725.78
1737.00
1376.10
344.03
92.96
8275.87
1158.62
9434.50

SF
4725.78
1737.00
1501.20
375.30
185.92
8525.20
1193.53
9718.75

TF
4725.78
1737.00
1626.30
406.58
278.87
8774.53
1228.43
10003.00

b) VRCC M25 design mix for Slabs


75mm thick
Cost of VRCC for 75 mm thick slab
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
c) VRCC M25 design mix for Slabs
100mm
thick for 100 mm thick slab
Cost of VRCC
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
d) VRCC M25 design mix for Slabs of
110mm thick
Cost of VRCC for 110 mm thick slab

0.075 cu.m.

25%

GF
354.43
197.00
142.00
35.50

0.14
Total

728.93
102.05
831.00

0.1 cu.m.

25%

GF
472.58
197.00
142.00
35.50

0.14
Total

847.08
118.59
965.70

0.11 cu.m.

Rate for other Floors


Rate as worked out above per Cum.

GF
519.84

Page 134

4725.78
FF
354.43
197.00
156.20
39.05
6.97
753.65
105.51
859.20

4725.78
FF
472.58
197.00
156.20
39.05
9.30
874.13
122.38
996.55

4725.78

FF
519.84

1 cu.m.
SF
354.43
197.00
170.40
42.60
13.94
778.37
108.97
887.35

TF
354.43
197.00
184.60
46.15
20.92
803.10
112.43
915.55

1 cu.m.
SF
472.58
197.00
170.40
42.60
18.59
901.17
126.16
1027.35

472.58

TF
472.58
197.00
184.60
46.15
27.89
928.22
129.95
1058.20

1 cu.m.

SF
519.84

354.43

519.84

TF
519.84

C-data

Hire charges on centering material


Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.

25%

197.00
142.00
35.50

0.14
Total

894.34
125.21
1019.55

197.00
156.20
39.05
10.23
922.32
129.12
1051.45

197.00
170.40
42.60
20.45
950.29
133.04
1083.35

197.00
184.60
46.15
30.68
978.27
136.96
1115.25

e) VRCC M25 design mix for Slabs of


120mm thick
Cost of VRCC for 120 mm thick slab
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.

0.12 cu.m.

25%

GF
567.09
197.00
142.00
35.50

0.14
Total

941.59
131.82
1073.45

4725.78
FF
567.09
197.00
156.20
39.05
11.15
970.49
135.87
1106.40

1 cu.m.
SF
567.09
197.00
170.40
42.60
22.31
999.40
139.92
1139.35

567.09

TF
567.09
197.00
184.60
46.15
33.46
1028.30
143.96
1172.30

f) VRCC M25 design mix for Slabs of


120mm thick
Cost of VRCC for 120 mm thick slab
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
g) VRCC M25 for Slabs 125mm thick
Cost of VRCC for 125 mm thick slab
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
h) VRCC M25 for Slabs 140 mm
thick
Cost of VRCC for 140 mm thick slab

0.12 cu.m.

25%

GF
567.09
197.00
142.00
35.50

0.14
Total

941.59
131.82
1073.45

0.125 cu.m.

25%

GF
590.72
197.00
142.00
35.50

0.14
Total

965.22
135.13
1100.40

0.14 cu.m.

Page 135

4725.78
FF
567.09
197.00
156.20
39.05
11.15
970.49
135.87
1106.40
4725.78
FF
590.72
197.00
156.20
39.05
11.62
994.59
139.24
1133.85
4725.78

1 cu.m.
SF
567.09
197.00
170.40
42.60
22.31
999.40
139.92
1139.35

TF
567.09
197.00
184.60
46.15
33.46
1028.30
143.96
1172.30

1 cu.m.
SF
590.72
197.00
170.40
42.60
23.24
1023.96
143.35
1167.35

567.09

590.72

TF
590.72
197.00
184.60
46.15
34.86
1053.33
147.47
1200.85

1 cu.m.

661.61

C-data

Rate for other Floors


Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.

25%

GF
661.61
197.00
142.00
35.50

0.14
Total

1036.11
145.06
1181.20

i) VRCC M25 design mix for Slabs of 115mm thick


Cost of VRCC for 115 mm thick slab
0.115 cu.m.
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
j) VRCC M25 for Slabs 100 mm
thick
Cost of VRCC for 100 mm thick slab

FF
661.61
197.00
156.20
39.05
13.01
1066.87
149.36
1216.25

4725.78

25%

GF
543.46
197.00
142.00
35.50

0.14
Total

917.96
128.52
1046.50

0.1 cu.m.

FF
543.46
197.00
156.20
39.05
10.69
946.40
132.50
1078.95

4725.78

SF
661.61
197.00
170.40
42.60
26.03
1097.64
153.67
1251.35

TF
661.61
197.00
184.60
46.15
39.04
1128.40
157.98
1286.40

1 cu.m.
SF
543.46
197.00
170.40
42.60
21.38
974.84
136.48
1111.35

543.46

TF
543.46
197.00
184.60
46.15
32.07
1003.28
140.46
1143.75

1 cu.m.

472.58

Rate for other Floors


Rate as worked out above per Cum.
Hire charges on centering material

GF
472.58
197.00

FF
472.58
197.00

SF
472.58
197.00

TF
472.58
197.00

Labour charges for centering

142.00

156.20

170.40

184.60

35.50

39.05

42.60

46.15

9.30

18.59

27.89

0.14

847.08
118.59

874.13
122.38

901.17
126.16

928.22
129.95

Total

965.70

996.55

1027.35

1058.20

LA on centering labour charges

25%

Lift charges @ 10% extra on each floor

Add 14% over heads


Rate per 1 Sqmts.
k) VRCC M25 for Slabs 50mm Wearing coat
Cost of VRCC for 50 mm thick slab
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
l) VRCC M25 for Slabs
175mm
thick for 175 mm thick slab
Cost of VRCC

0.05 cu.m.

4725.78

1 cu.m.

236.29

GF
236.29

FF
236.29

SF
236.29

TF
236.29

236.29
33.08
269.40

236.29
33.08
269.40

236.29
33.08
269.40

236.29
33.08
269.40

25%

0.14
Total

0.175 cu.m.

Page 136

4725.78

1 cu.m.

827.01

C-data

Rate for other Floors


Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor

Add 14% over heads


Rate per 1 Sqmts.
m) VRCC M20 for Slabs
180mm
thick for 180 mm thick slab
Cost of VRCC
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
n) VRCC M20 for Slabs
200mm thick
Cost of VRCC for 200 mm thick slab
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 1 Sqmts.
o) VRCC M20 for Slabs of 300 mm
thick
Cost of VRCC for 300 mm thick slab
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
LA on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per 10 Sqmts.
10

25%

0.14
Total

GF
827.01
203.00
146.00
36.50
1212.51

FF
827.01
203.00
160.60
40.15
16.27
1247.03

SF
827.01
203.00
175.20
43.80
32.54
1281.55

TF
827.01
203.00
189.80
47.45
48.80
1316.06

169.75
1382.30

174.58
1421.65

179.42
1461.00

184.25
1500.35

0.18 cu.m.

25%

GF
850.64
203.00
146.00
36.50

0.14
Total

1236.14
173.06
1409.25

0.2 cu.m.

25%

GF
945.16
203.00
146.00
36.50

0.14
Total

1330.66
186.29
1516.95

0.3 cu.m.

25%

GF
1417.73
203.00
146.00
36.50

0.14
Total

1803.23
252.45
2055.70

4725.78
FF
850.64
203.00
160.60
40.15
16.73
1271.12
177.96
1449.10

4725.78
FF
945.16
203.00
160.60
40.15
18.59
1367.50
191.45
1558.95

4725.78
FF
1417.73
203.00
160.60
40.15
27.89
1849.37
258.91
2108.30

1 cu.m.
SF
850.64
203.00
175.20
43.80
33.46
1306.10
182.85
1489.00

TF
850.64
203.00
189.80
47.45
50.20
1341.09
187.75
1528.85

1 cu.m.
SF
945.16
203.00
175.20
43.80
37.18
1404.34
196.61
1600.95

945.16

TF
945.16
203.00
189.80
47.45
55.77
1441.18
201.76
1642.95

1 cu.m.
SF
1417.73
203.00
175.20
43.80
55.77
1895.50
265.37
2160.90

850.64

1417.73

TF
1417.73
203.00
189.80
47.45
83.66
1941.64
271.83
2213.50

Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite
machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of
cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand),
coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using
Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine
mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402 & 403)

Page 137

C-data

Material
Graded Metal 20mm to 6mm
Sand
Cement
Water
Machinery
Batchingplant 0.5 cum
LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor
Add Agency area allowence
Basic rate per Cum
a) For Lintels
Rate for other Floors

11

0.8
0.4
380
1.2

cu.m.
cu.m.
kgs
KL

1428.85
851.78
4546.12
100.00

1.333 Hour
25%
0.167 Nos.
0.167 Nos.
5.6 Nos.
25%

cu.m.
cu.m.
kgs
KL

1143.08
340.71
1727.53
120.00

503.90
359.24

1 Hour
1

671.70
89.81

380.00
320.00
280.00
1684.90

1 Each
1 Each
1 Each

63.46
53.44
1568.00
421.23
6198.95

GF

FF

Rate as worked out above per Cum.

6198.95

6198.95

Hire charges on centering material


Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor

984.00
1062.00
265.50

1
1
1000
1

SF

TF

6198.95

6198.95

984.00
984.00
984.00
1168.20 1274.40
1380.60
25%
292.05
318.60
345.15
168.49
336.98
505.47
8510.45
8811.69 9112.93
9414.17
Add 14% over heads
0.14
1191.46
1233.64 1275.81
1317.98
Rate per Cum.
Total
9701.95 10045.35 10388.75
10732.20
Reinforced cement concrete with M 25 grade Design mix ( by weigh batching ) using 20mm size (SS 5) machine
crushed hard blasted granite graded metal (coarse aggregate) from approved quarry using a minimum quantity of
380 Kg of cement per 1 Cum of concrete including cost and conveyance of all materials like cement, fine aggregate
(sand) ,coarse aggregate, water etc. to site and cost of seigniorage charges on all materials including centering
using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering,
machine mixing, laying concrete, 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of
6.25cm including labour charges for mixing, laying, curing etc., complete but excluding cost of steel and its
fabrication charges for finished item of work
for sun-shades of any width as per approved plan / design and of average thickness of 62.50mm ( thickness at
support 75mm and thickness at edge 50mm) (APSS No. 402, 403)
material
Graded Metal 20mm to 6mm
Sand
Cement
Water
Machinery
Batchingplant 0.5 cum
LA on crew charges
manpower
1st Class Mason
2nd Class Mason
Man Mazdoor
Add Agency area allowence
Basic rate per Cu.m
a) Chajja / Sunshade
Cost of RCC for 62.5 mm thick
sunshade
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges

0.8
0.4
380
1.2

cu.m.
cu.m.
kgs
KL

1428.85
851.78
4546.12
100.00

0.308 Hour
25%
0.067 Nos.
0.133 Nos.
3.077 Nos.
25%

0.0625 cu.m.

25%

Page 138

1
1
1000
1

cu.m.
cu.m.
kgs
KL

1143.08
340.71
1727.53
120.00

503.90
83.01

1 Hour
1

155.20
20.75

380.00
320.00
280.00
929.58

1 Each
1 Each
1 Each
Total

25.46
42.56
861.56
232.40
4669.25

1 cu.m.

291.83

4669.25

GF

FF

SF

291.83
194.00
163.00
40.75

291.83
194.00
179.30
44.83

291.83
194.00
195.60
48.90

TF
291.83
194.00
211.90
52.98

C-data

Lift charges @ 10% extra on each floor


Add 14% over heads
Rate per Sqmt.

689.58
96.54
786.15

0.14
Total

5.81

11.62

17.43

715.77
100.21
816.00

741.95
103.87
845.85

768.14
107.54
875.70

b) for platforms of 50 mm thick


Cost of RCC for 50 mm thick platform
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per Sqmt.
b) for shelves of 25 mm thick
Cost of RCC for 25 mm thick shelves
Rate for other Floors
Rate as worked out above per Cum.
Hire charges on centering material
Labour charges for centering
La on centering labour charges
Lift charges @ 10% extra on each floor
Add 14% over heads
Rate per Sqmt.
12

12

0.05 cu.m.

25%

GF
233.46
197.00
142.00
35.50

0.14
Total

607.96
85.11
693.10

0.025 cu.m.
GF
116.73
197.00
142.00
25%
35.50
491.23
68.77
560.05

0.14
Total

4669.25

1 cu.m.

FF
233.46
197.00
156.20
39.05
4.65
630.36
88.25
718.65

SF
233.46
197.00
170.40
42.60
9.30
652.76
91.39
744.20

4669.25
FF
116.73
197.00
156.20
39.05
2.32
511.30
71.58
582.90

1 cu.m.
SF
TF
116.73
116.73
197.00
197.00
170.40
184.60
42.60
46.15
4.65
6.97
531.38
551.45
74.39
77.20
605.80
628.70

233.46

TF
233.46
197.00
184.60
46.15
13.94
675.15
94.52
769.70

116.73

Pointing to Cuddapah / Shahabad slabs in CM(1:3) Prop: including cost and conveyance of all materials like
cost of cement for Cement Mortar (1:3)
0.96 Kgs
4.55
1 Kgs
4.36
cost of sand for Cement Mortar (1:3)
0.002 cu.m.
851.78
1 cu.m.
1st Class Mason
0.048 Nos.
380.00
1 Each
18.24
2nd Class Mason
0.112 Nos.
320.00
1 Each
35.84
Man mazdoor
0.05 Nos.
280.00
1 Each
14.00
Woman mazdoor
0.11 Nos.
280.00
1 Each
30.80
Rate per 1 Sqmt.
Total
103.20
Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from approved source having
minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks,
water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and
labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc.,
complete for finished item of work. (APSS No. 501 & 504).
wall thickness
Material
Cement
Second class Bricks
sand for mortor
B Labour
1st class mason
2nd class mason
Man Mazdoor
Add Agency area allowence
Basic Rate per Cum.
Rate for other Floors
Basic rate per Cum

0.225
36 kgs
512 Nos
0.2 cu.m.

4546.12
4474.82
851.78

1000 kgs
1000 Nos
1 cu.m.

163.66
2291.11
170.36

0.24 Nos.
0.56 Nos.

380.00
320.00

1 Each
1 Each

91.20
179.20

1.89 Nos.
25%

280.00
799.60

1 Each

529.20
199.90
3624.62

GF
3624.62

Page 139

FF
3624.62

SF
3624.62

TF
3624.62

C-data

Hire charges of stage scafflding per cum


Labour charges for stage scaffolding per
cum
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor

20

24.27
24.27
24.27
269.56
359.38
449.24
25%
67.39
89.85
112.31
79.96
159.92
239.88
3873.50
4065.80 4258.04
4450.32
Add 14% over heads
0.14
542.29
569.21
596.13
623.05
Rate per Cum.
Total
4415.80
4635.05 4854.20
5073.40
Reinforced Brick Masonry 11.5cm (4 1/2") thick for partition walls in CM (1:4) prop: using second class bricks
from approved source having minimum crushing strength of 40 Kg/Sqcm. and placing 2nos. of 6mm dia MS bars
embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work
whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,
seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing
cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance
of steel and its fabrication charges complete for finished item of work. (APSS No. 501 & 504).
wall thickness
Material
Cement
Second class Bricks
sand for mortor
B Labour
1st class mason

21

24.27
179.69
44.92

0.115
7.56 kgs
51.2 Nos
0.021 cu.m.

4546.12
4474.82
851.78

1000 kgs
1000 Nos
1 cu.m.

34.37
229.11
17.89

0.06 Nos.

380.00

1 Each

22.80

2nd class mason


Man Mazdoor
Add Agency area allowence
Basic Rate per One Sqmt.
Rate for other Floors
Basic rate per sqm
Hire charges of stage scafflding per cum
Labour charges for stage scaffolding per
cum
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor

0.06 Nos.
0.275 Nos.
25%

320.00
280.00
119.00

1 Each
1 Each

19.20
77.00
29.75
430.12

Wall thickness
Material
Fly Ash Bricks 290x225x140mm
Cement for Cement Mortar (1:8)
Sand for Cement Mortar (1:8)
Labour
1st class mason
2nd class mason
Man Mazdoor
Woman Mazdoor
Add Agency area allowence
Basic Rate per Cum.
Rate for other Floors
Basic rate per Cum
Hire charges of stage scafflding per cum
Labour charges for stage scaffolding per
cum
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor

0.225

GF
430.12
5.46
40.43
10.11

FF
SF
TF
430.12
430.12
430.12
5.46
5.46
5.46
60.65
80.86
101.08
25%
15.16
20.22
25.27
11.90
23.80
35.70
486.12
523.29
560.46
597.63
Add 14% over heads
0.14
68.06
73.26
78.46
83.67
Rate per One Sqmt.
Total
554.20
596.55
638.95
681.30
Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with
compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement,
sand, fly ash bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges,
lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).

110 Nos
18 Kgs
0.1 cu.m.
0.42
0.92
0.7
2.1
25%

cu.m.
Nos.
Nos.
Nos.

25%

GF
3881.78
24.27
179.69
44.92
4130.66

Page 140

19701.81
4.55
851.78

1000 Nos
1 Kgs
1 cu.m.

380.00
320.00
280.00
280.00
1238.00

1
1
1
1

FF
3881.78
24.27
269.56
67.39
123.80
4366.80

SF
3881.78
24.27
359.38
89.85
247.60
4602.88

cu.m.
Each
Each
Each

2167.20
81.90
85.18
159.60
294.40
196.00
588.00
309.50
3881.78

TF
3881.78
24.27
449.24
112.31
371.40
4839.00

C-data

Add 14% over heads


Rate per Cum.
21

578.29
4708.95

611.35
4978.15

644.40
5247.30

677.46
5516.50

Brick Masonry in superstructure with CM (1:6) prop: using Fly ASH Bricks of size 290x225x140mm with
compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement,
sand, fly ash bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges,
lift charges, curing, etc., complete for finished item of work. for basement (APSS No. 501 & 504).
Wall thickness
Material
Fly Ash Bricks 290x225x140mm
Cement for Cement Mortar (1:8)
Sand for Cement Mortar (1:8)
Labour
1st class mason
2nd class mason
Man Mazdoor
Woman Mazdoor
Add Agency area allowence
total
Add 14% over heads
Basic Rate per Cum.

22

0.14
Total

0.225
110 Nos
24 Kgs
0.1 cu.m.
0.42
0.92
0.7
2.1
25%

cu.m.
Nos.
Nos.
Nos.

19701.81
4.55
851.78
380.00
320.00
280.00
280.00
1238.00

1000 Nos
1 Kgs
1 cu.m.
1
1
1
1

cu.m.
Each
Each
Each

0.14

2167.20
109.20
85.18
159.60
294.40
196.00
588.00
309.50
3909.08
547.27
4456.35

Reinforced Fly Ash Brick Masonry 10cm thick for partition walls in CM (1:4) prop: Fly Bricks of size
290x100x140mm with compressive of 50 Kgs / Sqcm from approved source and placing 2nos. of 6mm dia MS
bars embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick
work whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc.,
to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges
such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., but
excluding cost and conveyance of steel and its fabrication charges complete for finished item of work. (APSS
No. 501 & 509).
Material
Fly Ash Bricks 290x100x140mm

24 Nos

10311.92

1000 Nos

247.49

Cement for Cement Mortar (1:4)

7.2 Kgs

4.55

Kgs

32.76

Sand for Cement Mortar (1:4)


Labour
1st class mason
2nd class mason
Man Mazdoor
Basic Rate per One Sqmt.
Rate for other Floors
Basic rate per sqm
Hire charges of stage scafflding per cum
Labour charges for stage scaffolding per
cum
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor

13

0.02 cu.m.

851.78

1 cu.m.

17.04

0.06 cu.m.
0.06 Nos.
0.275 Nos.

380.00
320.00
280.00

1 cu.m.
1 Each
1 Each

22.80
19.20
77.00
416.28

GF
416.28
5.46
40.43
10.11

FF
SF
TF
416.28
416.28
416.28
5.46
5.46
5.46
60.65
80.86
101.08
25%
15.16
20.22
25.27
11.90
23.80
35.70
472.28
509.45
546.62
583.79
Add 14% over heads
0.14
66.12
71.32
76.53
81.73
Rate per One Sqmt.
Total
538.45
580.80
623.20
665.55
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm
diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and
binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost
and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover
blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as
cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished
item of work (APSS No.126) in all floors.

Page 141

C-data

Material
Cost of steel including 5% wastage and
overlaps
cost of binding wire
Labour
Blacksmith/Tin Smith/Rivetor
Light mazdoor
Add Agency area allowence
Rate per MT
Rate for other Floors
Basic rate per MT
Lift Charges per MT @10% extra on
labour per floor

14

44055.29

1 MT

46258.05

6 Kg

70.00

1 Kg

420.00

10 Nos
10 Nos
25%
GF
54178.05

320.00
280.00
6000.00

1 Nos
1 Nos

FF
SF
54178.05 54178.05
600.00 1200.00

Total
TF
54178.05
1800.00

3200.00
2800.00
1500.00
54178.05

54178.05 54778.05 55378.05


55978.05
Add 14% over heads
0.14
7584.93
7668.93 7752.93
7836.93
Rate per One MT
Total 61763.00 62447.00 63131.00
63815.00
Providing Mild Steel Bars (Fe 250 grade as per IS 432) of 6mm diameter, cutting, bending, to required sizes
and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills
for reinforcement work as per approved designs and drawings including cost and conveyance of bars from
approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps,
spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending,
placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of
work (APSS No.126) in all floors.
Material
Cost of Mild steel
cost of binding wire
Labour
Blacksmith/Tin Smith/Rivetor
Light mazdoor
Add Agency area allowence
Rate per MT
Rate for other Floors
Basic rate per MT
Lift Charges per MT @10% extra on
labour per floor
Add 14% over heads
Rate per One MT

14

1.05 MT

1.05 MT

44000.00

1 MT

46200.00

6 Kg

70.00

1 Kg

420.00

10 Nos
10 Nos
25%
GF
54870.00

0.14
Total

54870.00
7681.80
62551.80

380.00
280.00
6600.00

1 Nos
1 Nos

FF
SF
54870.00 54870.00
660.00 1320.00
62410.00 56191.00
8737.40 7866.74
71147.40 64057.75

Total
TF
54870.00
1980.00
56850.00
7959.00
64809.00

3800.00
2800.00
1650.00
54870.00

Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick
in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing
mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in
- charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 &
904)
Material
Base coat 8mm thick in C.M. (1:5)
Cement

3.17 kgs

4546.12

0.011 cu.m.

971.78

1.92 kgs

4546.12

cost of sand for mortor

0.004 cu.m.

971.78

1 cu.m.

3.89

Labour
1st Class Mason
2nd Class Mason
Light mazdoor
Add Agency area allowence

0.063 Nos.
0.147 Nos.
0.39 Nos.
25%

380.00
320.00
280.00
180.18

1 Each
1 Each
1 Each

23.94
47.04
109.20
45.05

cost of sand for mortor

1000 kgs

14.41

1 cu.m.

10.69

Top Coat 4mm thick in C.M. (1:3)


Cement

Page 142

1000 kgs

8.73

C-data

Basic rate per 1 Sqmt.

15

Rate for other Floors


Basic rate per 1 Sqmt.
Hire charges of stage scafflding per sqm

GF
262.94
1.28

FF
262.94
1.28

SF
262.94
1.28

TF
262.94
1.28

Labour charges for stage scaffolding per


sqm
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor

8.00

12.00

16.00

20.00

2.00

3.00
18.02

4.00
36.04

5.00
54.05

25%

274.22
297.24
320.26
343.27
Add 14% over heads
0.14
38.39
41.61
44.84
48.06
Rate per 1 Sqmt.
Total
312.61
338.85
365.10
391.33
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM
(1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing
mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in
- charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 &
904)
Material
Base coat 8mm thick in C.M. (1:6)
Cement
cost of sand for mortor
Top Coat 4mm thick in C.M. (1:4)
Cement
cost of sand for mortor
Labour
1st Class Mason
2nd Class Mason
Light mazdoor
Add Agency area allowence
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Hire charges of access scafflding pers
qm
Labour charges for access scaffolding
per sqm
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor

Add 14% over heads


Rate per 1 Sqmt.
16

262.94

2.64 kgs
0.011 cu.m.

4546.12
971.78

1000 kgs
1 cu.m.

12.00
10.69

1.44 kgs
0.004 cu.m.

4546.12
971.78

1000 kgs
1 cu.m.

6.55
3.89

0.04 Nos.
0.1 Nos.
0.26 Nos.
25%

380.00
320.00
280.00
120.00

1 Each
1 Each
1 Each

15.20
32.00
72.80
30.00
183.12

GF
183.12
0.55

FF
183.12
0.55

SF
183.12
0.55

TF
183.12
0.55

4.04

6.06

8.09

10.11

25%

1.01

1.52
18.02

2.02
36.04

2.53
54.05

0.14
Total

188.72
26.42
215.15

209.27
29.30
238.60

229.82
32.18
262.05

250.36
35.05
285.45

Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM
(1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site,
seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing
mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by
Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work.
(APSS 901,903 & 904)
Base coat 16 mm thick in C.M. (1:6)
Cement
cost of sand for mortor
Top Coat 4mm thick in C.M. (1:4)
Cement
cost of sand for mortor

4.32 kgs
0.018 cu.m.

4546.12
971.78

1000 kgs
1 cu.m.

19.64
17.49

1.44 kgs
0.004 cu.m.

4546.12
971.78

1000 kgs
1 cu.m.

6.55
3.89

Page 143

C-data

Labour
1st Class Mason
2nd Class Mason
Light mazdoor
Add Agency area allowence
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Hire charges of access scafflding pers
qm
Labour charges for access scaffolding
per sqm
Add LA on Labour for scaffolding
Lift charges @ 10% extra on each floor

0.063 Nos.
0.147 Nos.
0.39 Nos.
25%

cost of cement for Cement Mortar (1:4)


sand for Cement Mortar (1:4)
1st Class Mason
Man mazdoor
Add Agency area allowence
Rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Hire charges of access scafflding pers
qm
Labour charges for access scaffolding
per
Addsqm
LA on Labour for scaffolding
Lift charges @ 10% extra on each floor

10.08
0.015
0.06
0.096
25%

380.00
320.00
280.00
180.18

1 Each
1 Each
1 Each

23.94
47.04
109.20
45.05
272.79

GF
272.79
0.55

FF
272.79
0.55

SF
272.79
0.55

TF
272.79
0.55

4.04

6.06

8.09

10.11

1.52
2.02
2.53
18.02
36.04
54.05
278.39
298.94
319.49
340.03
Add 14% over heads
0.14
38.97
41.85
44.73
47.60
Rate per 1 Sqmt.
Total
317.40
340.80
364.25
387.65
Ornamental Plastering with CM(1:3) Prop: 12mm thick in single coat including cost and conveyance of all
materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all
operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished
item of work. (APSS 901,906)

Add 14% over heads


Rate per 1 Sqmt.
28

25%

1.01

kg
cu.m.
Nos.
Nos.

25%

GF
122.55
0.55
4.04
1.01

0.14
Total

128.15
17.94
146.10

4546.12
971.78
380.00
280.00
49.68

1000
1
1
1

FF
122.55
0.55
6.06
1.52
4.97
135.65
18.99
154.65

SF
122.55
0.55
8.09
2.02
9.94
143.15
20.04
163.20

kg
cu.m.
Each
Each
Total
TF
122.55
0.55
10.11
2.53
14.90
150.64
21.09
171.75

45.82
14.58
22.80
26.88
12.42
122.55

Plastering with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like
cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of
work. (APSS 901,906)

cost of cement for Cement Mortar (1:4)

5.4 kg

sand for Cement Mortar (1:4)


1st Class Mason
Man mazdoor
Add Agency area allowence
Rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Hire charges of access scafflding pers
qm
Labour charges for access scaffolding
per
Addsqm
LA on Labour for scaffolding
Lift charges @ 10% extra on each floor

0.015 cu.m.
0.06 Nos.
0.096 Nos.
25%

Add 14% over heads

4.55

25%

GF
101.25
0.55
4.04
1.01

0.14

106.85
14.96

Page 144

971.78
380.00
280.00
49.68
FF
101.25
0.55
6.06
1.52
4.97
114.35
16.01

24.57

kg

1 cu.m.
1 Each
1 Each

SF
101.25
0.55
8.09
2.02
9.94
121.85
17.06

Total
TF
101.25
0.55
10.11
2.53
14.90
129.34
18.11

14.58
22.80
26.88
12.42
101.25

C-data

29

30

17

Rate per 1 Sqmt.


Total
121.85
130.40
138.95
147.45
Plastering with CM(1:3) Prop: 20mm thick in single coat including cost and conveyance of all materials like
cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational,
incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of
work. (APSS 901,906)
cost of cement for Cement Mortar (1:4)

10.08 kg

4.55

sand for Cement Mortar (1:4)


1st Class Mason
Man mazdoor
Add Agency area allowence
Rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Hire charges of access scafflding pers
qm
Labour charges for access scaffolding
per
Addsqm
LA on Labour for scaffolding
Lift charges @ 10% extra on each floor

0.021 cu.m.
0.094 Nos.
0.16 Nos.
25%

25%

GF
166.95
0.55
4.04
1.01

Add 14% over heads


Rate per 1 Sqmt.

0.14
Total

172.55
24.16
196.75

971.78
380.00
280.00
80.52
FF
166.95
0.55
6.06
1.52
8.05
183.13
25.64
208.80

45.86

kg

1 cu.m.
1 Each
1 Each

SF
166.95
0.55
8.09
2.02
16.10
193.71
27.12
220.85

Total
TF
166.95
0.55
10.11
2.53
24.16
204.30
28.60
232.90

20.41
35.72
44.80
20.13
166.95

Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average)
mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at
1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and
thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand,
water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational,
incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering
smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).
cost of cement for Cement Mortar (1:3)
sand for Cement Mortar (1:3)
Water proof compound
1st Class Mason
2nd Class Mason
Man Mazdoor
Add Agency area allowence
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor

10.08
0.021
0.2
0.066
0.154
0.37
25%

Add 14% over heads


Rate per 1 Sqmt.

0.14
Say

kg
cu.m.
Kgs
Nos.
Nos.
Nos.

GF
293.52
293.52
41.09
334.65

4.55
971.78
24.00
380.00
320.00
280.00
177.96

1
1
1
1
1
1

FF
293.52
15.29
308.81
43.23
352.05

SF
293.52
30.58
324.10
45.37
369.50

kg
cu.m.
Kgs
Each
Each
Each

45.86
20.41
4.80
25.08
49.28
103.60
44.49
293.52

TF
293.52
45.86
339.38
47.51
386.90

set over a base coat of CM (1:8), 12mm ing with


thick
(joints
stone must
be flushed)
Flooring
withof Polished
Black
Kadapa slabs minimum of 15 mm thick (0.457M x 0.457M) set over a base coat of
over
C.C.
bed
already
laid
R.C.C.
CM (1:8), 12mm thick (joints or
of stone
must be flushed) over C.C. bed already laid or R.C.C. roof slab only after it is
roof
slab only
it ismoistered
properly and where necessary treated with neat grey cement slurry of honey like
properly
cured,after
cleaned,
cured, cleaned,
where
consistency
spredmoistered
at3.3 kgs and
of cement
for 1 sqm. and jointed with neat cement paste to full depth, including cost and
necessary treated
neat grey
cement sand, water, flooring stones etc. to site, seigniorage charges, sales and other
conveyance
of allwith
materials
like cement,
slurry
ofall
honey
like consistency
spred
taxes on
materials,
all operational,
incidental and labour charges such as dressing of flooring stones to the required
at3.3
kgs
of
cement
for
1
sqm.
and jointing, curing, lift charges etc., complete for finished item of work.(APSS
sizes, mixing of cement mortar, laying,
jointed &
with
neat cement paste to full
No.703
701)
depth, including cost and conveyance of
all materials like cement, sand, water,
flooring
Materialstones etc. to site, seigniorage
charges, sales and other taxes on all
Cost
of Polished
Shabad/Tandur
1.1 Sqmt.
522.83
1 Sqmt.
575.12
materials,
all operational,
incidentalblue
and
Slabas
18 mm
(0.457M of
x
Cement15
fortoMorter
andthick
slurry
7.46 Kgs
4546.12
1000 Kgs
33.91
labour
charges
such
as dressing
0.457M)
flooring
stones
to the required
Coarse sand
for mortor(C.M.
1:8) sizes,
0.012 cum
851.78
1 cum
10.22
mixing
of cement mortar, laying,
Machinery
jointing, curing, lift charges etc.,
complete for finished item of work.
(APSS No.703 & 701)
Page 145
C-data

Machine charges for rubbuing/polishing


floor
LA charges on crew charges
Labour
1st Class Mason
2nd Class Mason
Man Mazdoor
Add Agency area allowence
Add water charges @1% on labour
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor

0.1 day
25%

0.00

0.31 Nos.
0.11 Nos.
0.086 Nos.
25%
1%
GF
842.37

380.00
320.00
280.00
177.08
177.08
FF
842.37
17.89

1 day

0.00
0.00

1 Each
1 Each
1 Each

SF
842.37
35.77

117.80
35.20
24.08
44.27
1.77
842.37
TF
842.37
53.66

842.37
860.26
878.14
896.03
Add 14% over heads
0.14
117.93
120.44
122.94
125.44
Rate per 1 Sqmt.
Total
960.35
980.75 1001.10
1021.50
laid over existing CC bed or roof slab set over a base coat of CM (1:8), 12mm thick and pointing with CM(1:3) to full
32 #REF! Flooring with Rough Kadapa slabs of minimum 40 mm thick, size not less than (0.457 x 457M)laid over
existing CC bed or roof slab set over a base coat of CM (1:8), 12mm thick and pointing with CM(1:3) to full
depth of flooring slabs dully filling joints neatly , including cost and conveyance of all materials like flooring
stones, cement, sand, water, etc. to site, seigniorage charges, sales and other taxes on all materials, all
operational, incidental and labour charges such as mixing of cement mortar, laying, pointing, curing, lift
charges etc., complete for finished item of work.(APSS No.703 & 701)

Rough Tandur slab


cost of cement for Cement Mortar (1:8)

33

1.1 Sqmt.
2.16 kg

306.38
4.55

10 Sqmt.
1
kg

33.70
9.83

sand for Cement Mortar (1:8)


Pointing with CM (1:3)

0.012 cu.m.
1 Sqmt.

851.78
103.20

1 cu.m.
1 Sqmt.

10.22
103.20

1st Class Mason


2nd Class Mason
Man Mazdoor
Woman Mazdoor
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor

0.096
0.224
0.22
0.11

380.00
320.00
280.00
280.00

1
1
1
1

36.48
71.68
61.60
30.80
357.51

Nos.
Nos.
Nos.
Nos.

Each
Each
Each
Each

FF
SF
TF
357.51
357.51
357.51
20.06
40.11
60.17
357.51
377.57
397.62
417.68
Add 14% over heads
0.14
50.05
52.86
55.67
58.48
Rate per 1 Sqmt.
Total
407.60
430.45
453.30
476.20
with length
equaltotointernal
flooringwalls
stones
over
a base
coat of CM
(1:3), 12mm
thick
with15cement
slurry
Providing
skirting
12.5setCm
high
withPolished
Shabad/Tandur
blue
Slabas
to 18 mm
thickof honey
like
consistency
spread
3.3 Kgs
andstones
jointed
cement
with pigment
ofcement
matching
(0.457M
x 0.457M)
with @
length
equalper
to sqm
flooring
setwith
overneat
a base
coat ofpaste
CM mixed
(1:3), 12mm
thick with
shade of
tohoney
full depth
(joints of spread
stone @
should
be per
flushed),
costneat
and
conveyance
of allwith
materials
slurry
like consistency
3.3 Kgs
sqm andincluding
jointed with
cement
paste mixed
pigmentlike
of
cement, sand,
stones
etc. toshould
site, seigniorage
charges, sales
andconveyance
other taxesofon
materials,
matching
shadewater,
to full flooring
depth (joints
of stone
be flushed), including
cost and
all all
materials
like all
operational,
and stones
labouretc.
charges
as dressing
of flooring
to theonrequired
sizes,allmixing of
cement,
sand,incidental
water, flooring
to site,such
seigniorage
charges,
sales andstones
other taxes
all materials,
cement mortar,
laying,
jointing,
curing,such
lift charges
etc.,
for finished
item ofsizes,
work.(APSS
operational,
incidental
and
labour charges
as dressing
of complete
flooring stones
to the required
mixing ofNo.701
cement&
707) laying, jointing, curing, lift charges etc., complete for finished item of work.(APSS No.701 & 707)
mortar,
Material
Cost of Polished Shabad/Tandur blue
Slabas 15 to 18 mm thick (0.457M x
0.457M)
sand for Cement Mortar (1:3)
cement for Cement Mortar (1:3) base
coat
Cement for slurry
Labour
1st Class Mason
2nd Class Mason

GF
357.51

1.1 Sqmt.

522.83

1 Sqmt.

575.12

0.012 cu.m.
5.76 Kgs
3.3 Kgs

851.78
4546.12
4546.12

1 cu.m.
1000 Kgs
1000 Kgs

10.22
26.19
15.00

0.096 Nos.
0.224 Nos.

380.00
320.00

1 Each
1 Each

36.48
71.68

Page 146

C-data

Man Mazdoor
Add Agency area allowence
Add water charges @1% on labour
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor

34

0.31 Nos.
25%
1%

1 Each

86.80
48.74
1.95
872.17

FF
SF
TF
872.17
872.17
872.17
19.69
39.38
59.07
872.17
891.86
911.55
931.24
Add 14% over heads
0.14
122.10
124.86
127.62
130.37
Rate per 1 Sqmt.
Total
994.30
1016.75 1039.20
1061.65
Supplying and fixing of Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) in Single piece
with the edges flat nosed and set over a base coat of CM (1:3), 12mm thick, and fixing in position with neat cement
paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges,
sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the
required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of
work For raisers (APSS No.701 & 707)
For Raisers of 0.15 Mt. Height
Material
Cost of Polished Shabad/Tandur blue
Slabas
to 18 Mortar
mm thick
sand for15
Cement
(1:3)(0.457M x
0.457M)
cement for Cement Mortar (1:3) base
coat
Cement for slurry
Labour
1st Class Mason
2nd Class Mason
Man Mazdoor
Flat nosing edges as per BMM-V.14
Add water charges @1% on labour
Basic rate per 1 Sqmt.
Rate for other Floors

GF
872.17

1.1
0.012
5.76
3.3

Sqmt.
cu.m.
Kgs
Kgs

522.83
851.78
4546.12
4546.12

1
1
1000
1000

0.096
0.224
0.31
13.33
1%

Nos.
Nos.
Nos.
Rmt.

380.00
320.00
280.00
8.00
194.96

1
1
1
1

Basic rate per 1 Sqmt.


Lift charges @ 10% extra on each floor
Add 14% over heads

35

280.00
194.96
194.96

GF

FF

930.07

930.07
19.69
949.76
132.97
1082.73

930.07
130.21
1060.28

0.14

Sqmt.
cu.m.
Kgs
Kgs

575.12
10.22
26.19
15.00

Each
Each
Each
Rmt.

36.48
71.68
86.80
106.64
1.95
930.07

SF

TF

930.07
39.38
969.45
135.72
1105.17

930.07
59.07
989.14
138.48
1127.62

Rate per Sqmt.


in Single piece with the edges flat fixing of
nosed
and and
set fixing
over aofbase
coat of
CM
Supplying
Polished
Shabad/Tandur
blue Slabas 15 to 18 mm thick (0.457M x 0.457M) in Single piece
(1:8),the12mm
thick,
fixing
with
edges flat
nosedand
and set
over ainbase coat of CM (1:8), 12mm thick, and fixing in position with neat cement
position
with cost
neat
cement paste
paste
including
and conveyance
of all materials like cement, sand, water, stones etc. to site, seigniorage charges,
including
cost taxes
and on
conveyance
of all operational, incidental and labour charges such as dressing of stones to the
sales
and other
all materials,
materialssizes,
likemixing
cement,
sand, mortar,
water, fixing in position, curing, lift charges etc., complete for finished item of
required
of cement
stones
etc.
to site,
seigniorage
charges,
work for
Treads
(APSS
No.701 &
707)
sales and other taxes on all materials, all
operational,
Treads of 0.30incidental
Mt wide and labour
charges such as dressing of stones to the
cost
of Polished
Shabad/Tandur
blue
1.1 Sqmt.
522.83
1 Sqmt.
575.12
required
sizes, mixing
of cement
Slabas
15
to 18inmm
thick curing,
(0.457Mlift
x
mortar,
fixing
position,
jointing compound BMT-M.22
2 Kgs
30.00
1 Kgs
60.00
0.457M)
charges etc., complete for finished item
Cement
5.46 Kgs
4546.12
1000 Kgs
24.82
of work for
forjointing
Treads (APSS No.701 &
707)
Coarse sand for mortor(C.M. 1:8)
0.012 cum
851.78
1 cum
10.22
Machinery
Machine charges for rubbuing/polishing
floor
LA charges on crew charges

0.1 day

0.00

1 day

0.00

25%

0.00

Labour
1st Class Mason
2nd Class Mason
Man Mazdoor
Flat nosing edges

0.31
0.11
0.086
6.67

Nos.
Nos.
Nos.
Rmt.

Page 147

380.00
320.00
280.00
8.00

1
1
1
1

Each
Each
Each
Rmt.

117.80
35.20
24.08
53.36

C-data

Basic rate per 1 Sqmt.


Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor

36

900.60
FF
SF
TF
900.60
900.60
900.60
17.71
35.42
53.12
900.60
918.31
936.02
953.72
Add 14% over heads
0.14
126.08
128.56
131.04
133.52
Rate per Sqmt.
Say
1026.68
1046.87 1067.06
1087.24
In - situ - Granolithic Concrete Flooring 20mm thick with CC(1:1:2) Prop: using 6mm to 12mm size HBG machine
crushed metal laid monolithically over slabs/ CC flooring bed (1:5:10) with 40mm HBG metal in alternate panels of
size not exceeding 1.50m x 1.50m and finishing the top surface to required smoothness and slopes, thread lining as
directed by the Engineer - in - charge including cost and conveyance of all materials like cement, sand, water, etc. to
site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as
mixing of cement concrete, laying, curing, lift charges etc., complete for finished item of work (APSS No.701 &
710)
6mm to 12mm HBG metal
Sand
Cement
PCC bed (1:5:10) 100mm thick
1st Class Mason
2nd Class Mason
Manand women Mazdoor

37

GF
900.60

19.84
7.24
54.55
0.00
47.50
1.92
84.00
215.05
Add 14% over heads
0.14
215.05
30.11
Rate per 1 Sqmt.
Total
245.20
Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of any shade as approved by Engineer - in - charge set
over a base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like
consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement paste to full depth
mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water,
ceramic tiles etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and
labour charges such as mixing of cement mortar, laying, curing, lift charges etc., complete for finished item of work.
(APSS No.701 & 707) in All Floors

Material
Ceramic Tiles
Sand
Cement
Grey Cement for slurry
White Cement for pointing

0.017
0.0085
12
0.00
0.125
0.006
0.3

cum
cum
Kgs
cum
Nos.
Nos.
Nos.

1166.93
851.78
4546.12
2850.57
380.00
320.00
280.00

1
1
1000
1
1
1
1

cum
cum
Kgs
cum
Each
Each
Each

1.05
0.012
2.16
3.3
0.2

Sqmt.
cum
Kgs
Kgs
Kgs

447.00
851.78
4546.12
4546.12
27.00

1
1
1000
1000
1

Sqmt.
cum
Kgs
Kgs
Kgs

469.35
10.22
9.82
15.00
5.40

Labour
1st Class Mason
2nd Class Mason
Man Mazdoor
Add Agency area allowence
Add water charges @1% on labour
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor

Add 14% over heads

0.096 Nos.
0.224 Nos.
0.33 Nos.
25%
1%

0.14
Rate per Sqmt.

Page 148

380.00
320.00
280.00
200.56
200.56

1 Each
1 Each
1 Each

36.48
71.68
92.40
50.14
2.01
762.50

GF
762.50

FF
762.50
20.26

SF
762.50
40.51

TF
762.50
60.77

762.50
106.75
869.25

782.76
109.59
892.35

803.01
112.42
915.45

823.27
115.26
938.55

C-data

38

Dadooing to walls with white glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge
and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with
white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like
cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, C921 such as mixing
of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 &
707) in All Floors
white glazed tiles

1.05 Sqmt

Grey cement
White cement
Cement for Cement Mortar CM (1:5)
Sand Mortar CM (1:5)

0.33
0.6
3.45
0.012

335.00

Kgs
Kgs
Kgs
Cum

4546.12
27.00
4.55
851.78

0.077 Nos.
0.08 Nos.
25%

1 Sqmt
1000
1
1
1

351.75

Kgs
Kgs
Kgs
Cum

1.50
16.20
15.70
10.22

380.00

1 Each

29.26

280.00
51.66

1 Each

22.40
12.92
459.94

Labour
1st Class Mason
Man Mazdoor
Add Agency area allowence
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor
Add 14% over heads

GF
459.94

0.14
Rate per Sqmt.

18

SF
459.94
10.33
470.27
65.84

TF
459.94
15.50
475.44
66.56

524.35

530.25

536.15

542.00

Whiting to new walls and ceiling in two coats with Birla White or equavalent quality to give an even shade after
thoroughly brushing the surface to remove all loose powdered materials including cost and conveyance of all
materials and water to site, sales & other taxes, all operational, incidental and labour charges such as cleaning the
surface, painting, curing etc., complete for finished item of work for internal walls. (APSS No.901 & 908) in All
Floors
Surya Cem
Painter
Man Mazdoor
Add Agency area allowence
sundries including brushes,ladders, etc.,
Add 14% over heads
Rater per 1 Sqmt. for all floors

19

459.94
64.39

FF
459.94
5.17
465.11
65.12

0.2 kgs
0.021 Nos.
0.032 Nos.
25%
1%
0.14

27.00
338.00
280.00
16.06
21.46

1 kgs
1 Each
1 Each

5.40
7.10
8.96
4.01
0.21
25.69
3.60
29.30

25.69
Total

Painting to New walls with two coats of Snowcem cement paint of superior quality of approved brand and shade
over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing
the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and
conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and
labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors
for External Walls.(APSS No. 912) in All Floors
Material
Cement Primer Grade I

0.1 Kgs

134.00

1 Kgs

13.40

Snowcem Paint
Labour for Priming Coat
1st class painter
2nd class painter
Add Agency area allowence
Labour for Two Coats
1st class painter

0.35 Kgs

44.24

1 Kgs

15.48

0.021 Nos.
0.049 Nos.
25%

400.00
320.00
24.08

1 Each
1 Each

8.40
15.68
6.02

0.015 Nos.

400.00

1 Each

6.00

2nd class painter


Man and women mazdoor
Add Agency area allowence

0.035 Nos.
0.15 Nos.
25%

320.00
280.00
59.20

1 Each
1 Each

11.20
42.00
14.80
132.98

Page 149

C-data

Add 14% over heads


Rater per 1 Sqmt. for all floors
20

132.98
Total

Add 14% over heads


Rater per 1 Sqmt. for all floors

0.11 Ltr
0.033 Nos.
0.077 Nos.
25%
0.14

230.00
400.00
320.00
37.84

1 Ltr
1 Each
1 Each

25.30
13.20
24.64
9.46
72.60
10.16
82.80

72.60
Total

Supply and fixing of 110mm dia ISI mark PVC rain water spouts of 2.5 Kg/cm2 pressure including Cost of
necessary pvc bends, shoes and M.S.clamps and all other accessories and fixing in position including cost and
conveyance of all materials to site , seigniorage charges sales and other taxes on all materials, all operational,
incidental and labour cahrges such as fixing in alignment etc., complete for finished item of work.(APSS NO1328) in
All Floors
Cost of 110mm dia PVC Pipe.(page
274)
Cost of P.V.C.Bend 391 BMW-F.57
Cost PVC shoe 397 BMW-G.63
Cost of Clips 440 BMW-G.106
Plumber 1st Class
Plumber 2nd class
Man Mazdoor

3.00
1.00
1.00
3.00
0.30
0.70
1.00

Add 14% over heads

0.14

Rmt.
No.
No.
Nos.
Nos.
Nos.
No.

70.00
1 Rmt
65.00
1 No
56.00
1 No
14.00
1 No
380.00
1 Each
320.00
1 Each
280.00
1 Each
Rate per 3 Rmt.
330.33

Rate per Rmt.


43

18.62
151.65

Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an
existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational
and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
Cost of Synthetic Enamel Paint
1st Class Painter
2nd Class Painter
Add Agency area allowence

42

0.14

Total

210.00
65.00
56.00
42.00
114.00
224.00
280.00
991.00
330.33
46.25
376.60

Reinforced cement mortar Facia 5 cm thick in CM (1:3) for drop walls, Fins & staircase railing with rabbit wire
mesh & nominal reinforcement as directed by Engineer-in-charge with dubara spong finishing including cost &
conveyence of all materials to site, including seigniorage charges, sales and other taxes on all materials and all
operational, incidental charges such as labour charges, like mixing cement mortar, scaffolding charges, lift charges,
curing, for making 50 mm thick RCM Paradah walls (RCM Drop walls) including tying Rabbit (chicken) wire mesh
to the existing mild steel / HYSD Steel reinforcement applying mortar lumps, finishing, plastering to both faces,
sponge finishing etc complete for finished item of work but excluding cost of steel and its fabrication charges in All
Floors
materials
Costof rabit wire mesh
43 Grade cement
Cost of coarse sand
Labour
1st Class Mason
Miller operator
Man Mazdoor
Add Agency area allowence
Hire charges of miller
Basic rate per 1 Sqmt.
Rate for other Floors
Basic rate per 1 Sqmt.
Lift charges @ 10% extra on each floor

Add 14% over heads

1.33 Sqmt
31.91 Kgs
0.06 Cum
0.80
0.10
1.00
25%
0.20

Nos.
Nos.
Nos.
Hour

0.14
Rate per Sqmt.

Page 150

16.00
4546.12
851.78

1 Sqmt
1000 Kgs
1 Cum

21.28
145.07
49.40

380.00
380.00
280.00
622.00
89.00

1 Each
1 Each
1 Each

304.00
38.00
280.00
155.50
17.80
1011.05

1 Hour

GF
1011.05

FF
1011.05
63.98

SF
1011.05
127.96

TF
1011.05
191.94

1011.05
141.55
1152.60

1075.03
150.50
1225.55

1139.01
159.46
1298.50

1202.99
168.42
1371.45

C-data

21

Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give
an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all
remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and
labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
PRIMARY COAT
Luppam finish
Ready mixed primer
Ist class painter
2nd class painter
TWO COATS OF PAINTING
Synthetic enamel paint
1st class painter
2nd class painter
Add Agency area allowence
Add 14% over heads
Rate per 1 Sqmt. for all Floors

0.1
0.07
0.021
0.049

Kg.
lit
Nos.
Nos.

330.00
135.00
400.00
320.00

1
1
1
1

Kg
Lt
Each
Each

33.00
9.45
8.40
15.68

0.12 lit
0.036 Nos.
0.084 Nos.
25%

230.00
400.00
320.00
41.28

1 lit
1 Each
1 Each

27.60
14.40
26.88
10.32
145.73
20.40
166.15

0.14

145.73
Total

AEE/AE

Dy. Executive Engineer

Executive Engineer

TW/ Gundala

TW/SD/ Sudimalla

TW/Division/ Bhadrachalam

Page 151

C-data

DOORS & WINDOWS

Supply and fixing of Door size 1.05 x 2.00 M Single Leaf with Door Frame of Medium Teak wood
Section 100 mm x 75 mm and shutter of 35mm thick of solid bond wood block board type with
commercial play on both faces, Hardware fixtures ie., MSPC Butt Hinges 150mm Long 6 nos,
MSPC Handles 150 mm Long 2 Nos MSPC Tower Bolt 300mm long 1 Nos,MSPC Aldrop 300 mm
long 1 no, MS Hold Fast 6 Nos including Including Labour charges for making of door, fixing of
fixtures etc., and cost and conveyance of all materials to site, taxes extra for finished item of work.
Size : 1.05 x 2.00 BMT
E.01
Vertical port
Horizontal Port

1X
1X

Solid black board wood


300 mm thick BMT
N17

Laminate Sheets Glossy Finish: 1.00 mm


thick BMT K114

2 X
1X

1x

2.00 X
1.05 X

1.01

1.01

0.075 X
0.075 X

0.10
0.10

=
=

1.96

0.03
0.008
0.037875

63567

2407.6

771

1526.27

376

1488.66

1.9796

1.96

3.96

Hold fasts
MS aldrom MBT G45
MS Tower bolts MBT G17
MH Butt hinges MBT G50
MS handles 125mm long MBT G35
Door stopper
Labour charges
20 % agency allowence

6.00
2.00
2.00
3.00
2.00
1.00
2.10
1262.10

Add 14% over heads

7757.05

20
164
78
40
31
34
601

0.14

120.00
328.00
156.00
120.00
62.00
34.00
1262.10
252.42
7757.05
1085.99
8843.04

Supply and fixing of Window of Size 0.90 x 1.22 M shutter with window frame of Medium Teak
wood of Section 100 mm x 75 mm and shutter frame 3 verticals of Medium Teak wood of section
100mm x 32 mm thick and BISON PANEL CEMENT BONDED PARTICLE BOARD
CONFORMING TO IS 14276 and safety bars of 10 mm square bars at 100mm center to center
distance horizantally and Hardware fixtures ie., MSPC Butt Hinges 100mm Long 12nos, MSPC
Handles 125 mm Long 6 Nos MSPC Tower Bolt 150mm long 6 Nos, MS Hold Fast 4 Nos Including
Labour charges for making Window frame and shutter, fixing of Fixtures etc., and cost and
conveyance of all materials to site, taxes extra complete for finished item of work.
Window frame
Size : 1.05 x 2.00 BMT
E.01
Vertical port
Horizontal Port
Shutter frame
Styles
Rails
CEMENT BONDED
PARICLE BOARD
CONFORMING TO IS
14276- 12 mm thick
BMT k89

1
1

1
1

3
2

4
4

0.90
1.22

0.41
1.115

0.27

0.075
0.075

0.07
0.07

0.975

0.10 =
0.10

0.035
0.035

0.02025
0.018
0.03855

63567

2450.51

0.004018
0.010927
0.014945

63567

950.01

0.5265

356

187.43

Grills flats
Horizantal
Verticals

2
2

2
2

0.77
1.09
Equalent wt.

Sq. bars
Horizantal
Verticals

1
1

5
7

0.79

0.77
1.07

Hold fasts
MS aldrom MBT G45
MS Tower bolts MBT G15
MH Butt hinges MBT G50
MS handles 125mm long MBT G35
Delux stay alluminium BMT G56
Labour charges
20 % agency allowence

3.85
7.49
11.34
8.845
14.686
6.00
2.00
2.00
3.00
2.00
2.00
0.98
586.58

Add 14% over heads

5910.396

Equalent wt.
Total weght

3.08
4.36
7.44
5.840

0.78

46.75
20
164
35
40
31
116
601

0.14

686.55
120.00
328.00
70.00
120.00
62.00
232.00
586.58
117.32
5910.40
827.46
6737.86

Supply and fixing of Door size 0.75 x 2.00 M Single Leaf with Door Frame of Medium Teak wood
Section 100 mm x 75 mm and shutter of 35mm thick of solid bond wood block board type with
commercial play on both faces, Hardware fixtures ie., MSPC Butt Hinges 150mm Long 6 nos,
MSPC Handles 150 mm Long 2 Nos MSPC Tower Bolt 300mm long 1 Nos,MSPC Aldrop 300 mm
long 1 no, MS Hold Fast 6 Nos including Including Labour charges for making of door, fixing of
fixtures etc., and cost and conveyance of all materials to site, taxes extra for finished item of work.
Size : 1.05 x 2.00 BMT
E.01
Vertical port
Horizontal Port

1X
1X

Solid black board wood


300 mm thick BMT
N17

Laminate Sheets Glossy Finish: 1.00 mm


thick BMT K114

2 X
1X

1x

Hold fasts
MS aldrom MBT G45
MS Tower bolts MBT G17
MH Butt hinges MBT G50
MS handles 125mm long MBT G35
Labour charges
20 % agency allowence
Add 14% over heads

0.75
1.05 X

0.74

1.01

0.075 X
0.075 X

1.96

1.96

0.10
0.10

=
=

0.01125
0.008
0.019125

63567

1215.72

771

1118.26

376

1090.7

1.4504

2.90

3.00
2.00
2.00
3.00
2.00
1.50
901.50
5232.48

20
164
78
40
31
601

0.14

60.00
328.00
156.00
120.00
62.00
901.50
180.30
5232.48
732.55
5965.03

Supply and fixing of medium teak wood Ventilators of size 0.60x0.40M with safety bars of 10mm
square rods at 100mm centre to centre horizontally and vertically as per approved drawing of
Engineer-in-charge including red oxide primer of grade-I quality, sales and other taxes, cost and
conveyance of all materials to site, all labour charges etc., complete for finished item of work.
Size
Vertical port
Horizontal Port
Glass
Sq. bars
Horizantal
Verticals

1
1

2
2

0.40
0.6

0.075
0.075

1X

0.48

0.28

1
1

5
7

0.77
1.07
Equalent wt.
Total weght

Labour charges

0.78

0.006
0.009
0.015
0.06
3.85
7.49
11.34
8.845
8.860
0.24

63567
401

46.75
601

144.24

20 % agency allowence
Add 14% over heads

0.10
0.10

1564.868

0.14

953.51
24.06

414.21
144.24
28.85
1564.87
219.08
1783.95

Supply and Fixing of MS Hallow square pipe purlin of 40mmX40mmX4mm as required no. of sheets
of size 120mmX50mmX6mm welded to the ends of the purlin for fixing purlins including cost and
conveyance of all materials and all labour charges etc complete
Calculation of weight
of Purlins
40mmX40mm Square
medium hallow pipe
125X50X6mm

3.45

3.75

12.9375

0.125

2.4

0.6000
13.5375

Abstract
40mmX40mm Square
medium hallow pipe
125X50X6mm
Cost of MS bolts
Fabrication
Redoxide paint
Synthetic enamel

12.94

57.00

0.60
4.00
13.54
0.50
0.50

57.00
6.00
18.00
253.40
750.00

737.58
34.20
24.00
243.72
12.67
37.50

243.72

25 % agency allowence
Add 14% over heads

1150.6

60.93
0.14
RMT

1150.60
161.08
1311.68
380.20

Labour charges for roofing of provided with 0.5mm thick galvanized/prepaint profied sheet fixed to
the purlins with 14 size self drilling screws with neopreme washers are stiched with self
tapping/drilling screws end laps are to be sealed with 25X3mm duty tape unit-184.518m2
Material
GI Scan bolts & nuts
2X27
limpet washers

Abstract
884.00

5.00

1694.00

1.00

4420.00
1694.00

cost of 0.5mm galvanized sheet


labour
Carpeter
Man Mazdoor

193.74

799.00

154801.37

0.84
0.91

385.00
295.00

323.40
268.45

25 % agency allowence
Add 14% over heads

591.85
161655.183

147.96
0.14

161655.18
22631.73
184286.91
998.75

Supply of roof accessories medium size ridge with 0.50mm thick 0.585 width
Rate as per BMS-W-59
Add 14% over heads

307.00
307.00

0.14

307.00
42.98
349.98
350.00

DATAS FOR DOORS AND WINDOWS


Sno

Qty

Description of Item

Rate

Unit

Per

Amount

1.52

2.13

3.24

0.03195
0.01140
0.04335

cum
cum
cum

2.89

sqm

40012.00
40012.00

1
1

Cum
Cum

1278.38
456.14

734.00
10.00
124.00
51.00
34.00
23.00
50.00
34.00

1
1
1
1
1
1
1
1

Sqm
Each
Each
Each
Each
Each
Each
Each

2121.26
60.00
124.00
102.00
68.00
138.00
50.00
68.00

380.00
320.00
280.00

1
1
1

day
day
day

87.47
171.87
106.81

295.00

Sqm

852.55

2.13

0.03195
0.01500

cum
cum

Supply and Fixing of Door with Double leaf shutter, Door Size 1.52x2.13 mtrs
with Sal wood Frame of sections size 75mm x 100mm with Flush Door Shutter
Solid Bond Wood black board type with commercial ply on both faces of 35mm
thick including cost of fixtures such as M.S.Powder Coated Tower Bolts 250mm
long 2 Nos, M.S.Powder Coated Handles 150mm long 2 Nos, 300mm long
M.S.Powder Coated Aldrops 1No, 125mm long M.S.Powder Coated butt
hinges 6Nos, 300 mm long M.S.Powder Coated Flat latch 1No, Door stoppers
2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of
all materials to site all Labour charges such as Fixing of Door Frame and
shutter Fixing in position , with Hardware fixtures etc., complete for finsihed

1
2

utem of work.
DOOR SIZE 1.52 x 2.13 mtrs : Area = 3.24 Sqm
Sal Wood for Frame
Verticals 2 x 2.13 x 0.075 x 0.10
= 0.0319
Horizental 1 x 1.52 x 0.075 x 0.10
= 0.00864
Total
= 0.04054
35mm thick flush door shutter of soild wood block board type with commercial
play on both faces
1x1.41x2.05 = 2.89 Sqm
ABSTRACT
a)MATERIAL
0.03195 Cost of Sal wood scantling of any size BMT-E-015 Item Sl No 122
0.01140 Cost of Sal wood scantling of any size BMT-E-015

3
4
5
6
7
8
9
10

2.89
6.00
1.00
2.00
2.00
6.00
1.00
2.00

11
12
13

0.23
0.54
0.38
2.89

Flush door shutters, solid bond wood block board type with commercial ply on
both faces.: 35 mm thick conforming to IS:2202 of ANAND/ RAAVILA/ KUTTY/
STANDARD/ SHUBHDWAR/ ITP (BMT-N.17)
MS Hold Fasts
Cost of 300mm Long M.S.Powder Coated Aldrops(BMT-G.45)
Cost of 250 long M.S.Powder Coated Towerbolts (BMT-G.17)
Cost of 150mm Long M.S.Powder Coated Handles (BMT-G.36)
Cost of 125mm long M.S.Powder Coated but hinges (BMT-G29)
Cost of Flat latch M.S.Powder Coated 300long (BMT-G.52)
Cost of Door Stoper (BMT-G.53)
a) LABOUR
Carpenter class I
Carpenter class II
Light mazdoor
Labour charges for fixing flush door shutter of any thickness fixing the door
shutter to the frame and fixtures to the door shutter

14

Add overheads @

14%

Rate per / Each


Supply and Fixing of Door with Double leaf shutter, Door Size 2.00x2.13 mtrs
with Sal wood Frame of sections size 75mm x 100mm with Flush Door
Shutter Solid Bond Wood black board type with commercial ply on both faces
of 35mm thick including cost of fixtures such as M.S.Powder Coated Tower
Bolts 250mm long 2 Nos, Alluminimum Handles 150mm long 2 Nos, 300mm
1

long M.S.Powder Coated Aldrops 1No, 125mm long M.S.Powder Coated butt
hinges 6Nos, 300 mm long M.S.Powder Coated Flat latch 1No, Door stoppers
2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of
all materials to site all Labour charges such as Fixing of Door Frame on shutter
Fixing in position , with Hardware fixtures etc., complete for finsihed utem of
work.
DOOR SIZE 2.00 x 2.13 mtrs : Area = 4.26 Sqm
Sal Wood for Frame
Verticals 2 x 2.13 x 0.075 x 0.10
=
Horizental 1 x 2.00 x 0.075 x 0.10
=

D&W DATA (1)

4.26

P No 156

Total of soild
= wood block board type with commercial
35mm thick flush door shutter
play on both faces
1x1.89x2.05 = 3.87 Sqm
ABSTRACT

0.04695

cum

3.87

sqm

a)MATERIAL
1

0.03195 Cost of Sal wood scantling of size 2.0 to 3.0 M

40012.00

Cum

1278.38

0.01500 Cost of Sal wood scantling of size up to 2.0 M

40012.00

Cum

600.18

3.87

Flush Door Shutter Solid Bond Wood black board type with commercial ply on
both faces of 35mm thick

734.00

Sqm

2840.58

6.00

MS Hold Fasts

10.00

Each

60.00

1.00

Cost of MS-Powder Coated Aldrop (IS:2681) 300 mm long(BMT-G.45)

134.00

Each

134.00

2.00

Cost of MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 250 mm Long


(BMT-G.17)

55.00

Each

110.00

2.00

Cost of MS-Powder Coated Door Handles (IS:208) 150 mm Long (BMT-G.36)

37.00

Each

74.00

6.00

Cost of MS-Powder Coated Butt hinges (IS:205)- 125 mm Long (BMT-G29)

25.00

Each

150.00

1.00

Cost of MS-Powder Coated Flat Latches: 300 mm long (BMT-G.52)

54.00

Each

54.00

10

2.00

Cost of MS-Powder Coated - Door Stoppers (BMT-G.53)


a) LABOUR

37.00

Each

74.00

11

0.22

Carpenter class I

380.00

day

82.93

12

0.51

Carpenter class II

320.00

day

162.95

13

0.36

Light mazdoor

280.00

day

101.27

3.87

Labour charges for fixing flush door shutter of any thickness fixing the door
shutter to the frame and fixtures to the door shutter

295.00

Sqm

1141.65

14

Add overheads @

6863.94
960.95
7824.90

14%

Rate per / Each


Supply and Fixing of Door with Double leaf shutter, Door Size 1.22x2.13 mtrs
with Sal wood Frame of sections size 75mm x 100mm with Flush Door
Shutter Solid Bond Wood black board type with commercial ply on both faces
of 35mm thick including cost of fixtures such as M.S.Powder Coated Tower
Bolts 250mm long 2 Nos, Alluminimum Handles 150mm long 2 Nos, 300mm
long M.S.Powder Coated Aldrops 1No, 125mm long M.S.Powder Coated butt

hinges 6Nos, 300 mm long M.S.Powder Coated Flat latch 1No, Door stoppers
2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of
all materials to site all Labour charges such as Fixing of Door Frame on shutter
Fixing in position , with Hardware fixtures etc., complete for finsihed utem of
work.
DOOR SIZE 1.22 x 2.13 mtrs : Area = 2.60 Sqm
Sal Wood for Frame
Verticals 2 x 2.13 x 0.075 x 0.10
=
Horizental 1 x 1.22 x 0.075 x 0.10
=
Total
=
35mm thick flush door shutter of soild wood block board type with commercial
play on both faces
1x1.11x2.05 = 2.28 Sqm
ABSTRACT

1.22

0.03195
0.00915
0.04110

cum
cum
cum

2.28

sqm

2.13

2.6

a)MATERIAL
0.03195 Cost of Sal wood scantling of size 2.0 to 3.0 M

40012.00

Cum

1278.38

0.00915 Cost of Sal wood scantling of size up to 2.0 M

3
4

2.28
6.00

Flush door shutters, solid bond wood block board type with commercial ply on
both faces.: 35 mm thick conforming to IS:2202 of ANAND/ RAAVILA/ KUTTY/
STANDARD/ SHUBHDWAR/ ITP (BMT-N.17)
MS Hold Fasts

1.00

Cost of MS-Powder Coated Aldrop (IS:2681) 300 mm long(BMT-G.45)

D&W DATA (1)

40012.00

Cum

366.11

734.00
10.00

1
1

Sqm
Each

1673.52
60.00

134.00

Each

134.00

P No 157

2.00

Cost of MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 250 mm Long


(BMT-G.17)

55.00

Each

110.00

2.00

Cost of MS-Powder Coated Door Handles (IS:208) 150 mm Long (BMT-G.36)

37.00

Each

74.00

6.00

Cost of MS-Powder Coated Butt hinges (IS:205)- 125 mm Long (BMT-G29)

25.00

Each

150.00

1.00

Cost of MS-Powder Coated Flat Latches: 300 mm long (BMT-G.52)

54.00

Each

54.00

10

2.00

Cost of MS-Powder Coated - Door Stoppers (BMT-G.53)


a) LABOUR

37.00

Each

74.00

11

0.22

Carpenter class I

380.00

day

82.93

12

0.51

Carpenter class II

320.00

day

162.95

13

0.36

Light mazdoor

280.00

day

101.27

2.28

Labour charges for fixing flush door shutter of any thickness fixing the door
shutter to the frame and fixtures to the door shutter

295.00

Sqm

672.60

14

Add overheads @

4993.76
699.13
5692.90

14%

Rate per / Each


Supply and Fixing of Door with Single leaf shutter, Door Size 0.90x2.13 mtrs
with Sal Wood Frame of sections size 75mm x 100mm with Flush Door
Shutter Solid Bond Wood black board type with commercial ply on both faces
of 35mm thick including cost of fixtures such as M.S.Powder Coated Tower
Bolts 250mm long 2 Nos, M.S.Powder Coated Handels 150mm long 1 No,
300mm long M.S.Powder Coated Aldrops 1No, 125mm long M.S.Powder
Coated butt hinges 3 Nos, 300 mm long M.S.Powder Coated Flat latch 1No,
Door stoppers 2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and
convenyance of all materials to site all Labour charges such as Fixing of Door
Frame on shutter Fixing in position , with Hardware fixtures etc., complete for
finsihed utem of work. D6

DOOR SIZE 0.90 x 2.13 mtrs : Area = 1.92 sqm

0.9

2.13

1.92

Sal Wood for Frame


Verticals 2 x 2.13 x 0.075 x 0.10

0.03195

cum

Horizental 1 x 0.90 x 0.075 x 0.10

0.00675

cum

0.03870

cum

1.6

sqm

Total

35mm thick flush door shutter of soild wood block board type with commercial
play on both faces
1x0.78x2.05 = 1.599
ABSTRACT
a)MATERIAL
1

0.03195 Cost of Sal wood scantling of size 2.0 to 3.0 M

40012.00

Cum

1278.38

0.00675 Cost
Sal wood
scantling
size up
2.0 wood
M
Cost of
35mm
thick flush
doorofshutter
of to
soild
block board type with
commercial play on both faces
1.6
(BMT-N.17)

40012.00

Cum

270.08

734.00

Sqm

1174.40

3
4

6.00

MS Hold Fasts

10.00

Each

60.00

1.00

Cost of 300mm Long M.S.Powder Coated Aldrops(BMT-G.45)

134.00

Each

134.00

2.00

Cost of 250 long M.S.Powder Coated Towerbolts (BMT-G.17)

55.00

Each

110.00

1.00

Cost of 150mm Long M.S.Powder Coated Handles (BMT-G.36)

37.00

Each

37.00

3.00

Cost of 125mm long M.S.Powder Coated but hinges (BMT-G29)

25.00

Each

75.00

1.00

Cost of Flat latch M.S.Powder Coated 300long (BMT-G.52)

54.00

Each

54.00

10

1.00

Cost of Door Stoper (BMT-G.53)

37.00

Each

37.00

11

0.21

Carpenter class I

380.00

day

78.09

12

0.48

Carpenter class II

320.00

day

153.44

13

0.34

Light mazdoor

280.00

day

95.36

1.60

Labour charges for fixing flush door shutter of any thickness fixing the door
shutter to the frame and fixtures to the door shutter

295.00

Sqm

472.00

a) LABOUR

4028.75
14

D&W DATA (1)

Add overheads @

14%

564.03

P No 158

Rate per / Each

4592.80

Supply and Fixing of Door with Double leaf shutter, Door Size 1.00x2.13 mtrs
with Sal Wood Frame of sections size 75mm x 100mm with Flush Door
Shutters Solid Bond Wood black board type with commercial ply on both faces
of 35mm thick including cost of fixtures such as M.S.Powder Coated Tower
Bolts 200mm long 2 Nos, M.S.Powder Coated Handels 150mm long 1 No,
4

300mm long M.S.Powder Coated Aldrops 1No, 125mm long M.S.Powder


Coated butt hinges 6 Nos, 300 mm long M.S.Powder Coated Flat latch 1No,
Door stoppers 2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and
convenyance of all materials to site all Labour charges such as Fixing of Door
Frame on shutter Fixing in position , with Hardware fixtures etc., complete for
finsihed item of work.

1
2

DOOR SIZE 1.00 x 2.13 mtrs : Area = 2.13 Sqm


Salwood Frame
Verticals 2 x 2.13 x 0.075 x 0.10
=
Horizental 1 x 1.00 x 0.075 x 0.10
= 0.0075
Total
= 0.0394
35mm thick flush door shutter of soild wood block board type with commercial
play on both faces
1x0.875x2.05 = 1.79 Sqm
ABSTRACT
a)MATERIAL
0.03195 Cost of Sal wood scantling of size 2.0 to 3.0 M
0.00750 Cost of Sal wood scantling of size up to 2.0 M

3
4
5

1.79
6.00
1.00

6
7
8

2.00
1.00
6.00

9
10

1.00
2.00

11
12
13

0.21
0.49
0.35
1.79

Cost 35mm thick flush door shutter of soild wood block board type with
commercial play on both faces
(BMT-N.17)
MS Hold Fasts
Cost of 300mm Long M.S.Powder Coated Aldrops(BMT-G.45)
Cost of MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 200 mm Long
(BMT-G.16)
Cost of 150mm Long M.S.Powder Coated Handles (BMT-G.36)
Cost of 125mm long M.S.Powder Coated but hinges (BMT-G29)
Cost of Flat latch M.S.Powder Coated 300long (BMT-G.52)
Cost of Door Stoper (BMT-G.53)
a) LABOUR
Carpenter class I
Carpenter class II
Light mazdoor
Labour charges for fixing flush door shutter of any thickness fixing the door
shutter to the frame and fixtures to the door shutter

14

Add overheads @

0.9

2.13

1.92

0.03195
0.00750
0.03945

cum
cum
cum

1.79

sqm

40012.00
40012.00

1
1

Cum
Cum

1278.38
300.09

734.00
10.00
134.00

1
1
1

Sqm
Each
Each

1313.86
60.00
134.00

41.00
37.00
25.00

1
1
1

Each
Each
Each

82.00
37.00
150.00

54.00
37.00

1
1

Each
Each

54.00
74.00

380.00
320.00
280.00

1
1
1

day
day
day

79.60
156.41
97.20

295.00

Sqm

528.05
4344.59
608.24
4952.85

14%

Rate per / Each


Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the
size 50 x 47mm with a wall thickness of 5mm, made out of extruded 5mm rigid
PVC foam sheet, mitre cut at two corners and joined with 2nos. of 150mm long
brackets of 15x15mm M.S. square tube. The two vertical door profiles are to be
reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall
be fixed to the wall using 65/100mm long M.S. Screws through the frame by
using PVC fasteners. A minimum of 4nos. of screws to be provided for each
vertical member & minimum 2nos. for horizontal member etc. complete as per
manufacturers specification and direction of Engineer-in-Charge for finished
item of work

1 rmt

cost of rajasri door frame (BMT-N.01) Item Sl No 643

303.00
Add overheads @

Rate per Rmt

D&W DATA (1)

Rmt

303.00

14%
303.00

P No 159

Providing and fixing 30mm thick Solid panel PVC door shutter consisting of
frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x
19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have
a coat of steel primers of approved make and manufacture. M.S. frame shall
be covered with 5mm thick heat moulded PVC C channel of size 30 x 50mm
forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail &
bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC
sheet as gap insert for top rail & bottom rail. Panelling of 10mm thick PVC
sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with
30mm wide x 5mm thick PVC sheet beading on either side, and joined together
with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm
width is to be stuck on the interior side of the C Channel using PVC solvent
adhesive. Complete as per direction of Engineer-in-charge, manufacturers
specification & drawing for finished item of work .

cost of door shutter (BMT-N.02) Item Sl No 644


Add overheads @

2205.00
14%

sqm

Rate per 1 sqm

2205.00
2205.00

NCL or Equivalent Eco 3000 Series Windows with Galvalume


Corrugated sheet.

Providing and Fixing of windows made of pre-painted steel (Base


steel as per IS 513 of 0.6 mm thick galvanized as per IS 277 with
Zinc of 120 GSM). Primer coated with epoxy primer of 5-7 microns
thick, finish painted with a polyester paint of 12-16 microns thick and
back coated with 5-7 microns thick alkyd backer. Section for outer
frame should be of 48x50mm, centre mullion should be of 48x50mm,
section for shutter should be of 47x20mm and fixed panel beading
section should be 12x12mm. Outer frame and mullions to have
rebate for Galvalume corrugated sheet shutter and a 20mm provision
for Guard bars/Grills. The sections are to be cut to length metre
joined with corner bracket. Centre mullion is to be fixed with mullion
cap. Seccolor Handle, seccolor stay, 2 nos. of Stainless Steel heavy
duty Pivot hinges shall be provided per shutter. The windows should
be panelled with 0.60 mm thick Galvalume corrugated sheet (BMSW.55). The above frames should be fixed to the concrete/masonry
wall by means of self expanding screws, Including 10mm Square
guard bars with 6 (152.4mm) pitch etc., complete for finished item
of work.

a)

Centre fixed both side openable shutter window 50x40 (1524mm


x1219.2mm). Outer frame section size of 48x50mm. Shutter frame section size
of 48x25mm. Mullion section size of 48x50mm. Fixed beading section size of
12x12mm.
basic rate as per ssr item no 743 item code BMT-P.26
Deduct 5 mm plain glass BMT-I.02
Add 0.5 mm thick Galvalume corrugated sheet BMS-W.55
Add 14% overheads
Rate per sqmt.

b)

4450

SQM

Total
14%

4423.00

Double shutter Window with vertical mullion 30 x 40


( 914.4mm x 1219.2mm) outer frame section size of
72x50mm shutter frame section size of 48x25mm. Mullion
section size of 72x50mm.
basic rate as per ssr item no 746 item code BMT-P.25
Deduct 5 mm plain glass BMT-I.02
Add 0.5 mm thick Galvalume corrugated sheet BMS-W.55
Add 14% overheads
Rate per sqmt.

4450.00
-427.00
400.00
4423.00

5050.00
-427.00
400.00
5023.00

Total
14%

5023.00

Supply and Fixing of Ventilator of size 1.22 x 0.45 with 25mm x 25mm x 3mm thick equal L angles and 10mm square rods
@ 150mm c/c fixing in position ,complete for finsihed item of work
VENTILATOR SIZE 1.20 x 0.45 mtrs : Area = 0.54

D&W DATA (1)

1.2

0.45

0.54

P No 160

Angular frame 25 x 25 x 3mm thick


Verticals 1 x 22 x 0.45
=
Horizental 1 x2 x 1.20
=
For Hold fasts 1 x 2 x 0.15 =
Total
=
10 mm square rods @ 150 mm c/c
Verticals 1 x 7 x 0.45
Horizental 1 x2 x 1.22

0.90
2.40
0.30
3.60

m
m
m

3.96

Kgs

=
=
total

3.15
2.40
5.55

4.357

Kgs

Cost of Structural Steel

44.50

Cum

370.10

Fabrication Charges BMM.V.14


Fixing Charges BMM-V.15

18.00
3.50

1
1

Kg
Kg

Add overheads @
Rate per / Each

14%

149.70
29.11
548.91
76.85
625.75

ABSTRACT
a)MATERIAL
8.32
a) LABOUR
8.32
8.32

Supply and Fixing of Ventilator of size 1.00 x 0.45 with 25mm x 25mm x 3mm thick equal L angles and 10mm square
rods @ 150mm c/c fixing in position ,complete for finsihed item of work
VENTILATOR SIZE 1.00 x 0.45 mtrs : Area = 0.45
1
X
Angular frame 25 x 25 x 3mm thick
Verticals 1 x 2 x 0.45
=
0.90
m
Horizental 1 x2 x 1.00
=
2.00
m
For Hold fasts 1 x 2 x 0.15 =
0.30
Total
=
3.20
m
10 mm square rods @ 150 mm c/c
Verticals 1 x 5 x 0.45
Horizental 1 x2 x 1.00

0.45

0.45

3.52

Kgs

=
=
total

2.25
2.00
4.25

3.336

Kgs

Cost of Structural Steel

44.50

Cum

305.10

Fabrication Charges BMM.V.14


Fixing Charges BMM-V.15

18.00
3.50

1
1

Kg
Kg

Add overheads @
Rate per / Each

14%

123.41
24.00
452.51
63.35
515.86

ABSTRACT
a)MATERIAL
6.86
a) LABOUR
6.86
6.86

10

Supply and Fixing of Ventilator of size 0.90 x 0.45 with 25mm x 25mm x 3mm thick equal L angles and 10mm
@ 150mm c/c fixing in position ,complete for finsihed item of work
VENTILATOR SIZE 0.90 x 0.45 mtrs : Area = 0.41
0.9
Angular frame 25 x 25 x 3mm thick
Verticals 1 x 2 x 0.45
=
0.90
Horizental 1 x2 x 0.90
=
1.80
For Hold fasts 1 x 2 x 0.15 =
0.30
Total
=
3.00
10 mm square rods @ 150 mm c/c
Verticals 1 x 5 x 0.45
Horizental 1 x2 x 0.90

square rods
X

0.45

0.405

3.3

Kgs

m
m

=
=
total

2.25
1.80
4.05

3.179

Kgs

Cost of Structural Steel

44.50

Cum

288.33

Fabrication Charges BMM.V.14


Fixing Charges BMM-V.15

18.00
3.50

1
1

Kg
Kg

Add overheads @
Rate per / Each

14%

116.63
22.68
427.63
59.87
487.50

ABSTRACT
a)MATERIAL
6.48
a) LABOUR
6.48
6.48

11

Supply and Fixing of Balcony Grill of size 3.60 x 1.50 with 25mm x 25mm x 3mm thick equal L angles and 10mm square
rods @ 150mm c/c fixing in position ,complete for finsihed item of work
GRILL SIZE 3.60x1.50 mtrs : Area = 5.40
Angular frame 25 x 25 x 3mm thick
Verticals 1 x 2 x 1.50
=

D&W DATA (1)

3.6

3.00

1.5

5.4

P No 161

Total

Horizental 1 x2 x 3.60
=
For Hold fasts 1 x 2 x 0.15 =
=

10 mm square rods @ 150 mm c/c


Verticals 1 x 19 x 1.50
Horizental 1 x9 x 3.6

7.20
0.30
10.50

m
m

11.55

Kgs

=
=
total

28.50
32.40
60.90

47.81

Kgs

Cost of Structural Steel

44.50

Cum

2641.36

Fabrication Charges BMM.V.14


Fixing Charges BMM-V.15

18.00
3.50

1
1

Kg
Kg

Add overheads @
Rate per / Each

14%

1068.42
207.75
3917.53
548.45
4465.98

ABSTRACT
a)MATERIAL
59.36
a) LABOUR
59.36
59.36

12

Supply and fixing Sintex or equivalen PVC door frames made from extruded sections in overall dimensions of 40 X 48mm
having a wall thickness of 1.5mm with usual process variation of 0.3mm, complete, for finished item of work t.
1 rmt

cost of rajasri door frame (BMT-N.37) Item Sl No 679


Add overheads @

228.00
14%

Rmt

Rate per Rmt

13

228.00
228.00

PVC Door shutter conforming to IS: 10151-1982, the infill panel made of seamless one piece multi chamber PVC extruded
sections having overall dimensions of 610 mm x 20 mm with wall thickness of 1mm + 0.2mm with the top and bottom edges
of the shutter covered with end cap of the size 20 mm x 11 mm with the door shutter to be reinforced with special polymeric
reinforcements as per drawing for hardwares and fixtures. Stickers indicating the locations of hardware will be pasted at
appropriate places.for finished item of work.

1.4
2
3
2
1

Area of Shutter = 0.70x2.00= 1.40 sqm


cost of Syntex PVC door shutter (BMT-N.65) Item Sl No 707
Cost of 150mm Long M.S.Powder Coated Handles (BMT-G.36)
Cost of 125mm long M.S.Powder Coated but hinges (BMT-G29)
MS-Powder Coated Tower Bolt-10 mm Bolt (IS:204) 150 mm Long BMT-G.15)
MS-Powder Coated Aldrop (IS:2681) 200 mm longBMT - G.43)

1.4
1100.00
37.00
25.00
29.00
86.00

1
1
1
1
1

1 Sqm
Sqm
Each
Each
Each
Each

1540.00
74.00
75.00
58.00
86.00

1.4

Labour charges for fixing flush door shutter of any thickness fixing the door
shutter to the frame and fixtures to the door shutter

295.00

Sqm

413.00

Rate per Sqm


Add overheads @

14%

Rate per sqmt

2246.00
1604.00
224.56
1829.00

AEE/AE

Dy. Executive Engineer

Executive Engineer

Badangi

Vizianagaram

Vizianagaram

0
Guntur

D&W DATA (1)

P No 162

WATER SUPPLY AND SANITARY DATAS


Construction of Post Matric Hostel for girls at Paloncha (V&M) in Khammam District
DATAS
AREA ALLOWENCE
ADD 14% OVERHEADS
Sl.
No
1

0%
14%

Amount
(Rs.)
Supplying and laying, filling, jointing and testing SWG SP-1 pipes of ISI make confirming to IS 1651 & 4127 1st
quality with air tight Cement joints in CM (1.5:1)prop. including excavation of trenches and socket pits in any soil
(except rock requiring blasting) and refilling with watering and tamping including cost and conveyance of all materials
to site and all labour charges for finished item of work (APSS NO 1301 & 1318)
DESCRIPTION

ITEM CODE

a) 101.60 mm dia SWG pipe upto 3'


depth
BMW-A.02
Area allowence on labour charges

BMW-A.05

COEF.

1.00

UNIT

Rmt

20%

RATE

PER

UNIT

193.00

1.00 Rmt

102.00

1.00

0.00

193.00
20.40
213.40

add overheads @

14.00%

29.88

Total rate per 1 Rmt


b) 152.40mm dia SWG pipe upto 5'
depth
Area allowence on labour charges

243.30
BMW-A.03
BMW-A.06

1.00

Rmt

20%

471.00

1.00 Rmt

138.00

1.00

0.00

471.00
27.60
498.60

add overheads @

14.00%

69.80

Total rate per 1 Rmt

568.40

c 101.60 mm dia SWG pipe upto 5'


BMW-A.01
depth
Area allowence on labour charges
BMW-A.06

1.00

Rmt

20%

348.00

1.00 Rmt

138.00

1.00

0.00

348.00
27.60
375.60

add overheads @

14.00%

52.58

Total rate per 1 Rmt


152.40mm dia SWG pipe upto 3'
depth
Area allowence on labour charges

428.20
BMW-A.04
BMW-A.05

1.00
20%

Rmt

319.00

1.00 Rmt

102.00

1.00

0.00

319.00
20.40
339.40

add overheads @
Total rate per 1 Rmt
2

14.00%

47.52
386.95

Constructing 904.0 mm (30) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement
mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing
strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; thick both inside and outside fitted with
20 dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils
(exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching
and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement,
sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour
charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as
per Standard specification.

WS-DATA

P No 163

Sl.
No

DESCRIPTION
basic rate as per ssr item

ITEM CODE
BMW-B.03

Area allowence on labour charges

COEF.
1.00

UNIT
Nos

20%

RATE
4814.00
0.00

PER

UNIT

1.00 Nos
1.00

0.00

Amount
(Rs.)
4814.00
0.00
4814.00

add overheads @

14.00%

673.96

Total rate per 1 Nos


3

Constructing 904.0 mm (30) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement
mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing
strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; thick both inside and outside fitted with
20 dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of
soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4
benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials
like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and
operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for
finished item of work as per Standard specification.
basic rate as per ssr item
Area allowence on labour charges

5488.00

BMW-B.04

Nos

20%

7455.00
0.00

1.00 Nos

7455.00

1.00

0.00
7455.00
1043.70
8498.70

0.00

14.00%
add overheads @
Total rate per 1 Nos
Constructing 904.0 mm (30) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with
cement mortar (1:6) prop using fly ash blocks of 225mm thick from approved source having a minimum crushing
strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; thick both inside and outside fitted with
20 dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of
soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4
benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials
like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and
operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for
finished item of work as per Standard specification.
basic rate as per ssr item
Area allowence on labour charges

BMW-B.02

1.00

Nos

20%

8288.00
0.00

1.00 Nos

8288.00

1.00

0.00
8288.00
1160.32
9448.35

0.00

14.00%

add overheads @
Total rate per 1 Nos
5

1.00

Constructing 904.0 mm (30) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with
cement mortar (1:6) prop using fly ash blocks of 225mm thick from approved source having a minimum crushing
strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; thick both inside and outside fitted with
20 dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (3'-0") in all sorts of
soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4
benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials
like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and
operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for
finished item of work as per Standard specification.
basic rate as per ssr item
Area allowence on labour charges

add overheads @
Total rate per 1 Nos

WS-DATA

BMW-B.01

1.00
20%
14.00%

Nos

5246.00
0.00

1.00 Nos

5246.00

1.00

0.00
5246.00
734.44
5980.45

0.00

P No 164

Sl.
No
6

Amount
(Rs.)
Supplying and fixing 150.00mmx100.00mm SWG gully trap 1st class confirming to ISI 651 & 4127 with CI grating
and constructing single brick masonry wall chamber of size 20" x 14" x 12 in CM (1:6) prop. Over a CC (1:5:10)prop.
bed, and fitted with 304.8 mm x 225.6 mm(12" x 9") CI frame and hinged cover and plastering 12mm thk. in CM (1:4)
prop. both inside and outside surfaces and including cost and conveyance of all materials to site, labour charges etc.,
complete for finished item of work. SSR ITEM NO.527
DESCRIPTION

Basic rate as per ssr item


Area allowence on labour charges

ITEM CODE

BMW-A.72
BMW-A.74

COEF.

1.00

UNIT

Nos

20%

RATE

PER

UNIT

530.00

1.00 Nos

530.00

23.00

1.00

4.60
534.60
74.84
609.45

0.00

14.00%
add overheads @
Total rate per 1 Nos
Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to
IS:2556-Part-4:1972 of size 550mm x 400mm with waste fittings like rubber plug, chain, 32 mm nominal size C.P.
Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated
Pillar Tap of 1st quality Indian make 400 grams Seiko/ Esso or equivalent complete with standard CI brackets including
wooden block ,1 No.12.70mm PVC connection with brass union nuts CP coated , 1 No.12.70mm NP bib tap 300 gms
Seiko or equivalent including cost and conveyance of all materials to site, labour charges etc. complete for finished item
of work
A Basic rate as per ssr item
Area allowence on labour charges

BMW-D24
BMW-D28

add overheads @
Total rate per 1 Nos
B Basic rate as per ssr item 12.7MM
DIA PVC conection with brass
union nut CP coated
BMW-I.48
Area allowence on labour charges

BMW-I.49

BMW-E 05
BMW-E 06

add overheads @
Total rate per 1 Nos
D Basic rate as per ssr item 38.1 MM
CP WASTE COUPLING half or full
thread 1st quality indian make
paryware or equivalent
BMW-E31
Area allowence on labour charges

BMW-E32

add overheads @
Total rate per 1 Nos
E Basic rate as per ssr item 31.75 MM
dia PVC fleible waste pipe of 914.4
mm length of first quality
BMW-G05

WS-DATA

Nos

1323.00

1.00 Nos

1323.00

288.00

1.00

57.60
1380.60
193.28
1573.90

85.00

1.00 Nos

16.00

1.00

403.00

1.00 Nos

403.00

35.00

1.00

7.00
410.00
57.40
467.40

201.00

1.00 Nos

201.00

23.00

1.00

4.60
205.60
28.78
234.40

21.00

1.00 Nos

0.00

14.00%

1.00

Nos

20%

0.00

14.00%

add overheads @
Total rate per 1 Nos
C Basic rate as per ssr item 12.7 MM
ANGLE STOP COCK first quality
Indian make 400 gms Seiko
Area allowence on labour charges

1.00
20%

1.00

Nos

20%

0.00

14.00%

1.00

Nos

20%

0.00

14.00%

1.00

Nos

85.00
3.20
88.20
12.35
100.55

21.00

P No 165

Sl.
No

DESCRIPTION

20%

add overheads @
Total rate per 1 Nos
TOTAL COST (A+B+C+D+E)

14.00%

RATE
0.00

PER
1.00

UNIT
0.00

Rs

BMW-I.28
BMW-I.29

Amount
(Rs.)
0.00
21.00
2.94
23.95
2400.20

1.00

Nos

20%

206.00

1.00 Nos

206.00

10.00

1.00

2.00
208.00
29.12
237.15

0.00

14.00%
add overheads @
Total rate per 1 Nos
Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm , plywood back with NP
screws 1st quality including cost and conveyance of all materials, labour charges etc., complete for finished item of work
in all floors.
BMW-I 105
BMW-I.106

1.00

Nos

20%

435.00

1.00 Nos

435.00

95.00

1.00

19.00
454.00
63.56

0.00

14.00%

add overheads @
Total rate per 1 Nos

11

UNIT

Supplying and fixing NP soap dish heavy type of approved make ISI quality with NP screws etc., complete including
cost and conveyance of all materials, labour charges for fixing etc., complete for finished item of work in all floors as per
ssr item no 598

Basic rate as per ssr item


Area allowence on labour charges

10

COEF.

Area allowence on labour charges

Basic rate as per ssr item


Area allowence on labour charges

ITEM CODE

517.60

Supplying and fixing of 25.4mm dia , 609.6mm long aluminium anodized towel rods with brackets and aluminium
screws including cost and conveyance of all materials, labour charges etc., complete for finished item of work.
Basic rate as per ssr item

BMW-I 20

Area allowence on labour charges

BMW-I 21

1.00

Nos

20%

139.00

1.00 Nos

139.00

36.00

1.00

7.20
146.20
20.47
166.70

0.00

14.00%
add overheads @
Total rate per 1 Nos
Supplying and fixing NP bib taps of size 12.70mm dia of Indian make Seiko or equivalent including cost and
conveyance of all materials, labour charges etc., complete for finished item of work in all floors.
a) 300 grams
Basic rate as per ssr item
Area allowence on labour charges

BMW-E 09
BMW-E 10

add overheads @
Total rate per 1 Nos
b) 400 gms
BMW-E 07
Basic rate as per ssr item
Area allowence on labour charges
BMW-E 08
add overheads @
Total rate per 1 Nos

WS-DATA

1.00

Nos

20%

219.00

1.00 Nos

219.00

23.00

1.00

4.60
223.60
31.30
254.90

345.00

1.00 Nos

345.00

23.00

1.00

4.60
349.60
48.94
398.55

0.00

14.00%

1.00
20%
14.00%

Nos

0.00

P No 166

Sl.
No
12

Amount
(Rs.)
Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and
fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement,
fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all
materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)
DESCRIPTION

(a) 90mm dia 3 Mts single socket


Basic rate as per ssr item
Area allowence on labour charges

ITEM CODE

BMW-G12
BMW-G.152

add overheads @
Total rate per 1 RMT
(b) 110mm dia 3 Mts single socket
BMW-G13
Basic rate as per ssr item
Area allowence on labour charges
BMW-G.152

13

COEF.

UNIT

1.00 RM
20%

RATE

PER

UNIT

368.00

3.00 RMT

122.67

58.00

1.00

11.60
134.27
18.80
153.10

440.00

3.00 RMT

146.67

58.00

1.00 RM

11.60
158.27
22.16
180.45

0.00

14.00%

1.00 RM
20%

RM

14.00%
add overheads @
Total rate per 1 RMT
Supplying & fixing GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings in ground or
on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with
necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonry walls and making
good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and
conveyance of all materials and labour charges complete for finished item of work.
a) 15mm Nominal bore
Basic rate as per ssr item
Area allowence on labour charges

BMW-F79
BMW-F80

add overheads @
Total rate per 1 RMT
b) 20mm Nominal bore
BMW-F81
Basic rate as per ssr item
Area allowence on labour charges
BMW-F82

1.00 Rmt

151.00

1.00 Rmt

151.00

Rmt

33.00

1.00

6.60
157.60
22.06
179.70

1.00 Rmt

168.00

1.00 Rmt

168.00

Rmt

33.00

1.00 Rmt

6.60
174.60
24.44
199.05

1.00 Rmt

220.00

1.00 RMT

220.00

33.00

1.00 Rmt

20%
14.00%

20%
14.00%

add overheads @
Total rate per 1 RMT
c) 25mm Nominal bore
Basic rate as per ssr item

BMW-F83

Area allowence on labour charges

BMW-F84

20%

Rmt

6.60
226.60

add overheads @
Total rate per 1 RMT
D 40mm Nominal bore
Basic rate as per ssr item
Area allowence on labour charges

14.00%

BMW-F87
BMW-F88

31.72
258.35

1.00 Rmt
20%

Rmt

346.00

1.00 RMT

36.00

1.00 Rmt

346.00
7.20
353.20

add overheads @
Total rate per 1 RMT

14.00%

49.45
402.65

E 50mm Nominal bore

WS-DATA

P No 167

Sl.
No

DESCRIPTION
Basic rate as per ssr item
Area allowence on labour charges

ITEM CODE
BMW-F89
BMW-F90

1.00 Rmt
20%

Rmt

RATE

PER

UNIT

373.00

1.00 RMT

55.00

1.00 Rmt

Amount
(Rs.)
373.00
11.00
384.00
53.76
437.80

BMW-F91
BMW-F90

1.00 Rmt
20%

Rmt

661.00

1.00 RMT

661.00

55.00

1.00 Rmt

11.00
672.00
94.08

14.00%

add overheads @
Total rate per 1 RMT
14

UNIT

14.00%

add overheads @
Total rate per 1 RMT
F 65mm Nominal bore
Basic rate as per ssr item
Area allowence on labour charges

COEF.

766.10

Supplying and fixing Gunmetal Gate ( GM peet ) valve as per IS-778 Class - I , Indian make heavy type including cost
and conveyance of all materials , labour charges etc. complete for finished item of work.
15 mm dia nominal bore
Basic rate as per ssr item
Area allowence on labour charges

BMW-F21
BMW-F22

1.00
20%

add overheads @
Total rate per 1 No
a) 20mm Nominal bore
BMW-F19
Basic rate as per ssr item
Area allowence on labour charges
BMW-F20

14.00%

add overheads @
Total rate per 1 No
b) 25mm Nominal bore
BMW-F17
Basic rate as per ssr item
Area allowence on labour charges
BMW-F18

14.00%

add overheads @
Total rate per 1 No
c) 40mm Nominal bore
BMW-F25
Basic rate as per ssr item
Area allowence on labour charges
BMW-F26
add overheads @
Total rate per 1 No
d) 50mm Nominal bore
BMW-F27
Basic rate as per ssr item
Area allowence on labour charges
BMW-F28

WS-DATA

1.00

Nos

0%

1.00

Nos

20%

306.00

1.00 Nos

306.00

36.00

1.00

7.20
313.20
43.85
357.05

414.00

1.00 Nos

414.00

36.00

1.00

0.00
414.00
57.96
472.00

610.00

1.00 Nos

610.00

36.00

1.00

7.20
617.20
86.41
703.65

0.00

0.00

0.00

14.00%

1.00

Nos

20%

1243.00
55.00

1.00 Nos

1243.00

1.00

11.00
1254.00
175.56
1429.60

0.00

14.00%

1.00

Nos

20%

1795.00
74.00

1.00 Nos

1795.00

1.00

14.80
1809.80
253.37
2063.20

0.00

14.00%

add overheads @
Total rate per 1 No
e 65 mm nominal bore
Basic rate as per ssr item

Nos

BMW-F29

1.00

Nos

3424.00

1.00 Nos

3424.00

P No 168

Sl.
No

DESCRIPTION
Area allowence on labour charges

ITEM CODE
BMW-F30

COEF.

UNIT

20%

RATE
92.00

PER
1.00

UNIT
0.00

Amount
(Rs.)
18.40
3442.40

add overheads @

14.00%

481.94

Total rate per 1 No

3924.35

Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement
of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5
pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS
15778:2007
28.60mm OD Pipe - SDR 13.5
Basic rate as per ssr item

BMW-l 222

Area allowence on labour charges

BMW-F30

1.00

Rmt

20%

198.00
0.00

1.00 Rmt
1.00

0.00

198.00
0.00
198.00

add overheads @

14.00%

27.72

Total rate per Rmt

225.75

34.90mm OD Pipe - SDR 11


Basic rate as per ssr item

BMW-l 229

Area allowence on labour charges

BMW-F30

1.00

Rmt

20%

289.00
0.00

1.00 Rmt
1.00

0.00

289.00
0.00
289.00

add overheads @

14.00%

40.46

Total rate per Rmt


15

Supply and fixing of white glazed flat back bowl urinals of size 440 mm x 265 mm x 315 mm with internal rim flushing
mm fixied with screws complete inidan make (HS W/Parry/Neycer) conforming to IS 2556 -1995 as approved be
Engineer - in - charge 12.7 mm PVC connection with brass plumber union nuts CM Coated. including 12.70 mm push
cock 1st qulaity of approved make including supply & fixing 31.75 m dia PVC flexible waser pipe of 914.40 mm lenght
of 1st including cost and conveyance of all materials to site labour charges etc., complete for finished item of work for all
floors
Basic rate as per ssr item
Area allowence on labour charges

16

BMW-D33
BMW-D36

1.00

Nos

20%

690.00

1.00 Nos

690.00

115.00

1.00

23.00
713.00
99.82
812.85

0.00

14.00%
add overheads @
Total rate per 1 No
Construction of brick masonry support for GI pipe of size 304.80mm x 228.60mm x 228.60 mm in CM (1:8) prop
including plastering and finishing with 12mm thick in CM (1:5) including cost and conveyance of all materials and all
labour charges etc. complete
Basic rate as per ssr item
Area allowence on labour charges

17

329.50

BMW-i63
BMW-i64

1.00

Nos

20%

62.00

1.00 Nos

62.00

18.00

1.00

3.60
65.60
9.18
74.80

0.00

14.00%
add overheads @
Total rate per 1 No
Supplying and fixing 150.00mmx100.00mm SWG gully trap 1st class confirming to ISI 651 & 4127with CI grating and
constructing single brick masonry wall chamber of size 20" x 14" x 12 in CM (1:6) prop. Over a CC (1:5:10)prop. bed,
and plastering 12mm thk. in CM (1:4) prop. both inside and outside surfaces and fitted with 304.8MM X 288.6 MM
(12"X9") CI frame and hinged cover including labour for fixing and laying the SWG junctions/plugs/bends with air
tightcement joints etc., complete including cost and conveyance of all materials to site, labour charges etc., complete for
finished item of work as directed by Engineer-in-charge.
Basic rate as per ssr item

WS-DATA

BMW-A72

1.00

Nos

530.00

1.00 Nos

530.00

P No 169

Sl.
No

DESCRIPTION
Area allowence on labour charges

ITEM CODE
BMW-A74

Basic rate as per ssr item Nahany


trap
Area allowence on labour charges

BMW-C41
BMW-C42

Basic rate as per ssr item Nahany


trap cover
Area allowence on labour charges

23.00

PER
1.00

UNIT
0.00

Amount
(Rs.)
4.60
534.60
74.84
609.45

1.00

Nos

20%

279.00

1.00 Nos

279.00

45.00

1.00

9.00
288.00
40.32
328.35

26.00

1.00 Nos

15.00

1.00

0.00

BMW-i12
BMW-i13

1.00

Nos

20%

0.00

26.00
3.00
29.00
4.06
33.10
361.45

14.00%
add overheads @
Total rate per 1 No
Total cost (A +B)
Supplying and fixing 580 mm x 440 mm long Orissa pan white glazed Water Closet 1st qualityISI marked confirming to
IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick masonry seat, CC squatting plate and
fixing 12.70mm dia NP Push cock 1st quality , P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm
alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to
site, cost of CC bed, labour charges and seigniorage charges etc., complete for finished item of work.
Basic rate as per ssr item
Area allowence on labour charges
Providing brick masonry seat

BMW-D04
BMW-D06
BMW-D09

1.00

Nos

1052.00

1.00 Nos

1052.00

Nos

288.00
253.00

1.00 0.00
1.00 Nos

57.60
253.00
1362.60
190.76
1553.40

20%
1.00
14.00%

add overheads @

Total cost (A +B)


Providing and placing on terrace (at all floor levels) polyetheylene water storage tank with double layer approved brand
and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over
flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour
charges for placing and fixing in position as directed by Engineer-in-Charge.
Basic rate as per ssr item
Area allowence on labour charges

21

20%

RATE

14.00%

add overheads @
Total rate per 1 No

20

UNIT

14.00%
add overheads @
Total rate per 1 No
Supplying and fixing CI Nahani traps 100 mm dia Inlet- 75 mm (3") outlet pipe - 4 Kgs 1st quality ISI marked
conforming to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice
for all floors including cost and conveyance of all materials to site, labour charges etc., complete for finished item of
work.

18

19

COEF.

BMW-G01
BMW-G02

1.00

Lit

20%

5.00

1.00 Lit

5.00

0.00

1.00

0.00
5.00
0.70
5.70

0.00

14.00%
add overheads @
Total rate per 1 Ltr
Supplying and fixing 609.6 mm x 457.2 mm x 254 mm RCC terrazo finished sink (or constructed at site with 50.80 mm
thick) brass plug and chain incluiding CI cantilever brackets, 31.75 mm dia PVC flexible waste pipe 914.4 mmm length
of 1st quality including cost and conveyance fo all materials labour charges etc., complete for finished item of work
Basic rate as per ssr item
Area allowence on labour charges

WS-DATA

BMW-D40
BMW-D41

1.00
0%

Nos

587.00

1.00 Nos

184.00

1.00

0.00

587.00
0.00

P No 170

Sl.
No

DESCRIPTION

ITEM CODE

COEF.

UNIT

RATE

PER

UNIT

Amount
(Rs.)
587.00
82.18
669.20

14.00%
add overheads @
Total rate per 1 No
Supply and fixing of stainless steel sink with drain board of size 914.4 mm x 457.2 mm 1 mm thick of indian make on
cantilever brackets including 32 mm CP waste coupling including supply & fixing of 31.75 mm dia PVC flexible waste
pipe of 914.4 mm length of 1st quality, chasing brick masonry wall and making good after construction i.e., restoring to
original srufaces etc., complete including cost and conveyance of all materials and labour charges for all operations etc.,
complete for finished item of work in all floors

22

Basic rate as per ssr item


Area allowence on labour charges

BMW-I119
BMW-I120

1.00

Nos

20%

5826.00

1.00 Nos

5826.00

414.00

1.00

82.80
5908.80
827.23
6736.05

0.00

14.00%
add overheads @
Total rate per 1 No
Supply & Fixing of 22" dia RCC Cover for manhole with nominal reinforecement 3" thick with hooks for lfifting
including cost and conveyance of all materials, labour charges etc., complete for finished tiem of work

23

Basic rate as per ssr item


Area allowence on labour charges

BMW-I130

1.00

Nos

20%

598.00
0.00

1.00 Nos

598.00

1.00

0.00
598.00
83.72
681.75

0.00

14.00%
add overheads @
Total rate per 1 No
Supply and fixing of 100 mm dia CI Vent pipe of 3 mts length double socket fitted with AC cowl and mosquito proof
wire mesh including cost and conveyance of all materials to site and labour charges for placing and fixing in position
etc., complete for finished item of work.
BMW-H05
1.00
Nos 1765.00
1.00 Nos
1765.00
Basic rate as per ssr item

24

Area allowence on labour charges

20%

0.00

1.00

0.00

0.00
1765.00
247.10
2012.10

14.00%
add overheads @
Total rate per 1 No
Supply and fixing of 75 mm dia CI Vent pipe of 3 mts lenth fitted with AC cowl and mosquito proof wire mesh including
cost and conveyance of all materials to site and labour charges for placing and fixing in position etc., complete for
finished item of work.
BMW-H04
1.00
Nos 1308.00
1.00 Nos
1308.00
Basic rate as per ssr item

25

Area allowence on labour charges

20%

0.00

1.00

0.00

0.00
1308.00
183.12
1491.15

14.00%
add overheads @
Total rate per 1 No
Supply and fixing of CI pipes 101.6mm Single socket ISI marked confirming to IS: 1729 - 1979 of reputed make with
cement caulked joints and paintaed black with japan paint and fixing with necessary woden blocks fixed in the masoery
walls in CM (1.5:1) including fixing of MS clamps of necessary size and required no of Bombay nails etc., complete
including cost and conveyance of all materials to site all labour charges sales and other taxes on all materials etc.,,
complete for finished item of work all Floors

26

a
Basic rate as per ssr item
Area allowence on labour charges

add overheads @
Total rate per 1 No

WS-DATA

BMW-CO2
BMW-CO7

1.00
20%
14.00%

Nos

737.00

1.00 Nos

737.00

173.00

1.00

34.60
771.60
108.02
879.65

0.00

P No 171

Sl.
No
27

Amount
(Rs.)
Supply and fixing of CI pipes 76.2 mm Single socket ISI marked confirming to IS: 1729 - 1979 of reputed make with
cement caulked joints and paintaed black with japan paint and fixing with necessary woden blocks fixed in the masoery
walls in CM (1.5:1) including fixing of MS clamps of necessary size and required no of Bombay nails etc., complete
including cost and conveyance of all materials to site all labour charges sales and other taxes on all materials etc.,,
b complete for finished item of work all Floors
BMW-CO1
1.00
Nos
645.00
1.00 Nos
645.00
Basic rate as per ssr item
DESCRIPTION

Area allowence on labour charges

28

BMW-CO7

COEF.

UNIT

20%

RATE

173.00

PER

1.00

UNIT

0.00

34.60
679.60
95.14
774.75

14.00%
add overheads @
Total rate per 1 No
Constructing 457.2mm x 457.2mm (1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm
(3'-0") and fitted with light weight 457.2mm x 457.2mm (1'-6" x 1"-6") frame and cover of 20kg., including cost and
convenyance of all materials to site, all labour charges, sales and otehr taxes on all materials etc., complete for finished
item of work
Basic rate as per ssr item
Area allowence on labour charges

29

ITEM CODE

BMW-B06

1.00
0%

Nos

3020.00
0.00

1.00 Nos
1.00 0.00

3020.00
0.00
3020.00
422.80
3442.80

14.00%
add overheads @
Total rate per 1 No
Supply and Fixing of AC Cowls 88.9 mn dia with all necessary requirements including all operational , incidental sales
and other taxes and all labour charges etc., complete including cost and convenyance of all materials complete for
finished item of work for all Floors.
BMW-I36
1.00
Nos
60.00
1.00 Nos
60.00
Basic rate as per ssr item
12.00
1.00 0.00
2.40
Area allowence on labour charges BMW-I37
20%
62.40
14.00%
8.74
add overheads @
71.15
Total rate per 1 No

30

Supply and Fixing of AC Cowls 63.50 mn dia with all necessary requirements including all operational , incidental sales
and other taxes and all labour charges etc., complete including cost and convenyance of all materials complete for
finished item of work for all Floors.
BMW-I38
1.00
Nos
41.00
1.00 Nos
41.00
Basic rate as per ssr item
9.00
1.00 0.00
1.80
Area allowence on labour charges BMW-I39
20%
42.80
14.00%
5.99
add overheads @
48.80
Total rate per 1 No

31

Construction of 50.8mm thick RCM Baffle wall with 2.267 Kg steel and rabit wire mesh in CM (1:3) prop: with fine
rendering in neat cement in septic tank including cost and convenyance of all materials to site, seigonarage charges sales
and othe taxes on all materials , and all labour charges etc., complete for finished item of work.
BMW-I95
1.00
Nos
213.00
1.00 Nos
213.00
Basic rate as per ssr item
Area allowence on labour charges

32

BMW-I97

20%

36.00

1.00

0.00

7.20
220.20
30.83
251.05

14.00%
add overheads @
Total rate per 1 No
Supply and Fixing of C.I. (Spun ) Soil waste and ventilating pipe of 3.00 Mt length of 100mm dia with double socket for
vent over septic tank including cost and convenyance of all materials to site, all labour charges sales and all other taxes
on all materials etc., complete for finished item of work.
BMW-H05
1.00
Nos 1765.00
1.00 Nos
1765.00
Basic rate as per ssr item

WS-DATA

P No 172

Sl.
No

DESCRIPTION

ITEM CODE

Area allowence on labour charges


Basic rate as per ssr item
Area allowence on labour charges

33

37

BMW-I36
BMW-I37

1.00

Nos

20%

PER

UNIT

0.00
60.00

1.00 0.00
1.00 Nos

12.00

1.00

0.00

Amount
(Rs.)
0.00
60.00
2.40
1827.40
255.84
2083.25

BMW-I88

20%

BMW-I90

20%

115.00

1.00

0.00

9.00

1.00

0.00

1.80
54.80
7.67
62.50

14.00%
add overheads @
Total rate per 1 No
Supply and Fixing 10 Litres capacity Single Flush white PVC low level flushing system parryware, slimline with internal
components and short bend including cost and conveyance of all materials to site, all labour charges, sales and other
taxes on all materials etc., complete for finished item of work for all floors.
Basic rate as per ssr item
Area allowence on labour charges

36

20%

RATE

23.00
1668.00
14.00%
233.52
add overheads @
Total
1 Noof CI Steps for Septic Tank / Manhole complete for finished item of work including cost and 1901.55
Supplyrate
andper
Fixing
conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished
item of work.
BMW-I89
1.00
Nos
53.00
1.00 Nos
53.00
Basic rate as per ssr item
Area allowence on labour charges

35

UNIT

14.00%
add overheads @
Total rate per 1 No
Supply and Fixing of 914.4mm x 457.2mm Light Weight CI Manhole Frame and Cover (30 Kgs) complete for finished
item of work including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all
materials etc., complete for finished item of work.
BMW-I86
1.00
Nos 1645.00
1.00 Nos
1645.00
Basic rate as per ssr item
Area allowence on labour charges

34

COEF.

BMW-G08

1.00

Nos

20%

1323.00
0.00

1.00 Nos

1323.00

1.00

0.00
1323.00
185.22
1508.25

0.00

14.00%
add overheads @
Total rate per 1 No
Supply & Fixing 4" dia (101.6 mm) CI Plug (Door) bends 1st quality ISI marked conforming to IS : 1729-1979 with
cement caulked joints and fixing as per site requirements with standard practice including cost and conveyance of all
materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for all
floors.
Basic rate as per ssr item

BMW-C12

Area allowence on labour charges

BMW-C14

1.00

Nos

20%

332.00

1.00 Nos

332.00

55.00

1.00

11.00
343.00
48.02
391.05

0.00

14.00%
add overheads @
Total rate per 1 No
Supply & Fixing 3" dia (76.2 mm) CI Plug (Door) bends 1st quality ISI marked conforming to IS : 1729-1979 with
cement caulked joints and fixing as per site requirements with standard practice including cost and conveyance of all
materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for all
floors.
Basic rate as per ssr item
Area allowence on labour charges

add overheads @
Total rate per 1 No

WS-DATA

BMW-C11
BMW-C14

1.00
20%
14.00%

Nos

284.00

1.00 Nos

284.00

55.00

1.00

11.00
295.00
41.30
336.30

0.00

P No 173

Sl.
No
38

Amount
(Rs.)
Manufacture, supply & delivery of 50mm of outer dia HDPE pipes of 6Kg/Sqcm. conforming to IS 4984 - 1995
including transportation to site including laying and jointing of HDPE pipes as per BIS No.7634 Part -II/75 including
fixing required specials /fittings including excavation of trenches up to 0.50 mts depth in all soils except rock requires
blasting and refilling trenches after laying and jointing of pipes as per standard specifications including cost and
conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished
item of work.
DESCRIPTION

Basic rate as per ssr item


Labour charges for laying and
jointing
Area allowence on labour charges

ITEM CODE

COEF.

UNIT

RATE

PER

UNIT

Table 17.1/PH

1.00

RMT

49.00

1.00 RMT

12-b / PH

1.00

RMT

21.00

1.00

20%

RMT

21.00

49.00
21.00
4.20
74.20
10.39
84.60

14.00%
add overheads @
Total rate per 1Rmt
Construction of 60,000 liters capacity OHSR(VRCC) with 12.7 mts staging without seismic analysis including fixtures
OF rcc OR ALLUMINIUM LADDER INSIDE 0.45 Mtrs wide, MS ladder on the outside . Lighting including condutor
& earthing etc., RCC ventilators with copper or stainless steel skyproof mesh, Manhole frame and cover 0.75x0.75mts
with frame as per IS specifications (light duty - 2 Nos), Ralling with 32mm dia GI pipes (A class in 2 nos alround OHSR
fixed in RCC (1:2:4) poles of size 100x75x75mm with 1.50mts intervals alround periphery on top of the OHSR for
smaller capacities,Water level indicator of good quality with ebonite /copper float approved pattern - 1 no

39

a . RCC or allumininum ladder


inside 0.45mts wide
b. MS ladder on the outside
c. Lighting including condutor &
earthing etc.,
d. RCC ventilators with copper or
stainless steel skyproof mesh
e. Manhole frame and cover
0.75x0.75mts with frame as per IS
specifications
dutydia
- 2GI
Nos)
f. Ralling with(light
32mm
pipes
(A class in 2 nos alround OHSR
fixed in RCC (1:2:4) poles of size
100x75x75mm
with
1.50mts
intervals
alround
periphery
top
g. Water level indicator ofongood
of the OHSR
smaller
capacities
quality
with for
ebonite
/copper
float
approved pattern - 1 no
45.e / PH

1.00

Lt

20.94

1.00 Lt

Add for difference in cost of cement (5400-5500)*0.00007

-0.01

Add for difference in cost of steel

0.02
20.95

(42000-41000)*0.00002

Add 10% extra for rural area


allowence

a)

2.10
23.05
3.23
26.30

14.00%

add overheads @
Total rate per 1 Lt
40

20.94

Supply and fixing of the following


fixtures
80mm dia x 2.00 mts CI D/F pipes
Table 26/PH
Add overheads @
Total rate per 1 Kg

WS-DATA

1.00
14.00%

Kg

58.00

1.00 Kg

58.00
8.12
66.15

P No 174

Sl.
No

DESCRIPTION

ITEM CODE

COEF.

UNIT

RATE

PER

UNIT

Amount
(Rs.)

b) 80mm dia x 1.00 CI D/F pipes


initiate cost only
1.00
Add overheads @
c)

1.00 Kg

Total rate per 1 Kg


d) 80mm dia CI sluice valves

Kg

58.00

1.00 Kg

14.00%

Table 27.1

Add overheads @

1.00

nos

4468.00

1.00 nos

Add overheads @

Kg

88.00

1.00 Kg

14.00%

Add overheads @

1.00

88.00
12.32
100.35

Total rate per 1 Kg


Rubber packing 3/6mm thick
Table 36-4 /
PH

4468.00
625.52
5093.55

Total rate per 1 Nos


80mm dia CI duct foot bends
1.00

58.00
8.12
66.15

14.00%

Table 24-VI /
PH

58.00
8.12
66.15

Total rate per 1 Kg


80mm dia x flonged spigot CI tail
pieces
Add overheads @

f)

58.00

14.00%

1.00

e)

Kg

kg

77.00

1.00 kg

14.00%

77.00
10.78
87.80

Total rate per 1 Kg


g) Bolts & nuts
Table 36-5 /
PH

41

Add overheads @
Total rate per 1 Kg
Construction of Perforated Dry
Brick Masonry without using CM
and keeping vertical dry joints of 15
to 20mm as directed by the
Engineer in Charge including
cost and conveyance of all amterials
to site seignorage charges, sales and
other taxes, all labour charges etc.,
complete item of work for Soak Pit.

Cost of Bricks

1.00
14.00%

Kg

93.00

1.00 Kg

93.00
13.02
106.05

322.50

654 Nos.

4474.82

1000 Nos.

2926.53

98.10 Nos.

4474.82

-1000 Nos.

-438.98

Brick layer

1.28 Each

380.00

1 Each

486.40

Man Mazdoor

0.64 Each

280.00

1 Each

179.20

Women Mazdoor

1.93 Each

280.00

1 Each

540.40

Deduct 15% for perforation

Rate per Cum

WS-DATA

3693.55

P No 175

Standard Data Electrical Items SSR 2013-14


Construction of Post Matric Hostel for girls at Paloncha (V&M) in Khammam District
Area allowence
Overheads and contractors profit on materials

20%

Overheads and contractors profit on labour

14%

Index Specific
-code
ation No.
1
1

1.4.2
(C)

Description

QTY

Rate Rs.

Amount Rs.

100 M
Each

1
12

3030.00
24.00

3030.00
288.00

elec-1.2.44 25mm PVC bends

Each

12

6.00

Add contr profit @14% on material


Total material cost
b) Labour charges :
elec-8.1.77 Skilled Electrician
elec-8.1.78 Semi skilled Electrician
elec-8.1.85 Helpers
Add area allowence on labour charges @

0.00

72.00
3390.00
0.00
3390.00

2
2
2

400.00
320.00
320.00

800.00
640.00
640.00
416.00

1.4.2
(b)

elec-1.2.3
elec-8.1.10
elec-1.4.12
ele-1.2.39

day
day
day
20%

Add contr profit @14% on Labour


14%
2496.00
349.44
C) Cost for 100 RM
6235.44
Rate per Metre = C/100
62.40
Note : 1. If 25mm dia PVC / MS pipes are used for
light / and
fan Fixing
point, add
the cost
of sheet
metal
/ well
Supply
of 25mm
dia 1.5mm
thick
P.V.C.
pipe (ISI MARK) concealed in wall with
seasoned
wooden
board including
/ box.
all
required
accessories
masonary work for light, fan and separate plug point with
well seasoned TW box including all labour charges etc., complete. Make : Sudhakar/ Maco
Plast / Modi
Taking Output = 100 M
a) Material
25mm dia 1.5mm thick PVC pipe
100 M
1
2420.00
2420.00
U' Links
2
40.00
80.00
100
Nos
8"x10" TW deep boxes
Each
2
44.00
88.00
25mm dia 1,2,3 & 4 way deep Junction Box
Each
12
24.00
288.00

elec-1.2.44 25mm PVC bends


elec-8.1.54 Cement

Each
kg

Add contr profit @14% on material


Total material cost
b) Labour charges :
elec-8.1.77 Skilled Electrician
elec-8.1.78 Semi skilled Electrician
elec-8.1.85 Helpers

0.00

El Data

ohr

2
3
4
5
6
Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs
with all required accessories including masonary work and labour charges etc., complete.
Make : Sudhakar/ Maco Plast / Modi

Taking Output = 100 M


a) Material
elec-1.2.4 25mm dia 2mm thick PVC pipe
ele-1.2.39 25mm dia 1,2,3 & 4 way deep Junction Box

Unit

day
day
day

12
50

6.00
5.60

72.00
280.00
3228.00
0.00
3228.00

2
2
2

400.00
320.00
320.00

800.00
640.00
640.00
P No 176

Description

Index Specific
-code
ation No.

1
2
elec-8.1.79 Mason Ist class
Add area allowence on labour charges @

2.1.1

Unit

QTY

Rate Rs.

3
day
20%

4
2

5
350.00

elec-1.7.1 6A Switch @18/- each


elec-1.7.15 6A 3 way Ceiling Rose@21/-each
elec-1.4.19 25 x 20 cms (10" x8") Hylam sheet 3mm thick

Add contr profit @14% on material


Total material cost
b) Labour charges :
elec-8.1.77 Skilled Electrician
elec-8.1.78 Semi skilled Electrician
elec-8.1.85 Helpers
Add area allowence on labour charges @
Add contr profit @14% on Labour
C) Cost for 6 Points

6
700.00
556.00

each
each
no

1001.00

1001.00

6
6
1

18.00
21.00
44.00

108.00
126.00
44.00

0.00

day
day
day
20%

0.6
1.2
0.6

14%

400.00
320.00
320.00

240.00
384.00
192.00
163.20

979.20

137.09
2095.00
349.20

Wiring with 2 runs of1.0 Sqmm PVC insulated flexible copper cable,(phase,neutral) in the
metalic/nonmetalic conduit pipe with 6A flush type two way switch control, ceiling rose and 3mm thick
hylam sheet covering to MS switch control box including all labour charges etc., complete for staircase
in Residential buildings as required. Make: Finolex L&T.
Rate as per light point in non residential
Building=327.40
For stair case
2.1.4

1.5

327.40

491.10

Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with
earth continuity including wire leads, earth connections along with all labour charges etc., complete.
Makes : Anchor / Gold Medal Olive /Million Zoom
Taking Output = each
a) Material

elec-1.7.4 6A 3 pin / 2 pin Socket


elec-1.7.1 6A 1 way flush type switch
Add contr profit @14% on material
El Data

1279.00
0.00
1279.00

Rate per Point = C/6

ohr

Add contr profit @14% on Labour


14%
3336.00
467.04
C) Cost for 100 RM
7031.04
Rate per Metre = C/100
70.35
Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible
copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick
hylam sheet covering to switch control box including all labour charges etc., comp
Make : Million / RPG/ paragon

Taking Output = 6 Points


a) Material
elec-1.5.1 14/0.3mm (1.00 Sqmm) FRLS PVC insulated 100 M
flexible copper wire

Amount Rs.

each
each
0.00

1
1

27.00
18.00

27.00
18.00
45.00
0.00
P No 177

Index Specific
-code
ation No.

Description

Unit

QTY

Rate Rs.

Amount Rs.
6
45.00

Total material cost


b) Labour charges :

ohr

elec-8.1.77 Skilled Electrician

day

0.067

400.00

26.80

elec-8.1.85 Helpers
Add area allowence on labour charges @

day
20%

0.067

320.00

21.44
9.65

57.89

8.10

Add contr profit @14% on Labour

14%

Rate per each

111.00

Note : Labour Charges proposed for 1point considering


15 per day
6

wiring with 2 runs of 14/0.3(1.0 Sqmm) PVC insulated FR flexible copper cable,
(phase,neutral) in the metalic/nonmetalic conduit pipe with 6A flush type switch control,
switch control box including all labour Charges etc., complete. Make : Phinolex / L&T
Taking out put=15 Points
a) Materials
elec 1.5.1 14/0.3(1.0Sqmm)FRLS
flexible copper wire
elec 1.7.1 6A switch@ 18/- each

PVC

insulated 100M

elec 1.7.4 6A 3pin /2pin socket

1001.00

1001.00

each

15

18.00

270.00

each

15

27.00

405.00

0.00

0.00

Add contractor profit @ 14% on materail.


Total material cost

1676.00

Labour charges :
elec 8.1.77 Skilled Electrician

day

1.5

400.00

600.00

elec 8.1.78 Semi skilled Electricinan

day

1.5

320.00

480.00

elec 8.185 Helpers


Add area allowence on labour charges @
Add contractor profit @ 14% on labour.
Cost for 15.points

day
20%
0%

1.5

320.00

480.00
312.00
0.00
3548.00

Rate per point=/15


7

2.1.5

236.53

Supply and Fixing of 16A 3pin and 6A 3pin plug socket with and 16A switch control duly
recessed in wall with MS switch deep box of 6" x8" x2 1/2" size covered with hylam sheet
including earth connections and all labour charges etc., complete. Plug Socket.
Makes : Gold Medal / ANCHOR/ OLIVE/Million ZOOM.
Taking Output = each

a) Material
elec-1.3.5 20 x 15 cms (8" x6") MS switch deep box
elec-1.4.18 21.6 x 16.6 cms (8.5 x 6.5") 3mm thick hylam
sheet

each
each

1
1

162.00
26.40

162.00
26.40

elec-1.7.11 16A 3 pin / 6A 3pin plug socket (5 in 1)

each

146.00

Add contr profit @14% on material


Total material cost
b) Labour charges :
elec-8.1.77 Skilled Electrician

0.00

146.00
334.40
0.00
334.40

0.1

400.00

40.00

El Data

day

P No 178

Description

Index Specific
-code
ation No.

1
2
elec-8.1.78 Semi Skilled Electrician
elec-8.1.85 Helpers

Unit

QTY

Rate Rs.

3
day
day

4
0.1
0.1

5
320.00
320.00

Add area allowence on labour charges @

20%

Add contr profit @14% on Labour

14%

Amount Rs.

ohr

6
32.00
32.00
20.80

124.80

Rate per each

17.47
476.70

Note : Labour Charges proposed for 10 jobs per day


Supply and fixing of cat-6 RJ-45information outlets including dual face plate with MS box
with modular plate cover with screws connections etc., Makes: Belden/D link/Legrand
a) Material
elec-7.1.5 cat-6 RJ 45 information oulet
1
340.00
340.00

elec-1.3.1 MS box

54.00

54.00
0.00
394.00
0.00
394.00

Add contr profit @14% on material


Total for material
b) Labour charges :
elec-8.1.77 Skilled Electrician

0.00

day

0.2

400.00

80.00

elec-8.1.78 Semi Skilled Electrician

day

0.2

320.00

64.00

elec-8.1.85 Helpers

day

0.12

320.00

38.40

Add area allowence on labour charges @

3.1.2

20%

36.48

Add contr profit @14% on Labour


14%
218.88
30.64
Sundries
C) Cost for each
643.55
Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in
existing pipe for earth continuity including all labour charges etc., complete.
Makes : Finolex / L&T.
Taking Output = 100 M
a) Material

elec-1.5.1 14/0.3mm FR PVC copper cable


Add contr profit @14% on material

100 M

1001.00

0.00

1001.00
0.00

Total material cost

1001.00

b) Labour charges :
elec-8.1.77 Skilled Electrician

day

0.34

400.00

136.00

elec-8.1.78 Semi Skilled Electrician

day

320.00

320.00

elec-8.1.85 Helpers

day

0.34

320.00

108.80

Add area allowence on labour charges @

20%

Add contr profit @14% on Labour

14%

C) Cost for 100 RM


Rate per Metre = C/100

112.96
677.76

94.89
1773.65
17.75

Note : Labour Charges considered for 150 M / day

El Data

P No 179

Description

Index Specific
-code
ation No.
1
3.1.4.a

10

Unit

QTY

Rate Rs.

Amount Rs.

ohr

2
3
4
5
6
Supply and run of 2 of 2.5 Sq mm PVC insulated flexible copper cable and 1 run of 1.00 Sq
mm flexible PVC insulated flexible copper cable in the existing conduit pipe for run of
mains from main panel board to TPN DB'S to swithc boards connections etc.,
Taking Output = 100 M
a) Material

elec-1.5.3 36/0.3mm (2.5 sqmm) FR PVC copper cable

100 M

2389.20

4778.40

elec-1.5.1 14/0.3mm FR PVC copper cable

100 M

1001.00

1001.00

Add contr profit @14% on material


Total material cost
b) Labour charges :

5779.40
0.00
5779.40

0.00

elec-8.1.77 Skilled Electrician (2.0 + 0.5)

day

1.005

400.00

402.00

elec-8.1.78 Semi skilled Electrician (6 + 1.5)

day

320.00

960.00

elec-8.1.85 Helpers (2.0 + 0.5)

day

1.005

320.00

321.60

11

3.1.5

Add area allowence on labour charges @

20%

Add contr profit @14% on Labour


Sundries
C) Cost for 100 RM
Rate per Metre = C/100

14%

Add contr profit @ 14% on material


Total material cost
Labour Charges
Skilled Electrician (1.0 + 0.34)
Semi skilled Electrician (3+1)
Helpers(1.0 + 0.34)
Add area allowence on labour charges @
Add contr profit @ 14% on Labour
Cost per 100 Rmt
Rate per Metre = C/100
3.3.7

2020.32

282.84
8082.56
80.85

Supply and 2 runs of 4.0 sq mm PVC insulated flexible copper cable and 1 run of 2.5 sq.mm
flexible PVC insulated copper cable for earthing in the existing conduit pipe for power point
including labour charges for 16A sockets. Make: Finolex / L&T

elec- 1.5.4 2 run of 4.0 sq.mm wire


elec- 1.5.3 1 run of 2.50 sq. mm wire

12

336.72

1
1

2
1

3650.00
2390.00

7300.00
2390.00
9690.00
0.00
9690.00

1.34
4
1.34

400.00
320.00
320.00

536.00
1280.00
428.80
0.00
0.00
11934.80
119.35

day
day
day
0%
0%

Supply and run of 4 of 10 Sq mm PVC insulated flexible copper cable and 1 run of 4 Sq mm
PVC insulated flexible copper cable in the existing conduit pipe for run of mains from main
panel board to TPN DB'S with pin type lugs and connections etc.,complete
Taking Output = 100 M
a) Material

elec-1.5.6 140/0.3mm (10 Sq.mm) FR PVC flexible 100 M


copper cable
1.5.4
El Data

56/0.3 (4.0 sqmm) FR PVC flexible copper


cable

8600.00

34400.00

3650.00

3650.00
P No 180

Description

Index Specific
-code
ation No.

Unit

QTY

Rate Rs.

Amount Rs.

2
Add contr profit @14% on material
Total material cost
b) Labour charges :
elec-8.1.77 Skilled Electrician (2.0 + 0.5)

day

400.00

800.00

elec-8.1.78 Semi skilled Electrician (6 + 1.5)

day

320.00

1920.00

elec-8.1.85 Helpers (2.0 + 0.5)

day

320.00

640.00

Add area allowence on labour charges @

20%

Add contr profit @14% on Labour


Sundries
C) Cost for 100 RM

14%

ohr

6
0.00
38050.00

672.00
4032.00

564.48
42646.48

Rate per Metre = C/100

426.50

Note : Labour Charges considered for 100 M / day


13

8.2.2

Supply, Transportation and fixing of 4' - 40 Watt box type flourescent single Tube Light
fitting with Energy saving electronic ballast, consuming 28 W suitable for 40 Watt tube on
varnished teak wood round blocks with flexible 3 core wire etc.,, complet Makes : Chowk:
Trinic , tube : Philips / crompton

a) Material
elec-3.6.8 4' x 40 watts box type flourscent light fitting.

14

each

850.50

850.50

elec-3.7.16 Lamp cost of 40W


each
1
45.00
45.00
elec-8.1.35 Tw Round blocks
each
2
6.00
12.00
Rate per each
907.50
Add contr profit @14% on material
0.00
0.00
Total for material
907.50
a) Labour charges
day
0.10
elec-8.1.77 Skilled Electrician
400
40.00
day
0.10
elec-8.1.78 Semi Skilled Electrician
320
32.00
Labour for 1 No
979.50
Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point
complete with all connections and all labour charges with 40W bulb (for new installation).
Makes : Gold Medal /Million / Vimal
Taking Output = each
a) Material
elec-1.7.16 PVC batten holder

each

20.00

20.00

elec-3.7.1 40W bulb

each

12.00

12.00

elec-1.7.15 Deduct Cost of Ceiling Rose

each

21.00

-21.00

Add contr profit @14% on material

11.00
0.00

0.00

Total for material

11.00

b) Labour charges :
elec-8.1.77 Skilled Electrician

day

0.05

400.00

20.00

elec-8.1.85 Helpers

day

0.05

320.00

16.00

El Data

P No 181

Description

Unit

QTY

Rate Rs.

2
Add area allowence on labour charges @

3
20%

6
7.20

Add contr profit @14% on Labour

14%

43.20

6.05

Index Specific
-code
ation No.
1

Rate per each

Amount Rs.

ohr

60.25

Note : 1. The Cost of Ceiling Rose may be


deducted in view of holder.
2. Labour Charges proposed for 20 jobs per day
15

Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball
bearings with all standard accessories.
Makes: Crompton Decora / Bajaj Ultima /Havells Velocity / Usha Astra / Orient PSPO.

a) Material
elec-5.1.1 1200 mm (48") Ceiling Fan

each

Transportation Charges on Unit Cost

16

33

1600.00

1%

16.00

220.00

1600

16.00
1616.00
Add contr profit @14% on material
0.00
0.00
Total material cost
1616.00
Supply and erecting Electronic type regulator for ceiling fans 1200 mm sweep complete
erected on existing board.Make : Anchor / Gold Medal Olive / Million Zoom
a) Material

elec-1.7.14 Steeped type Electronics type Regulator


Add contr profit @14% on material

M
0.00

0.00

Total material cost


b) Labour charges.
elec-8.1.78 Semi skilled Electrician

220.00

220.00
day

0.1

320.00

Sundries.

32.00
21.20

Add area allowence on labour charges @

20%

10.64

Add contr profit @14% on Labour

14%

0.00

Rate per Each

283.85

Note : Labour is Considered for 10 jobs /


day
Labour Charges
17

Labour charges for Fixing of Ceiling fan and regulator including transportation and giving
connections with twin core wire etc., complete.
a) Material
elec-1.6.8 23/0060 Twin Core wire
Unforseen item works, such as painting to
down rod, screws etc.,
Add contr profit @14% on material
Total for material
b) Labour charges.
elec-8.1.77 Skilled Electrician
elec-8.1.85 Helper

El Data

M
LS

1
1

9.90
3.00

12.90
0.00
12.90

0.00

day
day

9.90
3.00

0.125
0.125

400.00
320.00

50.00
40.00
P No 182

Index Specific
-code
ation No.
1

18

Description

Unit

QTY

Rate Rs.

Amount Rs.

2
Add area allowence on labour charges @

3
20%

6
18.00

Add contr profit @14% on Labour


Rate per Each
Note : Labour is Considered for 8 fans / day

14%

108.00

15.12
136.05

ohr

Supply of fresh air exhaust fan of heavy duty 250V A.C.50Hz.. 300mm size (12") 900 R.P.M
etc., complete.
Makes: CG / Bajaj / Havells/ Orient.
a) Material
elec-5.1.14 300mm (12") 900 RPM H.D. Exhaust Fan

each

Transportation Charges on Unit Cost

19

36

elec-1.6.8
elec-8.1.54

elec-8.1.77
elec-8.1.85
elec-8.1.79

2645.00

1%

26.45

2645.00
26.45

Rate per Each


2671.45
Add contr profit @14% on material
0.14
374.00
Total for material
3045.45
Labour charges for fixing of Exhaust fan in wall with necessary connections and masonary
work of making hole, finishing etc., complete
a) Material
23/0060 Twin flat wire
M
1
9.90
9.90
Cement
kg
25
5.60
140.00
149.90
Add contr profit @14% on material
0.14
20.99
Total for material
170.89
b) Labour charges.
Skilled Electrician
day
0.25
400.00
100.00
Helper
day
0.25
320.00
80.00
Mason
day
0.25
350.00
87.50
Add area allowence on labour charges @
20%
53.50
Add contr profit @14% on Labour
Sundries such as Sand, Bolt, Nuts etc.,
Rate per Each

14%

321.00

44.94
3314.78

Note :1. Labour is Considered for 6 jobs /


day
2. Cost of louver shutter may be added if
required.
3. If hole is already made available, labour
charges of Mason shall be deleted.
20

Supply of 1x40W weather proof flourescent streetlight fitting comprising canopy of sheet
Aluminium in stove enamel finish with copper / VPIT ballast, capacitor, tube and starter etc.,
complete. Makes: Phillips / GE / Wipro /Thorn
a) Material
elec-3.1.1 1x40W WP flourscent street light fitting.
elec-3.7.16 Lamp cost of 40W
Add contr profit @14% on material
Total for material

El Data

each
each
0.14

1
1

1400.00
45.00

1400.00
45.00
1445.00
202.30
1647.30
P No 183

Index Specific
-code
ation No.
1
21

Description

Unit

QTY

Amount Rs.

ohr

2
3
4
5
6
Fixing of 40W street light luminaire to the wall with 1.0 Mtr., 25mm dia GI pipe bracket and
anti tilting MS flat etc., including giving connections and labour charges etc., complete.

a) Material
elec-8.1.59 25mm dia G.I pipe light grade
elec-1.6.8 23/0060 twin core flexible copper cable
Pipe bending charges
M.S flat and welding charges
Add contr profit @14% on material
Total for material
b) Labour charges
elec-8.1.77 Skilled Electrician/carpenter
elec-8.1.79 Mason
elec-8.1.78 Semi skilled Electrician / Helper
Add area allowence on labour charges @

M
M
LS
LS

1
2
1
1

205.00
9.90
25.00
35.00

205.00
19.80
25.00
35.00
284.80
0.00
284.80

0.2
0.2
0.2

400.00
350.00
320.00

80.00
70.00
64.00
42.80

256.80

35.95
1974.90

0.00

day
day
day
20%

Add contr profit @14% on Labour


14%
Rate per each
Note : Labour Charges considered for 5
fixtures / day .
22

Rate Rs.

Supply and fixing TPN - Vertical type Distribution board with IP -43 Protection with 125A,
4 Pole 25 kA MCCB as incomer with 4Nos 63A TP MCBs and 12 Nos. 10 kA SPMCBs as
outgoing including internal connection and labour charges for flush mounting etc.
8 way TPN Vertical DB
a) Material
elec.2.12.3 8 Way TPN Vertical DB with IP -43 (Metal
7
door) protection suitable for 125A, 4 Pole,
25kA MCCB as incomer.

Nos

9100.00

9100.00

elec-2.8.2 125 Amps, 4 Pole , 25 kA MCCB


elec-2.9.6 10 kA, 63A TP MCBs:
elec-2.9.1 10kA, 6 to 32A SP MCBs: Rs.184 / Each

Nos
Nos
Nos

0
1
24

7194.00
1477.00
201.00

0.00
1477.00
4824.00
15401.00
0.00
15401.00

day
day
day

1
1
1

400.00
320.00
320.00

400.00
320.00
320.00
0.00
0.00
19.00
16460.00
16460.00

Add contr profit @14% on material


Total material cost
b) Labour charges :
elec-8.1.77 Skilled Electrician
elec-8.1.78 Semi Skilled Electrician
elec-8.1.85 Helpers
Add area allowence on labour charges @
Add contr profit @14% on Labour
Sundries such as T.W. Plugs, Screws, Cement
etc.,
Rate per each
Note : 1. Labour Charges considered for 1
jobsIf / the
day Distribution Boards from Item No.
2.
4.4.1
to 4.4.8
proposed
for concealing, add the
a
1No.
Semi
skilled mason
following:

El Data

LS

1040.00
19.00
Say

P No 184

Index Specific
-code
ation No.
1
b
1/4
bag cement
23

Description

Unit

QTY

Rate Rs.

Amount Rs.

ohr
6

Supply and fixing TPN Distribution board with IP-43 protection (Metal Door) suitable for 3
phase ELCB / RCCB / FP Isolator as incomer and 10kA SP MCBs as outing going including
internal connection and labour charges for flush mounting etc., complete. 40A 4 Pole isolater
1 No 10KA 6-32 A range SPMCBS 8Nos for Outgoing. Make: MDS/GE/L&T
40A FP Isolator - 1 No for incomer, 10kAHanger/SIEMANS/SCHNEIDERS.
6-32A SP MCBs - 12Nos for outgoing.
Taking Output = each
a) Material
elec.2.12.2 4way TPN, D.B with IP-43 Protection (MD)
4
suitable for 3 phase ELCB / RCCB/ FP
Isolator as incommer.

each

2491.00

2491.00

elec-2.10.6 40A, 4 Pole Isolator


elec-2.9.1 10kA - 6-32A range SP MCBs

each
each

1
12

814.00
201.00

Add contr profit @14% on material


Total material cost
b) Labour charges :
elec-8.1.77 Skilled Electrician
elec-8.1.78 Semi Skilled Electrician
elec-8.1.85 Helpers
Add area allowence on labour charges @

0.00

814.00
2412.00
5717.00
0.00
5717.00

0.5
1
1

400.00
320.00
320.00

200.00
320.00
320.00
168.00

1008.00
14.00

141.12
14.00

day
day
day
20%

Add contr profit @14% on Labour


14%
Sundries such as TW Plugs, Screws Cement LS
etc,

Rate per each


6880.12
Note : Labour Charges considered for 2 jobs / day
Supply and fixing TPN Distribution board with IP-43 protection (Metal Door) suitable for 3
phase ELCB / RCCB / FP Isolator as incomer and 10kA SP MCBs as outing going including
internal connection and labour charges for flush mounting etc., complete. 63 A FP Isolater 1
No, 6-32 A SPMCB's 8 Nos .Make :MDS/GE/L&T Hanger/SIEMANS/SCHNEIDERS.

24

40A FP Isolator - 1 No for incomer, 10kA6-32A SP MCBs - 12Nos for outgoing.


Taking Output = each
a) Material
4way TPN, D.B with IP-43 Protection (MD)
suitable for 3 phase ELCB / RCCB/ FP
Isolator as incommer.
elec-2.10.6 63A, 4 Pole Isolator
elec-2.9.1 10kA - 6-32A range SP MCBs
Add contr profit @14% on material
Total material cost
El Data

each

2491.00

2491.00

each
each

1
8

890.00
201.00

890.00
1608.00
4989.00
0.00
4989.00

0.00

P No 185

Description

Index Specific
-code
ation No.
1

Unit

QTY

Rate Rs.

ohr

2
b) Labour charges :
elec-8.1.77 Skilled Electrician
elec-8.1.78 Semi Skilled Electrician

day
day

0.5
1

400.00
320.00

200.00
320.00

elec-8.1.85 Helpers

day

320.00

320.00

Add area allowence on labour charges @

20%

Add contr profit @14% on Labour

14%

Elec4.1.25 supply of 35 sqmm 3.5 core PVC XLPE


armourd cable 1100V Grade with ISI Mark
Standard / Solid Alluminium Conductor.
Make : Universal/NICCO/Torrent/CCI

168.00

Sundries such as TW Plugs, Screws Cement LS


etc,
Rate per each
Note : Labour Charges considered for 2 jobs / day
25

Amount Rs.

1008.00

141.12

14.00

14.00
6152.12

SSR rateRs.246.20.

246.20
26

Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per
size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary
accessories with hume pipe ring duly providing staggered holes
a) Material
Earth Work Excavation of Hard gravel Soil
with small boulder for trench 1st step of size
1.5 x 0.9 x 0.9 m

cum

1.21

122.11

147.75

cum

0.9

150.00

135.00

25.00

25.00

40mm dia 'B' Class G.I pipe


Mtr
25 x 6 mm (1"X 1/4") G.I Flat duly drilled Each
12mm holes (4 Nos) of 200 mm (8") length

2.5
1

301.00
75.00

752.50
75.00

Drilling of 16 Nos through holes of 12mm dia Each


to G.I pipe

16

5.00

80.00

Set
Each
Kg
Kg

4
1
20
20

12.00
100.00
8.00
4.00

Add contr profit @14% on material


0.00
Total material cost
b) labour charges for fixing pipe ring and Each
connections
Semi skilled Electrician
day
Helpers
day

48.00
100.00
160.00
80.00
1603.25
0.00
1603.25

0.5
0.5

320.00
320.00

160.00
160.00

Excavation of Hard disteggrated rocks and


boulders for trench 2nd Step of size 1.2 x 0.6
x 1.2 m (Civil SSR)
25% extra for narrow trench & pit and back
filling with Sand, Coke, Salt etc., and leveling

elec-8.1.12 G.I Nuts, Bolts an Washers


18" dia hume pipe ring
elec-8.1.16 Hard Coke
elec-8.1.17 Salt

El Data

P No 186

Index Specific
-code
ation No.
1

Description
2
Add area allowence on labour charges @

Unit

QTY

Rate Rs.

3
20%

Amount Rs.

ohr

6
64.00

Add contr profit @14% on Labour


14%
384.00
53.76
Sundries
Rate per each
Say
2041.05
Supply and Fixing of 3 phase meter Box, 3 Nos 100 A fuse units, Neutral link, on T.W block
with all accessaries etc., complete for finished items of work.

27

a) Material
elec-2.6.4 100 A Fuse units
100 A neutral links
elec-1.4.7 T.W blocks ( 12" x 15" )
Add contr profit @14% on material
Total for material
b) Labour charges
elec-8.1.77 Skilled Electrician
elec-8.1.85 Helper
Add area allowence on labour charges @

each
each
each

3
1
1

484.00
118.00
99.00

1452.00
118.00
99.00
1669.00
0.00
1669.00

1
4

400.00
320.00

400.00
1280.00
336.00

2016.00

282.24
50.00
4017.25

0.00

day
day
20%

Add contr profit @14% on Labour


14%
Sundires such as Cement, Sand etc.,
Rate per Each
Supply and laying of 2 pair telephone wire in
the existing metallic/non metallic conduit pipe
with connections etc.,complete

28

Makes: million/payal/goldmedal/powerflex

elec-7.1.1

elec-8.1.77
elec-8.1.78
elec-8.1.85

Taking Output = 100 M


a) Material
2 pair telephone wire
Add contr profit @14% on material
Total for material
b) Labour charges :
Skilled Electrician
Semi Skilled Electrician
Helpers
Add area allowence on labour charges @
Add contr profit @14% on Labour
Sundries

100 M
0.00

1010.00

1010.00
0.00
1010.00

day
day
day
20%

0.34
1
0.34

315.00
285.00
285.00

107.10
285.00
96.90
97.80

586.80

82.15

14%

C) Cost for 100 RM


Rate per Metre = C/100
Note : Labour Charges considered for 150 M / day

29

El Data

1678.95
16.80

Supply and fixing of telephone jack type socket with top on MS box with modular plate
cover with screws connections etc., Makes: Gold Medal Olive / Million zoom

P No 187

Description

Unit

QTY

Rate Rs.

elec-1.7.18 telephone jack type socket

48.00

48.00

elec-1.3.1 MS box

54.00

54.00

elec-1.4.22 4x4 sunglass delux board

13.20

13.20

Index Specific
-code
ation No.
1

2
Taking Output = 100 M

Amount Rs.

ohr
6

a) Material

Add contr profit @14% on material

115.20
0.00

0.00

Total for material

115.20

b) Labour charges :
elec-8.1.77 Skilled Electrician

day

0.1

315.00

31.50

elec-8.1.78 Semi Skilled Electrician

day

0.1

285.00

28.50

elec-8.1.85 Helpers

day

0.1

285.00

28.50

Add area allowence on labour charges @

20%

Add contr profit @14% on Labour

14%

17.70
106.20

14.87

Sundries
C) Cost for each
30

236.30

elec3.7.26 Supply of 18W pin type CFL Lamp of


Makes:Wipro/Bajaj/Phillips/Thorn

31

115.00

115.00

Supply and laying of LAN cable Cat-6(A) UTP CABLE in the existing metallic/non metallic
conduit pipe with connections etc.,complete
Makes:D Link/Finolex

elec-7.1.4

elec-8.1.77
elec-8.1.78
elec-8.1.85

Taking Output = 100 M


a) Material
cat-6 UTP LAN cable
Add contr profit @14% on material
Total for material
b) Labour charges :
Skilled Electrician
Semi Skilled Electrician
Helpers
Add area allowence on labour charges @

100 M
0.00

2580.00

2580.00
0.00
2580.00

day
day
day
20%

0.34
1
0.34

315.00
285.00
285.00

107.10
285.00
96.90
97.80

586.80

82.15

Add contr profit @14% on Labour


14%
Sundries
C) Cost for 100 RM
Rate per Metre = C/100
Note : Labour Charges considered for 150 M / day

El Data

3248.95
32.50

P No 188

Index Specific
-code
ation No.
1

El Data

Description

Unit

QTY

Rate Rs.

Amount Rs.

ohr
6

P No 189

Name of the work : Sub Estiate for the work Providing Electrification to Model School
S.
NO
.

Quantity

Description of Work

Unit

Rate (Rs.)
in fig.

Amount
(Rs.)

CONDUIT PIPE

1 1250 RM

#REF!

ONE
RM

#REF!

#REF!

#REF!

ONE
RM

#REF!

#REF!

500 RM

WIRING
3

657 PTS #REF!

POINT

#REF!

#REF!

82 PTS #REF!

POINT

#REF!

#REF!

Supply and fixing of 3 Nos 6A 3 pin wall plug socket with 3 Nos. 6A EACH
switch control on a common switch board with earth continuity
including wire leads, earth connections along with all labour charges
etc., complete.
Makes : Anchor / Gold Medal Olive /Million Zoom

#REF!

#REF!

57

207 PTS Wiring with three runs of 1.0 sq.mm insulated PVC flexible
copper conductor cable (phase, neutral, earth) in the existing
conduit pipe with 6 Amps flush type switch, and 6 A 3/2 pin
socket on Separate switch board etc.,complete as required
Make:Million / Gold Medal

POINT

#REF!

#REF!

6
7

27 NOS #REF!
7 NOS Supply and fixing single phase DB in sheet steel enclosure
with metalic plug and socket with 1 No. 20/32A,10KA
SPMCB ( Motor characteristics MCBs) control including
making connections etc., complete concealing in wall.
Makes : MDS / L&T Hager.

EACH
EACH

#REF!
#REF!

#REF!
#REF!

57 NOS Supply and fixing of cat-6 RJ-45information outlets including dual EACH

#REF!

#REF!

face plate with MS box with modular plate cover with screws
connections etc., Makes: Belden/D link/Legrand

RUN OF MAINS
9

628 RM

Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C.


insulated flexible copper cable in existing pipe for earth
continuity including all labour charges etc., complete.
Makes : Gold Medal / Finolex / RPG/ L&T Hager / Million

ONE
RM

#REF!

#REF!

10 1985 RM

Supply and run of 2 of 2.5 sq.mm PVC insulated flexible


copper cable and one run of 1.0 sq.mm flexible copper wire
for earthing in existing MS conduit pipe for circuits including
labour charges (phase neutral and earth) etc., complete as
required for switch board circuit mains.
Make:Finolex / Gold Medal /L&T/ Million / RPG.

ONE
RM

#REF!

#REF!

11

420 RM

Supply and run of 2 of 2.5 sq.mm PVC insulated flexible


copper cable for earthing in existing MS conduit pipe for
circuits including labour charges (phase neutral and earth)
etc., complete as required for switch board circuit mains.
Make:Finolex / Gold Medal /L&T/ Million / RPG.

ONE
RM

#REF!

#REF!

12

44 RM

Supply and run of 4 of 6 Sq mm PVC insulated flexible


copper cable PVC insulated flexible copper cable in the
existing conduit pipe for run of mains from main panel board
to TPN DB'S with pin type lugs and connections
etc.,complete for Lighting Distribution boards.
Make:Finolex / Gold Medal /L&T/ Million / RPG.

ONE
RM

#REF!

#REF!

13

50 RM

Supply and run of 4 of 10 Sq mm PVC insulated flexible


copper cable PVC insulated flexible copper cable in the
existing conduit pipe for run of mains from main panel board
to TPN DB'S with pin type lugs and connections
etc.,complete for PDB's and AC DBS
Make:Finolex / Gold Medal /L&T/ Million / RPG.

ONE
RM

#REF!

#REF!

14

224 RM

Supply and laying of 2 pair telephone wire in the existing


metallic/non metallic conduit pipe with connections etc.,complete

ONE
RM

#REF!

#REF!

ONE
RM

#REF!

#REF!

Makes: million/payal/goldmedal/powerflex

15

538 RM

Supply and laying of LAN cable Cat-6(A) UTP CABLE in the existing
metallic/non metallic conduit pipe with connections etc.,complete
Makes:D Link/Finolex

16

50 NOS Supply of 3feet length patch cords of make D link make / Beldan / EACH

200.00

10000.00

17

11 NOS Supply and fixing of telephone jack type socket with top on MS box EACH

#REF!

#REF!

Krone

with modular plate cover with screws connections etc., Makes: Gold
Medal Olive / Million zoom

LIGHT FITTINGS
18

306 NOS Supply, Transportation and fixing of 4' - 40 Watt box type flourescent EACH

#REF!

#REF!

19

85 NOS Supply and fixing of batten holder / slanting holder in lieu of ceiling EACH

#REF!

#REF!

20

157 NOS Supply of 1200 mm (48") sweep 230V, A.C 50 Hz.Ceiling fan with 3 EACH

#REF!

#REF!

21

157 NOS Supply and erecting Electronic type regulator for ceiling fans 1200 EACH

#REF!

#REF!

single Tube Light fitting with Energy saving electronic ballast


suitable for 40 Watt tube on varnished teak wood round blocks with
flexible 3 core wire etc.,, complete with all connections including cost
of 40W tube. The fitting shall be under warranty for three years.
Makes: Crompton/Bajaj/Surya/Havells.

rose of light point complete with all connections and all labour
charges with 40W bulb (for new installation).
Makes : Gold Medal /Million / Vimal
Blades and double ball bearings with all standard accessories.
Makes: Crompton Aura / Bajaj R Gold / Havells Festiva / Usha
Premium.

mm sweep complete erected on existing board.

22

157 NOS Labour charges for Fixing of Ceiling fan and regulator including EACH

#REF!

#REF!

23

14 NOS Supply of fresh air exhaust fan of heavy duty 250V A.C.50Hz.. EACH

#REF!

#REF!

24

14 NOS Labour charges for fixing of Exhaust fan in wall with necessary EACH

#REF!

#REF!

25

12 NOS Supply of 1x40W weather proof flourescent streetlight fitting EACH

#REF!

#REF!

26

12 NOS Fixing of 40W street light luminaire to the wall with 1.0 Mtr., 25mm EACH

#REF!

#REF!

27

1 NOS Supply of Integral street light luminaire of 150W HPSV lamp fitting EACH

#REF!

#REF!

28

1 NOS Fixing of MV / SV/MH luminaire on wall with 1.0mt 40mm dia GI EACH

#REF!

#REF!

transportation and giving connections


complete.

with twin core wire etc.,

300mm size (12") 900 R.P.M etc., complete.


Makes: CG / Bajaj / Havells/ Orient.

connections and masonary work of making hole, finishing etc.,


complete
comprising canopy of sheet Aluminium in stove enamel finish with
copper / VPIT ballast, capacitor, tube and starter etc., complete.
Makes: Phillips / GE / Wipro

dia GI pipe bracket and anti tilting MS flat etc., including giving
connections and labour charges etc., complete.

comprises of single piece die cast Aluminium body with copper


wound ballast and capacitor, Ignitor, with pot optics including 150W
HPSV lamp etc., complete.
Makes: Phillips / GE.
pipe bracket and anti-tilting MS flat, 2.5 Sq.mm flexible copper cable
etc.,including all labour charges for mason work and giving
connections etc., complete.

DISTRIBUTION BOARDS
29

2 NOS Supply and fixing TPN - Vertical type Distribution board with IP -43 EACH

#REF!

#REF!

30

8 NOS Supply and fixing of TPN 4 way distribution board board


flushed in wall suitable for single pole outgoing MCB's in
sheet metal enclosure with 63 Amps -4 pole isolator incomer
and 12 nos. 16 to 32 Amps single pole, 10 KA breaking
capacity MCB outgoings including connections and labour
etc. (Lighting DB's)
Makes : MDS / L&T Hager.

EACH

#REF!

#REF!

ONE
RM

#REF!

#REF!

#REF!

#REF!

31

32
33
34

Protection with 125A, 4 Pole 25 kA MCCB as incomer with 4Nos


63A TP MCBs and 12 Nos. 10 kA SPMCBs as outgoing including
internal connection and labour charges for flush mounting etc.,
complete.
Makes: MDS/ L&T Hager

250 RM

Supply of the following PVC XLPE armoured cable 1100 V.


Grade with ISI mark stranded/solid aluminimum conduct
complete., Make: Universal/NICCO/RPG/SURANA/POY
CAB/Paragaon Cables. 3.50Core 25 Sq.mm

2 Nos Supply and fixing of 24 port switches of D link make including EACH
making connections and etc., complete
2 Nos Supply of 17U floor mounting net work rack with power spike
including all accessries of make HCL / Vall
2 Nos Supply and fixing TPN - Vertical type Distribution board with IP -43 EACH
Protection with 1 No. 63A TP MCB as incomer with 24 Nos. 10 kA
SPMCBs as outgoing including internal connection and labour
charges for flush mounting etc., complete.
Makes: MDS/ L&T Hager

CABLES

#REF!
#REF!

#REF!

35

100 Mtrs Supply of 3.5 Core 95 Sq. mm PVC XLPE armoured cable 1100 V.

36

upto 50 Sq,mm
200 Mtrs Earth work excavation of Trench in hard ground soil, laying of U.G cables
1 Mtr
#REF! on sand cushion
#REF! covering th

Grade with ISI mark stranded / solid, aluminimum conductor


complete
Make: Universal / NICCO/ TORRENT/CCI/ FORTUNE ART

1 Mtr

#REF!

#REF!

EARTHING
37

4 NOS Providing independent earthing by excavating a trench to a


depth of 2.1 M in all soild, as per size specified in the Data
using 40 mm dia 'B' Class GI pipe of 2.5 mtrs length with
necessary accessories with hume pipe rings duly providing
staggered holes including filling with equal proportion of salt
and charcoal in layers and all labour charges etc., complete
for smal quarters.

38

1 NO

EACH

Supply and Fixing of 3 phase meter Box, 3 Nos 100 A fuse units, EACH
Neutral link, on T.W block with all accessaries etc., complete for
finished items of work.

#REF!

2521.00

TOTAL:

#REF!

2521.00

#REF!

DATA FOR OIL BOUND DISTEMPER PAINTING


Sl. No.

Description

Quantity

Rate (Rs.) Per Unit

Amount (Rs.)

Painting to new walls with two coats of ready mixed oil bound washable distemper of approved brand and
shade over a base coat of appropriate primer of approved brand, making three coats in all to give an even
shade after thoroughly brushing the surface to remove all dirt and reminds of loose powedered materials
including cost and conveyance of alla materials to work site and all operational, incidental, labour charges
1 etc.. complete for finished item of work as per SS911 for internal walls and ceiling.
Cost of Primer
Lts
0.5
134 Lts
67
Painter 1st Class
Nos
0.08
400.00 No
32
Painter 2nd Class
Nos
0.19
320.00 No
60.8
Add 20% Agency allowence
92.8
0.2
18.56
Cost of Washable Oil Bound Distemper
Lts
1.7
80 Lts
136
Painter 1st Class
Nos
0.36
400.00 No
144
Painter 2nd Class
Nos
0.84
320.00 No
268.8
Add 20% Agency allowence
412.8
0.2
82.56
Cost for 10Sqm
809.72
Add Over Heads 14%
0.14
113.36
Total Cost for 10 Sqm
923.08
Cost for 1 Sqm
92.31

CONVEYANCE CHARGES AS PER COMMON SSR 2009 - 2010

Sl.
No
##

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

PCC
Rubble/Size Cement/Steel/RC
Earth/Sand/
Slabs/Shabad
Lead in
Stone/Cut
C poles/A.C & G.I
Gravel/Murru
Slabs/CC &
Kms
Stone/Coarse
Sheets/Packed
m/Lime/Surki
Laterite
aggregates
materials
Blocks/Wood
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
49.00
50.00
51.00
52.00
53.00
54.00

26.32
36.84
49.12
59.65
70.18
80.70
91.23
101.75
112.28
122.81
133.33
143.86
154.39
164.91
175.44
185.96
196.49
207.02
217.54
228.07
238.60
249.12
259.65
270.18
280.70
291.23
301.75
312.28
322.81
333.33
342.11
350.88
359.65
368.42
377.19
385.96
394.74
403.51
412.28
421.05
429.82
438.60
447.37
456.14
464.91
473.68
482.46
491.23
500.00
508.77
517.54
526.32
535.09
543.86

25.35
35.44
49.12
59.65
70.18
80.70
91.23
101.75
112.28
122.81
133.33
143.86
154.39
164.91
175.44
185.96
196.49
207.02
217.54
228.07
238.60
249.12
259.65
270.18
280.70
291.23
301.75
312.28
322.81
333.33
342.11
350.88
359.65
368.42
377.19
385.96
394.74
403.51
412.28
421.05
429.82
438.60
447.37
456.14
464.91
473.68
482.46
491.23
500.00
508.77
517.54
526.32
535.09
543.86

0.00
7.50
16.26
23.76
31.26
38.76
46.26
53.76
61.26
68.76
76.26
83.76
91.26
98.76
106.26
113.76
121.26
128.76
136.26
143.76
151.26
158.76
166.26
173.76
181.26
188.76
196.26
203.76
211.26
218.76
225.01
231.26
237.51
243.76
250.01
256.26
262.51
268.76
275.01
281.26
287.51
293.76
300.01
306.26
312.51
318.76
325.01
331.26
337.51
343.76
350.01
356.26
362.51
368.76

37.19
52.11
72.28
87.72
103.25
118.68
134.12
149.56
165.00
180.44
195.88
211.32
226.75
242.19
257.63
273.07
288.51
303.95
319.39
334.82
350.26
365.70
381.14
396.58
412.02
427.46
442.89
458.33
473.77
489.21
502.11
515.00
527.89
540.79
553.68
566.58
579.47
592.37
605.26
618.16
631.05
643.95
656.84
669.74
682.63
695.53
708.42
721.32
734.21
747.11
760.00
772.89
785.79
798.68

Water

15.61
21.84
29.12
35.35
41.58
47.81
54.04
60.26
66.49
72.72
78.95
85.18
91.40
97.63
103.86
110.09
116.32
122.54
128.77
135.00
141.23
147.46
153.68
159.91
166.14
172.37
178.60
184.82
191.05
197.28
202.46
207.63
212.81
217.98
223.16
228.33
233.51
238.68
243.86
249.04
254.21
259.39
264.56
269.74
274.91
280.09
285.26
290.44
295.61
300.79
305.96
311.14
316.32
321.49

Bricks

42.19
59.04
78.77
95.61
112.54
129.39
146.23
163.07
179.91
196.75
213.60
230.44
247.28
264.12
280.96
297.81
314.65
331.49
348.33
365.18
382.02
398.86
415.70
432.54
449.39
466.23
483.07
499.91
516.75
533.60
547.63
561.67
575.70
589.74
603.77
617.81
631.84
645.88
659.91
673.95
687.98
702.02
716.05
730.09
744.12
758.16
772.19
786.23
800.26
814.30
828.33
842.37
856.40
870.44

55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115

55.00
56.00
57.00
58.00
59.00
60.00
61.00
62.00
63.00
64.00
65.00
66.00
67.00
68.00
69.00
70.00
71.00
72.00
73.00
74.00
75.00
76.00
77.00
78.00
79.00
80.00
81.00
82.00
83.00
84.00
85.00
86.00
87.00
88.00
89.00
90.00
91.00
92.00
93.00
94.00
95.00
96.00
97.00
98.00
99.00
100.00
101.00
102.00
103.00
104.00
105.00
106.00
107.00
108.00
109.00
110.00
111.00
112.00
113.00
114.00
115.00

552.63
561.40
570.18
578.95
587.72
596.49
605.26
614.04
622.81
631.58
640.35
649.12
657.89
666.67
675.44
684.21
692.98
701.75
710.53
719.30
728.07
736.84
745.61
754.39
763.16
771.93
780.70
789.47
798.25
807.02
815.79
824.56
833.33
842.11
850.88
859.65
868.42
877.19
885.96
894.74
903.51
912.28
921.05
929.82
938.60
947.37
956.14
964.91
973.68
982.46
991.23
1000.00
1008.77
1017.54
1026.32
1035.09
1043.86
1052.63
1061.40
1070.18
1078.95

552.63
561.40
570.18
578.95
587.72
596.49
605.26
614.04
622.81
631.58
640.35
649.12
657.89
666.67
675.44
684.21
692.98
701.75
710.53
719.30
728.07
736.84
745.61
754.39
763.16
771.93
780.70
789.47
798.25
807.02
815.79
824.56
833.33
842.11
850.88
859.65
868.42
877.19
885.96
894.74
903.51
912.28
921.05
929.82
938.60
947.37
956.14
964.91
973.68
982.46
991.23
1000.00
1008.77
1017.54
1026.32
1035.09
1043.86
1052.63
1061.40
1070.18
1078.95

375.01
381.26
387.51
393.76
400.01
406.26
412.51
418.76
425.01
431.26
437.51
443.76
450.01
456.26
462.51
468.76
475.01
481.26
487.51
493.76
500.01
506.26
512.51
518.76
525.01
531.26
537.51
543.76
550.01
556.26
562.51
568.76
575.01
581.26
587.51
593.76
600.01
606.26
612.51
618.76
625.01
631.26
637.51
643.76
650.01
656.26
662.51
668.76
675.01
681.26
687.51
693.76
700.01
706.26
712.51
718.76
725.01
731.26
737.51
743.76
750.01

811.58
824.47
837.37
850.26
863.16
876.05
888.95
901.84
914.74
927.63
940.53
953.42
966.32
979.21
992.11
1005.00
1017.89
1030.79
1043.68
1056.58
1069.47
1082.37
1095.26
1108.16
1121.05
1133.95
1146.84
1159.74
1172.63
1185.53
1198.42
1211.32
1224.21
1237.11
1250.00
1262.89
1275.79
1288.68
1301.58
1314.47
1327.37
1340.26
1353.16
1366.05
1378.95
1391.84
1404.74
1417.63
1430.53
1443.42
1456.32
1469.21
1482.11
1495.00
1507.89
1520.79
1533.68
1546.58
1559.47
1572.37
1585.26

326.67
331.84
337.02
342.19
347.37
352.54
357.72
362.89
368.07
373.25
378.42
383.60
388.77
393.95
399.12
404.30
409.47
414.65
419.82
425.00
430.18
435.35
440.53
445.70
450.88
456.05
461.23
466.40
471.58
476.75
481.93
487.11
492.28
497.46
502.63
507.81
512.98
518.16
523.33
528.51
533.68
538.86
544.04
549.21
554.39
559.56
564.74
569.91
575.09
580.26
585.44
590.61
595.79
600.96
606.14
611.32
616.49
621.67
626.84
632.02
637.19

884.47
898.51
912.54
926.58
940.61
954.65
968.68
982.72
996.75
1010.79
1024.82
1038.86
1052.89
1066.93
1080.96
1095.00
1109.04
1123.07
1137.11
1151.14
1165.18
1179.21
1193.25
1207.28
1221.32
1235.35
1249.39
1263.42
1277.46
1291.49
1305.53
1319.56
1333.60
1347.63
1361.67
1375.70
1389.74
1403.77
1417.81
1431.84
1445.88
1459.91
1473.95
1487.98
1502.02
1516.05
1530.09
1544.12
1558.16
1572.19
1586.23
1600.26
1614.30
1628.33
1642.37
1656.40
1670.44
1684.47
1698.51
1712.54
1726.58

116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176

116.00
117.00
118.00
119.00
120.00
121.00
122.00
123.00
124.00
125.00
126.00
127.00
128.00
129.00
130.00
131.00
132.00
133.00
134.00
135.00
136.00
137.00
138.00
139.00
140.00
141.00
142.00
143.00
144.00
145.00
146.00
147.00
148.00
149.00
150.00
151.00
152.00
153.00
154.00
155.00
156.00
157.00
158.00
159.00
160.00
161.00
162.00
163.00
164.00
165.00
166.00
167.00
168.00
169.00
170.00
171.00
172.00
173.00
174.00
175.00
176.00

1087.72
1096.49
1105.26
1114.04
1122.81
1131.58
1140.35
1149.12
1157.89
1166.67
1175.44
1184.21
1192.98
1201.75
1210.53
1219.30
1228.07
1236.84
1245.61
1254.39
1263.16
1271.93
1280.70
1289.47
1298.25
1307.02
1315.79
1324.56
1333.33
1342.11
1350.88
1359.65
1368.42
1377.19
1385.96
1394.74
1403.51
1412.28
1421.05
1429.82
1438.60
1447.37
1456.14
1464.91
1473.68
1482.46
1491.23
1500.00
1508.77
1517.54
1526.32
1535.09
1543.86
1552.63
1561.40
1570.18
1578.95
1587.72
1596.49
1605.26
1614.04

1087.72
1096.49
1105.26
1114.04
1122.81
1131.58
1140.35
1149.12
1157.89
1166.67
1175.44
1184.21
1192.98
1201.75
1210.53
1219.30
1228.07
1236.84
1245.61
1254.39
1263.16
1271.93
1280.70
1289.47
1298.25
1307.02
1315.79
1324.56
1333.33
1342.11
1350.88
1359.65
1368.42
1377.19
1385.96
1394.74
1403.51
1412.28
1421.05
1429.82
1438.60
1447.37
1456.14
1464.91
1473.68
1482.46
1491.23
1500.00
1508.77
1517.54
1526.32
1535.09
1543.86
1552.63
1561.40
1570.18
1578.95
1587.72
1596.49
1605.26
1614.04

756.26
762.51
768.76
775.01
781.26
787.51
793.76
800.01
806.26
812.51
818.76
825.01
831.26
837.51
843.76
850.01
856.26
862.51
868.76
875.01
881.26
887.51
893.76
900.01
906.26
912.51
918.76
925.01
931.26
937.51
943.76
950.01
956.26
962.51
968.76
975.01
981.26
987.51
993.76
1000.01
1006.26
1012.51
1018.76
1025.01
1031.26
1037.51
1043.76
1050.01
1056.26
1062.51
1068.76
1075.01
1081.26
1087.51
1093.76
1100.01
1106.26
1112.51
1118.76
1125.01
1131.26

1598.16
1611.05
1623.95
1636.84
1649.74
1662.63
1675.53
1688.42
1701.32
1714.21
1727.11
1740.00
1752.89
1765.79
1778.68
1791.58
1804.47
1817.37
1830.26
1843.16
1856.05
1868.95
1881.84
1894.74
1907.63
1920.53
1933.42
1946.32
1959.21
1972.11
1985.00
1997.89
2010.79
2023.68
2036.58
2049.47
2062.37
2075.26
2088.16
2101.05
2113.95
2126.84
2139.74
2152.63
2165.53
2178.42
2191.32
2204.21
2217.11
2230.00
2242.89
2255.79
2268.68
2281.58
2294.47
2307.37
2320.26
2333.16
2346.05
2358.95
2371.84

642.37
647.54
652.72
657.89
663.07
668.25
673.42
678.60
683.77
688.95
694.12
699.30
704.47
709.65
714.82
720.00
725.18
730.35
735.53
740.70
745.88
751.05
756.23
761.40
766.58
771.75
776.93
782.11
787.28
792.46
797.63
802.81
807.98
813.16
818.33
823.51
828.68
833.86
839.04
844.21
849.39
854.56
859.74
864.91
870.09
875.26
880.44
885.61
890.79
895.96
901.14
906.32
911.49
916.67
921.84
927.02
932.19
937.37
942.54
947.72
952.89

1740.61
1754.65
1768.68
1782.72
1796.75
1810.79
1824.82
1838.86
1852.89
1866.93
1880.96
1895.00
1909.04
1923.07
1937.11
1951.14
1965.18
1979.21
1993.25
2007.28
2021.32
2035.35
2049.39
2063.42
2077.46
2091.49
2105.53
2119.56
2133.60
2147.63
2161.67
2175.70
2189.74
2203.77
2217.81
2231.84
2245.88
2259.91
2273.95
2287.98
2302.02
2316.05
2330.09
2344.12
2358.16
2372.19
2386.23
2400.26
2414.30
2428.33
2442.37
2456.40
2470.44
2484.47
2498.51
2512.54
2526.58
2540.61
2554.65
2568.68
2582.72

177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237

177.00
178.00
179.00
180.00
181.00
182.00
183.00
184.00
185.00
186.00
187.00
188.00
189.00
190.00
191.00
192.00
193.00
194.00
195.00
196.00
197.00
198.00
199.00
200.00
201.00
202.00
203.00
204.00
205.00
206.00
207.00
208.00
209.00
210.00
211.00
212.00
213.00
214.00
215.00
216.00
217.00
218.00
219.00
220.00
221.00
222.00
223.00
224.00
225.00
226.00
227.00
228.00
229.00
230.00
231.00
232.00
233.00
234.00
235.00
236.00
237.00

1622.81
1631.58
1640.35
1649.12
1657.89
1666.67
1675.44
1684.21
1692.98
1701.75
1710.53
1719.30
1728.07
1736.84
1745.61
1754.39
1763.16
1771.93
1780.70
1789.47
1798.25
1807.02
1815.79
1824.56
1833.33
1842.11
1850.88
1859.65
1868.42
1877.19
1885.96
1894.74
1903.51
1912.28
1921.05
1929.82
1938.60
1947.37
1956.14
1964.91
1973.68
1982.46
1991.23
2000.00
2008.77
2017.54
2026.32
2035.09
2043.86
2052.63
2061.40
2070.18
2078.95
2087.72
2096.49
2105.26
2114.04
2122.81
2131.58
2140.35
2149.12

1622.81
1631.58
1640.35
1649.12
1657.89
1666.67
1675.44
1684.21
1692.98
1701.75
1710.53
1719.30
1728.07
1736.84
1745.61
1754.39
1763.16
1771.93
1780.70
1789.47
1798.25
1807.02
1815.79
1824.56
1833.33
1842.11
1850.88
1859.65
1868.42
1877.19
1885.96
1894.74
1903.51
1912.28
1921.05
1929.82
1938.60
1947.37
1956.14
1964.91
1973.68
1982.46
1991.23
2000.00
2008.77
2017.54
2026.32
2035.09
2043.86
2052.63
2061.40
2070.18
2078.95
2087.72
2096.49
2105.26
2114.04
2122.81
2131.58
2140.35
2149.12

1137.51
1143.76
1150.01
1156.26
1162.51
1168.76
1175.01
1181.26
1187.51
1193.76
1200.01
1206.26
1212.51
1218.76
1225.01
1231.26
1237.51
1243.76
1250.01
1256.26
1262.51
1268.76
1275.01
1281.26
1287.51
1293.76
1300.01
1306.26
1312.51
1318.76
1325.01
1331.26
1337.51
1343.76
1350.01
1356.26
1362.51
1368.76
1375.01
1381.26
1387.51
1393.76
1400.01
1406.26
1412.51
1418.76
1425.01
1431.26
1437.51
1443.76
1450.01
1456.26
1462.51
1468.76
1475.01
1481.26
1487.51
1493.76
1500.01
1506.26
1512.51

2384.74
2397.63
2410.53
2423.42
2436.32
2449.21
2462.11
2475.00
2487.89
2500.79
2513.68
2526.58
2539.47
2552.37
2565.26
2578.16
2591.05
2603.95
2616.84
2629.74
2642.63
2655.53
2668.42
2681.32
2694.21
2707.11
2720.00
2732.89
2745.79
2758.68
2771.58
2784.47
2797.37
2810.26
2823.16
2836.05
2848.95
2861.84
2874.74
2887.63
2900.53
2913.42
2926.32
2939.21
2952.11
2965.00
2977.89
2990.79
3003.68
3016.58
3029.47
3042.37
3055.26
3068.16
3081.05
3093.95
3106.84
3119.74
3132.63
3145.53
3158.42

958.07
963.25
968.42
973.60
978.77
983.95
989.12
994.30
999.47
1004.65
1009.82
1015.00
1020.18
1025.35
1030.53
1035.70
1040.88
1046.05
1051.23
1056.40
1061.58
1066.75
1071.93
1077.11
1082.28
1087.46
1092.63
1097.81
1102.98
1108.16
1113.33
1118.51
1123.68
1128.86
1134.04
1139.21
1144.39
1149.56
1154.74
1159.91
1165.09
1170.26
1175.44
1180.61
1185.79
1190.96
1196.14
1201.32
1206.49
1211.67
1216.84
1222.02
1227.19
1232.37
1237.54
1242.72
1247.89
1253.07
1258.25
1263.42
1268.60

2596.75
2610.79
2624.82
2638.86
2652.89
2666.93
2680.96
2695.00
2709.04
2723.07
2737.11
2751.14
2765.18
2779.21
2793.25
2807.28
2821.32
2835.35
2849.39
2863.42
2877.46
2891.49
2905.53
2919.56
2933.60
2947.63
2961.67
2975.70
2989.74
3003.77
3017.81
3031.84
3045.88
3059.91
3073.95
3087.98
3102.02
3116.05
3130.09
3144.12
3158.16
3172.19
3186.23
3200.26
3214.30
3228.33
3242.37
3256.40
3270.44
3284.47
3298.51
3312.54
3326.58
3340.61
3354.65
3368.68
3382.72
3396.75
3410.79
3424.82
3438.86

238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298

238.00
239.00
240.00
241.00
242.00
243.00
244.00
245.00
246.00
247.00
248.00
249.00
250.00
251.00
252.00
253.00
254.00
255.00
256.00
257.00
258.00
259.00
260.00
261.00
262.00
263.00
264.00
265.00
266.00
267.00
268.00
269.00
270.00
271.00
272.00
273.00
274.00
275.00
276.00
277.00
278.00
279.00
280.00
281.00
282.00
283.00
284.00
285.00
286.00
287.00
288.00
289.00
290.00
291.00
292.00
293.00
294.00
295.00
296.00
297.00
298.00

2157.89
2166.67
2175.44
2184.21
2192.98
2201.75
2210.53
2219.30
2228.07
2236.84
2245.61
2254.39
2263.16
2271.93
2280.70
2289.47
2298.25
2307.02
2315.79
2324.56
2333.33
2342.11
2350.88
2359.65
2368.42
2377.19
2385.96
2394.74
2403.51
2412.28
2421.05
2429.82
2438.60
2447.37
2456.14
2464.91
2473.68
2482.46
2491.23
2500.00
2508.77
2517.54
2526.32
2535.09
2543.86
2552.63
2561.40
2570.18
2578.95
2587.72
2596.49
2605.26
2614.04
2622.81
2631.58
2640.35
2649.12
2657.89
2666.67
2675.44
2684.21

2157.89
2166.67
2175.44
2184.21
2192.98
2201.75
2210.53
2219.30
2228.07
2236.84
2245.61
2254.39
2263.16
2271.93
2280.70
2289.47
2298.25
2307.02
2315.79
2324.56
2333.33
2342.11
2350.88
2359.65
2368.42
2377.19
2385.96
2394.74
2403.51
2412.28
2421.05
2429.82
2438.60
2447.37
2456.14
2464.91
2473.68
2482.46
2491.23
2500.00
2508.77
2517.54
2526.32
2535.09
2543.86
2552.63
2561.40
2570.18
2578.95
2587.72
2596.49
2605.26
2614.04
2622.81
2631.58
2640.35
2649.12
2657.89
2666.67
2675.44
2684.21

1518.76
1525.01
1531.26
1537.51
1543.76
1550.01
1556.26
1562.51
1568.76
1575.01
1581.26
1587.51
1593.76
1600.01
1606.26
1612.51
1618.76
1625.01
1631.26
1637.51
1643.76
1650.01
1656.26
1662.51
1668.76
1675.01
1681.26
1687.51
1693.76
1700.01
1706.26
1712.51
1718.76
1725.01
1731.26
1737.51
1743.76
1750.01
1756.26
1762.51
1768.76
1775.01
1781.26
1787.51
1793.76
1800.01
1806.26
1812.51
1818.76
1825.01
1831.26
1837.51
1843.76
1850.01
1856.26
1862.51
1868.76
1875.01
1881.26
1887.51
1893.76

3171.32
3184.21
3197.11
3210.00
3222.89
3235.79
3248.68
3261.58
3274.47
3287.37
3300.26
3313.16
3326.05
3338.95
3351.84
3364.74
3377.63
3390.53
3403.42
3416.32
3429.21
3442.11
3455.00
3467.89
3480.79
3493.68
3506.58
3519.47
3532.37
3545.26
3558.16
3571.05
3583.95
3596.84
3609.74
3622.63
3635.53
3648.42
3661.32
3674.21
3687.11
3700.00
3712.89
3725.79
3738.68
3751.58
3764.47
3777.37
3790.26
3803.16
3816.05
3828.95
3841.84
3854.74
3867.63
3880.53
3893.42
3906.32
3919.21
3932.11
3945.00

1273.77
1278.95
1284.12
1289.30
1294.47
1299.65
1304.82
1310.00
1315.18
1320.35
1325.53
1330.70
1335.88
1341.05
1346.23
1351.40
1356.58
1361.75
1366.93
1372.11
1377.28
1382.46
1387.63
1392.81
1397.98
1403.16
1408.33
1413.51
1418.68
1423.86
1429.04
1434.21
1439.39
1444.56
1449.74
1454.91
1460.09
1465.26
1470.44
1475.61
1480.79
1485.96
1491.14
1496.32
1501.49
1506.67
1511.84
1517.02
1522.19
1527.37
1532.54
1537.72
1542.89
1548.07
1553.25
1558.42
1563.60
1568.77
1573.95
1579.12
1584.30

3452.89
3466.93
3480.96
3495.00
3509.04
3523.07
3537.11
3551.14
3565.18
3579.21
3593.25
3607.28
3621.32
3635.35
3649.39
3663.42
3677.46
3691.49
3705.53
3719.56
3733.60
3747.63
3761.67
3775.70
3789.74
3803.77
3817.81
3831.84
3845.88
3859.91
3873.95
3887.98
3902.02
3916.05
3930.09
3944.12
3958.16
3972.19
3986.23
4000.26
4014.30
4028.33
4042.37
4056.40
4070.44
4084.47
4098.51
4112.54
4126.58
4140.61
4154.65
4168.68
4182.72
4196.75
4210.79
4224.82
4238.86
4252.89
4266.93
4280.96
4295.00

299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359

299.00
300.00
301.00
302.00
303.00
304.00
305.00
306.00
307.00
308.00
309.00
310.00
311.00
312.00
313.00
314.00
315.00
316.00
317.00
318.00
319.00
320.00
321.00
322.00
323.00
324.00
325.00
326.00
327.00
328.00
329.00
330.00
331.00
332.00
333.00
334.00
335.00
336.00
337.00
338.00
339.00
340.00
341.00
342.00
343.00
344.00
345.00
346.00
347.00
348.00
349.00
350.00
351.00
352.00
353.00
354.00
355.00
356.00
357.00
358.00
359.00

2692.98
2701.75
2710.53
2719.30
2728.07
2736.84
2745.61
2754.39
2763.16
2771.93
2780.70
2789.47
2798.25
2807.02
2815.79
2824.56
2833.33
2842.11
2850.88
2859.65
2868.42
2877.19
2885.96
2894.74
2903.51
2912.28
2921.05
2929.82
2938.60
2947.37
2956.14
2964.91
2973.68
2982.46
2991.23
3000.00
3008.77
3017.54
3026.32
3035.09
3043.86
3052.63
3061.40
3070.18
3078.95
3087.72
3096.49
3105.26
3114.04
3122.81
3131.58
3140.35
3149.12
3157.89
3166.67
3175.44
3184.21
3192.98
3201.75
3210.53
3219.30

2692.98
2701.75
2710.53
2719.30
2728.07
2736.84
2745.61
2754.39
2763.16
2771.93
2780.70
2789.47
2798.25
2807.02
2815.79
2824.56
2833.33
2842.11
2850.88
2859.65
2868.42
2877.19
2885.96
2894.74
2903.51
2912.28
2921.05
2929.82
2938.60
2947.37
2956.14
2964.91
2973.68
2982.46
2991.23
3000.00
3008.77
3017.54
3026.32
3035.09
3043.86
3052.63
3061.40
3070.18
3078.95
3087.72
3096.49
3105.26
3114.04
3122.81
3131.58
3140.35
3149.12
3157.89
3166.67
3175.44
3184.21
3192.98
3201.75
3210.53
3219.30

1900.01
1906.26
1912.51
1918.76
1925.01
1931.26
1937.51
1943.76
1950.01
1956.26
1962.51
1968.76
1975.01
1981.26
1987.51
1993.76
2000.01
2006.26
2012.51
2018.76
2025.01
2031.26
2037.51
2043.76
2050.01
2056.26
2062.51
2068.76
2075.01
2081.26
2087.51
2093.76
2100.01
2106.26
2112.51
2118.76
2125.01
2131.26
2137.51
2143.76
2150.01
2156.26
2162.51
2168.76
2175.01
2181.26
2187.51
2193.76
2200.01
2206.26
2212.51
2218.76
2225.01
2231.26
2237.51
2243.76
2250.01
2256.26
2262.51
2268.76
2275.01

3957.89
3970.79
3983.68
3996.58
4009.47
4022.37
4035.26
4048.16
4061.05
4073.95
4086.84
4099.74
4112.63
4125.53
4138.42
4151.32
4164.21
4177.11
4190.00
4202.89
4215.79
4228.68
4241.58
4254.47
4267.37
4280.26
4293.16
4306.05
4318.95
4331.84
4344.74
4357.63
4370.53
4383.42
4396.32
4409.21
4422.11
4435.00
4447.89
4460.79
4473.68
4486.58
4499.47
4512.37
4525.26
4538.16
4551.05
4563.95
4576.84
4589.74
4602.63
4615.53
4628.42
4641.32
4654.21
4667.11
4680.00
4692.89
4705.79
4718.68
4731.58

1589.47
1594.65
1599.82
1605.00
1610.18
1615.35
1620.53
1625.70
1630.88
1636.05
1641.23
1646.40
1651.58
1656.75
1661.93
1667.11
1672.28
1677.46
1682.63
1687.81
1692.98
1698.16
1703.33
1708.51
1713.68
1718.86
1724.04
1729.21
1734.39
1739.56
1744.74
1749.91
1755.09
1760.26
1765.44
1770.61
1775.79
1780.96
1786.14
1791.32
1796.49
1801.67
1806.84
1812.02
1817.19
1822.37
1827.54
1832.72
1837.89
1843.07
1848.25
1853.42
1858.60
1863.77
1868.95
1874.12
1879.30
1884.47
1889.65
1894.82
1900.00

4309.04
4323.07
4337.11
4351.14
4365.18
4379.21
4393.25
4407.28
4421.32
4435.35
4449.39
4463.42
4477.46
4491.49
4505.53
4519.56
4533.60
4547.63
4561.67
4575.70
4589.74
4603.77
4617.81
4631.84
4645.88
4659.91
4673.95
4687.98
4702.02
4716.05
4730.09
4744.12
4758.16
4772.19
4786.23
4800.26
4814.30
4828.33
4842.37
4856.40
4870.44
4884.47
4898.51
4912.54
4926.58
4940.61
4954.65
4968.68
4982.72
4996.75
5010.79
5024.82
5038.86
5052.89
5066.93
5080.96
5095.00
5109.04
5123.07
5137.11
5151.14

360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420

360.00
361.00
362.00
363.00
364.00
365.00
366.00
367.00
368.00
369.00
370.00
371.00
372.00
373.00
374.00
375.00
376.00
377.00
378.00
379.00
380.00
381.00
382.00
383.00
384.00
385.00
386.00
387.00
388.00
389.00
390.00
391.00
392.00
393.00
394.00
395.00
396.00
397.00
398.00
399.00
400.00
401.00
402.00
403.00
404.00
405.00
406.00
407.00
408.00
409.00
410.00
411.00
412.00
413.00
414.00
415.00
416.00
417.00
418.00
419.00
420.00

3228.07
3236.84
3245.61
3254.39
3263.16
3271.93
3280.70
3289.47
3298.25
3307.02
3315.79
3324.56
3333.33
3342.11
3350.88
3359.65
3368.42
3377.19
3385.96
3394.74
3403.51
3412.28
3421.05
3429.82
3438.60
3447.37
3456.14
3464.91
3473.68
3482.46
3491.23
3500.00
3508.77
3517.54
3526.32
3535.09
3543.86
3552.63
3561.40
3570.18
3578.95
3587.72
3596.49
3605.26
3614.04
3622.81
3631.58
3640.35
3649.12
3657.89
3666.67
3675.44
3684.21
3692.98
3701.75
3710.53
3719.30
3728.07
3736.84
3745.61
3754.39

3228.07
3236.84
3245.61
3254.39
3263.16
3271.93
3280.70
3289.47
3298.25
3307.02
3315.79
3324.56
3333.33
3342.11
3350.88
3359.65
3368.42
3377.19
3385.96
3394.74
3403.51
3412.28
3421.05
3429.82
3438.60
3447.37
3456.14
3464.91
3473.68
3482.46
3491.23
3500.00
3508.77
3517.54
3526.32
3535.09
3543.86
3552.63
3561.40
3570.18
3578.95
3587.72
3596.49
3605.26
3614.04
3622.81
3631.58
3640.35
3649.12
3657.89
3666.67
3675.44
3684.21
3692.98
3701.75
3710.53
3719.30
3728.07
3736.84
3745.61
3754.39

2281.26
2287.51
2293.76
2300.01
2306.26
2312.51
2318.76
2325.01
2331.26
2337.51
2343.76
2350.01
2356.26
2362.51
2368.76
2375.01
2381.26
2387.51
2393.76
2400.01
2406.26
2412.51
2418.76
2425.01
2431.26
2437.51
2443.76
2450.01
2456.26
2462.51
2468.76
2475.01
2481.26
2487.51
2493.76
2500.01
2506.26
2512.51
2518.76
2525.01
2531.26
2537.51
2543.76
2550.01
2556.26
2562.51
2568.76
2575.01
2581.26
2587.51
2593.76
2600.01
2606.26
2612.51
2618.76
2625.01
2631.26
2637.51
2643.76
2650.01
2656.26

4744.47
4757.37
4770.26
4783.16
4796.05
4808.95
4821.84
4834.74
4847.63
4860.53
4873.42
4886.32
4899.21
4912.11
4925.00
4937.89
4950.79
4963.68
4976.58
4989.47
5002.37
5015.26
5028.16
5041.05
5053.95
5066.84
5079.74
5092.63
5105.53
5118.42
5131.32
5144.21
5157.11
5170.00
5182.89
5195.79
5208.68
5221.58
5234.47
5247.37
5260.26
5273.16
5286.05
5298.95
5311.84
5324.74
5337.63
5350.53
5363.42
5376.32
5389.21
5402.11
5415.00
5427.89
5440.79
5453.68
5466.58
5479.47
5492.37
5505.26
5518.16

1905.18
1910.35
1915.53
1920.70
1925.88
1931.05
1936.23
1941.40
1946.58
1951.75
1956.93
1962.11
1967.28
1972.46
1977.63
1982.81
1987.98
1993.16
1998.33
2003.51
2008.68
2013.86
2019.04
2024.21
2029.39
2034.56
2039.74
2044.91
2050.09
2055.26
2060.44
2065.61
2070.79
2075.96
2081.14
2086.32
2091.49
2096.67
2101.84
2107.02
2112.19
2117.37
2122.54
2127.72
2132.89
2138.07
2143.25
2148.42
2153.60
2158.77
2163.95
2169.12
2174.30
2179.47
2184.65
2189.82
2195.00
2200.18
2205.35
2210.53
2215.70

5165.18
5179.21
5193.25
5207.28
5221.32
5235.35
5249.39
5263.42
5277.46
5291.49
5305.53
5319.56
5333.60
5347.63
5361.67
5375.70
5389.74
5403.77
5417.81
5431.84
5445.88
5459.91
5473.95
5487.98
5502.02
5516.05
5530.09
5544.12
5558.16
5572.19
5586.23
5600.26
5614.30
5628.33
5642.37
5656.40
5670.44
5684.47
5698.51
5712.54
5726.58
5740.61
5754.65
5768.68
5782.72
5796.75
5810.79
5824.82
5838.86
5852.89
5866.93
5880.96
5895.00
5909.04
5923.07
5937.11
5951.14
5965.18
5979.21
5993.25
6007.28

421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481

421.00
422.00
423.00
424.00
425.00
426.00
427.00
428.00
429.00
430.00
431.00
432.00
433.00
434.00
435.00
436.00
437.00
438.00
439.00
440.00
441.00
442.00
443.00
444.00
445.00
446.00
447.00
448.00
449.00
450.00
451.00
452.00
453.00
454.00
455.00
456.00
457.00
458.00
459.00
460.00
461.00
462.00
463.00
464.00
465.00
466.00
467.00
468.00
469.00
470.00
471.00
472.00
473.00
474.00
475.00
476.00
477.00
478.00
479.00
480.00
481.00

3763.16
3771.93
3780.70
3789.47
3798.25
3807.02
3815.79
3824.56
3833.33
3842.11
3850.88
3859.65
3868.42
3877.19
3885.96
3894.74
3903.51
3912.28
3921.05
3929.82
3938.60
3947.37
3956.14
3964.91
3973.68
3982.46
3991.23
4000.00
4008.77
4017.54
4026.32
4035.09
4043.86
4052.63
4061.40
4070.18
4078.95
4087.72
4096.49
4105.26
4114.04
4122.81
4131.58
4140.35
4149.12
4157.89
4166.67
4175.44
4184.21
4192.98
4201.75
4210.53
4219.30
4228.07
4236.84
4245.61
4254.39
4263.16
4271.93
4280.70
4289.47

3763.16
3771.93
3780.70
3789.47
3798.25
3807.02
3815.79
3824.56
3833.33
3842.11
3850.88
3859.65
3868.42
3877.19
3885.96
3894.74
3903.51
3912.28
3921.05
3929.82
3938.60
3947.37
3956.14
3964.91
3973.68
3982.46
3991.23
4000.00
4008.77
4017.54
4026.32
4035.09
4043.86
4052.63
4061.40
4070.18
4078.95
4087.72
4096.49
4105.26
4114.04
4122.81
4131.58
4140.35
4149.12
4157.89
4166.67
4175.44
4184.21
4192.98
4201.75
4210.53
4219.30
4228.07
4236.84
4245.61
4254.39
4263.16
4271.93
4280.70
4289.47

2662.51
2668.76
2675.01
2681.26
2687.51
2693.76
2700.01
2706.26
2712.51
2718.76
2725.01
2731.26
2737.51
2743.76
2750.01
2756.26
2762.51
2768.76
2775.01
2781.26
2787.51
2793.76
2800.01
2806.26
2812.51
2818.76
2825.01
2831.26
2837.51
2843.76
2850.01
2856.26
2862.51
2868.76
2875.01
2881.26
2887.51
2893.76
2900.01
2906.26
2912.51
2918.76
2925.01
2931.26
2937.51
2943.76
2950.01
2956.26
2962.51
2968.76
2975.01
2981.26
2987.51
2993.76
3000.01
3006.26
3012.51
3018.76
3025.01
3031.26
3037.51

5531.05
5543.95
5556.84
5569.74
5582.63
5595.53
5608.42
5621.32
5634.21
5647.11
5660.00
5672.89
5685.79
5698.68
5711.58
5724.47
5737.37
5750.26
5763.16
5776.05
5788.95
5801.84
5814.74
5827.63
5840.53
5853.42
5866.32
5879.21
5892.11
5905.00
5917.89
5930.79
5943.68
5956.58
5969.47
5982.37
5995.26
6008.16
6021.05
6033.95
6046.84
6059.74
6072.63
6085.53
6098.42
6111.32
6124.21
6137.11
6150.00
6162.89
6175.79
6188.68
6201.58
6214.47
6227.37
6240.26
6253.16
6266.05
6278.95
6291.84
6304.74

2220.88
2226.05
2231.23
2236.40
2241.58
2246.75
2251.93
2257.11
2262.28
2267.46
2272.63
2277.81
2282.98
2288.16
2293.33
2298.51
2303.68
2308.86
2314.04
2319.21
2324.39
2329.56
2334.74
2339.91
2345.09
2350.26
2355.44
2360.61
2365.79
2370.96
2376.14
2381.32
2386.49
2391.67
2396.84
2402.02
2407.19
2412.37
2417.54
2422.72
2427.89
2433.07
2438.25
2443.42
2448.60
2453.77
2458.95
2464.12
2469.30
2474.47
2479.65
2484.82
2490.00
2495.18
2500.35
2505.53
2510.70
2515.88
2521.05
2526.23
2531.40

6021.32
6035.35
6049.39
6063.42
6077.46
6091.49
6105.53
6119.56
6133.60
6147.63
6161.67
6175.70
6189.74
6203.77
6217.81
6231.84
6245.88
6259.91
6273.95
6287.98
6302.02
6316.05
6330.09
6344.12
6358.16
6372.19
6386.23
6400.26
6414.30
6428.33
6442.37
6456.40
6470.44
6484.47
6498.51
6512.54
6526.58
6540.61
6554.65
6568.68
6582.72
6596.75
6610.79
6624.82
6638.86
6652.89
6666.93
6680.96
6695.00
6709.04
6723.07
6737.11
6751.14
6765.18
6779.21
6793.25
6807.28
6821.32
6835.35
6849.39
6863.42

482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515

482.00
483.00
484.00
485.00
486.00
487.00
488.00
489.00
490.00
491.00
492.00
493.00
494.00
495.00
496.00
497.00
498.00
499.00
500.00
501.00
502.00
503.00
504.00
505.00
506.00
507.00
508.00
509.00
510.00
511.00
512.00
513.00
514.00
515.00

4298.25
4307.02
4315.79
4324.56
4333.33
4342.11
4350.88
4359.65
4368.42
4377.19
4385.96
4394.74
4403.51
4412.28
4421.05
4429.82
4438.60
4447.37
4456.14
4464.91
4473.68
4482.46
4491.23
4500.00
4508.77
4517.54
4526.32
4535.09
4543.86
4552.63
4561.40
4570.18
4578.95
4587.72

4298.25
4307.02
4315.79
4324.56
4333.33
4342.11
4350.88
4359.65
4368.42
4377.19
4385.96
4394.74
4403.51
4412.28
4421.05
4429.82
4438.60
4447.37
4456.14
4464.91
4473.68
4482.46
4491.23
4500.00
4508.77
4517.54
4526.32
4535.09
4543.86
4552.63
4561.40
4570.18
4578.95
4587.72

3043.76
3050.01
3056.26
3062.51
3068.76
3075.01
3081.26
3087.51
3093.76
3100.01
3106.26
3112.51
3118.76
3125.01
3131.26
3137.51
3143.76
3150.01
3156.26
3162.51
3168.76
3175.01
3181.26
3187.51
3193.76
3200.01
3206.26
3212.51
3218.76
3225.01
3231.26
3237.51
3243.76
3250.01

6317.63
6330.53
6343.42
6356.32
6369.21
6382.11
6395.00
6407.89
6420.79
6433.68
6446.58
6459.47
6472.37
6485.26
6498.16
6511.05
6523.95
6536.84
6549.74
6562.63
6575.53
6588.42
6601.32
6614.21
6627.11
6640.00
6652.89
6665.79
6678.68
6691.58
6704.47
6717.37
6730.26
6743.16

2536.58
2541.75
2546.93
2552.11
2557.28
2562.46
2567.63
2572.81
2577.98
2583.16
2588.33
2593.51
2598.68
2603.86
2609.04
2614.21
2619.39
2624.56
2629.74
2634.91
2640.09
2645.26
2650.44
2655.61
2660.79
2665.96
2671.14
2676.32
2681.49
2686.67
2691.84
2697.02
2702.19
2707.37

6877.46
6891.49
6905.53
6919.56
6933.60
6947.63
6961.67
6975.70
6989.74
7003.77
7017.81
7031.84
7045.88
7059.91
7073.95
7087.98
7102.02
7116.05
7130.09
7144.12
7158.16
7172.19
7186.23
7200.26
7214.30
7228.33
7242.37
7256.40
7270.44
7284.47
7298.51
7312.54
7326.58
7340.61

HIRE CHARGES OF MACHINERY


Hire
Fuel
Crew
Charges
Charges
Charges

Total

Per

a) Hire charges of Tipper 5.00


Cum capacity

456.20

280.70

140.40

877.30

Hour

b) Hire charges of Tipper 10


Tonnes capacity

422.80

280.70

140.40

843.90

Hour

c) Hire charges of Water Tanker


8000 Ltrs capacity

411.00

280.70

140.40

832.10

Hour

d) Hire charges of Truck 10


Tonnes capacity

424.50

239.10

117.00

780.60

Hour

e) Hire charges of FE loader 422.80


280.70
140.40
843.90
1.00 Cum bucket capacity @
45 Cum
RATES FOR CONVEYANCE BY MACHINERY
1 Mincipal area allowance
2 Industrial area allowance
3 Agency area allowance
4 Allowable allowance
5 Add Overhead Charges & Contractor's Profit
A) For Earth/Gravel/Sand/Morrum/Lime/Surki (per Cum):
1 Lead up to 1 Km:
Out put
=
5.00 Cum
Rate
Per
0.15 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
456.20
Hour
0.15 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
280.70
Hour
0.15 Hrs. crew charges of Tipper 5.00 Cum @ 140.40
Hour
0.00 Rs.
add area allowance at 0% on Rs.
21.06
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14% 26.32
on Rs.
Total rate for
1.00 Cum

Hour

2 Lead up to 2 Km:
Out put
=
5.00 Cum
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. crew charges of Tipper 5.00 Cum @
0.00 Rs.
add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

Per
Hour
Hour
Hour

36.85

Hour

1.00 Cum

3 Lead up to 3 Km:
Out put
=
5.00 Cum
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. crew charges of Tipper 5.00 Cum @
0.00 Rs.
add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
4 Lead up to 4 Km:
Out put
=

Rate
456.20
280.70
140.40
29.48

Rate
456.20
280.70
140.40
39.31

Per
Hour
Hour
Hour

49.13

Hour

1.00 Cum

5.00 Cum

Rate

Per

0.00%
0.00%
0.00%
0.00%
14.00%

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
68.43
42.11
21.06
0.00
131.60
26.32
3.68

Rs.

30.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
95.80
58.95
29.48
0.00
184.23
36.85
5.16

Rs.

42.01

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
127.74
78.60
39.31
0.00
245.65
49.13
6.88

Rs.

56.01

Amount

0.34
0.34
0.34
0.00

Hrs. hire charges of Tipper 5.00 Cum @ Rs.


Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
Hrs. crew charges of Tipper 5.00 Cum @
Rs.
add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

Hour

Rate
456.20
280.70
140.40
56.16

Per
Hour
Hour
Hour

70.18

Hour

Rate
456.20
280.70
140.40
8.42

Per
Hour
Hour
Hour

10.53

Hour

1.00 Cum

7 Lead for every Km beyond 30 Km:


Out put
=
5.00 Cum
0.05 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.05 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.05 Hrs. crew charges of Tipper 5.00 Cum @
0.00 Rs.
add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

59.66

1.00 Cum

6 Lead for every Km from 5 to 30 Km:


Out put
=
5.00 Cum
0.06 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.06 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.06 Hrs. crew charges of Tipper 5.00 Cum @
0.00 Rs.
add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

Hour
Hour
Hour

1.00 Cum

5 Lead up to 5 Km:
Out put
=
5.00 Cum
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. crew charges of Tipper 5.00 Cum @
0.00 Rs.
add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

456.20
280.70
140.40
47.74

Rate
456.20
280.70
140.40
7.02

Per
Hour
Hour
Hour

8.77

1.00 Cum

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

155.11
95.44
47.74
0.00
298.29
59.66
8.35

Rs.

68.01

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
182.48
112.28
56.16
0.00
350.92
70.18
9.83

Rs.

80.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
27.37
16.84
8.42
0.00
52.63
10.53
1.47

Rs.

12.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
22.81
14.04
7.02
0.00
43.87
8.77
1.23

Rs.

10.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
68.43
42.11
21.06
0.00
131.60
26.32
3.68

Rs.

28.90

B) For Rubble/Size stones/Cut stones/Coarse aggregates (per Cum):


1 Lead up to 1 Km:
Out put
=
5.00 Cum
0.15 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.15 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.15 Hrs. crew charges of Tipper 5.00 Cum @
0.00 Rs.
add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 Cum

Rate
456.20
280.70
140.40
21.06

26.32

Per
Hour
Hour
Hour

2 Lead up to 2 Km:
Out put
=
5.00 Cum
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. crew charges of Tipper 5.00 Cum @
0.00 Rs.
add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

Rate
456.20
280.70
140.40
39.31

Per
Hour
Hour
Hour

49.13

Hour

Rate
456.20
280.70
140.40
47.74

Per
Hour
Hour
Hour

59.66

Hour

Rate
456.20
280.70
140.40
56.16

Per
Hour
Hour
Hour

70.18

Hour

1.00 Cum

6 Lead for every Km from 5 to 30 Km:


Out put
=
5.00 Cum
0.06 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.06 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.06 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

Hour

1.00 Cum

5 Lead up to 5 Km:
Out put
=
5.00 Cum
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

36.85

1.00 Cum

4 Lead up to 4 Km:
Out put
=
5.00 Cum
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

Per
Hour
Hour
Hour

1.00 Cum

3 Lead up to 3 Km:
Out put
=
5.00 Cum
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. crew charges of Tipper 5.00 Cum @
0.00 Rs.
add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

Rate
456.20
280.70
140.40
29.48

1.00 Cum

Rate
456.20
280.70
140.40
8.42

Per
Hour
Hour
Hour

10.53

Hour

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
95.80
58.95
29.48
0.00
184.23
36.85
5.16

Rs.

40.40

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
127.74
78.60
39.31
0.00
245.65
49.13
6.88

Rs.

56.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
155.11
95.44
47.74
0.00
298.29
59.66
8.35

Rs.

68.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
182.48
112.28
56.16
0.00
350.92
70.18
9.83

Rs.

80.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
27.37
16.84
8.42
0.00
52.63
10.53
1.47

Rs.

12.00

7 Lead for every Km beyond 30 Km:


Out put
=
5.00 Cum
0.05 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.05 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.05 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
5.00 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

Rate
456.20
280.70
140.40
7.02

Per
Hour
Hour
Hour

8.77

1.00 Cum

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
22.81
14.04
7.02
0.00
43.87
8.77
1.23

Rs.

10.00

C) For Cement/Steel/RCC poles/A.C & G.I sheets/Packed materials (per Tonne):


1 Lead up to 1 Km:
Out put
=
8.00 MT
0.15 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.15 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.15 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
8.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 MT
2 Lead up to 2 Km:
Out put
=
8.00 MT
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
8.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

Per
Hour
Hour
Hour

16.45

Rate
456.20
280.70
140.40
29.48

Per
Hour
Hour
Hour

23.03

Hour

1.00 MT

3 Lead up to 3 Km:
Out put
=
8.00 MT
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
8.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

Rate
456.20
280.70
140.40
21.06

Rate
456.20
280.70
140.40
39.31

Per
Hour
Hour
Hour

30.71

Hour

1.00 MT

4 Lead up to 4 Km:
Out put
=
8.00 MT
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
8.00 MT
Rate for
1.00 MT

Rate
456.20
280.70
140.40
47.74

Per
Hour
Hour
Hour

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
68.43
42.11
21.06
0.00
131.60
16.45
2.30

Rs.

18.75

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
95.80
58.95
29.48
0.00
184.23
23.03
3.22

Rs.

26.25

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
127.74
78.60
39.31
0.00
245.65
30.71
4.30

Rs.

35.01

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
155.11
95.44
47.74
0.00
298.29
37.29

0.14 add overheads and contractors profit at 14%


on Rs.
Total rate for

Per
Hour
Hour
Hour

43.87

Hour

Rate
456.20
280.70
140.40
8.42

Per
Hour
Hour
Hour

6.58

Hour

1.00 MT

7 Lead for every Km beyond 30 Km:


Out put
=
8.00 MT
0.05 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.05 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.05 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
8.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

Rate
456.20
280.70
140.40
56.16

1.00 MT

6 Lead for every Km from 5 to 30 Km:


Out put
=
8.00 MT
0.06 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.06 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.06 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
8.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

Hour

1.00 MT

5 Lead up to 5 Km:
Out put
=
8.00 MT
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
8.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

37.29

Rate
456.20
280.70
140.40
7.02

Per
Hour
Hour
Hour

5.48

1.00 MT

Rs.

5.22

Rs.

42.51

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
182.48
112.28
56.16
0.00
350.92
43.87
6.14

Rs.

50.01

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
27.37
16.84
8.42
0.00
52.63
6.58
0.92

Rs.

7.50

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
22.81
14.04
7.02
0.00
43.87
5.48
0.77

Rs.

6.25

D) For PCC Slabs/Shabad Slabs/CC & Laterite Blocks/Wood (per Cum):


1 Lead up to 1 Km:
Out put
=
3.40 Cum
0.15 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.15 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.15 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
3.40 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 Cum
2 Lead up to 2 Km:
Out put
=
3.40 Cum
0.21 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.21 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.

Rate
456.20
280.70
140.40
21.06

Per
Hour
Hour
Hour

38.71

Rate
456.20
280.70
140.40
29.48

Per
Hour
Hour
Hour

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
68.43
42.11
21.06
0.00
131.60
38.71
5.42

Rs.

42.40

Rs.
Rs.
Rs.
Rs.

Amount
95.80
58.95
29.48
0.00

Rate for
3.40 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

72.25

Hour

Rate
456.20
280.70
140.40
47.74

Per
Hour
Hour
Hour

87.73

Hour

Rate
456.20
280.70
140.40
56.16

Per
Hour
Hour
Hour

103.21

Hour

1.00 Cum

6 Lead for every Km from 5 to 30 Km:


Out put
=
3.40 Cum
0.06 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.06 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.06 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
3.40 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

Per
Hour
Hour
Hour

1.00 Cum

5 Lead up to 5 Km:
Out put
=
3.40 Cum
0.40 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.40 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
3.40 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

Rate
456.20
280.70
140.40
39.31

1.00 Cum

4 Lead up to 4 Km:
Out put
=
3.40 Cum
0.34 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.34 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
3.40 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

Hour

1.00 Cum

3 Lead up to 3 Km:
Out put
=
3.40 Cum
0.28 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.28 Hrs. crew charges of Tipper 5.00 Cum @
0.00 add area allowance at 0% on Rs.
Rate for
3.40 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

54.19

Rate
456.20
280.70
140.40
8.42

Per
Hour
Hour
Hour

15.48

Hour

1.00 Cum

7 Lead for every Km beyond 30 Km:


Out put
=
3.40 Cum
0.05 Hrs. hire charges of Tipper 5.00 Cum @ Rs.
0.05 Hrs. fuel charges of Tipper 5.00 Cum @ Rs.
0.05 Hrs. crew charges of Tipper 5.00 Cum @

Rate
456.20
280.70
140.40

Per
Hour
Hour
Hour

Rs.
Rs.
Rs.

184.23
54.19
7.59

Rs.

59.40

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
127.74
78.60
39.31
0.00
245.65
72.25
10.12

Rs.

82.40

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
155.11
95.44
47.74
0.00
298.29
87.73
12.28

Rs.

100.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
182.48
112.28
56.16
0.00
350.92
103.21
14.45

Rs.

117.70

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Amount
27.37
16.84
8.42
0.00
52.63
15.48
2.17

Rs.

17.60

Rs.
Rs.
Rs.

Amount
22.81
14.04
7.02

0.00 add area allowance at 0% on Rs.


Rate for
3.40 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for

7.02

12.90

1.00 Cum

E) For Water (per 1000 Ltrs):


1 Lead up to 1 Km:
Out put
=
8000 Ltrs
0.15 Hrs. hire charges of water tanker 8000 ltrs
capacity @ Rs.

Rs.
Rs.
Rs.
Rs.

0.00
43.87
12.9
1.81

Rs.

14.70

Rate
411.00

Per
Hour

Rs.

Amount
61.65

0.15 Hrs. fuel charges of water tanker 8000 ltrs


capacity @ Rs.

280.70

Hour

Rs.

42.11

0.15 Hrs. crew charges of water tanker 8000 ltrs


capacity @ Rs.

140.40

Hour

Rs.

21.06

0.00 add area allowance at 0% on Rs.


Rate for
8000 Ltrs
Rate for
1000 Ltrs
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Ltrs

21.06

Rs.
Rs.
Rs.
Rs.

0.00
124.82
15.60
2.18

Rs.

17.80

2 Lead up to 2 Km:
Out put
=
8000 Ltrs
0.21 Hrs. hire charges of water tanker 8000 ltrs
capacity @ Rs.

15.60

Rate
411.00

Per
Hour

Rs.

Amount
86.31

0.21 Hrs. fuel charges of water tanker 8000 ltrs


capacity @ Rs.

280.70

Hour

Rs.

58.95

0.21 Hrs. crew charges of water tanker 8000 ltrs


capacity @ Rs.

140.40

Hour

Rs.

29.48

0.00 add area allowance at 0% on Rs.


Rate for
8000 Ltrs
Rate for
1000 Ltrs
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Ltrs

29.48

Rs.
Rs.
Rs.
Rs.

0.00
174.74
21.84
3.06

Rs.

24.90

3 Lead up to 3 Km:
Out put
=
8000 Ltrs
0.28 Hrs. hire charges of water tanker 8000 ltrs
capacity @ Rs.

21.84

Rate
411.00

Per
Hour

Rs.

Amount
115.08

0.28 Hrs. fuel charges of water tanker 8000 ltrs


capacity @ Rs.

280.70

Hour

Rs.

78.60

0.28 Hrs. crew charges of water tanker 8000 ltrs


capacity @ Rs.

140.40

Hour

Rs.

39.31

0.00 add area allowance at 0% on Rs.


Rate for
8000 Ltrs
Rate for
1000 Ltrs
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Ltrs

39.31

Rs.
Rs.
Rs.
Rs.

0.00
232.99
29.12
4.08

Rs.

33.20

Rs.

Amount
139.74

4 Lead up to 4 Km:
Out put
=
8000 Ltrs
0.34 Hrs. hire charges of water tanker 8000 ltrs
capacity @ Rs.

29.12

Rate
411.00

Per
Hour

0.34 Hrs. fuel charges of water tanker 8000 ltrs


capacity @ Rs.

280.70

Hour

Rs.

95.44

0.34 Hrs. crew charges of water tanker 8000 ltrs


capacity @ Rs.

140.40

Hour

Rs.

47.74

0.00 add area allowance at 0% on Rs.


Rate for
8000 Ltrs
Rate for
1000 Ltrs
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Ltrs

47.74

Rs.
Rs.
Rs.
Rs.

0.00
282.92
35.37
4.95

Rs.

40.30

5 Lead up to 5 Km:
Out put
=
8000 Ltrs
0.40 Hrs. hire charges of water tanker 8000 ltrs
capacity @ Rs.

35.37

Rate
411.00

Per
Hour

Rs.

Amount
164.40

0.40 Hrs. fuel charges of water tanker 8000 ltrs


capacity @ Rs.

280.70

Hour

Rs.

112.28

0.40 Hrs. crew charges of water tanker 8000 ltrs


capacity @ Rs.

140.40

Hour

Rs.

56.16

0.00 add area allowance at 0% on Rs.


Rate for
8000 Ltrs
Rate for
1000 Ltrs
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Ltrs

56.16

Rs.
Rs.
Rs.
Rs.

0.00
332.84
41.61
5.83

Rs.

47.40

6 Lead for every Km from 5 to 30 Km:


Out put
=
8000 Ltrs
0.06 Hrs. hire charges of water tanker 8000 ltrs
capacity @ Rs.

41.61

Rate
411.00

Per
Hour

Rs.

Amount
24.66

0.06 Hrs. fuel charges of water tanker 8000 ltrs


capacity @ Rs.

280.70

Hour

Rs.

16.84

0.06 Hrs. crew charges of water tanker 8000 ltrs


capacity @ Rs.

140.40

Hour

Rs.

8.42

0.00 add area allowance at 0% on Rs.


Rate for
8000 Ltrs
Rate for
1000 Ltrs
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Ltrs

8.42

Rs.
Rs.
Rs.
Rs.

0.00
49.92
6.24
0.87

Rs.

7.10

7 Lead for every Km beyond 30 Km:


Out put
=
8000 Ltrs
0.05 Hrs. hire charges of water tanker 8000 ltrs
capacity @ Rs.

6.24

Rate
411.00

Per
Hour

Rs.

Amount
20.55

0.05 Hrs. fuel charges of water tanker 8000 ltrs


capacity @ Rs.

280.70

Hour

Rs.

14.04

0.05 Hrs. crew charges of water tanker 8000 ltrs


capacity @ Rs.

140.40

Hour

Rs.

7.02

0.00 add area allowance at 0% on Rs.


Rate for
8000 Ltrs
Rate for
1000 Ltrs
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Ltrs

7.02

Rs.
Rs.
Rs.
Rs.

0.00
41.61
5.20
0.73

Rs.

5.90

F) For Bricks (per 1000 Nos):


1 Lead up to 1 Km:

5.20

Out put
=
3000 Nos
0.15 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.

Rate
424.50

Per
Hour

Rs.

Amount
63.68

0.15 Hrs. fuel charges of Truck 10 Tonnes


capacity @ Rs.

239.10

Hour

Rs.

35.87

0.15 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

Hour

Rs.

17.55

0.00 add area allowance at 0% on Rs.


Rate for
3000 Nos
Rate for
1000 Nos
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Nos

17.55

Rs.
Rs.
Rs.
Rs.

0.00
117.10
39.03
5.46

Rs.

48.10

2 Lead up to 2 Km:
Out put
=
3000 Nos
0.21 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.

39.03

Rate
424.50

Per
Hour

Rs.

Amount
89.15

0.21 Hrs. fuel charges of Truck 10 Tonnes


capacity @ Rs.

239.10

Hour

Rs.

50.21

0.21 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

Hour

Rs.

24.57

0.00 add area allowance at 0% on Rs.


Rate for
3000 Nos
Rate for
1000 Nos
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Nos

24.57

Rs.
Rs.
Rs.
Rs.

0.00
163.93
54.64
7.65

Rs.

67.30

3 Lead up to 3 Km:
Out put
=
3000 Nos
0.28 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.

54.64

Rate
424.50

Per
Hour

Rs.

Amount
118.86

0.28 Hrs. fuel charges of Truck 10 Tonnes


capacity @ Rs.

239.10

Hour

Rs.

66.95

0.28 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

Hour

Rs.

32.76

0.00 add area allowance at 0% on Rs.


Rate for
3000 Nos
Rate for
1000 Nos
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Nos

32.76

Rs.
Rs.
Rs.
Rs.

0.00
218.57
72.86
10.20

Rs.

89.80

4 Lead up to 4 Km:
Out put
=
3000 Nos
0.34 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.

72.86

Rate
424.50

Per
Hour

Rs.

Amount
144.33

0.34 Hrs. fuel charges of Truck 10 Tonnes


capacity @ Rs.

239.10

Hour

Rs.

81.29

0.34 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

Hour

Rs.

39.78

0.00 add area allowance at 0% on Rs.


Rate for
3000 Nos
Rate for
1000 Nos
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Nos

39.78

Rs.
Rs.
Rs.
Rs.

0.00
265.40
88.47
12.39

Rs.

109.00

88.47

5 Lead up to 5 Km:
Out put
=
3000 Nos
0.40 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.

Rate
424.50

Per
Hour

Rs.

Amount
169.80

0.40 Hrs. fuel charges of Truck 10 Tonnes


capacity @ Rs.

239.10

Hour

Rs.

95.64

0.40 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

Hour

Rs.

46.80

0.00 add area allowance at 0% on Rs.


Rate for
3000 Nos
Rate for
1000 Nos
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Nos

46.80

Rs.
Rs.
Rs.
Rs.

0.00
312.24
104.08
14.57

Rs.

128.30

6 Lead for every Km beyond 5 Kms up to 30 Kms:


Out put
=
3000 Nos
0.06 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.

104.08

Rate
424.50

Per
Hour

Rs.

Amount
25.47

0.06 Hrs. fuel charges of Truck 10 Tonnes


capacity @ Rs.

239.10

Hour

Rs.

14.35

0.06 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

Hour

Rs.

7.02

0.00 add area allowance at 0% on Rs.


Rate for
3000 Nos
Rate for
1000 Nos
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Nos

7.02

Rs.
Rs.
Rs.
Rs.

0.00
46.84
15.61
2.19

Rs.

19.20

7 Lead for every Km beyond 30 Kms:


Out put
=
3000 Nos
0.05 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.

15.61

Rate
424.50

Per
Hour

Rs.

Amount
21.23

0.05 Hrs. fuel charges of Truck 10 Tonnes


capacity @ Rs.

239.10

Hour

Rs.

11.96

0.05 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

Hour

Rs.

5.85

0.00 add area allowance at 0% on Rs.


Rate for
3000 Nos
Rate for
1000 Nos
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Nos

5.85

Rs.
Rs.
Rs.
Rs.

0.00
39.04
13.01
1.82

Rs.

16.00

13.01

LOADING & UNLOADING CHARGES BY MANUAL MEANS (EXCLUDING IDLE HIRE CHARGES
OF TRUCKS)
A) For Earth, Sand, Morrum, Manure, Fly Ash (per Cum):
(i) Loading charges:
Out put
=
5.50 Cum
Rate
a) Labour:
0.01 day Head mazdoor
320.00
0.25 day Mazdoor
280.00
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
5.50 Cum

73.20

Per
day
day

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

3.20
70.00
73.20
0.00
73.20
73.20

Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 Cum
(ii) Unloading charges:
Out put
=
5.50 Cum
a) Labour:
0.005 day Head mazdoor
0.125 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 Cum

13.31

Rate

Per

320.00
280.00

day
day

36.60

6.65

Rs.
Rs.

13.31
1.86

Rs.

15.20

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

1.60
35.00
36.60
0.00
36.60
36.60
6.65
0.93

Rs.

7.60

B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish, Crushed
slag, Stone for masonry work (per Cum):
(i) Loading charges:
Out put
=
5.50 Cum
a) Labour:
0.02 day Head mazdoor
0.50 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 Cum
(ii) Unloading charges:
Out put
=
5.50 Cum
a) Labour:
0.01 day Head mazdoor
0.25 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 Cum
C) For Cement (per Tonne):
(i) Loading charges:
Out put
=
10.00 MT
a) Labour:
0.06 day Head mazdoor
1.50 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
10.00 MT

Rate

Per

320.00
280.00

day
day

146.40

26.62

Rate

Per

320.00
280.00

day
day

73.20

13.31

Rate

Per

320.00
280.00

day
day

439.20

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

6.40
140.00
146.40
0.00
146.40
146.40
26.62
3.73

Rs.

30.35

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

3.20
70.00
73.20
0.00
73.20
73.20
13.31
1.86

Rs.

15.17

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

19.20
420.00
439.20
0.00
439.20
439.20

Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 MT
(ii) Unloading & Stacking charges:
Out put
=
10.00 MT
a) Labour:
0.06 day Head mazdoor
1.50 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
10.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 MT
D) For Structural steel, Steel bars (per Tonne):
(i) Loading charges:
Out put
=
10.00 MT
a) Labour:
0.07 day Head mazdoor
1.80 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
10.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 MT
(ii) Unloading & Stacking charges:
Out put
=
10.00 MT
a) Labour:
0.07 day Head mazdoor
1.80 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
10.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 MT

43.92

Rate

Per

320.00
280.00

day
day

439.20

43.92

Rate

Per

320.00
280.00

day
day

526.40

52.64

Rate

Per

320.00
280.00

day
day

526.40

52.64

E) For Bricks of size 225 x 140 x 70mm (per 1000 Nos):


(i) Loading charges:
Out put
=
2000.00 Nos
Rate
a) Labour:
0.01 day Head mazdoor
320.00
0.25 day Mazdoor
280.00
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
2000 Nos
Rate for
1000 Nos

73.20

Rs.
Rs.

43.92
6.15

Rs.

50.07

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

19.20
420.00
439.20
0.00
439.20
439.20
43.92
6.15

Rs.

50.07

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

22.40
504.00
526.40
0.00
526.40
526.40
52.64
7.37

Rs.

60.01

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

22.40
504.00
526.40
0.00
526.40
526.40
52.64
7.37

Rs.

60.01

Per
day
day

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

3.20
70.00
73.20
0.00
73.20
73.20
36.60

0.14 add overheads and contractors profit at 14%


on Rs.
Total rate for
1000 Nos
(ii) Unloading & Stacking charges:
Out put
=
2000.00 Nos
a) Labour:
0.01 day Head mazdoor
0.25 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
Rate for
2000 Nos
Rate for
1000 Nos
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Nos

36.60

Rate

Per

320.00
280.00

day
day

73.20

36.60

Rs.

5.12

Rs.

41.72

Amount
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

3.20
70.00
73.20
0.00
73.20
73.20
36.60
5.12

Rs.

41.72

LOADING & UNLOADING CHARGES BY MANUAL MEANS (INCLUDING IDLE HIRE CHARGES
OF TRUCKS)
A) For Earth, Sand, Morrum, Manure, Fly Ash (per Cum):
(i) Loading charges:
Out put
=
5.50 Cum
Rate
a) Labour:
0.01 day Head mazdoor
320.00
0.25 day Mazdoor
280.00

Per

Amount

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

3.20
70.00
73.20
0.00
73.20

424.50

Hour

Rs.

212.25

0.50 Hrs. fuel charges of Truck 10 Tonnes


capacity @ Rs.

239.10

Hour

Rs.

119.55

0.50 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

Hour

Rs.

58.50

0.00 add area allowance at 0% on Rs.


Total machinery charges
Total labour and machinery charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 Cum

58.50

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

0.00
390.30
463.50
463.50
84.27
11.80

Rs.

96.07

0.00 add area allowance at 0% on Rs.


Total labour charges
b) Machinery:
0.50 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.

(ii) Unloading charges:


Out put
=
5.50 Cum
a) Labour:
0.005 day Head mazdoor
0.125 day Mazdoor
0.00 add area allowance at 0% on Rs.
Total labour charges
b) Machinery:
0.166 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.
0.166 Hrs. fuel charges of Truck 10 Tonnes
capacity @ Rs.

73.20

84.27

Rate

Per

320.00
280.00

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

1.60
35.00
36.60
0.00
36.60

424.50

Hour

Rs.

70.47

239.10

Hour

Rs.

39.69

36.60

Amount

0.166 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

0.00 add area allowance at 0% on Rs.


Total machinery charges
Total labour and machinery charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 Cum

19.42

Hour

30.21

Rs.

19.42

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

0.00
129.58
166.18
166.18
30.21
4.23

Rs.

34.44

B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish, Crushed
slag, Stone for machinery work (per Cum):
(i) Loading charges:
Out put
=
5.50 Cum
a) Labour:
0.02 day Head mazdoor
0.50 day Mazdoor

Rate

Per

Amount

320.00
280.00

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

6.40
140.00
146.40
0.00
146.40

0.00 add area allowance at 0% on Rs.


Total labour charges
b) Machinery:
0.50 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.

146.40

424.50

Hour

Rs.

212.25

0.50 Hrs. fuel charges of Truck 10 Tonnes


capacity @ Rs.

239.10

Hour

Rs.

119.55

0.50 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

Hour

Rs.

58.50

0.00 add area allowance at 0% on Rs.


Total machinery charges
Total labour and machinery charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 Cum

58.50

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

0.00
390.30
536.70
536.70
97.58
13.66

Rs.

111.24

(ii) Unloading charges:


Out put
=
5.50 Cum
a) Labour:
0.01 day Head mazdoor
0.25 day Mazdoor

97.58

Rate

Per

320.00
280.00

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

3.20
70.00
73.20
0.00
73.20

424.50

Hour

Rs.

106.13

0.25 Hrs. fuel charges of Truck 10 Tonnes


capacity @ Rs.

239.10

Hour

Rs.

59.78

0.25 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

Hour

Rs.

29.25

0.00 add area allowance at 0% on Rs.


Total machinery charges
Total labour and machinery charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.

29.25

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

0.00
195.16
268.36
268.36
48.79
6.83

0.00 add area allowance at 0% on Rs.


Total labour charges
b) Machinery:
0.25 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.

73.20

48.79

Amount

Total rate for

1.00 Cum

C) For Cement (per Tonne):


(i) Loading charges:
Out put
=
10.00 MT
a) Labour:
0.06 day Head mazdoor
1.50 day Mazdoor

Rs.

55.62

Rate

Per

Amount

320.00
280.00

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

19.20
420.00
439.20
0.00
439.20

0.00 add area allowance at 0% on Rs.


Total labour charges
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.

439.20

424.50

Hour

Rs.

424.50

1.00 Hrs. fuel charges of Truck 10 Tonnes


capacity @ Rs.

239.10

Hour

Rs.

239.10

1.00 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

Hour

Rs.

117.00

0.00 add area allowance at 0% on Rs.


Total machinery charges
Total labour and machinery charges
Rate for
10.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 MT

117.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

0.00
780.60
1219.80
1219.80
121.98
17.08

Rs.

139.06

(ii) Unloading & Stacking charges:


Out put
=
10.00 MT
a) Labour:
0.07 day Head mazdoor
1.80 day Mazdoor

121.98

Rate

Per

Amount

320.00
280.00

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

22.40
504.00
526.40
0.00
526.40

0.00 add area allowance at 0% on Rs.


Total labour charges
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.

526.40

424.50

Hour

Rs.

424.50

1.00 Hrs. fuel charges of Truck 10 Tonnes


capacity @ Rs.

239.10

Hour

Rs.

239.10

1.00 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

Hour

Rs.

117.00

0.00 add area allowance at 0% on Rs.


Total machinery charges
Total labour and machinery charges
Rate for
10.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 MT

117.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

0.00
780.60
1307.00
1307.00
130.70
18.30

Rs.

149.00

D) For Structural steel, Steel bars (per Tonne):


(i) Loading charges:
Out put
=
10.00 MT
a) Labour:
0.07 day Head mazdoor
1.80 day Mazdoor
0.00 add area allowance at 0% on Rs.

130.70

Rate

Per

320.00
280.00

day
day

526.40

Amount
Rs.
Rs.
Rs.
Rs.

22.40
504.00
526.40
0.00

Total labour charges


b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.

Rs.

526.40

424.50

Hour

Rs.

424.50

1.00 Hrs. fuel charges of Truck 10 Tonnes


capacity @ Rs.

239.10

Hour

Rs.

239.10

1.00 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

Hour

Rs.

117.00

0.00 add area allowance at 0% on Rs.


Total machinery charges
Total labour and machinery charges
Rate for
10.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 MT

117.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

0.00
780.60
1307.00
1307.00
130.70
18.30

Rs.

149.00

(ii) Unloading & Stacking charges:


Out put
=
10.00 MT
a) Labour:
0.07 day Head mazdoor
1.80 day Mazdoor

130.70

Rate

Per

Amount

320.00
280.00

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

22.40
504.00
526.40
0.00
526.40

0.00 add area allowance at 0% on Rs.


Total labour charges
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.

526.40

424.50

Hour

Rs.

424.50

1.00 Hrs. fuel charges of Truck 10 Tonnes


capacity @ Rs.

239.10

Hour

Rs.

239.10

1.00 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

Hour

Rs.

117.00

0.00 add area allowance at 0% on Rs.


Total machinery charges
Total labour and machinery charges
Rate for
10.00 MT
Rate for
1.00 MT
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 MT

117.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

0.00
780.60
1307.00
1307.00
130.70
18.30

Rs.

149.00

130.70

E) For Bricks of size 225 x 140 x 70mm (per 1000 Nos):


(i) Loading charges:
Out put
=
2000.00 Nos
Rate
a) Labour:
0.01 day Head mazdoor
320.00
0.25 day Mazdoor
280.00

Per

Amount

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

3.20
70.00
73.20
0.00
73.20

424.50

Hour

Rs.

140.09

0.33 Hrs. fuel charges of Truck 10 Tonnes


capacity @ Rs.

239.10

Hour

Rs.

78.90

0.33 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

Hour

Rs.

38.61

0.00 add area allowance at 0% on Rs.

38.61

Rs.

0.00

0.00 add area allowance at 0% on Rs.


Total labour charges
b) Machinery:
0.33 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.

73.20

Total machinery charges


Total labour and machinery charges
Rate for
2000 Nos
Rate for
1000 Nos
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Nos
(ii) Unloading & Stacking charges:
Out put
=
2000.00 Nos
a) Labour:
0.06 day Head mazdoor
1.50 day Mazdoor

165.40

Rs.
Rs.
Rs.
Rs.
Rs.

257.60
330.80
330.80
165.40
23.16

Rs.

188.56

Rate

Per

Amount

320.00
280.00

day
day

Rs.
Rs.
Rs.
Rs.
Rs.

19.20
420.00
439.20
0.00
439.20

0.00 add area allowance at 0% on Rs.


Total labour charges
b) Machinery:
1.00 Hrs. hire charges of Truck 10 Tonnes
capacity @ Rs.

439.20

424.50

Hour

Rs.

424.50

1.00 Hrs. fuel charges of Truck 10 Tonnes


capacity @ Rs.

239.10

Hour

Rs.

239.10

1.00 Hrs. crew charges of Truck 10 Tonnes


capacity @ Rs.

117.00

Hour

Rs.

117.00

0.00 add area allowance at 0% on Rs.


Total machinery charges
Total labour and machinery charges
Rate for
2000 Nos
Rate for
1000 Nos
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1000 Nos

117.00

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

0.00
780.60
1219.80
1219.80
609.9
85.39

Rs.

695.29

609.90

LOADING & UNLOADING CHARGES BY MECHANICAL MEANS (INCLUDING IDLE HIRE


CHARGES OF TRUCKS)
A) For Earth, Sand, Morrum, Manure, Fly Ash (per Cum):
(i) Loading charges:
Out put
=
5.50 Cum
Rate
a) Machinery:
0.11 Hrs. hire charges of Tipper 10 Tonnes 422.80
capacity @ Rs.

Per

Amount

Hour

Rs.

46.51

0.11 Hrs. fuel charges of Tipper 10 Tonnes


capacity @ Rs.

280.70

Hour

Rs.

30.88

0.11 Hrs. crew charges of Tipper 10 Tonnes


capacity @ Rs.

140.40

Hour

Rs.

15.44

0.06 Hrs. hire charges of FE loader 1.00 Cum


bucket capacity @ 45 Cum @ Rs.

422.80

Hour

Rs.

25.37

0.06 Hrs. fuel charges of FE loader 1.00 Cum


bucket capacity @ 45 Cum @ Rs.

280.70

Hour

Rs.

16.84

0.06 Hrs. crew charges of FE loader 1.00 Cum


bucket capacity @ 45 Cum @ Rs.

140.40

Hour

Rs.

8.42

0.00 add area allowance at 0% on Rs.


Total machinery charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 Cum

23.86

Rs.
Rs.
Rs.
Rs.
Rs.

0.00
143.46
143.46
26.08
3.65

Rs.

29.73

26.08

(ii) Unloading charges:


Out put
=
5.50 Cum
a) Machinery:
0.08 Hrs. hire charges of Tipper 10 Tonnes
capacity @ Rs.

Rate

Per

422.80

Hour

Rs.

33.82

0.08 Hrs. fuel charges of Tipper 10 Tonnes


capacity @ Rs.

280.70

Hour

Rs.

22.46

0.08 Hrs. crew charges of Tipper 10 Tonnes


capacity @ Rs.

140.40

Hour

Rs.

11.23

0.00 add area allowance at 0% on Rs.


Total machinery charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 Cum

11.23

Rs.
Rs.
Rs.
Rs.
Rs.

0.00
67.51
67.51
12.27
1.72

Rs.

13.99

12.27

Amount

B) For Lime, Agrregate, Stone Boulder, Brick aggregate, Kankar, Building rubbish, Crushed
slag, Stone for machinery work (per Cum):
(i) Loading charges:
Out put
=
5.50 Cum
a) Machinery:
0.17 Hrs. hire charges of Tipper 10 Tonnes
capacity @ Rs.

Rate

Per

422.80

Hour

Rs.

71.88

0.17 Hrs. fuel charges of Tipper 10 Tonnes


capacity @ Rs.

280.70

Hour

Rs.

47.72

0.17 Hrs. crew charges of Tipper 10 Tonnes


capacity @ Rs.

140.40

Hour

Rs.

23.87

0.12 Hrs. hire charges of FE loader 1.00 Cum


bucket capacity @ 45 Cum @ Rs.

422.80

Hour

Rs.

50.74

0.12 Hrs. fuel charges of FE loader 1.00 Cum


bucket capacity @ 45 Cum @ Rs.

280.70

Hour

Rs.

33.68

0.12 Hrs. crew charges of FE loader 1.00 Cum


bucket capacity @ 45 Cum @ Rs.

140.40

Hour

Rs.

16.85

0.00 add area allowance at 0% on Rs.


Total machinery charges
Rate for
5.50 Cum
Rate for
1.00 Cum
0.14 add overheads and contractors profit at 14%
on Rs.
Total rate for
1.00 Cum

40.72

Rs.
Rs.
Rs.
Rs.
Rs.

0.00
244.74
244.74
44.5
6.23

Rs.

50.73

44.50

Amount

You might also like