You are on page 1of 91

The user of this template must enter all prices in the Rate column & Workings in the Units

Col

Builder
Job Address
Date

Cost Centers

7 Concretor

9 Bricklayer

10 Stone layer

11 Frame Carpenter

12 Structural Steel

13 Roof Plumber

15 Timber

16 Skylights

17 Electrician

18 Plumber

19 Lockup Carpenter

20 Mechanical Services

21 Insulation

22 Stairs

23 Plasterer

24 Renderer

25 Waterproofing

26 Tiler

27 Fixing Carpentry

28 Balustrade

29 Joinery

30 Painter

31 Floor Covering's

32 Garage Door

33 Glazing

34 Int. Cleaner

35 Site Cleaner

36 Paving

37 Fixtures & Fitting's

38 Appliances

39 Window Furnishing's

40 Clothes Lines / Mailbox

41 Fencing

42 Landscaping

Subtotal
Contingency Sum
Supervision Fee's
Builders margins & Overheads
GST

Total of Building Works


Sales Fee's inc Advertising
Finance Fe's

emplate must enter all prices in the Rate column & Workings in the Units Column. The user must seek professional

Description
Cement bags
Cement bags in Wall
Coarse aggrated roof
Fine aggrated roof
Coarse aggrated Wall
Fine aggrated Wall

Face Brick Allowance


Clay Commons
Masonary Bricks
Labour to lay face Brickwork - First,second & third Floor
Labour to lay face Brickwork - forth Floor
Labour cost
Brick Chimney
Labour to lay Brick piers
Brick Up gable End
Squint Corners
Labour to fit Sislation
Brick Sand
Brighton Lite cement
Portland grey Cement
Limil
Brick hardware
Acidwash face brickwork
Bag brickwork - Single Coat
Bag brickwork - Double Coat
100 x 100 x 6 UA Lintel - Gal
150 x 100 x 6 UA Lintel - Gal
200x200 "T" Bar - Gal
Pressed Metal Door Frame
Enter extra items here

Description

Stone
390x190x140 Masonary Blocks
390x190x190 Masonary Blocks
390x190x290 Masonary blocks
Labour to lay 390x190x90 Blocks
Labour to lay 390x190x140 Blocks
Labour to lay 390x190x190 Blocks
Labour to lay 390x190x290 Blocks
20MPa Corefill Mini-Mix Concrete
Labour to Core Fill Concrete
N12 Reio bars
N16 Reio bars
Mini-Line pump for core filling Blocks walls
Enter extra items here

Carpentry labour - Frame


Frame hardware
Concrete Stumps
90x45 MGP10 studs to grd flr walls
Panel flooring
Liquid Nails
90 x 45 F17 Joists
Grd floor framing
150x45 Hyspan
300x45 Hyspan
300x63 Hyspan
240x45 Hyspan
90x45 Hyspan
190x45 F17
120x45 F17
90x45 F17
90x90 Cypress
125x125 Cypress
150x50 Cypress
100x50 Cypress
Panel Flooring
Liquid Nails
Ply Brace 2700x900
90x45 MGP10 plates
Mini Brace 4.2 long
Posi-Struts
First Floor Framing
120x45 MGP10

190x45 MGP10
130x36 Hyspan
90x45 Mgp10 Studs
90x45 MGP10 plates
90x35 Mgp10 noggins
Roof trusses
Roof Battens - 90 x 35
Roof Battens - 90 x 45
OBHW - 75 x 25
OBHW - 150 x 25
190x32 T/Pine Fascia
Merch Pine
Enter extra items here

Structural Steel P/Tonne refer to breakdown


Crane Hire for steel errection
Labour to fit Steel
Enter extra items here

Corragated Zinc Roofing inc flash, Cap, D/Pipes etc


Corragated C/Bond Roofing inc flash, Cap, D/Pipes etc
Metal Fascia & Gutter
Supply & fit Guard Rail
Box Gutters
Metal Gutter - C/Bond
Downpipes single story no eaves
Downpipes Double story no eaves
Downpipes single story with eaves
Downpipes Double story with eaves
Supply & Fit 75mm Blanket Insulation
Enter extra items here

Wooden Frame
Door
Timber Windows sspecials leadlite
Timber Windows Specials
Enter extra items here

Elertican
Plumber

Openable skylite supply & fit


Electric Skylite supply & fit
Enter extra items here

Glass
Paint
Connection Fee's
Meterbox Supply & fit
Provide Telstra Pit
Provide light point
Labour allowance to fit light point
Provide data point
Provide phone Point
Supply & fit Door Chime
Provide 2 way point
Provide Dimmer switch
Provide appliance points. R/Hood etc
Provide Oven circuit, Spa etc inc fitof
External Gpo's
Internal Double Gpo's
Smoke Detectors
External appliance Gpo's
Exhaust fans inc ducting to external atmosphere
Swtch board supply & fit
PC Allowance for light fitting's
Intercom Supply & fit
Security Sytem supply & fit
Enter extra items here

Provide Hot & Cold Point inc Drain


Provide Floor Drain
Gas Allowance
Stacks
Sewer Suspended
Stormwater supply & fit
Septic Tank Allowance
Stormwater pit Allowance
Garden tap supply & fit
Fit Spa bath
Fit of D/Washer, W/c etc
Enter extra items here

Lock Up Carpentry labour


Lock Up hardware
90 x 35 Merch pine
4.5mm hardieflex
140x20 Dar Pine Bird Brds
Gable Infils no details provided
Cavity Slider - 2040x720
Double Cavity Slider
Weather Brds - Timber
Weather Brds - primeline - 170mm
Tile Underlay 1800x900
Masonite packers
60x32 Crn Mouldings to w/brds
30x32 Crn Mouldings to w/brds
150x25 T/Pine Plinth
190x35 F17 Bearers
Sislation Tyvek 2700x30mtr Roll
Decking Brds - Merbau 90 x 19
90 x 45 F17 joists
Enter extra items here

Supply & fit Jetmaster


Supply & Fit Combustion Heater
8 Point Ducted Heating
12 Point Ducted Heating
Supply & Fit Split System
Enter extra items here

Supply & fit R1.5 Wall batts


Supply & Fit R2.5 Ceiling batts
Supply & fit Acoustic Batts
Enter extra items here

Timber Staircase Inc Standard balustrade


Steel & Timber Staircase no Balustrade
Enter extra items here

Supply & fit plasterboard to walls


Supply & fit plasterboard to ceiling's
Wet Area Walls
Supply & fit 90mm scotia cornice

Patch & Reapir exisitng as required


P50 stopping Bead
Enter extra items here

Sup & fit 50mm Poly & coloured render


Sup & fit 75mm Poly & coloured render
Sup & fit 100mm Poly & coloured render
Render inc colour coat
Render for paint finsh by others
Membrane finish
Enter extra items here

Caulking Internal Joins


Caulking external Joins / Joints
Waterproofing membrane
Waterproof Shower / bath
Enter extra items here

PC Allowance for Floor Tiles


PC Allowance for Wall Tiles
Labour to lay Wall Tiles
Labour to lay Floor Tiles
Cement screed to falls
Construct showerbase inc Falls
Enter extra items here

Fixing Carpentry Labour


Fixing Hardware
Prehung 2040 single MDF Door Jamb
Prehung 2040 double MDF Door Jamb
Redicoat 2040 Door
Solidcore 2040 Door
Redicoat 2340 Door
Solidcore 2340 Door
Passage Sets
Privacy Sets
Robe Handles
Door Stops
Flush Pulls
67x18 MDF Architraves
87 x 18 MDF Skirting

110 x 18 MDF
Curved Architraves
Enter extra items here

External Balustrade
Internal Balustrade
Enter extra items here

Supply & fit Robes inc sliding vynil doors


Supply & fit Joinery Carcasses
Linen Fitouts
Stone Benchtops
Enter extra items here

Painter - internal 3 coats inc 2 features


Painter - External Cladding
Enter extra items here

Supply & lay Carpets inc Underlay inc stairs


Supply & lay Floating Floor
Sand & polish Floor boards
Sand & polish Concrete Slab
Enter extra items here

Supply & fit Ply Tilt-a-Door


Supply & fit sectional Garage Door
Supply & fit Ceder Garage Door
Enter extra items here

Fully Framed Shower Screen


Semi-Framed Shower Screen
Frameless Shower Screen
Colourback Splashback
6mm Mirror Supply & Fit
Enter extra items here

Internal Clean inc Windows

Enter extra items here

Site Clean inc Bobcat & Bins


Enter extra items here

100mm thick Paving Slab - Plain


100mm thick Paving Slab - Coloured
125mm thick Paving Slab - Coloured
Labour to lay pavers
PC Allowance for Pavers
Enter extra items here

Taps sets
Basins
Toilet Suites
Pressed metal Baths
Shower Base 900x900
Shower Base 1350x900
Toilet Roll Holders
Towel Rails
Towel Rings
Soap Dishes / Toothbrush Holders
Kitchen Sink
Cistern Stops
L/dry Sink
Enter extra items here

Cooktop Allowance
Wall Oven Allowance
Rangehood Allowance
Dishwasher Allowance
Insinkerator Allowance
Enter extra items here

Blinds, Curtains & Drapes Supply & Fit


Enter extra items here

Hills Paraline Clothes Hoist

Brass Letterbox & Numerals


Enter extra items here

1800high Paling Fence


gate
Enter extra items here

PC Allowance for soft landscaping


Enter extra items here

Overheads

uilding Works

This Template has been provided by Organized Builders with the clear understanding that this docum
indicative range of costs that should be considered within a Building Estimate. This template does no
specialized items, other consulting, Government or External costs. The user should check the relevan
purchasing, signing contracts, ordering materials or any other cost related excerise until they have re
advice. Organized Builders recommends that the client is fully aware of all costs prior to committing t
no responsibility for financial loss that may occur due to incorrect pricing, quantities or unforeseen re

r must seek professional advice on all costs

Supplier

PC Allowances

Units
bags per
bags per
foot
foot
foot
foot

PC Allowance

sq feet

p/kg

Frame
Door
Window
Lamira
main

PC Allowance
PC Allowance
PC Allowance

PS Allowance

PS
PS
PS
PS
PS

Allowance
Allowance
Allowance
Allowance
Allowance

PC Allowance
PC Allowance

PC
PC
PC
PC
PC

Allowance
Allowance
Allowance
Allowance
Allowance

pack

PS Allowance
PS Allowance

PS
PS
PS
PS

Allowance
Allowance
Allowance
Allowance

PS
PS
PS
PS

Allowance
Allowance
Allowance
Allowance

PC Allowance

PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC

Allowance
Allowance
Allowance
Allowance
Allowance
Allowance
Allowance
Allowance
Allowance
Allowance
Allowance
Allowance
Allowance

PC
PC
PC
PC
PC

Allowance
Allowance
Allowance
Allowance
Allowance

PC Allowance

PC Allowance

rstanding that this document is to provide an


te. This template does not take into account
should check the relevance of this template prior to
excerise until they have recieved qualified written
costs prior to committing to any purchase & accepts
uantities or unforeseen reasons bearing financial interests.

Total Quantity
420
875
2800
3500
1400
1400

7000
72000
0
8000

Rate

Per
260
260
50
50
50
50

5
5
5
145

Item Totals

M3
M3
M3
M2
M2
M2

109,200.00
227,500.00
140,000.00
175,000.00
70,000.00
70,000.00

1000
1000
1000
1000
1000
sq feet
Each
Each
L/M
Each
Each
M3
Each
Each
Each
Each
M2
M2
M2
L/M
L/M
L/M
Each
?? Unit

35,000.00
360,000.00
1,160,000.00
-

6849

20

1000
1000
1000
1000
1000
1000
1000
1000
M3
Hr
L/M
L/M
Each
?? Unit

Hrs
Each
L/M
Each
Each
Each
L/M
L/M
L/M
L/M
L/M
L/M
L/M
L/M
L/M
L/M
L/M
L/M
L/M
L/M
Each
Each
Each
L/M
Each
L/M
L/M
L/M

136,980.00
-

12000

50

40
40
40
20
1

3300
2000
1000
3000
100000

1
1

60000
60000

L/M
L/M
L/M
L/M
L/M
M2
L/M
L/M
L/M
L/M
L/M
L/M
?? Unit

P/kg
Hr
Hr
?? Unit

M2
M2
L/M
L/M
L/M
L/M
Each
Each
Each
Each
Roll
?? Unit

M2
M2
M2
M2
?? Unit

132,000.00
80,000.00
40,000.00
60,000.00
100,000.00

Each
Each

60,000.00
60,000.00

600,000.00
-

1
1

100000
100000

Each
Each
?? Unit

100,000.00
100,000.00
-

1
1

100000
300000

20
2

500
100000

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
?? Unit

100,000.00
300,000.00
10,000.00
200,000.00
-

Each
Each
Each
L/M
L/M
L/M
Each
Each
Each
Each
Each
?? Unit

Each
Each
L/M
M2
L/M
Each
Each
Each
L/M
L/M
Each
Each
L/M
L/M
L/M
L/M
Each
L/M
L/M
?? Unit

Each
Each
Each
Each
Each
?? Unit

M2
M2
M2
?? Unit

Each
Each
?? Unit

M2
M2
L/M
L/M

138

100
23
80
500
7

300

300
200
50
25
3000

L/M
L/M
?? Unit

M2
M2
M2
M2
M2
M2
?? Unit

L/M
L/M
M2
Each
?? Unit

M2
M2
M2
M2
M2
Each
?? Unit

41,400.00
-

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
L/M
L/M

30,000.00
4,600.00
4,000.00
12,500.00
21,000.00
-

L/M
Each
?? Unit

L/M
L/M
?? Unit

Each
Each
Each
M2
?? Unit

M2
M2
?? Unit

M2
M2
M2
M2
?? Unit

Each
Each
Each
?? Unit

Each
Each
Each
M2
M2
?? Unit

Each

?? Unit

Each
?? Unit

M2
M2
M2
M2
M2
?? Unit

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
?? Unit

Each
Each
Each
Each
Each
?? Unit

Each
?? Unit

Each

70000

Each
?? Unit

L/M
L/M
?? Unit

Each
?? Unit

0
0
0
0

70,000.00
-

4,547,180.00
4,547,180.00
4,547,180.00
4,547,180.00

Cost Center Totals

791,700.00

1,555,000.00

136,980.00

600,000.00

350,000.00

320,000.00

610,000.00

41,400.00

72,100.00

70,000.00

4,547,180.00

4,547,180.00

The user of this template must enter all prices in the Rate column & Workings in the Units Col

Builder
Job Address
Date

Cost Centers

7 Concretor

9 Bricklayer

10 Stone layer

11 Frame Carpenter

12 Structural Steel

13 Roof Plumber

15 Timber

16 Skylights

17 Electrician

18 Plumber

19 Lockup Carpenter

20 Mechanical Services

21 Insulation

22 Stairs

23 Plasterer

24 Renderer

25 Waterproofing

26 Tiler

27 Fixing Carpentry

28 Balustrade

29 Joinery

30 Painter

31 Floor Covering's

32 Garage Door

33 Glazing

34 Int. Cleaner

35 Site Cleaner

36 Paving

37 Fixtures & Fitting's

38 Appliances

39 Window Furnishing's

40 Clothes Lines / Mailbox

41 Steel Gate

42 Landscaping

Subtotal
Contingency Sum
Supervision Fee's
Builders margins & Overheads
GST

Total of Building Works


Sales Fee's inc Advertising
Finance Fe's

emplate must enter all prices in the Rate column & Workings in the Units Column. The user must seek professional

Description
Cement bags
Cement bags in Wall
Coarse aggrated roof
Fine aggrated roof
Coarse aggrated Wall
Fine aggrated Wall

Face Brick Allowance


Clay Commons
Masonary Bricks
Marble stone picese
Labour to lay face Brickwork - forth Floor
Labour cost
Brick Chimney
Labour to lay Brick piers
Brick Up gable End
Squint Corners
Labour to fit Sislation
Brick Sand
Brighton Lite cement
Portland grey Cement
Limil
Brick hardware
Acidwash face brickwork
Bag brickwork - Single Coat
Bag brickwork - Double Coat
100 x 100 x 6 UA Lintel - Gal
150 x 100 x 6 UA Lintel - Gal
200x200 "T" Bar - Gal
Pressed Metal Door Frame
Enter extra items here

Description

floor tile
Drawing room floor tile
Bed room tile
Kitchen tile
Parking area
staircase stone in owener area
staircase stone in rented area
Bathroom in rented area
Bathroom in owener area
Labour to Core Fill Concrete
N12 Reio bars
N16 Reio bars
Mini-Line pump for core filling Blocks walls
Enter extra items here

Carpentry labour - Frame


Frame hardware
Concrete Stumps
90x45 MGP10 studs to grd flr walls
Panel flooring
Liquid Nails
90 x 45 F17 Joists
Grd floor framing
150x45 Hyspan
300x45 Hyspan
300x63 Hyspan
240x45 Hyspan
90x45 Hyspan
190x45 F17
120x45 F17
90x45 F17
90x90 Cypress
125x125 Cypress
150x50 Cypress
100x50 Cypress
Panel Flooring
Liquid Nails
Ply Brace 2700x900
90x45 MGP10 plates
Mini Brace 4.2 long
Posi-Struts
First Floor Framing
120x45 MGP10

190x45 MGP10
130x36 Hyspan
90x45 Mgp10 Studs
90x45 MGP10 plates
90x35 Mgp10 noggins
Roof trusses
Roof Battens - 90 x 35
Roof Battens - 90 x 45
OBHW - 75 x 25
OBHW - 150 x 25
190x32 T/Pine Fascia
Merch Pine
Enter extra items here

Structural Steel P/Tonne refer to breakdown


Crane Hire for steel errection
Labour to fit Steel
Enter extra items here

Corragated Zinc Roofing inc flash, Cap, D/Pipes etc


Corragated C/Bond Roofing inc flash, Cap, D/Pipes etc
Metal Fascia & Gutter
Supply & fit Guard Rail
Box Gutters
Metal Gutter - C/Bond
Downpipes single story no eaves
Downpipes Double story no eaves
Downpipes single story with eaves
Downpipes Double story with eaves
Supply & Fit 75mm Blanket Insulation
Enter extra items here

Wooden Frame
Door
Timber Windows sspecials leadlite
Timber Windows Specials
Enter extra items here

Elertican
Plumber

Openable skylite supply & fit


Electric Skylite supply & fit
Enter extra items here

Glass
false ceiling
Wall putty
Meterbox Supply & fit
Steel Door
Provide light point
Labour allowance to fit light point
Provide data point
Provide phone Point
Supply & fit Door Chime
Provide 2 way point
Provide Dimmer switch
Provide appliance points. R/Hood etc
Provide Oven circuit, Spa etc inc fitof
External Gpo's
Internal Double Gpo's
Smoke Detectors
External appliance Gpo's
Exhaust fans inc ducting to external atmosphere
Swtch board supply & fit
PC Allowance for light fitting's
Intercom Supply & fit
Security Sytem supply & fit
Enter extra items here

Provide Hot & Cold Point inc Drain


Provide Floor Drain
Gas Allowance
Stacks
Sewer Suspended
Stormwater supply & fit
Septic Tank Allowance
Stormwater pit Allowance
Garden tap supply & fit
Fit Spa bath
Fit of D/Washer, W/c etc
Enter extra items here

Lock Up Carpentry labour


Lock Up hardware
90 x 35 Merch pine
4.5mm hardieflex
140x20 Dar Pine Bird Brds
Gable Infils no details provided
Cavity Slider - 2040x720
Double Cavity Slider
Weather Brds - Timber
Weather Brds - primeline - 170mm
Tile Underlay 1800x900
Masonite packers
60x32 Crn Mouldings to w/brds
30x32 Crn Mouldings to w/brds
150x25 T/Pine Plinth
190x35 F17 Bearers
Sislation Tyvek 2700x30mtr Roll
Decking Brds - Merbau 90 x 19
90 x 45 F17 joists
Enter extra items here

Supply & fit Jetmaster


Supply & Fit Combustion Heater
8 Point Ducted Heating
12 Point Ducted Heating
Supply & Fit Split System
Enter extra items here

Supply & fit R1.5 Wall batts


Supply & Fit R2.5 Ceiling batts
Supply & fit Acoustic Batts
Enter extra items here

Timber Staircase Inc Standard balustrade


Steel & Timber Staircase no Balustrade
Enter extra items here

Supply & fit plasterboard to walls


Supply & fit plasterboard to ceiling's
Wet Area Walls
Supply & fit 90mm scotia cornice

Patch & Reapir exisitng as required


P50 stopping Bead
Enter extra items here

Sup & fit 50mm Poly & coloured render


Sup & fit 75mm Poly & coloured render
Sup & fit 100mm Poly & coloured render
Render inc colour coat
Render for paint finsh by others
Membrane finish
Enter extra items here

Caulking Internal Joins


Caulking external Joins / Joints
Waterproofing membrane
Waterproof Shower / bath
Enter extra items here

PC Allowance for Floor Tiles


PC Allowance for Wall Tiles
Labour to lay Wall Tiles
Labour to lay Floor Tiles
Cement screed to falls
Construct showerbase inc Falls
Enter extra items here

Fixing Carpentry Labour


Fixing Hardware
Prehung 2040 single MDF Door Jamb
Prehung 2040 double MDF Door Jamb
Redicoat 2040 Door
Solidcore 2040 Door
Redicoat 2340 Door
Solidcore 2340 Door
Passage Sets
Privacy Sets
Robe Handles
Door Stops
Flush Pulls
67x18 MDF Architraves
87 x 18 MDF Skirting

110 x 18 MDF
Curved Architraves
Enter extra items here

External Balustrade
Internal Balustrade
Enter extra items here

Supply & fit Robes inc sliding vynil doors


Supply & fit Joinery Carcasses
Linen Fitouts
Stone Benchtops
Enter extra items here

Painter - internal 3 coats inc 2 features


Painter - External Cladding
Enter extra items here

Supply & lay Carpets inc Underlay inc stairs


Supply & lay Floating Floor
Sand & polish Floor boards
Sand & polish Concrete Slab
Enter extra items here

Supply & fit Ply Tilt-a-Door


Supply & fit sectional Garage Door
Supply & fit Ceder Garage Door
Enter extra items here

Fully Framed Shower Screen


Semi-Framed Shower Screen
Frameless Shower Screen
Colourback Splashback
6mm Mirror Supply & Fit
Enter extra items here

Internal Clean inc Windows

Enter extra items here

Site Clean inc Bobcat & Bins


Enter extra items here

100mm thick Paving Slab - Plain


100mm thick Paving Slab - Coloured
125mm thick Paving Slab - Coloured
Labour to lay pavers
PC Allowance for Pavers
Enter extra items here

Taps sets
Basins
Toilet Suites
Pressed metal Baths
Shower Base 900x900
Shower Base 1350x900
Toilet Roll Holders
Towel Rails
Towel Rings
Soap Dishes / Toothbrush Holders
Kitchen Sink
Cistern Stops
L/dry Sink
Enter extra items here

Cooktop Allowance
Wall Oven Allowance
Rangehood Allowance
Dishwasher Allowance
Insinkerator Allowance
Enter extra items here

Blinds, Curtains & Drapes Supply & Fit


Enter extra items here

Hills Paraline Clothes Hoist

Brass Letterbox & Numerals


Enter extra items here

Balcone Railing
Stair case Railing
gate
Enter extra items here

PC Allowance for soft landscaping


Enter extra items here

Overheads

uilding Works

This Template has been provided by Organized Builders with the clear understanding that this docum
indicative range of costs that should be considered within a Building Estimate. This template does no
specialized items, other consulting, Government or External costs. The user should check the relevan
purchasing, signing contracts, ordering materials or any other cost related excerise until they have re
advice. Organized Builders recommends that the client is fully aware of all costs prior to committing t
no responsibility for financial loss that may occur due to incorrect pricing, quantities or unforeseen re

r must seek professional advice on all costs

Supplier

PC Allowances

Units
bags per
bags per
foot
foot
foot
foot

PC Allowance

sq
sq
sq
sq
sq
sq
sq
sq
sq

feet
feet
feet
feet
feet
feet
feet
feet
feet

p/kg

Frame
Door
Window
Door
Window

PC Allowance
PC Allowance
PC Allowance

PS Allowance

Carpentry

PS
PS
PS
PS
PS

Allowance
Allowance
Allowance
Allowance
Allowance

PC Allowance
PC Allowance

PC
PC
PC
PC
PC

Allowance
Allowance
Allowance
Allowance
Allowance

pack

PS Allowance
PS Allowance

PS
PS
PS
PS

Allowance
Allowance
Allowance
Allowance

PS
PS
PS
PS

Allowance
Allowance
Allowance
Allowance

PC Allowance

PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC

Allowance
Allowance
Allowance
Allowance
Allowance
Allowance
Allowance
Allowance
Allowance
Allowance
Allowance
Allowance
Allowance

PC
PC
PC
PC
PC

Allowance
Allowance
Allowance
Allowance
Allowance

PC Allowance

PC Allowance

rstanding that this document is to provide an


te. This template does not take into account
should check the relevance of this template prior to
excerise until they have recieved qualified written
costs prior to committing to any purchase & accepts
uantities or unforeseen reasons bearing financial interests.

Total Quantity
200
0
0
1200
200
1

4000
1
0
0

Rate

Per
300
260
50
45
50
10000

5
25000
5
145

Item Totals

M3
M3
M3
M2
M2
M2

60,000.00
54,000.00
10,000.00
10,000.00

1000
1000
1000
1000
1000
sq feet
Each
Each
L/M
Each
Each
M3
Each
Each
Each
Each
M2
M2
M2
L/M
L/M
L/M
Each
?? Unit

20,000.00
25,000.00
-

5500
396
840
108
700
600
800
2800
1160

32
85
100
40
65
20
50
15
30

1000
1000
1000
1000
1000
1000
1000
1000
M3
Hr
L/M
L/M
Each
?? Unit

Hrs
Each
L/M
Each
Each
Each
L/M
L/M
L/M
L/M
L/M
L/M
L/M
L/M
L/M
L/M
L/M
L/M
L/M
L/M
Each
Each
Each
L/M
Each
L/M
L/M
L/M

176,000.00
33,660.00
84,000.00
4,320.00
45,500.00
12,000.00
40,000.00
42,000.00
34,800.00
-

50

0
40
40
14
0

3300
1000
1000
5000
100000

1
1

35000
35000

L/M
L/M
L/M
L/M
L/M
M2
L/M
L/M
L/M
L/M
L/M
L/M
?? Unit

P/kg
Hr
Hr
?? Unit

M2
M2
L/M
L/M
L/M
L/M
Each
Each
Each
Each
Roll
?? Unit

M2
M2
M2
M2
?? Unit

40,000.00
40,000.00
70,000.00
-

Each
Each

35,000.00
35,000.00

1
1

50000
120000

Each
Each
?? Unit

50,000.00
120,000.00
-

1
1
1
20
0

70000
100000
150000
500
25000

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
?? Unit

70,000.00
100,000.00
150,000.00
10,000.00
-

Each
Each
Each
L/M
L/M
L/M
Each
Each
Each
Each
Each
?? Unit

20000

Each
Each
L/M
M2
L/M
Each
Each
Each
L/M
L/M
Each
Each
L/M
L/M
L/M
L/M
Each
L/M
L/M
?? Unit

20,000.00
-

Each
Each
Each
Each
Each
?? Unit

M2
M2
M2
?? Unit

Each
Each
?? Unit

M2
M2
L/M
L/M

0
0
0
0
0

300

300
200
50
25
3000

L/M
L/M
?? Unit

M2
M2
M2
M2
M2
M2
?? Unit

L/M
L/M
M2
Each
?? Unit

M2
M2
M2
M2
M2
Each
?? Unit

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
L/M
L/M

L/M
Each
?? Unit

L/M
L/M
?? Unit

Each
Each
Each
M2
?? Unit

M2
M2
?? Unit

M2
M2
M2
M2
?? Unit

Each
Each
Each
?? Unit

Each
Each
Each
M2
M2
?? Unit

Each

?? Unit

Each
?? Unit

M2
M2
M2
M2
M2
?? Unit

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
?? Unit

Each
Each
Each
Each
Each
?? Unit

Each
?? Unit

Each

1
1
1

36000
36000
50000

Each
?? Unit

L/M
L/M
?? Unit

Each
?? Unit

0
0
0
0

36,000.00
36,000.00
50,000.00
-

1,513,280.00
1,513,280.00
1,513,280.00
1,513,280.00

Cost Center Totals

134,000.00

45,000.00

472,280.00

150,000.00

240,000.00

330,000.00

20,000.00

122,000.00

1,513,280.00

213,280.00

Compatibility Report for Prelimanary Costing.xls


Run on 20/03/2009 10:37
The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when you save this workbook in
an earlier file format.
Minor loss of fidelity
Some cells or styles in this workbook contain formatting that is not supported by
the selected file format. These formats will be converted to the closest format
available.

# of occurrences
3

You might also like