ANNEXURE - IV (CELL CAPACITY RATING FACTOR CALCULATION SHEET)

Cell Type: KPL970P Amco make


End Cell Voltage 1.14V/Cell

Cell Ah Capacity

Discharge Time t1
Time t2
(1)
(2)
factor Kt1 for factor Kt2 for
Time
from data from data Amperes Amperes time t1 = Ah time t2 = Ah
(min)
(min)
(min)
for time t1 for time capacity(1) capacity(2)
(A)
t2 (A)
1
1
0
1229
0.79
0.00
2
1
5
1229
947
0.79
1.02
4
1
5
1229
947
0.79
1.02
5
5
0
947
1.02
0.00
24
5
30
947
862
1.02
1.13
25
5
30
947
862
1.02
1.13
29
5
30
947
610
1.02
1.59
30
30
0
610
1.59
0.00
45
30
60
610
494
1.59
1.96
44
30
60
610
494
1.59
1.96
54
30
60
610
494
1.59
1.96
58
30
60
610
494
1.59
1.96
59
30
60
610
494
1.59
1.96
60
60
0
494
1.96
0.00
90
90
0
421
2.30
0.00
120
120
0
368
2.64
0.00
450
300
480
183
117
5.30
8.29
475
300
480
183
117
5.30
8.29
479
300
480
183
117
5.30
8.29
480
480
0
117
8.29
0.00
510
480
600
117
94.7
8.29
10.24
530
480
600
117
94.7
8.29
10.24
538
480
600
117
94.7
8.29
10.24
539
480
600
117
94.7
8.29
10.24
540
480
600
117
94.7
8.29
10.24
554
480
600
117
94.7
8.29
10.24
555
480
600
117
94.7
8.29
10.24
569
480
600
117
94.7
8.29
10.24
570
480
600
117
94.7
8.29
10.24
575
480
600
117
94.7
8.29
10.24
594
480
600
117
94.7
8.29
10.24
595
480
600
117
94.7
8.29
10.24
598
480
600
117
94.7
8.29
10.24
599
480
600
117
94.7
8.29
10.24
600
600
0
94.7
10.24
0.00

970
Factor Kt
for time t

Note:

1. Kt is the interpolation of kt1 & kt2 as stipulated in IEEE Std 1115-2000, Annex A
i.e.

Kt

Kt2

(Kt2 - Kt1) x (t2 - t)


(t2 - t1)

0.79
0.85
0.97
1.02
1.10
1.11
1.57
1.59
1.78
1.76
1.89
1.94
1.95
1.96
2.30
2.64
7.79
8.21
8.27
8.29
8.78
9.10
9.23
9.25
9.27
9.49
9.51
9.74
9.75
9.84
10.15
10.16
10.21
10.23
10.24

2. For discharge data refer Annexure - V 'Cell Performance Data" as given by battery manufacturer.

Basic Data :
Lowest Electrolytic Temperature = 18C
Minimum end Cell Voltage = 1.13V
End Cell Voltage during Equalisation Charging = 1.42V
Minimum System Voltage, Umin = 193V
Maximum System Voltage, Umax = 242V
Number of cell per battery bank = 171 (refer clause 4.3.1)
(1)
Period

(2)
Load (ampere)

(3)
Change in load
(ampere)

(4)
(5)
(6)
(7)
(8)
Duration of
Time to end of
Capacity
Temperature
Required Section Size
Period (minute)
Section
rating factor for Derating Factor for
(3) x (6) x (7) = Rated Amp
(minute)
t Min Rate (Kt)
t Min (Tt)
hour

Section 1 - First Period Only


1
307

307

Section 2 - Period-1 & 2


1
307
2
247

307
-60

1
29

Section 3 - Period-1, 2 & 3


1
307
2
247
3
56

307
-60
-191

Random Equipment Load


1
0

Maximum Section
Size Ah
Random Load Size Ah
Design margin
Uncorrected size in Ah

=
=
=
=

668
0
1.05
668

Aging Factor

1.25

Required Capacity in Ah =

876

0.79
Sec-1 Total

242
242

30
29

1.59
1.57
Sec-2 Sub Total
Total

1
1

488
488
394

-94
-94

1
29
570

600
599
570

10.24
10.23
9.75
Sec-3 Sub Total
Total

1
1
1

3145
3145
668

-614
-1863
-2477

0.00

1 -

Temperature

KBL

1 Sec.

5 Sec.

30 Sec

1 Min.

5 Min.

10 Min. 15 Min. 20 Min. 30 Min.

1 Hr.

1.5 Hrs.

15 deg.C

0.940

0.941

0.943

0.950

0.950

0.950

0.950

0.950

0.952

0.960

0.970

12 deg.C

0.840

0.839

0.838

0.842

0.847

0.867

0.872

0.875

0.882

0.902

0.920

10 deg.C

0.880

0.880

0.880

0.885

0.888

0.900

0.903

0.905

0.910

0.925

0.940

5 deg.C

0.815

0.816

0.820

0.828

0.833

0.835

0.839

0.843

0.850

0.868

0.885

0 deg.C

0.752

0.752

0.760

0.762

0.765

0.775

0.781

0.787

0.800

0.820

0.830

-5 deg.C

0.680

0.681

0.686

0.700

0.700

0.705

0.709

0.713

0.725

0.752

0.765

-10 deg.C

0.630

0.630

0.630

0.630

0.630

0.640

0.643

0.645

0.650

0.680

0.700

2 Hrs.

3 Hrs.

4 Hrs.

5 Hrs.

6 Hrs.

7 Hrs.

8 Hrs.

9 Hrs.

10 Hrs.

0.980

0.990

0.995

0.995

1.000

1.000

1.000

1.000

1.000

0.930

0.940

0.953

0.953

0.958

0.958

0.958

0.958

0.958

0.950

0.960

0.970

0.970

0.975

0.975

0.975

0.975

0.975

0.900

0.915

0.925

0.930

0.938

0.938

0.938

0.938

0.938

0.850

0.870

0.880

0.893

0.900

0.900

0.900

0.900

0.900

0.788

0.815

0.830

0.847

0.850

0.850

0.850

0.855

0.860

0.725

0.760

0.780

0.800

0.800

0.800

0.800

0.810

0.820

ANNEXURE - IV (CELL CAPACITY RATING FACTOR CALCULATION SHEET)

Cell Type: KPL970P Amco make

Cell Ah Capacity

Discharge Time t1
Time t2
(1)
(2)
factor Kt1 for factor Kt2 for
Time
from data from data Amperes Amperes time t1 = Ah time t2 = Ah
(min)
(min)
(min)
for time t1 for time capacity(1) capacity(2)
(A)
t2 (A)
1
1
1546
0.79
2
1
5
1546
1191
0.79
1.02
4
1
5
1546
1191
0.79
1.02
5
5
1191
1.02
24
5
30
1191
768
1.02
1.13
29
5
30
1191
768
1.02
1.59
30
30
768
1.59
54
30
60
768
622
1.59
1.96
58
30
60
768
622
1.59
1.96
59
30
60
768
622
1.59
1.96
60
60
622
1.96
90
90
530
2.30
120
120
463
2.64
450
300
480
230
147
5.30
8.29
475
300
480
230
147
5.30
8.29
479
300
480
230
147
5.30
8.29
480
480
147
8.29
0.00
510
480
600
147
119
8.29
10.24
530
480
600
147
119
8.29
10.24
538
480
600
147
119
8.29
10.24
539
480
600
147
119
8.29
10.24
540
480
600
147
119
8.29
10.24
554
480
600
147
119
8.29
10.24
569
480
600
147
119
8.29
10.24
575
480
600
147
119
8.29
10.24
594
480
600
147
119
8.29
10.24
595
480
600
147
119
8.29
10.24
598
480
600
147
119
8.29
10.24
599
480
600
147
119
8.29
10.24
600
600
119
10.24
-

970
Factor Kt
for time t

0.79
0.85
0.97
1.02
1.10
1.57
1.59
1.89
1.94
1.95
1.96
2.30
2.64
7.79
8.21
8.27
8.29
8.78
9.10
9.23
9.25
9.27
9.49
9.74
9.84
10.15
10.16
10.21
10.23
10.24

Note:

1. Kt is the interpolation of Kt1 & Kt2 as stipulated in IEEE Std 1115-2000, Annex A
i.e.

Kt

Kt2

(Kt2 - Kt1) x (t2 - t)


(t2 - t1)

2. For discharge data refer Annexure - V "Cell Performance Data" as given by battery manufacturer.