You are on page 1of 23

AL RYUM GROUP PROJECTS COMPLETED

S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

Contract No. BA/2/L/1476 Hard & Soft


Landscape Works and Automatic Irrigation
System in Al Bateen Palace for H.H. Sheikh
Hamdan Bin Zayed Al Nahyan

Abu Dhabi
Municipality

Arabian
Engineering
Center & Al
Khatib Cracknell.

21.09.1998

30.11.1999

Contract No. BA/2/L/1568 For Construction,


Completion and Remedying of defects of
Ghantoot Racing and Polo Club Landscape
at Abu Dhabi

Abu Dhabi
Municipality

25.06.1999

31.01.2000

Contact No. BA/2/L/1254 For the Supply &


Installation of Equipment in the Veterinary
Laboratory at Al Wathba Clinic

Abu Dhabi
Municipality

Spectrum Eng.
Consultants

03.03.1999

01.10.2001

Contract No. 231/2000 External


Landscaping Works for Marfa Hotel.

Public works
Department

The Arab Office


for Planning &
Architecture

19.06.2000

06.11.2001

Housing Complex Expansion Project


No.1215, Agreement No. 171215C8 /
Package 7. Construction of Landscaping &
Irrigation Branches

ADNOC

10.07.2001

06.08.2002

Supply and Installation of 353 Controllers

Abu Dhabi
Municipality

12.08.2002

20.04.2003

Supply and Installation of 240 Controllers

Abu Dhabi
Municipality

10.11.2002

12.05.2003

Contract No. BA/2/L/1959 H.H. Sheikh


Sultan Bin Zayed Al Nahyan Residential
Complex Landscape Works

Abu Dhabi
Municipality

Sam Engineering
Consultants

06.04.2002

12.05.2003

Construction & Completion of 170 Farms at


Khalifa City "A"

Abu Dhabi
Municipality

Jouzy & Partners


Consulting
Engineers

15.04.2002

27.05.2003

10

Abu Dhabi TRIP Contract No. 980 Umm Al


Nar Bridge and Tunnel Interchange
Landscaping Works

Abu Dhabi
Municipality

Delew Cather

31.12.2002

31.07.2003

11

Landscaping and Maintenance at Ruwais


Housing Comlex ADNOC

ADNOC

01.05.1999

08.08.2003

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

Contract No. BA/2/L/1664 Construction,


Completion and Maintenance of Al Wathba
Park

Abu Dhabi
Municipality

Derby Design

16.09.2000

31.08.2003

13

Contract No. BA/2/L/2072


Supply,
Installation & Maintenance of Electrical &
Mechanical Playground Equipment at
Different Locations in Abu Dhabi

Abu Dhabi
Municipality

Pan Emirates

01.09.2002

18.10.2003

14

Renewal and Maintenance of (5) Fountains


in Abu Dhabi

Abu Dhabi
Municipality

Arabian
Engineering
Center

01.04.2002

15.12.2003

15

Contract No. BA/2/L/1606


Furnishing of the Surgery and X-ray Section
at the Al Wathba Veterinary Clinic

Abu Dhabi
Municipality

Spectrum Eng.
Consultants

30.06.2000

16

Contract No. BA/2/L/1547


Supply
and Installation of Computer Control System
for Irrigation Network at Wadi Al Ryum

Abu Dhabi
Municipality

Arabian
Engineering
Center

10.10.2001

14.04.2004

Contract No. BA/2/L/2004 Construction &


Maintenance of 3 Nos. of Pumping Stations
for Fodder Farms in Wadi
Al Ryum

Abu Dhabi
Municipality

Dr. M.H. Ali El


Saie Consulting
Engineering

02.03.2002

22.05.2004

Contract No. BA/2/L/2222 Supply,


Installation & Maintenance of Electrical &
Mechanical Playground
Equipment at different locations in Abu
Dhabi

Abu Dhabi
Municipality

Pan Emirates

01.06.2003

30.05.2004

Contract No. 230/2002 Development and


Beautification Works at Lulu Island.

Public works
Department

15.08.2002

14.06.2004

Contract No. BA/2/L/2151 Completion &


Plantation of 240 Farmsat Khalifa City B Abu Dhabi

Abu Dhabi
Municipality

Sam Engineering
Consultants

01.09.2003

03.07.2004

21

Construction & Maintenance of 74 Farms

Abu Dhabi
Municipality

Sam Engineering
Consultants

01.03.2004

27.08.2004

22

Irrigation Control System at Quoryn Al Aich

Public works
Department

10.05.2004

09.09.2004

12

17

18

19

20

29.02.2004

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

Contract No. BA/2/L/2105 Construction &


Maintenance of 800 Farms at Al Falah Area,
Abu Dhabi

Abu Dhabi
Municipality

Sam Engineering
Consultants

01.07.2002

30.09.2004

24

Contract No. BA/2/L/2050 Construction &


Maintenance of 649 Farms at Al Rehbah,
Abu Dhabi

Abu Dhabi
Municipality

Sam Engineering
Consultants

10.11.2001

08.12.2004

25

Contract No.910/1 Irrigation Control System


at Abu Dhabi Industrial City - Phase I

Public works
Department

Parsons

23.10.2004

11.12.2004

26

Supply & Installation of 20 Tanks 100,000


Gallons at the Western Region

Western Region
Municipality

Joozy & Partners

17.11.2003

15.12.2004

27

Replacement of Irrigation System & Lighting


at Crown Prince Diwan

Abu Dhabi
Municipality

Joozy & Partners

17.11.2003

15.12.2004

28

Landscaping Works at Conference Palace


Hotel (Emirates Palace) - Abu Dhabi,
Package
14 A, B & C

Conference
Palace Hotel
Executive
Committee

Turner

25.07.2004

30.12.2004

29

Contract No. BA/2/L/2637 Replacement of


Irrigation System at his Highness The
President Palace at Muzairah.

Abu Dhabi
Municipality

Sam Engineering
Consultants

24.07.2004

19.01.2005

30

Contract No. BA/2/L/2516 Removal, Supply,


Installation & Maintenance of Garden Lights
at Mirfa Cornich.

Abu Dhabi
Municipality
Agriculture Dept.

Dr. M.H. Ali El


Saie Consulting
Engineering

15.05.2004

10.03.2005

31

Supply & Installation of 100 Pumps at Bida


Yamrah 8

Abu Dhabi
Municipality

Sam Engineering
Consultants

10.01.2004

08.05.2005

32

Supply & Installation of Flow Control Valves


at Taweelah, Rehba & Bahia

Abu Dhabi
Municipality

Dr. M.H. Ali El


Saie Consulting
Engineering

09.01.2004

09.05.2005

33

Contract No. BA/2/L/2472 Renovation &


Maintenance of 8 Fountains inside & outside
Abu Dhabi - Phase 3

Abu Dhabi
Municipality

Pan Emirates

13.12.2003

10.05.2005

34

Abu Dhabi TRIP Contract No. 982 Umm Al


Nar Bridge and Tunnel Interchange
Landscape & Irrigation Works.

Public works
Department

Delew Cather

10.03.2004

21.06.2005

23

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

Plantation Around the Villas at Rehba, Al


Shahama, Al Sader, Al Shelilla, Helleeya
North, Helleeya South, Shawmekh and
Baniyas - Phase II

Abu Dhabi
Municipality

Sam Engineering
Consultants

17.07.2004

16.07.2005

Contract No. 950 Irrigation, Agricultural


Drainage and Landscaping Works at Abu
Dhabi International
Airport - Phase I

Abu Dhabi
Municipality SPC
Dept.

Parsons

24.07.2004

18.07.2005

Contract No. 176/2004 Maintenance Works


at Ajban Race Track.

Public works
Department

01.05.2004

28.02.2006

Plantation Around the Villas at Rehba, Al


Shahama, Al Sader, Al Shelilla, Helleeya
North, Helleeya South, Shawmekh and
Baniyas - Phase I

Abu Dhabi
Municipality

Sam Engineering
Consultants

17.07.2004

26.03.2006

39

Burj Dubai Development - The Residences


Hard & Soft Landscaping Works

EMAAR

MACE Int'l Ltd.

06.10.2005

31.05.2006

40

Maintenance Works at Mirfa Garden

Abu Dhabi
Municipality

Arab Officer for


Planning and
Architecture

04.06.2005

03.06.2007

41

Contract No. BA/2/L/2872 Natural


Beautification, Fountains & Landscaping
Works at the area surrounding Mafraq Hotel
- Abu Dhabi

Abu Dhabi
Municipality

Sam Engineering
Consultants

09.07.2005

03.07.2006

42

Supply, Installation, Operation &


Maintenance of Steel Tank (1 M Gallon) &
Pumping Stations & 600 Water Line for Al
Foah Farm at Al Ain
Contract No. 08/2005

Al Foah Dev. Co.

20.12.2005

15.07.2006

Contract No. BA/2/L/2705


Supply &
Installation of 4 Nos. R.O. Plants (10,000
GPD) in Western Region.

Abu Dhabi
Municipality

Dr.M.S. Al Saie

24.01.2005

23.07.2006

Maintenance Works in Gardens & Parks


PROJECT I

Abu Dhabi
Municipality

Parsons

17.07.2004

16.07.2006

Shade Structures for various Schools in


Northern Emirates

Ministry of Public
Works.

12.05.2006

11.08.2006

35

36

37

38

43

44

45

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

46

Contract No. BA/2/L/2874 Supply,


Installation & Maintenance of Mechanical &
Electrical Playground Equipment inside &
outside Abu Dhabi

Abu Dhabi
Municipality

Pan Emirates
Consult

24.12.2005

20.08.2006

47

Arabian Ranches Dubai

EMAAR

Parsons

01.05.2006

01.09.2006

48

Emirates Hills - Frayland Villas Streetscape


Landscaping & Irrigation Works.

EMAAR

01.12.2005

15.09.2006

Maintenance Works in Gardens & Parks


PROJECT 2

Abu Dhabi
Municipality

04.10.2004

03.10.2006

50

Landscaping & Irrigation Works at Sea


Palace Side Road - Abu Dhabi

Abu Dhabi
Municipality

Hyder

01.10.2006

22.10.2006

51

Contract No. BA/2/L/2707 Completion &


Maintenance of Two Concrete Tanks at
Um al Nar.

Abu Dhabi
Municipality
Agriculture Dept.

Consulting
Engineering
Group

30.04.2005

30.09.2006

Burj Dubai Development:


Old Town
Sites A & B
Contract No. 3020 Site
A,Phase I Contract No. 4070 Landscaping
& Irrigation Works.

EMAAR

MACE Int'l Ltd.

20.12.2005

15.10.2006

53

Contract No. JAP006/C94 The Palm


Jumeirah - Concrete Works for Chiller Plant
(4000 Sq. Mtr. Concrete Works).

Nakheel

Parsons

20.12.2005

20.10.2006

54

Maintenance Works in Gardens & Parks


PROJECT 3

Abu Dhabi
Municipality

Parsons

01.11.2004

31.10.2006

Burj Dubai Development:


Business
Park - Phase I Landscaping & Irrigation
Works.

EMAAR

Shank Land Cox

08.02.2006

31.10.2006

56

Maintenance Works at Ajban Race Track.

Public works
Department

01.05.2004

10.11.2006

57

Contract No. BA/2/L/2270 Landscape,


Irrigation System & Lighting for

Abu Dhabi
Municipality

Sam Engineering
Consultants

08.01.2006

15.11.2006

49

52

55

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

Development Projects at Waves Breaker Villas Area

58

Maintenance Works in Gardens & Parks Project 4

Abu Dhabi
Municipality

02.01.2005

01.01.2007

59

Irrigation and Landscaping Works at Abu


Dhabi - Golf Course.

Tourism Devl &


Investment Co.

28.10.2006

17.01.2007

60

Construction of New Car Park with Shades


including Asphalt Works at Abu Dhabi
Intercontinental Hotel Refurbishment Project

National
Corporation for
Tourism and
Hotels

Turner

09.07.2006

10.02.2007

61

Shade Structure Works for Seven Schools


at Ajman Contract
No.MB24/190202051015/156/2006

Ministry of Public
Works

12.08.2006

11.02.2007

62

Shade Structure Works for Six Schools at


Dubai
Contract No. MB19020205105/155/2006

Ministry of Public
Works

12.08.2006

11.02.2007

63

Shade Structure Works for Two Schools at


Al Quwain Contract No.
MB190202051015/157/2006

Ministry of Public
Works

12.08.2006

11.02.2007

64

Soft Landscape and Irrigation Works of


Shahil Accommodation /Replacement for
ADMA-OPCO on Das Island

ADNOC

24.03.2006

18.02.2007

65

New Corniche Road East Landscaping &


Irrigation Works Contract No. 2015-2016

Abu Dhabi
Municipality

Delew Cather

18.03.2004

19.04.2007

66

Burj Dubai Development - The Residences Phase II Hard & soft Landscaping Works

EMAAR

MACE Int'l Ltd.

11.07.2006

31.05.2007

67

Landscaping & Irrigation Works at Shoreline


Apartment

Nakheel

11.03.2006

10.06.2007

Construction and Completion of The


Armenian Embassy in Abu Dhabi

The Armenian
Embassy in Abu
Dhabi

Spectrum
Engineering
Consultant

01.05.2006

30.07.2007

68

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

69

Contract No.952 Landscape, Agricultural &


Irrigation Works at Abu Dhabi Int'l Airport Phase II

Abu Dhabi
Municipality
Agriculture
Department.

Parsons

10.09.2005

30.12.2007

70

Contract No. PJ 9167/2 Construction of


New Community Facilities & Improvements
to Existing Facilities - Zone 2

Dubai Municipality

Gulf Engineering
Consultant

28.10.2006

30.12.2007

71

Contract No. PJ 9167/3 Construction of


New Community Facilities & Improvements
to Existing Facilities - Zone 3

Dubai Municipality

Gulf Engineering
Consultant

28.10.2006

30.12.2007

72

Contract No. PJ 9167/4 Construction of


New Community Facilities & Improvements
to
Existing Facilities - Zone 4

Dubai Municipality

Gulf Engineering
Consultant

28.10.2006

30.12.2007

73

Contract No. 910/2 - Agricultural & Irrigation


Works at Abu Dhabi Industrial City - Phase
II

Abu Dhabi
Municipality
Agriculture
Department.

Hyder

20.05.2007

14.03.2008

Contract No. 017/2007 - Various


Landscaping & Irrigation Works for Armed
Forces

G.H.Q. Armed
Forces Directorate
of Military Works.

01.04.2007

31.03.2008

75

Completion of Central Control Irrigation


System for Water Distribution for locals
farms at Mouazaz, Al Jarf & Al Nahda.

Abu Dhabi
Municipality

SAM Engg.

01.05.2007

30.04.2008

76

Contract No.N026-040-13 Palm Deira


Promenade at Deira Island Front

Nakheel

15.01.2008

30.03.2009

77

Contract No. AE/A/493/2007, Various work


for Armed Forces

G.H.Q. Armed
Forces Directorate
of Military Works

20.02.2008

19.08.2008

78

Contract No. PJ-9163, Construction,


Completion and Maintenance of Mirdif Park

Dubai Municipality

01.05.2007

31.12.2008

TenderL35/2007,Devl of Waves Breaker


Area in Abu Dhabi (Landscaping & Agric.
Works-Lighting
Network-Irrigation Network, Hardscaping
(Interlocks pavers II)

Abu Dhabi
Municipality &
Agriculture

SAM Engineering
Consultant

18.03.2008

17.01.2009

74

79

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

80

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

Kempinski Hotel & Residences at the Palm


Jumeirah Phase II

Emerald Palace
Group
Management FZLLC

28.09.2009

28.12.2010

81

Contract No.A219999/2008/C/004 400MM


External Infrastructure Trunk Sewer - Al
Raha Garden.

ALDAR Properties
PJSC

GHD

09.01.2009

30.06.2009

82

Contract No. 350 - Rehabilitation of Water


Tanks and Irrigation Network at Western
Region - Ghayathy City - Phase 1.

Abu Dhabi
Municipality

KEO

07.04.2007

31.07.2009

Green Reconstruction of Abu Dhabi Golf &


Equestrian Club

ALDAR Properties
PJSC

01.06.2009

15.10.2009

84

Contract No. A219999/2007/C/001 Landscaping Works for Parks, Gardens &


planting adjacent to roads, boundary walls
for the Residential Compounds of Al Raha
Gardens I & II, Abu Dhabi

ALDAR Properties
PJSC

GHD Global PTY


Ltd.

07.04.2007

30.10.2009

85

Contract No.ssc-08-02004-000000029 Irrigation works at Interchange 4 & 5, for the


Al Raha Beach Development

ALDAR Properties
PJSC

Cansult Maunsell

26.04.2009

01.11.2009

86

Contract No.147/2008 - Maint,


Rehabilitation & Additional Works for the
Roads and Brigdes of Emirate, Main Land
North, Farms in Al Idlah

Abu Dhabi
Municipality

04.08.2009

04.11.2009

87

Saadiyat Island Expressway Early


Landscape Works Project # C40

Tourism
Development &
Investment Co.

Parsons Engr.

13.06.2009

12/11/2009

88

Landscaping Works for Parks, Gardens &


planting adjacent to roads, boundary walls
for the Residential Compounds of Al Raha
Gardens III,
Abu Dhabi

ALDAR Properties
PJSC

GHD Global PTY


Ltd.

30.09.2008

30.11.2009

89

Soft Landscaping and Irrigation Works for 5


nos. of Operative Village at Yas Island

ALDAR Properties
PJSC

Whitby Bird

25.06.2008

30.11.2009

83

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

90

Soft Landscaping and Irrigation Works for


Links Golf Course at Yas Island

ALDAR Properties
PJSC

Whitby Bird

25.06.2008

30.11.2009

91

Contract No.A219999/2008/C/005
1200MM External Infrastructure Sewerage
Trunk
Service Al Raha Garden

ALDAR Properties
PJSC

GHD Global PTY


Ltd

08.11.2008

30.11.2009

92

Reactivation of Abu Dhabi Corniche Beach


Improvement Works Phase I

M/s. UPC Urban


Planning Council

M/s. Hyder
Consulting
Middle East
Limited

02.06.2009

31.12.2009

93

Const of Iraqi Embassy Building,


Ambassador Residence, Servant's Accom,
Utility Blocks and Boundary Walls.

Iraqi Embassy

DEWAN

29.04.2008

30.01.2010

94

Ref. No. S439001/2008/T/001 Infrastructure,


Soft Landscape and Irrigation Works, Yas
Island Development Zone P Central Park /
F1 Car Park

ALDAR Properties
PJSC

HALCROW

06.11.2008

30.01.2010

95

Hotels H3 & H4 (Crown Plaza Stay Bridge)


Contt#A430852/2007/c/007/sub/0021

ALDAR Properties
PJSC

Kannfinche

05.12.2008

31.01.2010

96

Development & Landscape for the Garden &


Entrance of Ministry of Presidential Affairs

Ministry of
Presidential
Affairs

17.12.2009

17.02.2010

97

Abu Dhabi International Shooting Club


External Landscape & Irrigation Planting
System Built For Wake Board
Facilities and Landscape Upgrade Design
for Paint Ball Area including Old Wake
Facilities

Private Property
Management

ATKINS

24.12.2008

31.03.2010

98

Al Forsan Intl Sports Resorts/AFISR


Complete Design & Build Air Supported
Structure

Private Property
Management

12.01.2010

30.04.2010

99

Landscaping and Maintenance at Ruwais


Housing Complex ADNOC Agreement
No.1740301

ADNOC

07.08.2003

30.06.2010

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

CONSULTANT

STARTING
DATE

COMPLETION
DATE

KEO

05.06.2010

30.07.2010

Parsons
Engineering

06.05.2010

30.08.2010

Musanada

24.10.2009

23.10.2010

Ph. 1A Welcome Pavilion Water Cascades


MEP Works

Al Dar Besix

03.02.2010

30.10.2010

Kempinski Residences Palm Jumeirah


Landscaping Works

KEMPINSKI

LMS Intl

05.08.2009

30.10.2010

MW/D/25/2010 - Supply & Installation


of Two Water Tanks in Al Ain

Crown Prince
Court

13.04.2010

14.11.2010

107

Landscaping Beautification Works to the


Area Located at West 2/19, Abu Dhabi

Abu Dhabi
Municipality

Dorsch Holding
GmBH

15.08.2010

11.09.2010

108

Al Gurm Villas Irrigation and Landscaping


Works

AL Dar Properties
PJSC

Dar Al Handasah

31.08.2010

15.01.2011

109

Annual Maintenance Contract for


Landscaping and Irrigation system
maintenance for Marina Office Park

National
Investment
Corporation

01.03.2010

28.02.2011

Contract No. 488 Subsoil Drainage for


Ghantoot Polo Club

Abu Dhabi
Municipality

Dorsch Holding
GmbH

11.04.2010

30.04.2011

111

Cont. #MW-OU-059-2009 Const. of


Concrete Boundary Wall, Observation
Towers, Road Works and Other Works at
Falag Hazza Camp Al Ain

GHD

07.03.2010

30.04.2011

112

Contract No. GC-26 Al Jawaher Temporary


utility Works

TDIC

07.12.2010

07.05.2011

PROJECT NAME

CLIENT

Additional Car Parks @ Emirates Palace

Emirates Palace

Nareel Island Development External Roads


and Fence

ALDAR Properties
PJSC

Al Ain Equestrian Club Steel Water Tank

103

104

100

101

102

105

110

10

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

113

New Pump Station at Rawdat Al Reef

Crown Prince
Court

3.01.2010

30.04.2011

114

T-FM-42-2010 Supply, Installation, Testing


and Commissioning and Operating of (23)
Traveller Irrigation Systems in Ghantoot
Racing and Polo Club

Abu Dhabi
General Services
PJSC trading as
MUSANADA

15.01.2011

15.06.2011

115

Supply, Installation and Commissioning of


500mm Water Supply to Plot (A) in Razeen
Labour City
Abu Dhabi

MUSANADA

Dr. M.H. Ali ElSaie Consulting


Engineers

12.07.2011

12.11.2011

116

AC7143 Al Raha Beach Development


Southside IC6 Extension Complete Works
Removal/Relocation of
Palm Trees

Balfour Beatty
LLC

Parsons
Engineering

15.08.2011

31.09.2011

117

Civil & Landscaping Works at Al Bateen


Palace

Crown Prince
Court

Dorsch Holding
GmbH

06.06.2011

30.10.2011

118

Contract No. 469 Landscape & Irrigation


Works for the VIP Entrance of H.H. Sheikh
Zayed Bin Sultan Al Nahyan Mosque

Abu Dhabi
Municipality

Dorsch Holding
GmBH

20.03.2011

17.09.2011

119

Supply & Installation of Tensile Fabric for


Private Villa Island

Shield Cont. Co.

01.08.2011

30.09.2011

120

Construction, Completion of Football Pitch


Facilities Building, Emirates Palace, Abu
Dhabi

Emirates Palace,
Abu Dhabi

21.09.2011

30.09.2011

121

Landscape and Irrigation Maintenance


Works at H.H. Sheikh Hamdan Al Nakheel
Palace Abu Dhabi

The Private Office


of H.H. Sheikh
Hamdan Al
Nakheel Bin
Zayed

01.10.2010

01.10.2011

122

Construction of Beach Restaurant & Grill


Phase 1 Kempinski Residences Palm
Jumeirah

Sunny Beach
Properties LTD,
Abu Dhabi, UAE

15.05.2011

30.09.2011

11

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

123

Renovation of Pump Sets & Controller and


Related Works at Al Maha Farm

Elite Agro LLC

Al Salaam
KLhalil N. Khoury

09.06.2011

31.12.2011

124

Supply & Installation of New Pipeline &


Electrical Lines to CPIs and Related Works

Elite Agro LLC

Al Salaam
KLhalil N. Khoury

09.06.2011

30.11.2011

125

Supply & Installation of One MIG Water


Tank in Al Maha Farm

Elite Agro LLC

Al Salaam
KLhalil N. Khoury

15.08.2011

30.11.2011

126

Gen. Maint. for Aljeel KG in Al Shamkha


Building no. C1142

MUSANADA

26.07.2011

30.11.2011

127

Gen. Maint. for Al Maha School in Al Falah


Building no. C1143

MUSANADA

26.07.2011

30.11.2011

128

Gen. Maint for Capital School in Al Shamkha


Building no. C11139

MUSANADA

26.07.2011

30.11.2011

129

Gen. Maint. for Al Janeen School in Al


Shamkha Building no. C1142

MUSANADA

26.07.2011

30.11.2011

130

Gen. Maint. for Al Taleeaa School in Al


Shamkha Building no. C1144

MUSANADA

26.07.2011

30.11.2011

131

Gen. Maint. for Gurun Yafour School in Al


Falah Building no. C1133

MUSANADA

26.07.2011

30.11.2011

132

Gen. Maint. for Al Tawan School in Al


Shamkha Building no. C1124

MUSANADA

26.07.2011

30.11.2011

133

Gen. Maint. for Al Hisn Secondary Shool in


Al Shamkha Building no. C1114

MUSANADA

26.07.2011

30.11.2011

134

Gen. Maint. for Mariam Bint Imran School


Baniyas Buildning no. C1134

MUSANADA

03.08.2011

30.11.2011

12

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

135

Gen. Maint. for Al Bidaya School Al


Shamkha Building no. C1433

MUSANADA

02.08.2011

30.11.2011

136

Gen. Maint. for Al Mo Tasem School


Baniyas Building no. C1117

MUSANADA

26.07.2011

30.10.2011

137

Gen. Maint. for Al Norr School Baniyas


Building no. C1121

MUSANADA

03.08.2011

30.11.2011

138

Gen. Maint. for Al Mafraq High School


Baniyas Building no. C1116

MUSANADA

26.07.2011

30.11.2011

139

Restoration & Maintenance Works of


Existing Buildings at Al Maha Farm

Elite Agro LLC

Al Salaam
KLhalil N. Khoury

13.08.2011

30.11.2011

140

Contract # MW-Gs-180-2008 Construction


of Headquarter Bldg. Stores & Different
Works for H.Q. of Logistic & Transforming
Arm at Maleeha

GHQ Armed
Forces

15.01.2010

30.11.2011

141

Contract No. 1004 Landscaping Works at


Raha Yas Tunnel Road Entrance

Abu Dhabi
Municipality

Parsons
Engineering

11.07.2010

31.12.2011

142

Khalifa City District Cooling Installation


of 4 Tanks in Khalifa City

Drake & scull Intl

01.08.2011

31.12.2011

DEWA

Al - Diar

15.06.2008

15.12.2011

143

CW/630/2007 const. of 2 pumping stations


each with 60 MIGD capacity in loc. no. 5 &
loc. no. 7 complete with surge protection
system and associated MEP works.

144

Contract C2010/3- Irrigation and


Landscaping Works for H.H. Crown Prince
Court, Abu Dhabi

Crown Prince
Court

Dorsch Holding
GmbH

15.01.2011

31.12.2011

145

Contract No. MW-AF-043-2009 Construction of 7 nos. Ammunition Stores


and Modification Works for Fence at Safran
Air Base

UAE Armed
Forces

25.09.2010

30.11.2011

13

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

146

Abu Dhabi Corniche Landscaping Services


(Maintenance)

John Buck
International
Properties

Hyder

15.11.2009

31.12.2011

147

Contract No. P042-C45 Electrically


Operated Sliding Gates

TDIC

01.05.2011

31.12.2011

148

Contract No. MW/D/27/2010, Supply and


Installation of 1 Water Tank with 1 Million
Gallon capacity along with Installation of an
Irrigation
Network at Farms of Mehier Al Ain

Private Dept. of
H.H. Sheik Fatima
Bint Mubarak

07.11.2010

30.11.2011

149

Contract No. MW/D/26/2010, Supply and


Installation of 1 Water Tank with 1 Million
Gallon capacity along with Installation of an
Irrigation Network at Al Maqam
Al Ain

Private Dept. of
H.H. Sheik Fatima
Bint Mubarak

07.11.2010

29.02.2012

150

Saadiyat Island Beach Resort Landscape &


Irrigation Works

TDIC

Parsons
Engineering

16.01.2010

29.02.2012

151

Main Irrigation Line from Mafraq WWTP to


Al Faya along Abu Dhabi Al Ain Road
Contract No. 956

Abu Dhabi
Municipality

Parsons
Engineering

01.05.2010

21.02.2012

152

Landscaping & Irrigation System


Maintenance for Marina Office Park
Abu Dhabi

National
Investment
Corporation

01.03.2011

29.02.2012

CONTRACT NO.SC-09-2048-0000011 Al
Raha Beach Development/Infrastructure
Irrigation Network at Eastern Precinct

ALDAR Properties
PJSC

19.02.2009

29.02.2012

154

CW/146A/2010 Design, Supply,


Installation, Testing and Commissioning of
Chlorine Dioxide
Dosing System at Mushrif Reservoir Phases
1 to 6

DEWA

09.01.2011

09.02.2012

155

Contract No. P001-C47 Saadiyat


Expressway Permanent Landscape Works

TDIC

Parsons
Engineering

11.02.2010

29.02.2012

153

14

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

156

Agreement No. 1741118 Supply & Lay of


a High Density Polyethylene (HDPE)
Pipeline from a Supplementary High Rise
Pumping Station (SHRPS) to H.H. the
Presi.Palace Plant Yard at Ruwais Housing
Complex

ADNOC

14.07.2011

29.02.2012

157

The Landmark Tower Project, Abu Dhabi

Al Habtoor &
CCIC Joint
Venture

30.10.2011

31.01.2012

158

Proposed Arzanah Development, Sector W57, Abu Dhabi-UAE-Rihan Heights (Phase


1A-Plot H)

MUBADALA
Capital and Real
Estate LLC

08.11.2011

31.01.2012

159

Landscaping & Irrigation Works of the Burj


Khalifa Boulevard Centre Media

EMAAR
Properties

09.11.2011

08.01.2012

160

Contract No. CW/0146A/2010 Design,


Supply, Installation, Testing &
Commissioning of Chlorine Dioxide Dosing
System at
Mushrif Reserviors Phases 1 to 6 including
Al Chlorination Lines, Interconnection with
Existing Chlorination Lines, All Associated
Earthworks, Civil, Electrical and Drainage
Works, Automation System and Safety
Equipment

DEWA

09.01.2011

31.01.2012

161

Contract no. 151/1 Removal of Weeds and


Pruning of Trees in Abu Dhabi Island

Abu Dhabi
Municipality

Parsons
Engineering

02.09.2010.

30.04.2012

162

Construction Works of irrigation Main Lines


at Khalifa Bin Zayed Town B Contract No.
481

Abu Dhabi
Municipality

Dorsch Holding
GmbH

28.04.2010

31.03.2012

163

Al Dhabeya Maritime Residential Complex

Crown Prince
Court

Dorsch Holding
GmbH

22.05.2010

28.04.2012

164

Maintenance and irrigation Services of


Landscaped Areas at ADNOC premises in
Abu Dhabi, Sas Al Nakhil and Al
Shawamekh Agreement No. 1720736

ADNOC

01.11.2008

03.05.2012

15

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

165

PROJECT NAME

Contract No. 6W/2010-4MIG & 2x1MIG


RCC Water Tanks & Pumping Station in
Central Area

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

FEWA

Dr. M. H. Ali ElSaie

01.06.2011

31.03.2012

166

Contract No. CMW 11051 C002


Construction of Stores at Al Maryal Camp
Camp No. (220802)

GHQ Armed
Forces

01.11.2011

31.03.2012

167

Modification to Boundary Wall For H.H. the


Crown Prince Diwan at W-35,
Abu Dhabi UAE

H.H. The Crown


Prince Diwan

Architectural &
Engineering
Consultant

20.01.2012

20.05.2012

168

Maintenance of Landscape Works, Sport


Field and Irrigation Network

Private Property
Management

10.07.2011

30.08.2012

169

CMW-11098-C002

GHQ Armed
Forces

17.07.2012

31.10.2012

171

Yas Island Development Modification of


Potable Water Network for Gateway Park

Al Dar Properties
PSJC

23.04.2012

31.10.2012

172

Contract no. 151/2 Removal of Weeds and


Pruning of Trees in Abu Dhabi Island

Abu Dhabi
Municipality

Parsons
Engineering

02.09.2010

31.12.2012

173

Oman Botanic Gardens, Phase IV

BAM International

01.12.2011

31.12.2012

174

Contract No. A199999/2011/C/025 Geotextile Fabric under Gravel Mulch at Al Gurm


Berm Area (Al Gurm Development)

Al Dar Properties
PSJC

26.12.2011

26.12.2012

175

New Management Building and New


Auditorium Building at Buhasa Soft
Landscaping & Irrigation Works

Abu Dhabi Gas


Industries Ltd.
(GASCO)

AECOM

01.05.2012

31.12.2012

176

Contract No. M46/2012 Landscaping &


Irrigation Works at Falj Al Mua ala Palace,
Ajman

Crown Prince
Court

19.10.2012

20.01.2013

177

Tender No. EPD-CT-12020


Design, Supply & Installation of Dense
Planting Screen at Khaleej Al Arabi Service
Station Abu Dhabi

ADNOC

30.01.2013

15.02.2013

16

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

178

Maintenance of Emirates Palace Football


Pitch

Emirates Palace
Hotel

15.01.2012

28.02.2013

179

C410 Development & Const. Works for


irrigation Network & Pumping Station in
Farm Areas (Dhaharat, Al Tayeb, Al Wafiya,
Al Wathba)

Abu Dhabi
Municipality

Dorsch Holding
GmbH

01.06.2010

11.03.2013

181

Millenium Hotel, Sulaimani, Kurdistan


Region Iraq

Faruk Holding
Company Ltd.

02.02.2012

31.03.2013

182

Landscape Complementary of Faruk


Medixal Center ( FMC)

Faruk Holding
Company Ltd.

19.07.2012

19.12.2012

183

Contract No. 15W/2010(2) 3x2MIG RCC


Water Tanks & Pumping Station in Rak Area

Federal Electricity
& Water Authority
(FEWA)

Dr. M. H. Ali ElSaie

01.06.2011

30.04.2013

184

Supply and Installation of Water Features

Al Dar Properties
PSJC

01.09.2012

31.03.2013

185

4EW/2011 Construction of New Water


Well Fields at Surrah UAE

Federal Electricity
& Water Authority
(FEWA)

13.02.2012

30.04.2013

186

Maintenance Works for Soft Landscape and


Irrigation System Zayed Sports City
Phase 1A

MUBADLA Capital
and Real Estate
LLC

02.01.2012

30.06.2013

Construction Works for Al Raha Gardens


Attached Housing
Project Contract No. ARG-00-C-NET-C-00

Sorouh Real
Estate

Const. Gen.
Contracting
House Ltd.

25.12.2012

25.06.2013

Abu Dhabi Gas


Industries Ltd.
(GASCO)

10.11.2011

31.08.2013

01.09.2010

01.10.2013

187

188

Supply & Installation of Landscaping Works


Habshan 5 Industrial Facilities, Habshan

189

Supplying Agriculture Equipment

UAE University

17

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

190

Elixier II Mirfa Landscaping & Irrigation


Works

ADNOC
LindeIndustrial
Gases Co. Ltd.

28.09.2011

27.09.2013

191

GS/RFP-0212-Landscape Works for the


Surrounding Areas of Al Bahr Tower Sector
-25, Plot 70 & 71

Abu Dhabi
Investment
Council

15.12.2012

15.09.2013

192

Bab Al Bahar A Luxury Collection Hotel on


Plot No. 44, Al Nakheel Area in Ajman
UAE

H.H. Crown Prince


of Ajman

Badri &
Bensouda
Architectural
Engineering

04.03.2012

30.09.2013

193

Contract No: 2012/97 Irrigation &


Landscape Works for H.H. Prince Crown
( VIP Entrance)

Crown Prince
Court

Dorsch Holding
GmbH

19.06.2013

15.11.2013

194

Removal of Existing Services Within


Basement Extension For the First Gulf Bank
Office Bldg, Plot C 110, Sector 48, Al Qurm
Area, Abu Dhabi

First Gulf Bank

M/s. Architectural
& Engr. Cons.

04.07.2013

03.11.2013

195

Contract No.PGD-O&M-309-Operation &


Maint. Of Landscape, Forests and Irrig.
Infrastructure at Ghayathi, Ghayathi (A,B,C),
Markaz/Hezam Ghayathi, Mashtal Ghayathi,
Qasr saleh Al Mazari, Gurnama (1,2) Bida
Rashed and Shamal Gharb Ghayadhi

Municipality of
Western Region WRM

KEO Intl

15.02.2007

31.12.2013

196

Sea Palace - The Governess House &


Boudary Wall

Crown Prince
Court

Dorsch Holding
GmbH

01.10.2012

31.12.2013

197

Recreational Park & Landscaping Works &


Plantation of Trees Along Main Road, Al
Ajban

Tawazun Holding
Co. LLC

05.12.2012

31.12.2013

198

GC-43Saadiyat Beach Public Realm


Streetscape Landscape Works

Tourism
Development &
Investment Co.

Parsons
Engineering

03.03.2013

31.12.2013

199

Al Maryah Island Public Realm &


Promenade

MUBADALA

08.05.2013

31.12.2013

200

Lusail Underground Car Park Project- Phase


2B

Lusail Real Estate


Development Co.
(LREDC)

ACE

10.10.2013

31.03.2014

18

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

201

Contract No. E19/2 Landscaping & irrigation


Works for Public Park E19/2

Crown Prince
Court

Dorsch Holding
GmbH

04.10.2012

31.03.2014

202

Contract no. 467/1 Removal of Weeds and


Pruning of Trees in Abu Dhabi Island

Abu Dhabi
Municipality

Dorsch Holding
GmbH

02.09.2010

01.04.2014

203

Contract no. 467/4 Removal of Weeds and


Pruning of Trees in Abu Dhabi Island

Abu Dhabi
Municipality

Dorsch Holding
GmbH

02.09.2010

01.04.2014

204

Landscape works at Ambulatory Healthcare


Center At Al Shamkha & Al Bahya(Site 108
A & B),
Abu Dhabi

SEHA

01.02.2013

30.04.2014

205

Mussafah Water Transmission Scheme,


Mussafah to Abu Dhabi ( Lot M)
Landscaping Works

AYDINER Const.
Abu Dhabi

Khatib & Alami

27.01.2014

20.04.2014

206

Infrastructure Works including all MEP


Works & Playground Foundation
Baghdad-Iraq Adjacent to Green Zone

Al Zawraa Park for


Games &
Commercial
Agencies Ltd.
Liability Co.

13.03.2013

31.05.2014

207

Contract No. 2013/58 External


Miscellaneous Works for Crown Prince
Court

Crown Prince
Court

Dorsch Holding
GmbH

01.09.2013

31.05.2014

208

6W2011-Network Rehabilitation at Khuzam


Rak Area

Federal Electricity
& Water Authority
(FEWA)

Dr. M. H. Ali ElSaie

27.09.2011

31.07.2014

209

Contract No.
PD/CA/FM/SB/R530/Gen/13/51 Blanket
Agreement for Supply of Potable Drinking
Water to Schools in
Al Ain City

MUSANADA

04.04.2013

03.07.2014

210

Agreement No. 1741257 Renovation of


the Children and Families Park in Ruwais
Housing Complex Ruwais UAE

ADNOC

14.09.2013

12.07.2014

211

Contract No. 21W/2012 Water Distribution


Networks in UAQ Areas

Federal Electricity
& Water Authority
(FEWA)

Dr. M. H. Ali ElSaie

22.08.2012

31.07.2014

19

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

212

25W/2012 5MIG RCC Water Tank at


Hiniya WDC - Fujairah

Federal Electricity
& Water Authority
(FEWA)

06.10.2012

12.07.2014

213

18W/2012 Rehabilitation of Distribution


Netwrok at Rams - RAK

Federal Electricity
& Water Authority
(FEWA)

Dr. M. H. Ali ElSaie

05.05.2012

31.07.2014

214

Contract no. 1W/2011/


Transmission/Distribution Pipeline System in
Al Jurf and Pumps at A. Zawra - Ajman

Federal Electricity
& Water Authority
(FEWA)

Dr. M. H. Ali ElSaie

01.09.2011

30.09.2014

215

Church Compound for Armenian Community


of Abu Dhabi

Armenian
Community of Abu
Dhabi

Kojakian
Engineering
Consultants

01.05.2012

29.11.2014

216

Tender No. 14EW/2013 Design, Supply &


Const. of RCC Brine Reject & Outfall
Structure at Ghallilah, Ras Al Khaimah, UAE

Federal Electricity
& Water Authority
(FEWA)

15.02.2014

30.11.2014

217

Landscape Works for New York University

Tourism
Development &
Inv. Co. (TDIC)

01.05.2014

31.10.2014

218

Modification in the Gate Building for H.H. the


Crown Prince Diwan at W-35, Abu Dhabi,
UAE

Crown Prince
Court

M/s. Architectural
& Engineering
Consultants

01.04..2014

31.11.2014

219

CW/200B/2011 Supply, Installation,


Testing & Commissioning of Fibre
Cement/Glass Reinforced Expoxy Water
Transmission Pipelines and Associated
Works at Various Locations in the Emirate of
Dubai

Dubai Electricity &


Water Authority
(DEWA)

NJS Consultants
Co. Ltd.

06.12.2011

31.12.2014

220

Supply & Installation of Yas Mall Main


Const. Works Ph. 2 Zone E Yas Island Devl.
- Contract No. A430601/2010/C/063

Al Dar Properties
PSJC

AECOM

01.10.2012

31.12.2014
(maintenance
period)

Dubai Electricity &


Water Authority
(DEWA)

09.12.2012

31.12.2014

221

Contract No. P.O. 3441200321 Supply,


Installation, Testing & Commissioning of
Glass Reinforced Epoxy Water
Transmission Pipelines and Associated
Works at Various Locations in the Emirate of
Dubai Including 600mm Dia Transmission
Pipeline along Outer Bypass Road to Al
Khawaneej Road in Wadi Al Mardi and
Interconnection Between the Two Existing

20

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

222

Replacing the Control System of the


Irrigation Network inside Abu Dhabi from the
Manual System to an Automated System,
Phase II, Contract No. 908/3A, Abu Dhabi,
UAE

Abu Dhabi
Municipality

Dorsch Holding
GmbH

01.10.2013

31.12.2014

223

Contract No.PGD-O&M-404-Operation &


Maint. For Irrig. Reservoirs with
Transmission Pipeline, Landscape, Irrig.
Infrastructure & Forests - Al Khatim Area 1

Abu Dhabi
Municipality

Dorsch Holding
GmbH

15.02.2007

31.12.2014

224

Contract No.PGD-O&M-406-Operation &


Maint. For Irrig. Reservoirs with
Transmission Pipeline, Landscape, Irrig.
Infrastructure & Forests - Al Khatim Area 3

Abu Dhabi
Municipality

Dorsch Holding
GmbH

25.02.2007

31.12.2014

225

Contract No.PGD-O&M-103 - Operation &


Maint. Of Landscape, Irrigation Storm Water
and Associated Infrastructure Abu Dhabi
Quadrant 3 & Surrounding Islands

Abu Dhabi
Municipality

Dorsch Holding
GmbH

07.10.2007

03.01.2015

226

CONTRACT NO. 208 - Operation &


Maintenance for Landscape, Irrigation, and
Landscape Facilities for Al Bahya & Al
Rahbah Gardens.

Abu Dhabi
Municipality

Parsons
Engineering

13.04.2009

03.01.2015

227

FP- 5020000006 - Dubai Endurance Table

Engineers Office
of HH Sheikh
Mohammed Bin
Rashid Al
Maktoum

19.01.2015

24.01.2015

228

FP- 2053000007 Construction of Gym,


Pool, Staff Accommodation, and Stable at
Lehbab, Dubai

Engineers Office
of HH Sheikh
Mohammed Bin
Rashid Al
Maktoum

17.01.2015

31.01.2015

229

Develop 20 Playgrounds in Abu Dhabi


Mainland Phase 1C Contract No. 393,
Abu Dhabi, U.A.E.

Abu Dhabi
Municipality

KEO
International

15.12.2013

10.04.2015

PROJECT NAME
900mm Dia Pipeline by 600mm Dia Pipeline
in Al Khawaneej Area

21

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

230

Contract No. 2014/51 Civil Works of the


Fountain in the Private Entrance of the Bldg.
of Crown Prince Court

Crown Prince
Court

11.09.2014

15.04.2015

231

Contract No. D-8604, Replacement of GRP


Water Pipelines & Construction of New
Connection in Madinat Zayed Western
Region, Abu Dhabi

Abu Dhabi
Distribution
Company (ADDC)

Ital Consult

27.03.2012

26.04.2015

232

FP- 2023000012 Landscaping and


Irrigation Works Infront of Main Villa at
Habab Coservation- Dubai

Engineers Office
of HH Sheikh
Mohammed Bin
Rashid Al
Maktoum

18.01.2015

15.04.2015

233

Landscaping for Marina Office Park

National
Investment
Corporation

01.04.2012

01.03.2015

234

20W/2012-DN600 Transmission Pipeline


from Shouka to Huwailat Junction and
Pumping Station at Shouka RAK

Federal Electricity
& Water Authority
(FEWA)

10.05.2013

31.05.2015

235

Commercial Bldg. For M/s. Inheritors of Late


Abdulsalam Hamad Abdulrahman Rashed
Al Mubarak, Located Sector E-25, Plot no.
C-13

ADCP

ARKAN

15.01.2013

11.06.2015
Under
maintenance

236

Landscaping & Irrigation Maintenance


Services at Ruwais Housing Complex
Agreement No. 1740716

ADNOC

01.07.2010

30.06.2015

237

Contract (12) for the Operation, Water


Management, Development, Maintenance
And Repair of Irrigation Water Supply and
Distribution System in
Al Ain Region

Al Ain Municipality

DMJM
International

01.07.2010

30.06.2015

238

C1004/1, Upgrading of VVIP Approach


Road Yas Island

Abu Dhabi
Municipality

Parson Intl Ltd.

16.01.2014

30.07.2015

239

Contract 10/2012 - Construction and


execution of a network for irrigation and
improving the main entrance for the eastern
sector

Al Ain Municipality

Dorsch Holding
GmbH

01.04.2013

31.08.2015

22

AL RYUM GROUP PROJECTS COMPLETED


S.
NO.

PROJECT NAME

CLIENT

CONSULTANT

STARTING
DATE

COMPLETION
DATE

240

Contract No. CPC-14014-M1 Periodic


Maintenance Works for Different Areas

Crown Prince
Court

01.05.2014

30.08.2015

241

Contract No. CPC-14024-M1 Maintenance


Palms in Falaj Mualla & Al Ain

Crown Prince
Court

01.05.2014

30.08.2015

23

You might also like