INDICATIVE
As of 15 October 2015
Committed /
Indicative
Name of the
Project
Project
Proponent
Location
COAL
Indicative
Indicative
Limay Power
Plant Project
Phase II
(2x150MW)
Rated
Capacity
(MW)
Project Status
Target Commercial
Operation
6,875.00
DMCI Power
Corporation
SMC
Consolidated
Power
Corporation
Barangay
Bato-bato,
Narra,
Palawan
Brgy. Lamao,
Limay, Bataan
15
300
Indicative
Limay Power
Plant Project
Phase III
(2x300MW)
SMC
Consolidated
Power
Corporation
Brgy. Lamao,
Limay, Bataan
600
Indicative
1x300 MW Coal
Power Plant
Lucidum
Energy, Inc.
Silanguin Bay,
Zambales
300
-Secured Barangay, Municipal and Provincial endorsements; filed application for Certificate Pre-Condition from the National Commission on
Indigenous People (NCIP) ; issued ECAN Zoning Certificate from PCSD and Zoning Certificate from the Municipal Planning Development Office
-Currently processing NCIP endorsement from DOE
Feb-17
Unit 1 - October
2016
Unit II - March 2017
June 2017
Mar-17
Unit 1 - December
2016
Unit II - May 2017
(Target Testing &
Commissioning)
June 2017
(Target Testing &
Commissioning)
Indicative
Indicative
Name of the
Project
Project
Proponent
Southwest
2 X 150 MW
Luzon Power
SLPGC Coal-Fired Generation
Power Plant
Corporation
Phase II
(Project
Company)
4 X 150 MW Coal
JG Summit
Fired Thermal
Holdings, Inc.
Power Plant
Location
Brgy. San
Rafael,
Calaca,
Batangas
Brgy.
Pinamukan
Ibaba,
Batangas City
Rated
Capacity
(MW)
Project Status
300
-Property is currently under Land Lease Agreement (LLA) between Sem-Calaca Power Corporation (SCPC) with PSALM;
-On-going negotiations with prospective off-takes (DUs and those currently with PSAs and contestable market under Open Access Regime;
-ACQUIRED Permits: SEC Registration - Aug 2011; ECC application approved 21 Oct. 2011; Issued COE for BOI on 11 March 2013 under the name
of SLPGC; ECC application approved 21 Oct. 2011;
Unit I - 2016
-On-going securing other necessary permits;
Unit II - 2016
-On-going financing negotiations with prospective banks;
-On-going negotiation with prospective EPC;
-Target NTP - End of 2013;
-Project cost for Phase II is Php19.864B
600
-Project Timeline: Pre-Construction Phase (8 months)- 1. construction of EIA study and permitting; 2. Design and Engineering; 3. Commissioning
of EPC Contractor (Phase 1 and Phase2); Construction Phase (12 months) - Civil Works and plant equipment installation; Operation Phase
(design life) - 1. Start-up and unit synchronization; 2. Commercial Operation;
- Conduct of public Scoping with Stakeholder representatives - 10 October 2013;
-Conduct of Technical Scoping with EMB and EIA Rev Com - 6 November 2013;
-Conduct of EIA Study and Preparation of EIS - November 2013 to February 2014;
-Draft EIS Submission and Preliminary Review - Middle of 2014;
-Public Hearing - 1 month after submission of EIS;
-EMB Review - 55 days;
-ECC Decision - Target before end of 2014; awaiting ECC Decision; In its latest ruling SC upheld the CA decision to deny "for insufficiency of
evidence," the request to issue a writ of kalikasan. The CA still invalidated the ECCs and the LDA. The respondents eventually filed a motion for
reconsideration, which had just been denied with CA's latest ruling;
-Secured Clearance from DOE for the conduct of GIS on 21 February 2014;
-Secured Endorsement from DOE for Certificate of CNO from NCIP on14 July 2014;
-On-going negotiations for the financing arrangements and other permits;
-On-going securing of regulatory requirements;
Target Commercial
Operation
December 2017
Name of the
Project
Project
Proponent
Indicative
2 X 600 MW
GNPower
Mariveles
Mariveles Coal
Expansion Project Plant Ltd. Co.
Indicative
San
Buenaventura
Power Ltd. Co.
(SBPL) Project
San
Buenaventura
Power Ltd. Co.
(SBPL)
Indicative
Redondo
2 X 300 MW CoalPeninsula
Fired Power Plant
Energy, Inc.
Indicative
2 X 300 MW
Masinloc
Expansion
Indicative
Meralco
PowerGen
2 x 600 MW (net) Corporation
Coal-Fired Power (Project
Plant
Company:
Atimonan One
Energy
AES Masinloc
Power Partners
Co., Inc.
Location
Mariveles,
Bataan
Mauban,
Quezon
Sitio
Naglatore,
Cawag, Subic
Bay Freeport
Zone
Zambales
Atimonan,
Quezon
Rated
Capacity
(MW)
Project Status
Target Commercial
Operation
Unit I - December
2018
Unit II -January 2020
December 2018
June 2019
2019
Unit 1 - December
2020
Unit 2 - May 2021
December 2019
(Target Testing and
Commissioning)
Unit 1 - December
2020
Unit 2 - May 2021
Indicative
Name of the
Project
Project
Proponent
H & WB ASIA
2 x 350 MW PCB
PACIFIC (PTE
Subcritical CoalLTD)
Fired Power Plant
CORPORATION
Location
Jose
Panganiban,
Camarines
Norte
Rated
Capacity
(MW)
700
Project Status
Target Commercial
Operation
Name of the
Project
Project
Proponent
Location
OIL
Indicative
Aero Derivative
Combined Cycle
Power Plant
Calamba,
Laguna
Target Commercial
Operation
150
TBA
-secured the necessary endorsement from DOE such as Clearance to undertake GIS released on 23 June 2015;
-securing the required land, Marubeni emphasized that they only need to secure a Right of Way from Shell;
- negotiating with various electric cooperatives for bilateral and also consider selling of power to WESM;
-project will last for only 8 years since the gas supply will be depleted by 2024;
May 2016
TBA
3,550.00
Indicative
250 MW Mobile
Gas Turbine
Power Plant
Team
(Philippines)
Energy
Corporation
Barangay
Libjo,
Batangas City
Indicative
2 x 1,200 MW
Combined Cycle
Gas Turbine
Power Plant
Project
Atlantic Gulf
and Pacific
Company of
Manila, Inc
Limay,
Bataan
(PNOC-AFC
Industrial
Estate)
Indicative
Project Status
150.00
Calamba Aero
Power
Corporation
NATURAL GAS
Rated
Capacity
(MW)
First Gen
Ecopower
Solutions Inc.
Santa Rita,
Batangas
250
2,400
900
June 2016
-On-going Feasibility Study; Secured Clearance to Undertake GIS from DOE on 3 June 2013;
-Awaiting for review and approval of conversion of PNOC ECC from Petro Chemicals to LNG for Power ;
Unit 1 - October
-AG&P has made major financial commitments to the development of the new power plant project at Bataan which includes expert third
Unit 1 - March 2017
2017;
parties to provide: (i) market data for electricity; (ii) technical feasibility and initial design studies for the project development; (iii) environment
Unit II - March 2018 Unit 2: October 2018;
support and permitting and (iv) market study on LNG supplies;
-Details of off-takers for electricity are still being considered;
-On-going Feasibility Study; Power Plant options update completed as of 17 June 2015
-Parcels of land to be used by the Project shall be purchased from FGHC and FGP Corp;
-Discussion on targeted offtakers on-going;
-City and Barangay endorsements acquired in 2013; Environmental compliance Certificate application is on-going (targeted to be acquired by
July 2015); Importation permit application is on-going; Accreditation from the BOI (targeted on December 2015)
1st Unit-2017
-Discussion with International Financing outfits and local banks on-going; DENR ECC on going; Certificae is expected in September 2015;
2nd Unit-2019
Importation permit is on-going; BOI Accreditation target is December 2015;
-EPC and Operation Maintenance contracts targeted to be awarded on December 2015; Issuance of ECC from DENR expected by October 2015;
BOI targeted January 2016; On-going coordination with affected barangays
-Target Commencement of Construction for first unit is on December 2015;
-Secured Clearance from DOE for the conduct of GIS on 18 February 2013 ;
1st Unit-December
2017
2nd Unit-December
2019
(Target Testing and
Commissioning)
Name of the
Project
Project
Proponent
Location
GEOTHERMAL
Rated
Capacity
(MW)
Indicative
Energy
Development
Corporation
Guinlajon,
Sorsogon
31
Indicative
Rangas
Geothermal
Project
Energy
Development
Corporation
Bacon
District,
Sorsogon,
Sorsogon City
40
Indicative
Kayabon
Geothermal
Project
Energy
Development
Corporation
Manito, Albay
40
HYDROPOWER
Ibulao
Hydroelectric
Power Project
Target Commercial
Operation
111.00
Bacman 3
(Tanawon)
Geothermal
Project
Indicative
Project Status
December 2016
June 2018
December 2019
May 2020
(Target Testing and
Commissioning)
June 2018
June 2018
(Target Testing and
Commissioning)
541.30
Hydrocore, Inc.
Lagawe,
Ifugao
4.5
Name of the
Project
Project
Proponent
Location
Rated
Capacity
(MW)
Project Status
Indicative
Barit (Irrigation
NASCENT
Discharge)
Technologies
Hydroelectric
Corporation
Power Project
Buhi,
Camarines
Sur
0.4
Indicative
Dupinga
Hydroelectric
Power Project
Constellation
Energy
Corporation
Gabaldon,
Nueva Ecija
Indicative
Pinacanauan
Sunwest Water
Peablanca,
& Electric Co.,
Cagayan
Inc.
6.0
Indicative
Colasi
Colasi
Mini
Hydro Electric
Power
Plant
Corporation
Mercedes,
Camarines
Norte
1.0
On-going rehabilitation;
-Submission of lacking requirements e.g. permits in progress;
-Clearance to Underatake GIS from DOE issued on 3 December 2012;
Indicative
Tinoc 1
Philnew Hydro
Power
Corporation
Tinoc, Ifugao
4.1
August 2018
August 2018
Indicative
Tinoc 4
Philnew Hydro
Power
Corporation
Tinoc, Ifugao
5.0
August 2018
August 2018
Indicative
Majayjay
Majayjay Hydro
Power
Company, Inc.
Majayjay,
Laguna
2.2
-On-going pre construction activities; Submission of lacking requirements e.g. permits in progress;
Indicative
Ranggas
Clean
and
Green Energy
Solutions, Inc.
Goa &
Tigaon,
Camarines
Sur
1.5
Indicative
Tinoc 3
Quadriver
Energy Corp.
Tinoc, Ifugao
5.0
Indicative
Tignoan HEP
20.0
Indicative
Biyao
AV
Garcia
Power Systems
Corp.
0.8
Indicative
Abdao HEP
AV
Garcia Tabaan Sur,
Power Systems Tuba,
Corp.
Benguet
1.0
Indicative
tumauini,
Isabela
7.8
October 2019
October 2019
Indicative
tumauini,
Isabela
14.0
October 2019
October 2019
Indicative
Tinoc 2
Philnew Hydro
Power
Corporation
Tinoc, Ifugao
11.0
January 2019
January 2019
(Target Testing and
Commissioning)
Indicative
Tinoc 5
Philnew Hydro
Power
Corporation
Tinoc, Ifugao
6.9
December 2019
December 2019
Balbalan,
Kalinga
Target Commercial
Operation
February 2019
April 2019
September 2019
June 2018
(Target Testing and
Commissioning)
September 2018
(Target Testing and
Commissioning)
February 2019
(Target Testing and
Commissioning)
April 2019
(Target Testing and
Commissioning)
June 2019
July 2019
January 2019
January 2019
(Target Testing and
Commissioning)
July 2019
July 2019
August 2019
August 2019
September 2019
Indicative
Indicative
Name of the
Project
Tinoc 6
Alilem
Location
Rated
Capacity
(MW)
Philnew Hydro
Power
Corporation
Tinoc, Ifugao
8.0
Philnew Hydro
Power
Corporation
Alilem, Ilocos
Sur
Project
Proponent
Project Status
Target Commercial
Operation
December 2019
December 2019
December 2019
December 2019
Jan-20
Jan-20
February 2020
February 2020
16.2
Indicative
Kapipian
Sunwest Water
San Miguel,
& Electric Co.,
Catanduanes
Inc.
2.4
Indicative
Ilaguen
Isabela Power
Corporation
San Mariano
& San
Guillermo
19.0
Indicative
Cawayan 2
Sunwest Water
& Electric Co.,
Inc.
Sorsogon,
Sorsogon
1.0
April 2020
April 2020
Indicative
Ilaguen 2
Isabela Power
Corporation
Dinapique,
Isabela
14.0
May 2020
May 2020
Indicative
Danac
Philnewriver
Power Corp.
Sugpon,
Ilocos Sur
13.2
June 2020
June 2020
Indicative
Matuno
Epower
Technologies
Corporation
Bambang,
Nueva Ecija
8.0
June 2020
June 2020
Indicative
Dibuluan
Greenpower
Resources Corp
San Agustin,
Isabela
5.0
June 2020
June 2020
Indicative
100 Alimit
SN
Aboitiz
Power-Ifugao
Lagawe,
Ifugao
100.0
January 2021
January 2021
Indicative
240 Alimit
SN
Aboitiz Lagawe,
Power-Ifugao
Ifugao
240.0
January 2021
January 2021
Indicative
10 MW Olilicon
HEPP
SN
Aboitiz Lagawe,
Power-Ifugao
Ifugao
10.0
January 2021
January 2021
Indicative
SN
Aboitiz
Maris Main Canal
Ramon,
Power
1 HEP
Isabela
Generation
6.0
-NIA agreement for pre-development activities secured; LGU endorsement completed; NCIP field based Investigation completed; awaiting
release of CNO ;
-DENR permitting completed; draft ECC for power plant issued; CNC for transmission line issued; NGCP studies completed; Environmental and
Social Studies completed; Water right and right of way acquisition on-going;
-Feasibility
design
completed;
technical
studies
completed;
;
-Pre Development Stage cost 25 M PhP
January 2021
January 2021
Name of the
Project
Project
Proponent
Location
SN
Aboitiz
Alfonso Lista,
Power
Ifugao
Generation
Indicative
Maris Main
Canal2 HEP
Indicative
2.6 MW Maapon
Renesons
River Mini-Hydro
Energy
Power Project
Corporation
(MHP)
Brgy. Piis,
Lucban,
Quezon
Rated
Capacity
(MW)
Project Status
Target Commercial
Operation
1.8
-NIA agreement for pre-development activities secured; LGU endorsement completed; NCIP field based Investigation completed; awaiting
release of CNO ;
-DENR permitting completed; draft ECC for power plant issued; CNC for transmission line issued; NGCP studies completed;
-Feasibility
design
completed;
technical
studies
completed;
;
-Pre Development Stage cost 25 M PhP
TBA
TBA
2.6
TBA
TBA
SOLAR
65.55
Indicative
Enfinity
Clark Freeport
Philippines
Zone Solar Power
Renewable
Project
Resources, Inc
Clark
Freeport
Zone,
Pampanga
12
Indicative
Enfinity
Concepcion Solar Philippines
Power Project
Renewable
Resources, Inc
Brgy. Sta.
Rosa,
Concepcion
Tarlac
50.55
Indicative
Cavite Solar
Power Project
Cavite
Economic
Zone, Rosario
Cavite
Enfinity
Philippines
Renewable
Resources, Inc
-Awarded with Solar Energy Service Contract (SESC No. 2014-07-086) on 24 July 2014;
-Acquired the DOE Certificate of Confirmation of Commerciality on 20 March 2015;
-On-going construction negotiation for Financial closing
December 2015
December 2015
(Target Testing and
Commissioning)
-Awarded with Solar Energy Service Contract (SESC No.2015-02-101)) on 28 January 2015;
-Acquired the DOE Certificate of Confirmation of Commerciality on 11 June 2015;
-On-going construction negotiations for financial closing (see FIT Monitoring Board)
December 2015
December 2015
(Target Testing and
Commissioning)
-Awarded with Solar Energy Service Contract (SESC No. 2011-12-006) on 16 December 2011;
-Acquired the DOE Certificate of Confirmation of Commerciality on 23 March 2015;
-On-going construction negotiations for financial closing
February 2016
March 2016
(Target Testing and
Commissioning)
Name of the
Project
Project
Proponent
Location
WIND
Indicative
Indicative
Phase 1:
Pasuquin East
Wind Power
Project
Rated
Capacity
(MW)
Project Status
Target Commercial
Operation
249.00
Energy Logics
Philippines, Inc.
Sembrano Wind
Power Project
Alternergy
(Formerly: Phase
Sembrano Wind
2:
Corporation
Mabitac Wind
Power Project)
Pasuquin,
Ilocos Norte
Mt.
Sembrano,
Mabitac,
Laguna
48
72
Indicative
Balaoi Wind
Power Project
Northern Luzon
UPC Asia
Corporation
Brgy. Balaoi,
Pagudpud,
Ilocos Norte
45
Indicative
Pagudpud Wind
Power Project
EDC Pagudpud
Wind Power
Corporation
Brgy. Balaoi
and
Caunayan,
Pagudpud,
Ilocos Norte
84
BIOMASS
'-Awarded with Wind Energy Service Contract (WESC No. 2009-09-001) on 14 Sept 2009;
- Acquired Forest Land-Use Agreement with DENR;
-On-going wind resource assessment; Completed the feasibility study; Acquired various LGU permits and resolutions of support;
- ECC secured 15 Jun 2010;
- GIS secured Dec 2010; On-going negotiation with the Dept. of National Defense for the clearance to construct wind farm within the vicinity of
Pasuquin Radar Station;
- Equity Investors committment secured; Selected Preferred EPC Turn-key Tenderer for both the wind energy farm and the connection assets;
Submitted the Declaration of Commerciality (DOC) with incomplete documentary requirements;
-The DOE is waiting for the final Work Plan of the project for further evaluation;
-On-going negotiations for project financing and acquisition of TL-ROW as per Workplan;
- Acquired DOE Certificate of Confirmation of Commerciality on 02 December 2013;
-Negotiation for financial closing is on-going
-On-going construction; Construction Stage as of 30 September 2014( Pre-Construction - 39% completed, Construction-0%, Interconnection0%);On-going negotiation for project financing and acquisition of TL-ROW as per Work Plan;
--Acquired
Project cost
Php6.048B;of Confirmation of Commerciality on 13 February 2014;
DOEisCertificate
June 2016
-Amended the Contract Area and assigned partially to Alternergy Sembrano Wind Corporation ASWC-WESC No. 2009-09-018-AP2 on 27
February 2014;
-Under the same contract area of WESC No. 2009-09-018;
-On-going wind resource assessment; Acquired various LGU permits and resolutions of support;
-AWOC to finance the implementation of the project with 100% equity;
-Interconnection Agreement with MERALCO last 1 March 2012;
-EPC and O&M Contract with consortium of Nordex SE and McConnell Donnell last 11 July 2012;
April 2017
-Project Finance Term Sheet with Bank last 27 July 2012; Negotiation for financial closing is on-going;
-Final review of GIS by NGCP last 31 July 2012;
-On-going construction; Construction Stage as of 30 September 2014( Pre-Construction - 22% completed, Construction-0%, Interconnection-0%);
-On-going completion of Pre-construction activities including financial closing Work Plan;
-Amended the Contract Area and assigned partially to Alternergy Sembrano Wind Corporation ASWC-WESC No. 2009-09-018-AP2 on 27
February 2014
- Project cost is Php7.056B;
-Acquired
of Service
Confirmation
of Commerciality
on 13 February
2014;
-Awarded DOE
with Certificate
Wind Energy
Contract
(WESC No. 2010-02-038)
on 1 Feb
2010; Conducted detailed wind resource assessment;
-Completed detailed feasibility atudy;
-Acquired various LGU permits and resolutions of support, NCIP Certificate of Non-Overlap on 15 Jan 2007, Forest Landuse Agreement with
DENR on 20 May 2009, DENR Environmental Compliance Certificate on 23 Jul 2009, DPWH Road Right-of-Way for T/L construction, and CAAP
Height Clearance permit;
-Final Report of SIS and Connection Agreement with NGCP secured on 4 Jan 2011; BOI Registered on 23 Jun 2011;
-Submitted proofs of negotiations/certifications from banks for project financing;
- Acquired DOE Certificate of Confirmation of Commerciality on 02 December 2013;
-On-going construction - 17.33% as of 30 March 2015; Construction Stage as of March 2015( Pre-Construction - 52% completed, Construction of
August 2017
Wind Farm-0%, Interconnection Facilities - 0%); Construction shall commence upon completion of Caparispisan Project;
-Development works shall commenced upon completion of Caparispisan Project;
-Acquired DOE Certificate of Confirmation of Commerciality on 02 December 2013;
-Financial Closing - 10% completed as of December 2014 (Project substantially permitted but funders will require clarity on Feed-in-Tariff
installation targets before committing funding);
-EPC, O&M, Owner's Engineer Contract/Agreement: 30% completed as of December 2014 (detailed Design Complete, Environmental Studies
Complete);
-Connection Agreement:NGCP is conducting SIS prior to signing of Connection Agreement;
-Land Rights Acquisition for WTG or PV, Access Road, and TL:12% ompleted as of December 2014 (all land rights secured through Flags and
'-Awarded with Wind Energy Service Contract (WESC No. 2010-02-040) on 19 Feb 2010;
-On-going construction; Construction Stage as of 30 September 2014( Pre-Construction - 20% completed, Construction-0%, Interconnection-0%);
-Construction shall commence upon completion of Burgos Project;
-Conducted detailed wind resource assessment;
December 2018
-Completed detailed feasibility study;
-Acquired various LGU permits and resolutions of support, DENR Environmental Compliance Certificate;
- Acquired DOE Certificate of Confirmation of Commerciality on 13 June 2014;
June 2016
(Target Testing and
Commissioning)
April 2017
(Target Testing and
Commissioning)
August 2017
(Target Testing and
Commissioning)
December 2018
(Target Testing and
Commissioning)
39.60
Indicative
20 MW Waste-toEnergy Project
CJ Global Green
using Thermal
Energy
Gasifier
Philippine Corp.
Conversion
Camarines
Sur
18
Indicative
Nueva Ecija
10.8
Grass Gold
Renewable
Energy Corp
-Financially Closed;
-For construction;
-For construction;
August 2015
August 2015
(Target Testing and
Commissioning)
January 2018
January 2018
Indicative
Name of the
Project
12 MW Napier
Grass-Fired
Biomass Power
Plant Project
Project
Proponent
Location
Rated
Capacity
(MW)
CleangreenEner
gy Corporation
Bataan
10.8
Project Status
For construction
Target Commercial
Operation
December 2018
December 2018
(Target Testing and
Commissioning)