You are on page 1of 4

BILL NO.

1 : PRELIMINARIES
Code Description
1.0 Tendering
1.1 Preperation and Submission of the Tender
The tenderer will be provided with :
(a)
The Insturction to Tenderer
(b)
One (1) Tender Booklet which comprises
1.00 Form of Tender and Appendics
2.00 Contract Agreement
3.00 Conditions of Contract
4.00 Method of Measurement
5.00 Specification
6.00 Bill of Quantities :
Bill No.1 : Preliminaries
Bill No.2 : Earth Retaining Structure
Bill No.3 : Piling works
Bill No.4 : Capping Beam
7.00 Final Summary
8.00 Tender Drawings
9.00 Project Directory
10.00 Soil Investigation Report
These documents and drawings are referred to collectively as The "The Tender
Documents".
The Tender Booklet shall be filled in and returned in sealed envelope as
directed
in the instruction to Tenderer
The tenderer is to note that the Employer reserves the right not to accept the

BILL NO.1 : PRELIMINARIES


Code
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
2.0
2.1
2.2
2.3
3.0
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
4.0
4.1
4.2
4.3
4.4
4.5
5.0
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
5.11
5.12

Description
Tendering
Preperations and Submission of The Tender
Operating Licence
Tenderer to Visit the Site
Preliminary Site Investigation
Alterations to Text
Alterations to Text (Cont'd)
Tendered Amount
Errors in Extensions and Casts
Soil Investigations
Type of Tender
Performance Bond
Project Particulars
Description of the Works
Site of the Woks
Access to The Site
Contract Particulars
Conditions of Contract
Completion of the Woks
Critical path Programs
Critical path Programs (Cont'd)
Approval of Programme
Taxes and Duties
Discrapancies
Fixed Price Contracts
Pricing of Preliminaries
Overtime
Permits and Fees
INSURANCES
Insurances of the Works and third Party Insurances
Employers not Liable for Workmen's Compensation
Contractor to Insure Workmen
Remedy on Failure to Insure
Contractor to give notice of injury
General Conditions
Site Managements and Establishment Costs
Contractor's Equipment
Contractor's Labour
Contractor's Employees
Work on Ssundays, Public holidays and at night
Workmen Living on the Site
Safety, Health and Welfare of Workpeople
Visitors
Testing of Materials
Setting Out the Works
Dimensions
Safeguarding the Works

5.13 Maintenance and Protection of Existing Roads, Footpaths,


Fences, Rivers, Irrigation Channels, and the like
5.14 Protection of Public and Private Services
5.15 Protection of Public and Adjoining property

Rupiahs
1000000
1000000
1000000
1000000
1000000
2000000
2000000
1000000
10000000
5000000
20000000
2000000
10000000
10000000

5000000
30000000
30000000
5000000

5000000
5000000
15000000
20000000
20000000
10000000
30000000

20000000
exclude
exclude

5.16
5.17
5.18
5.19
6.0
6.1
6.2
7.0
7.1
7.2
7.3
7.4
7.5
7.6
Totaled

Hard Hats and Protective Clothing


Restricted Use of the Site
Advertisements
Making Good Defects
Specific Conditions
Progess Photographs
Avoidance of Nuisance
Temporary Works
Temporary Access
Temporary Buildings
Telephones
Water
Lighting and Power
Temporary Drainage

exclude
exclude
exclude
exclude
10000000
exclude
20000000
20000000
10000000
10000000
25000000
20000000
377000000