Brown Field Site Model Indoor photos Album


Site ID
Site Name
Drafted by
Region

: 28UPD029.
: Perumnas Antang.
: Marwan Purba.
: South Sulawesi.

HUAWEI TECHNOLOGIES CO., LTD.

This document is Site Model that have been confirmed by Huawei and Indosat.
Below are PIC of each company.

No

Name

Company

Sign

General Information:
Site ID
: 28UPD029.
Site Name
: Perumnas Antang.
Site Type
: Brown Field Indoor.
Region
: South Sulawesi.
Project Name
: Indosat MBS Project.
Site Solution Scenario : Reuse U2100 (Cut Feeders + New Jumpers).
Previous System
: G900 & U2100.
Current System
: G900, DCS1800, U2100, U900.
Pre-assembly
: in the warehouse.
Supervised by:
Indosat Team:
1. Rae Lawrance as SME.
2. Zain Aslam as SME.
3. Dave Vipond as Senior QC.
Huawei Team:
1. Ian Raynold as QM HQ.
2. Caoweidong as RPM South Sulawesi.
3. Zhaoyongchao as PMO.
4. Mahardika Dewayana as DQA.
5. Apip Bisri as EHS Expert.
6. Marwan Mulia Purba as QC.
7. Muhammad Fauzan as Project Engineer.
8. Sugiharto as Project Engineer.
9. Maykel as MW Engineer.
10. Zhoujin, Hamdan, Chandra Gunawan and Fahmi as BSS Engineers.
11. Syaiful Nadjar as Power Engineer.

Pre-assembly

All connectors RRU, Filter, Port Antenna have


been tightened by Torch Wrench 25Nm.

All hybrid tale and power DC connection in


RRU have been checked by QC Huawei.

Pre-assembly

All hybrid tale and power DC connection in


Junction Box have been checked by QC
Huawei.

All hybrid tale and power DC connection in


Junction Box have been checked by QC
Huawei.

Pre-assembly

Waterproofing done by 3 layers; Insulate


tape, rubber then insulate tape.

Waterproofing done by 3 layers; Insulate


tape, rubber then insulate tape and finally
fixed by cable tie top and bottom.

Pre-assembly

Connection of Grounding to Junction box


have been checked and tightened properly.

Connection of grounding RRU and Filter


have been checked properly.

Pre-assembly

View of Pre-Assembly done on Warehouse.

View of Pre-Assembly done on Warehouse.

Pre-assembly

View of Pre-Assembly done on Warehouse

Packing and delivery

Antenna packet ready to delivery to site.

Crane Truck loading packet of antenna.

Antenna Installation

Unpacking materials antenna packet on site.

Unpacking materials antenna packet on site.

Anchor bolts Installation of Indoor Service Rack

Anchor bolts have been installed tightly.

Anchor bolts have been installed tightly.

Indoor Service Rack Installation

Left view of Indoor Service Cabinet

Right view of Indoor Service Cabinet

Indoor cabinet Installation

Indoor service cabinet front view.

Over view of ODF, BBU Main, BBU spare,


EMUA and DDF.

Optic Installation

View of ODF and DCPDU full pull out.

View of ODF and DCPDU from right side.

E1T1 Installation

View of Cross connection BTS and MW in


DDF.

View of Cross connection BTS and MW in


DDF.

Grounding Installation

View of Route cables of Power DC and


grounding.

Connection grounding at IGB inside Indoor


Service Rack.

Grounding Indoor Service Rack Installation

L-support of Indoor Service Rack Installation

Over view of L-support for Indoor Service


Rack.

Power system Installation

Route AC Power cable from Rectifier to


Existing ACPDB.

View AC Power entering ACPDB Existing.

Power system Installation

View of Connection DC Power of BBU, EMUA


and RRU at the DCPDU Rectifier.

Power system Installation

View of connection AC Power at Terminal


block of Indoor Service Rack.

Back view of Terminal block covered.

Power system Installation

Full view of existing ACPDB.

AC Power connection add 3 pieces New MCB


16A

Power system Installation

AC Power source measure result Phase-R


with Phase-S = 371 VAC.

AC Power source measure result Phase-S


with Phase-T = 379 VAC.

Power system Installation

Full view of Battery 2 Banks 170Ah.

Back view of Indoor Service Cabinet

Alarm Installation

View of Alarm connection in EMUA.

View of Alarm connection in DDF at top of


Indoor Service Rack.

Cable management

Left view of cable management Power


separate with Alarm and traffic cables.

Right view of cable management.

Cable management

View of route cable from EMUA to DDF.

View of route cable from EMUA to DDF.

Trunk cable Installation

View of route trunk cable on the indoor tray.

Full view of route trunk cable entering the


shelter.

Trunk cables Installation

Route cable of 2 pcs Trunk cable on HCT.

Route cable of 2 pieces Trunk cable on VCT.

Grounding Installation

View of connection grounding kit of Trunk


cables.

View of grounding kit RFS Trunk cables.

Grounding Installation

View of middle grounding kit of trunk cable


upper HCT.

View of top grounding kit of trunk.

Grounding Installation

Grounding RRU GSM, Filter GSM, RRU DCS


sector 1.

Grounding RRU GSM, Filter GSM, RRU DCS


sector 2.

Grounding Installation

Over view Grounding connection sector 3

Grounding RRU GSM, Filter GSM, RRU DCS


sector 3.

Grounding Installation

Route cable of main grounding from Sector


1,2 and 3 going to the main EGB on tower.

Over view connection of main grounding


cable sector 1,2 and 3 include 2 grounding
kit of trunk cables at the main EGB.

Trunk cable Installation

View of top bending trunk cable on tower.

Hoisting grip hang on tower.

Antenna Triple band Installation

Full view Antenna Triple band sector 1 on


tower.

Full view Antenna Triple band sector 2 on


tower.

Antenna Triple band Installation

Full view Antenna Triple band sector 3 on


tower.

Jumper cables Installation

View of connection jumper on port antenna


triple band sector 1.

View of connection jumper on port antenna


triple band sector 2.

Jumper cables Installation

View of connection jumper on port antenna


triple band sector 3.

Cables management

View of route Trunk cable to the Junction


Box.

View of route Trunk cable to the Junction


Box.

Cables management

View of route Trunk cable to the Junction


Box.

Power DC and Optic Installation

View of connection optic cables in CPRI 0 &


CPRI 1 and Power DC connection in RRU.

View of connection Optic and Power DC of


RRU inside Junction Box.

Mechanical Tilt measure

Mechanical tilt sector 1.

Mechanical tilt sector 2.

Mechanical Tilt measure

Mechanical tilt sector 3.

Cable management on tower

Routing trunk cable, grounding and jumper


through tower bracing sector 1 & 2.

Routing trunk cable, grounding and jumper


through tower bracing sector 3.

Antenna height base on RNP

View of antenna height base on


confirmation RNP 38.5 Magl.

View of antenna height base on


confirmation RNP 38.5 Magl.

Antenna strut Installation

View of connection strut antenna on bracing


tower.

Function test and alarm test result from BSC Indosat KIMA

Tested Video call on site using Indosat Sim


Card.

Function test and alarm test result. (Please


click twice at the above icon).

Site clean

Site Clean.

Site Clean.

Site clean

Site clean.

Full view of antenna triple band on tower.

Thank you
www.huawei.com
Copyright2011 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation, statements
regarding the future financial and operating results, future product portfolio, new technology, etc. There are a
number of factors that could cause actual results and developments to differ materially from those expressed or
implied in the predictive statements. Therefore, such information is provided for reference purpose only and
constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.

You might also like