CARDON IV PROJECT

DRAFT FOR PRE-DRILLING OPERATION

This draft is intended to supply a brief


guideline to prepare logistic activities and
drilling planning, not included details,
technical spec or HSE info relate to
equipment installation.

SURFACE SYSTEMS

SSMC + MLS PROCEDURE

After drill the Top hole, run


30 conductor as required.

Record the final setting


depth of mudline sub.

Cut the 30 conductor at an


appropriate level to install
the diverter system.

DRAFT
3

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

After final prep on conductor


Top, installing Starting Head

Ensure orientation as
required.

Energize and Test WQ seal.

DRAFT
4

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Energize slip lock


connection at the Bottom
side.

DRAFT
5

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Install 30 Riser on Top.

Test Pressure on seal to


ensure connection.

DRAFT
6

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Run WB and install it on


30 bowl if required.

Run 26 Bit and drill as


required.

DRAFT
7

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

After reach planned drilling


depth retrieve 26 bit.

Run WB Running tool.

Retrieve WB.

DRAFT
8

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Before run 20 string check


20 ML hanger running tool.

Check 20 ML hanger to
ensure threads and seal.

Check make up between


assemblys components.

DRAFT
9

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Release the assembly from


the rig floor and carefully
lower in the well.

Record final depth of


casing hanger.

DRAFT
1

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Perform Cement operation


on 20 string.

After Cement operation.


Rotate 20 string to open
washout ports.

Pump water to annulus


washout and displacement
of mud or cement in annulus
space.
Close washout port by
rotating casing string and
perform a pressure test.

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Rise, Bop equipment.

Rough cut of 20 casing.

Set 30 x 20 casing
hanger.

Final cut of 20 hanger and


beveling.

DRAFT
1

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Install Contingency section


A. Oriented as required.

Energize packing seal and


pressure test.

Install hold down device.

DRAFT
1

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Install Drilling riser and Bop


Equipment.

DRAFT
1

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Run test plug and pressure


test on riser and BOP.

DRAFT
1

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Retrieve test Plug.

DRAFT
1

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Run WB and install it on


20 bowl.

Run 12-1/4 Bit and drill as


required.

Retrieve Bit and WB.

DRAFT
1

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Before run 13-3/8 string


check 13-3/8 ML hanger
running tool.

Check 13-3/8 ML hanger to


ensure threads and seal.

Check make up between


assemblys components.

DRAFT
1

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Release the assembly from


the rig floor and carefully
lower in the well.

Record final depth of


casing hanger.

DRAFT
1

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Perform Cement operation


on 13-3/8 string.

After Cement operation.


Rotate 13-3/8 string to
open washout ports.

Pump water to annulus


washout and displacement
of mud or cement in annulus
space.
Close washout port by
rotating casing string and
perform a pressure test.

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Rise, Bop equipment.

Rough cut of 13-3/8 casing.

Set 20 x 13-3/8 casing


hanger.

Final cut of 13-3/8 hanger


and beveling.

DRAFT
2

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Install Contingency packoff.


Oriented as required.

Activate hold down device.

Pressure test.

DRAFT
2

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Run Section B + C.

DRAFT
2

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Install Drilling riser and Bop


Equipment.

Run Test plug and pressure


test connection and BOP.

Retrieve test Plug.

DRAFT
2

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Run 13-3/8 Well bushing.

Run drill pipe + Bit and


drilling as planned.

Retrieve Drilling string.

DRAFT
2

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Perform cleaning operation


on internal profile of 13-3/8
hanger.

DRAFT
2

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Before run 9-5/8 string


check 9-5/8 ML hanger
running tool.

Check 9-5/8 ML hanger to


ensure threads and seal.

Check make up between


assemblys components.

DRAFT
2

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Release the assembly from


the rig floor and carefully
lower in the well.

Record final depth of


casing hanger.

DRAFT
2

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Perform Cement operation


on 9-5/8 string.

After Cement operation.


Rotate 9-5/8 string to open
washout ports.

Pump water to annulus


washout and displacement
of mud or cement in annulus
space.
Close washout port by
rotating casing string and
perform a pressure test.

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Rise, Bop equipment.

Break connection between


B a C section.

Rough cut of 9-5/8 casing.

Set 13-5/8 x 9-5/8 casing


hanger.

Final cut of 9-5/8 hanger


and beveling.

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Prepare section C to install


secondary hold down
device.

DRAFT
3

Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Install Seal packoff on 9-5/8


casing hanger.

Install Cahn replace seal on


top of seal packoff

DRAFT
Surface Systems
SURFACE SYSTEMS

SSMC + MLS PROCEDURE

Install C section.

Pressure Test.

DRAFT
3

Surface Systems
SURFACE SYSTEMS

You might also like