You are on page 1of 12

Load

SN

Column size

comb 1(factored)

Grid

Type

Pu

KN

Footing size
bp

lp B=sqrt(Pu/p)
m

Pressure
p=Pu/BL

KN/m

Vu

Vu/4tc

KN

m2

300

F1

300

0.30

0.30

0.50 ###

1.35

1.50

1.50

133.33 253.5867

0.057

420

F2

420

0.30

0.30

0.50 ###

1.60

1.70

1.70

145.33 369.4111

0.083

485

F3

485

0.30

0.30

0.50 ###

1.72

1.80

1.80

149.69 423.6864

0.095

Moment
Mux
Muy
KNm/m

KNm/m

Moment
Consideratio
Mu,lim
n
X-direction Y-directiondxx (reqd) mm
dyy (reqd) mm d (reqd) mm

Two Way Shear

dccx

tv

tc'

N/mm

N/mm

Check
2

36.0

36.0

357.8

357.8

161.5

161.5

161.5

0.275

0.39

1.118

OK

60.5

60.5

405.6

405.6

209.4

209.4

209.4

0.278

0.56

1.118

OK

75.8

75.8

587.9

587.9

234.3

234.3

234.3

0.322

0.51

1.118

OK

Two Way
TRIAL
Shear
d
D
Consideration
d (reqd) mm Provided
m

Area of Steel Required


D'

Astx

Asty

mm

mm

Minm

Minm

L-bar Dia.

Steel

Steel

X-directionY-direction

X-directionY-direction

mm

mm

Spacing Required

Spx-dir

Spy-dir

mm

mm

0.13

294.0

0.35

0.15

357

357

301

301

12

12 474.9633819 474.96338

0.17

294.0

0.35

0.15

625

625

301

301

12

12 307.3807511 307.38075

0.19

344.0

0.40

0.20

663

663

352

352

12

12 306.9313589 306.93136

Spacing Provided

Area of steel providedbothway

X-direction Y-direction

mm

mm

Astx

Asty

mm

mm

Reinforcement Provided
X-direction

Y-direction

150

150

1131.0

1131.0 12mm dia. @150mm c/c 12mm dia. @150mm c/c

150

150

1281.8

1281.8 12mm dia. @150mm c/c 12mm dia. @150mm c/c

150

150

1357.2

1357.2 12mm dia. @150mm c/c 12mm dia. @150mm c/c

x5%
270
420
365
620
456
400
560
650
818
565
395
630
540
360
266
440
527
437
283

283.5
441
383.25
651
478.8
420
588
682.5
858.9
593.25
414.75
661.5
567
378
279.3
462
553.35
458.85
297.15

rounding
290
445
385
655
485
420
590
690
860
595
415
665
570
380
285
465
555
460
300

F1
F3
F2
F5
F3
F2
F4
F5
F6
F4
F2
F5
F4
F2
F1
F3
F4
F3
F1

275
425
350
610
465
390
535
585
750
560
370
620
555
355
270
440
505
440
290

Project:
Location:
Date:

Hotel
Janakpur

Title:

Load Calculation Sheet


Dead load of slab

Slab Thickness:

Stairs slab

125 mm

3.125 KN/m2

140 mm

3.5 KN/m2

150 mm

3.75 KN/m2

165 mm

4.125 KN/m2

Dead Load Provided Weighted KN/m2


Live Load:
10 KN/m2

Car Parking
Rooms

2 KN/m2

Toilet and Bathrooms

2 KN/m2

Shops/ Party Hall

4 KN/m2

Corridor and Passage

3 KN/m2
1.5 KN/m2

Terrace
Stairs/Kitchen/Resturant

3 KN/m2

Store

5 KN/m2

Balcony

4 KN/m2

Gym Hall

4 KN/m2

Floor Finish:
a) Rooms
Material
Plaster on ceiling
Screeding
Marble

Thickness Density

mm

KN/m

KN/m2

12.5
20

21
20

0.2625
0.4

20

26
Total

0.52
1.183

b) Terrrace
Material

Thickness Density

KN/m

KN/m2

Plaster on ceiling

mm
12.5

21

0.2625

Flat Brick Soling


Screeding

55
38

19
20

1.045
0.76

Crazy Marble

20

26
Total

0.52
2.588

b) Toilet
Material
Plaster on ceiling
Brick Bats Filling

Thickness Density

mm

KN/m

KN/m2

12.5
150

21
19
Total

0.2625
2.85
3.113

Wall Load:
Type of Wall

Thickness Density Opening Fl. Height


Beam Depth Height
m

KN/m3

0.25
0.25

19
19

100%
70%

3.35
3.35

0.35
0.35

3.00
3.00

Partition Wall
Partition Wall with opening

0.125
0.125

19
19

100%
70%

3.35
3.35

0.35
0.35

3.00
3.00

Partition Wall below slab

0.125

19

100%

3.35

0.125

3.23

Partition Wall below slab


with opening

0.125

19

70%

3.35

0.125

3.23

0.15

19

100%

1.25

1.25

0.175

25

100%

3.35

0.65

2.70

External Wall
Ext. Wall with Opening

Paraphet Wall
Rcc
e)

Base Shear Coefficient, Cd


Parameters
Height of Structure, H
Time Period, T
Soil Type
Flexiblity Coefficient, C
Zone Factor, Z
Importance Factor, I
Performance Factor, K
Cd = CZIK

Remarks
20.12 m
T = 0.06H3/4

0.570 Secs.
Soft Soil, Type III
0.080
0.89
1

for Janakpur as per Zone map

Ductile Moment Resisting Frame

0.071

Load Calculation of slab


Sn

Slab

Thk

DL

FF

KN/m

KN/m

KN/m

KN/m

1
2

5" thk Kitchen Slab


5" thk store Slab

m
0.125
0.125

3.125
3.125

1.2
1.2

3
5

7.33
9.33

GF
GF

3
4

5" thk shop Slab


5.5" thk shop Slab

0.125
0.14

3.125
3.5

1.2
1.2

4
4

8.33
8.70

GF
GF

5
6

6" thk Toilet Slab


5.5" thk passage Slab

0.15
0.14

3.75
3.5

2.5
1.2

2
3

8.25
7.70

GF
GF

5" thk Room Slab

0.125

3.125

1.2

6.33

Typical

8
9

5" thk Toilet Slab


5.5" thk Room Slab

0.125
0.14

3.125
3.5

3
1.2

2
2

8.13
6.70

Typical
Typical

10
11

5.5" thk Toilet Slab


6" thk Room Slab

0.14
0.15

3.5
3.75

3
1.2

2
2

8.50
6.95

Typical
Typical

12
13

5.5" thk Gym Slab


6" thk Gym Slab

0.14
0.15

3.5
3.75

1.2
1.2

4
4

8.70
8.95

3rd F
3rd F

14

5" thk Room Slab

0.125

3.125

7.13

3rd F

12
13

5" thk Terrace Slab


5.5" thk Terrace Slab

0.125
0.14

3.125
3.5

2.5
2.5

1.5
1.5

7.13
7.50

Terrace
Terrace

14

6" thk Terrace Slab

0.15

3.75

2.5

1.5

7.75

Terrace

15

6.5" thk stair Slab

0.165

4.125

8.13

Stair

LL
2

Total
2

Floor

W
KN/m
14.27
9.99
7.13
4.99
7.67
5.37
3.56
11.83

Deflection Check

Length (L)
m

Beam ID
1
1
1
1
stair
stair
stair

6
6
4.9
5.1
2.2
7.32
7.32

Breadth (b) Depth (D)


d
mm
mm
250
550
250
650
300
400
230
400
1000
150
300
450
300
450

fck
490
590
340
340
129
390
390

fy
20
20
20
20
20
20
20

415
500
500
500
415
500
500

Moment (M)
KNm
265
346
89
150
36
192
100

Mu/bd2
4.41482716
3.975869
2.56632065
5.64164285
2.16333153
4.20775805
2.19154065

Ast(reqd)
Ast(prov)

mm2
mm2
1817
4000
1
1
1
1
1
1
1
1
1
1
1
1

26
23
23
23
23
23
23

1
1
1
1
1
1
1

1.133697
0.89049
1.028947
0.803787
1.220415
0.875032
1.087009

1
1
1
1
1
1
1

1
1
1
1
1
1
1

29.47613
20.48127
23.66579
18.48711
28.06955
20.12574
25.00121

Reqd (d)

L/d

203.5545
292.9505
207.0499
275.868
78.37675
363.7134
292.7859

12.2449
10.16949
14.41176
15
17.05426
18.76923
18.76923

Check
ok
ok
ok
ok
ok
ok
ok

D
224.5545
313.9505
228.0499
296.868
99.37675
384.7134
313.7859

beam middle block