You are on page 1of 4

DESIGN & PLANNING DEPARTMENT

MANCOM REPORT
DATE: SEPTEMBER 08, 2015
PROJECT

ITEMS

A. Site Development Plan

B. HOUSING COMPONENTS

1. DASMARIAS

CURRENT STATUS

ON -GOING WORKS

D. ROAD SECTIONS
A. MIRABELLE

B. CRISTELLE

DONE

Revisions as per corrections of


MBF

Done

DONE

Land Data Computations

Done

DONE

Single Detached

Paolo

CURRENT TARGET

Done

Revised as of September 8

MJ

Preparation of plans for routing

MJ

Revised as of September 8

MJ

Preparation of plans for routing

MJ

Clubhouse

Scheme as of September 11

MJ

Target: Schemes Week 36 (Sep 7-11)

Gate and Guardhouse

Scheme as of September 14

Mariz

Target: Schemes Week 36 (Sep 7-11)

Commercial Center

Scheme as of September 14

MJ

Target: Schemes Week 36 (Sep 7-11)

For schematic

Scheme as of September 14

MJ

Target: Schemes Week 36 (Sep 7-11)

Interior Decoration- Final


Landscaping

2. AUREVILLE

IN-CHARGE

Transfer Dwgs to CAD file

Duplex

C. AMENITIES

REMARKS & ISSUES

Interior Decoration- Final


Landscaping

For inventory encoding

Mariz

For inventory and update w/ Romar

Mariz

For inventory encoding

Mariz

For inventory and update w/ Romar

Mariz

Week 38 (Sept 14-18)

Week 38 (Sept 14-18)

2. AUREVILLE
C. MODEL 64 SQ M

For schematic floor plan by Pao Schematic design for checking

D. Entrance Statement and Signage

3. COSTA SMERALDA

Landscaping Update

A. Planting Strip
B. RFO Units

As of July 29, 2015 (no movement of


sales)

Mariz

Week 38 (Sept 14-18)

For schematic site development


For landscape quotation
layout

Mariz

Week 38 (Sept 14-18)

Verify sales and docs department Ff up Ms. Al (Sales Doc)

Paolo

Janella- Blk 15 Lot 18;


Natalia- Blk 15 Lot 24

For scheduling

Paolo

aa. Phase 4A (2 units)

OLIVIA-Blk 14 Lot 17
OLIVIA-Blk 13 Lot 18

For scheduling

Paolo

aa. Phase 4B (2 units)

OLIVIA-Blk 1 Lot 10
OLIVIA-Blk 1 Lot 13

For scheduling

Paolo

aa. Block 2 Cluster- 5 units

For scheduling

Paolo

bb. Block 5 Cluster- 2 units

For scheduling

Paolo

Done

Paolo

C. FOR BUILDING PERMIT APPLICATION

A. FOR BUILDING PERMIT APPLICATION

Ff up Engineering

Paolo

4. PGV PHASE 1 to 4

A. FOR BUILDING PERMIT APPLICATION


(OLD VICTORIA)

5. PACIFIC GRAND
TOWNHOMES
B. NICOLE MODEL UNIT

Compilation of Engineering
Drawings as per Ar. Dupher's
update

A. Site Development Plan

Coordination with Ar. Dupher

MJ

Studies c/o BRB


B. House Model Units

6. PACIFIC GRAND VILLAS 5

aa. PHOEBE

For updating of plans comments For scheduling

Mariz & Paolo

bb. TIARA

For updating of plans comments For scheduling

Mariz & Paolo

Pouched Sept 9 2015

6. PACIFIC GRAND VILLAS 5


C. Linear Park

For architectural working


drawings

D. Signage Pylon

For finalization of working


drawings

E. Shophouse
F. Commercial Center

7. SCHEMATIC SITE
RESEARCH

9. CPE/Training and Expos

For schematic layout

For scheduling

A. Marilao Township

Proposal's Comparative Analysis

Mariz

8-Sep

B. Jaro Grand Estates, South Half

Proposal's Comparative Analysis

Mariz

8-Sep

C. Jaro Grand Estates, North Half

For Site Scheme

C. Angeles Pampanga Property

8. MAIN OFFICE INTERIOR


RENOVATION

DONE

Working drawings

8-Sep

aa. Acquire Angeles CLUP and zoning


ordinance

OB Angeles Pampanga

bb. Pampanga Provincial Framework


Plan

OB San Fernando Pampanga

cc. NAMRIA maps

OB NAMRIA Taguig

BRB & Mariz

A. Updating of Floor Plan Layout

Furnish copy to Logistics

Paolo

B. Costing study of carpet

Review of supplier / contractors


quotation

Logistics

C. Interior layout study of Finance


Department

For schematic study

Already got a copy of organizational


structure of Finance Department

Paolo

a. PHILCONSTRUCT

Pre-registered
Oct 8-11, 2015; 10:00am6:00pm SMX, MOA Complex, Pasay

Copy of pre-registration confirmation


code on file

Mariz

DONE

DONE

b. Manila FAME

Pre-registered
Oct 8-11, 2015; 10:00am6:00pm SMX, MOA Complex, Pasay

Copy of pre-registration confirmation


code on file

Mariz

c. Green Construct PH

Pre-registered
Sept 25,2015;
SMX, MOA Complex, Pasay

Copy of pre-registration confirmation


code on file

Mariz

d. Real Estate Organizations

Research

e. PHILGBC

For inquiries: Application / Membership


forms

9. CPE/Training and Expos

Arch./EnP. BRANDO R. BULOSAN


Design & Planning Manager

Approved by AAH

Mariz
MMY/MJM ID ff up HRD

Mariz

MJ

You might also like