You are on page 1of 9

About this sheet:

This sheet helps in capturing effort estimation for non incident categorie tickets in OTC JV.

Version History
Version
1

Details:
S.No
1
2
3
4
5
6
7
8
9
10
11
12
13

Note:
The sheet has refernce formulas, do not change referencing else will impact your overall efforts

ps in capturing effort estimation for non incident categorie tickets in OTC JV.

Version History
Description
Effort Estimation Template-OTC JV

Description
Fill header items referencing TOM (Eg TOM CR, TOM ticket , Details)
EE sheet is divided into 6 main heading with futher sub-headings, extended across functions horizontally
OQM effort is fixed with an average of 1 hr
Functional Consultant is owner and is responsible for collecting efforts of all tracks
Key Thoughts of Analysis/Estimation portion in bottom to be used to explain rationale of Efforts in case required considering
Completed EE template to be attached to parent TOM ticket
Original EE should not be changed , if in case delta work is required, it will be supported with new EE template and will be ad
Please add if required, if exisitng items doesnot have relevant sub headings
Total efforts can be obtained from G42 and H42 in mhrs and mdays respectively

refernce formulas, do not change referencing else will impact your overall efforts

Modified byModified date

Remarks

complexity

dtional sheet.

Eff
TOM CR Number
Functional Team
(manhours)
1 Analysis
1.1 Common Understanding of requirement
1.2 Consulting Solution (relevant for SR)
1.3 (please add if required)

2 Configuration/Development
2.1 Customizing (Functional)
2.2 Development (Development)
2.3 Table Maintenance (Z*)
2.4 Mass update (LSMW, SCATT etc)
2.5 Interface Manager (ZIFM, ZKBC)
2.6 Master data creation

3 Documentation
3.1 Configuration Documents
3.2 Functional Specification (FS)
3.3 Technical Specification (TS)
3.4 Test Script (UAT/UATTR)
3.5 TOM CR Handling
3.6 OQM Effort (Fixed)
3.7 (please add if required)

4 Testing
4.1 Screening / Test Execution (Dev and QA)
4.2 Test Data Creation (in Dev & QA)
4.3 (please add if required)
5 Coordination
5.1 Business/ Techical Expert Coordination
5.2 Team Coordination (SPOC/Other)
5.3 (please add if required)
6 Training
6.1 Training Documents
6.2 Training Execution
6.3 (please add if required)

TOTAL
Key Thoughts of Analysis/Estimation:

302300645.xlsx

Page 4 / 9

302300645.xlsx

Page 5 / 9

Effort Estimation-CARNEMA4-000019
TOM CR Title:
Development Team
(manhours)

Basis Team
(manhours)

302300645.xlsx

Page 6 / 9

302300645.xlsx

Page 7 / 9

9
TOM Ticket Number
Security Team
(manhours)

302300645.xlsx

CARNEMA4-000019

Total
man hours
1.0

Total
man-days
0.1

1.0
0.0
0.0

0.1
0.0
0.0

1.0

0.1

0.0
0.0
0.0
0.0
0.0
1.0

0.0
0.0
0.0
0.0
0.0
0.1

1.0

0.1

0.0
0.0
0.0
0.0
0.0
1.0
0.0

0.0
0.0
0.0
0.0
0.0
0.1
0.0

0.0

0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0

0.0

0.0
0.0
0.0

0.0
0.0
0.0

0.0

0.0

0.0
0.0
0.0

0.0
0.0
0.0

3.0

0.4

Page 8 / 9

302300645.xlsx

Page 9 / 9

You might also like