You are on page 1of 6

ZXUN-xGW GGSN GRE Configuration

Guide
V1.1

Product Type Technical Proposal

LEGAL INFORMATION
By accepting this certain document of ZTE CORPORATION you agree to the following
terms. If you do not agree to the following terms, please notice that you are not
allowed to use this document.

Copyright 2016 ZTE CORPORATION. Any rights not expressly granted herein are
reserved. This document contains proprietary information of ZTE CORPORATION. Any
reproduction, transfer, distribution, use or disclosure of this document or any portion of
this document, in any form by any means, without the prior written consent of ZTE
CORPORATION is prohibited.

and
are registered trademarks of ZTE CORPORATION. ZTEs company
name, logo and product names referenced herein are either trademarks or registered
trademarks of ZTE CORPORATION. Other product and company names mentioned
herein may be trademarks or trade names of their respective owners. Without the prior
written consent of ZTE CORPORATION or the third party owner thereof, anyones
access to this document should not be construed as granting, by implication, estopped
or otherwise, any license or right to use any marks appearing in the document.

The design of this product complies with requirements of environmental protection and
personal security. This product shall be stored, used or discarded in accordance with
product manual, relevant contract or laws and regulations in relevant country
(countries).

This document is provided as is and as available. Information contained in this


document is subject to continuous update without further notice due to improvement
and update of ZTE CORPORATIONs products and technologies.

ZTE CORPORATION
Addres
s:

NO. 55
Hi-tech Road South
ShenZhen

ZTE Confidential Proprietary

2013 ZTE Corporation. All rights reserved.

2(6)

Product Type Technical Proposal

P.R.China
518057
Websit
e:

http://support.zte.com.cn

Email:

800@zte.com.cn

ZTE Confidential Proprietary

2013 ZTE Corporation. All rights reserved.

1(6)

Product Type Technical Proposal

Revision History
Product Version
ZXUN-xGW GGSN V4
universal

Document Version

Serial Number

Reason for Revision

V1.0

1st draft

V1.1

Modified some
descriptions

Author
Document
Version

Date

Prepared by

Reviewed by

V1.0

2012-11-28

Huang Jun

Wang Dayou

V1.1

2013-10-25

Huang Jun

Zhu Wei

ZTE Confidential Proprietary

2013 ZTE Corporation. All rights reserved.

Approved by

2(6)

Product Type Technical Proposal

TABLE OF CONTENT

Overview........................................................................................................... 1

Working Principle............................................................................................2

2.1

Format of GRE Packets.....................................................................................2

2.2

GRE Tunnel Encapsulation................................................................................3

2.3

GRE Tunnel De-capsulation...............................................................................3

Application Scenario and Network Planning.................................................5

3.1

Single-Tunnel and Dual-Tunnel..........................................................................5

3.2

Dedicated Interface and Shared Interface..........................................................6

Configuration Example of a Single-Tunnel Using a Dedicated Sub-Interface


7

4.1

Data Planning....................................................................................................7

4.2

GGSN Configuration Commands.......................................................................8

4.2.1

Configuring the VRF..........................................................................................8

4.2.2

Configuring the PFU Interface and Sub-Interface..............................................8

4.2.3

Configuring the GRE Tunnel............................................................................10

4.2.4

Configuring the APN.........................................................................................11

4.2.5

Configuring the Route......................................................................................12

Configuration Example of a Single-Tunnel Sharing a Sub-Interface.........14

5.1

Data Planning..................................................................................................14

5.2

GGSN Configuration Commands.....................................................................15

5.2.1

Configuring the VRF........................................................................................15

ZTE Confidential Proprietary

2013 ZTE Corporation. All rights reserved.

3(6)

Product Type Technical Proposal

5.2.2

Configuring the PFU Interface and Sub-Interface............................................15

5.2.3

Configuring the GRE Tunnel............................................................................16

5.2.4

Configuring the APN........................................................................................17

5.2.5

Configuring the Route......................................................................................18

Configuration Example of a Dual-Tunnel.....................................................19

6.1

Data Planning..................................................................................................19

6.2

GGSN Configuration Commands.....................................................................20

6.2.1

Configuring the VRF........................................................................................20

6.2.2

Configuring the PFU Interface and Sub-Interface............................................20

6.2.3

Configuring the GRE Tunnel............................................................................22

6.2.4

Configuring the APN........................................................................................24

6.2.5

Configuring the Route......................................................................................25

GRE Maintenance Operations.......................................................................27

7.1

Querying the Configurations............................................................................27

7.2

Detecting the Tunnel Status.............................................................................29

7.3

Processing Alarms...........................................................................................30

7.4

Common Problems..........................................................................................31

ZTE Confidential Proprietary

2013 ZTE Corporation. All rights reserved.

4(6)

You might also like