RECONSTRUCTION NEWSLETTER

OFFICE OF COMMUNITY AFFAIRS


Spring 2010 Janette Sadik-Khan, Commissioner

The Roosevelt Island Bridge over the East River Channel


CONTRACT NO. HBM1117
! ! ! ! ! ! ! ! ! ! ! ! ! !

! COMMUNITY IMPACTS
• Contract work requiring a one-lane closure will continue
! between 9:15 a.m. and 3 p.m., when traffic volumes are at
their lowest.

• Closure of the Roosevelt Island Tram (March 1 through


August 31, 2010) coupled with the Roosevelt Island Bridge
serving as the only mode of land access to the island could
potentially create higher traffic volumes. Motorists should
plan accordingly.

• Periodic one-way only service of the NYCT “F” subway


line on some nights and weekends, due to line NYCT
maintenance, may result in higher traffic volumes on the
Above: Roosevelt Island Bridge, February 2010
bridge. Motorists should plan accordingly.
PROJECT DESCRIPTION
• Bridge testing which cannot be scheduled at any other
The New York City Department of Transportation (NYCDOT) time will occur during the same time period (May-August) as
Division of Bridges is currently reconstructing the Roosevelt the Roosevelt Island Tram outage. Necessary steps will be
Island Bridge. Now in its final stage, the project is scheduled taken to minimize impacts on the traveling public.
to be completed in March 2011.
• During the UN General Assembly, the west channel of
the river will be closed for security reasons. This will require
WORK IN PROGRESS additional bridge openings to accommodate marine traffic.
• Replacing all mechanical and electrical systems, Rules and regulations of the U.S. Coast Guard, require
including the lights on the bridge and approaches. marine traffic to have the right of way. Occasional delays are
expected for bridge traffic.
• Installing stairway enclosures.
COMMUNITY LIAISON
• Rehabilitating service roads on the Queens side of the
bridge. NYCDOT has assigned
Rembert Browne of Zetlin
WORK COMPLETED Strategic Communications as
• Replaced the entire roadway deck and approaches. the Community Liaison. Please
contact Mr. Browne for all
• Constructed a new turning lane from the bridge onto concerns or to be added to the
Vernon Boulevard, southbound. email distribution list at:

• Replaced bearings to meet current seismic codes.


Phone: 212-758-1060 ext. 22
• Removed and repainted the entire bridge.
Cell: 404-643-3125
• Installed new sidewalks and pedestrian safety fencing. Fax: 212-758-1696

• Repaired all deteriorated structural elements, river piers, Email: rbrowne@zetlin.com


and the timber fender system. Field Office Address: 101 Bridge Rd, Roosevelt
Island, NY 10044
LOOKING AHEAD

• Bridge Testing: May 2010 through August 2010