UPDATE :

12-Feb-16

136

44
SOD

No

II

Status

Submit

Receive

25

Status

25

Submit

3
Receive

APPROVED

Approval For Construction

3
As Built Drawing

General Layout

CIVIL

WDP

DONE

DONE

APPROVED

DONE

DONE

APPROVED

6-Aug-11

7-Aug-11

APPROVED

Foundation Plan & Detail

CIVIL

WDP

DONE

DONE

APPROVED

DONE

DONE

APPROVED

6-Aug-11

7-Aug-11

APPROVED

Section and detail

CIVIL

WDP

DONE

DONE

APPROVED

DONE

DONE

APPROVED

6-Aug-11

7-Aug-11

APPROVED

Drainage Pipe Layout

MECHANICAL

IGP

DONE

DONE

APPROVED

DONE

DONE

APPROVED

Drainage Pipe Section

MECHANICAL

IGP

DONE

DONE

APPROVED

DONE

DONE

APPROVED

CIVIL

VSAT ANTENNA PAD


WDP

25-Jul-11

6-Aug-11

APPROVED

CIVIL

WDP

25-Jul-11

6-Aug-11

APPROVED

General Layout ( new PVC grounding Pipe )

MECHANICAL

IGP

Grounding Cable Lay-out

ELECTRICAL

IGP

General Lay Out Vehicle Was Bay

CIVIL

WDP

DONE

DONE

Approved

18-Jan-11

22-Jul-11

Approved

Front & side view

CIVIL

WDP

DONE

DONE

Approved

18-Jan-11

22-Jul-11

Approved

Section A-A and Section B-B

CIVIL

WDP

DONE

DONE

Approved

18-Jan-11

22-Jul-11

Approved

Foundation Plan

CIVIL

WDP

Foundation Detail

CIVIL

WDP

DONE

DONE

Approved

18-Jan-11

22-Jul-11

Approved

Drainage Detail & Concrete Slab Detail

CIVIL

WDP

DONE

DONE

Approved

18-Jan-11

22-Jul-11

Approved

Steel Roof Frame Plan

CIVIL

WDP

DONE

DONE

Approved

18-Jan-11

22-Jul-11

Approved

Metal Roof Plan

CIVIL

WDP

DONE

DONE

Approved

18-Jan-11

22-Jul-11

Approved

Steel Structure Detail

CIVIL

WDP

DONE

DONE

Approved

18-Jan-11

22-Jul-11

Approved

Oil Trap Plan Section and Detail

CIVIL

WDP

DONE

DONE

Approved

18-Jan-11

22-Jul-11

Approved

Settling Pond Plan Section and Detail

CIVIL

WDP

DONE

DONE

Approved

18-Jan-11

22-Jul-11

Approved

Settling Pond Concrete and Detail

CIVIL

WDP

DONE

DONE

Approved

18-Jan-11

22-Jul-11

Approved

Detail Perimeter Ditch (A

CIVIL

WDP

DONE

DONE

Approved

18-Jan-11

22-Jul-11

Approved

Detail Perimeter Ditch (B

CIVIL

WDP

DONE

DONE

Approved

18-Jan-11

22-Jul-11

Approved

Piping Water Line layout

MECHANICAL

IGP

Lighting Fixture Layout

ELECTRICAL

IGP

Socket Outlet Layout

ELECTRICAL

IGP

Three Line Diagram

ELECTRICAL

IGP

Three Line Diagram

ELECTRICAL

IGP

Cable Tray Lay out

ELECTRICAL

IGP

General Lay Out

CIVIL

WDP

25-Oct-10

22-Jul-11

Approved

Steel roof plan dan roof plan

CIVIL

WDP

9-Nov-10

22-Jul-01

Approved

Submit I 25-10-11

Foundation Plan and Detail

CIVIL

WDP

14-Mar-11

22-Jul-01

Approved

Submit I 25-10-11; II 9-11-10

Fence View

CIVIL

WDP

9-Nov-10

22-Jul-01

Approved

Submit I 25-10-11

Fence Detail Radio Active Storage

CIVIL

WDP

9-Nov-10

22-Jul-01

Approved

Submit I 25-10-11

Access Road and Section

CIVIL

WDP

Plan , Section and Detail

CIVIL

WDP

General Electrical Lay out

ELECTRICAL

IGP

General And power socket outlet layout

ELECTRICAL

IGP

Lighting & Medical Equipment Panel Load Schedule and single line 1/2

ELECTRICAL

IGP

Lighting & Medical Equipment Panel Load Schedule and single line 2/2

ELECTRICAL

IGP

Lighting Fixture Layout

ELECTRICAL

IGP

HVAC Layout

ELECTRICAL

IGP

Fire Alarm System Layout

ELECTRICAL

IGP

General Lay Out

CIVIL

WDP

11-Nov-10

22-Jul-11

Approved

Medical Room, Doctor Room and Administration Room (Garden-1)

CIVIL

WDP

24-Nov-10

22-Jul-11

Approved

Column Plan & Detail

CIVIL

WDP

Roof Plan

CIVIL

WDP

Section

CIVIL

WDP

Section & Detail

CIVIL

WDP

New Lay Out Room

CIVIL

WDP

Section A-A

CIVIL

WDP

Section B-B

CIVIL

WDP

Section C-C

CIVIL

WDP

Section D-D

CIVIL

WDP

Section Det & Section

CIVIL

WDP

Steel Roof Plan

CIVIL

WDP

Metal Roofing Plan

CIVIL

WDP

Door Det.Type 2

CIVIL

WDP

General Lay Out

CIVIL

WDP

Foundations Plan

CIVIL

WDP

Section & Detail

CIVIL

WDP

Column & Tie Beam Plan

CIVIL

WDP

Steel Of Column Plan

CIVIL

WDP

25-Jul-11

25-Jul-11

Approved

Steel Roof Frame Plan

CIVIL

WDP

Metal Roof Plan

CIVIL

WDP

Section A-A

CIVIL

WDP

Section and Detail

CIVIL

WDP

General Lay Out

CIVIL

WDP

Nurse room

CIVIL

WDP

25-Jul-11

8-Aug-11

Approved

Panel Load Schedule and Single Line Diagram

ELECTRICAL

IGP

Lighting System Lay out

ELECTRICAL

IGP

Socket Outlet System Lay out

ELECTRICAL

IGP

HVAC Power System Lay out

ELECTRICAL

IGP

Single Line Diagram For HVAC Power Supply

ELECTRICAL

IGP

Fire Alarm System Lay out

ELECTRICAL

IGP

Plan and Section

CIVIL

WDP

Spare

CIVIL

WDP

Scheme Rack, Front View & Isometric

CIVIL

WDP

Cover and Partition Box

CIVIL

WDP

Lay Out

CIVIL

WDP

Door Detail

CIVIL

WDP

Celling Plan

CIVIL

WDP

Plan of Foundation & Plan of Reinforcement Slab

CIVIL

WDP

29-Dec-10

22-Jul-10

Approved

Submit I per 23-11-10

Detail & Section ( Foundations & Slab )

CIVIL

WDP

29-Dec-10

22-Jul-10

Approved

Submit I per 23-11-10

Steel Roof Frame Plan & Metal Roof Plan

CIVIL

WDP

29-Dec-10

22-Jul-11

Approved

Submit I per 23-11-10

Section

CIVIL

WDP

29-Dec-10

22-Jul-11

Approved

Submit I per 23-11-10

Detail

CIVIL

WDP

29-Dec-10

22-Jul-11

Approved

Submit I per 23-11-10

HVAC Power system Layout

ELECTRICAL

IGP

Single Line diagram for HVAC Power Supply

ELECTRICAL

IGP

Fire Alarm System Layout

ELECTRICAL

IGP

Fire Alarm Layout at Compressor Room, Drying Room & Store Room

ELECTRICAL

IGP

New Pantry Lay Out

CIVIL

WDP

5-Jan-11

22-Jul-11

Approved

Elevation - I & -II

CIVIL

WDP

Elevation -III & IV

CIVIL

WDP

Section A-A & B-B

CIVIL

WDP

Section C-C & D-D

CIVIL

WDP

5-Jan-11

22-Jul-11

Approved

General Electrical Layout

ELECTRICAL

IGP

General Power Socket Outlet Layout

ELECTRICAL

IGP

Locations of Dark Room

CIVIL

WDP

Layout Detail And Elevation

CIVIL

WDP

11-Nov-10

22-Jul-11

Approved

Water Layout And Elevations

CIVIL

WDP

General Lay Out (20ft Containner Fix Position)

CIVIL

WDP

Pedestal Plan, Room Plan & Detail Storage Container 20ft

CIVIL

WDP

21-Mar-11

General Lay Out (40ft Containner Fix Position)

CIVIL

WDP

Storage Containner Lay Out

CIVIL

WDP

Pedestal Plan, Room Plan & Detail Storage Container 40ft

CIVIL

WDP

CIVIL

WDP

12-Aug-11

Approved

Section and detail

IV

44

RECOVER ROT & CPI TANKS ORF AREA

VSAT Lay Out

III

25

Receive

Approval For Design

Remarks
Civ - Mech - El

44

Submit

PIC

LOCATION / BUILDING

VEHICLE WASH BAY

PIT FOR RADIO ACTIVE STORAGE

CLINIC BUILDING
A GENERAL

New Meeting Room, Doctor Room, Medical Room and Admin Office
(Ex. Garden-1)

C New Room (Ex. Garden-2)

D Laboratory & Storage Room for Malaria Control

12-Aug-11

12-Aug-11

Approved

E Nurse Station

VI

FIRE STATION BUILDING


A General
General Lay Out

B New Breathing Apparatus Storage Room (Ex. Locker Room)

C Compressor Room, Drying Room & Workshop

Modify existing toilet became pantry cancel, change with new build
D
pantry

E Training Plat form Cancel change with fence

VII

MARINE BUILDING
A 1 Floor Security

B Dark Room Modification

VIII

LABORATORY & MAIN CONTROL BUILDING


A Office & Storage Containner (20 & 40 ft)

Steel Frame Plan , Section and Detail


Walkway layout, Section and detail

CIVIL

WDP

General Electrical Layout

ELECTRICAL

IGP

Power Socket-Outlet & Lighting Layout

ELECTRICAL

IGP

Cable Feeder Layout

ELECTRICAL

IGP

Fire Alarm System Layout

ELECTRICAL

IGP

HVAC Lay Out and Elevations

ELECTRICAL

IGP

Panel Load Schedule & Single Line

ELECTRICAL

IGP

Isometric Perspective Gas Line Pipe

MECHANICAL

IGP

Lay Out Bicycle Shelter

CIVIL

WDP

11-Aug-11

11-Aug-11

12-Aug-11

Approved

Foundation Layout, Section & Detail

CIVIL

WDP

30-May-11

22-Jul-11

Approved

Concrete Slab Lay Out, Section & Detail

CIVIL

WDP

26-Jan-11

22-Jul-11

Approved

Steel Roof Frame Lay Out & Metal Roof PLan

CIVIL

WDP

11-Aug-11

12-Aug-11

Approved

11-Aug-11

12-Aug-11

Approved

Section. E-E, Section F-F, Section G-G, Section H-H

CIVIL

WDP

11-Aug-11

12-Aug-11

Approved

11-Aug-11

12-Aug-11

Approved

Detail and Section

CIVIL

WDP

11-Aug-11

12-Aug-11

Approved

11-Aug-11

12-Aug-11

Approved

B Bicycle Shelter
Revisi ke 4

UPDATE :

12-Feb-16

132

14
PA

No

RECOVERED ROT & CPI TANKS ORF AREA

Start

Finish

Gusti - Inge

27-Aug-11

10-Sep-11

Dody

15-Sep-11

16-Sep-11

Andreas

18-Sep-11

18-Sep-11

Andreas

Cover plate installatioon


Delivery material for Butterfly Valve (incl. accessoris)

Dody

Butt. Valve installation


Punch list clossing

VSAT ANTENNA PAD

Wayra

DONE

DONE

DONE

DONE

DONE

DONE

DONE

8-Aug-11

8-Aug-11

DONE

DONE

8-Aug-11

9-Aug-11

Formwork & reinforcement installation

Demianus

10-Aug-11

12-Aug-11

13-Aug-11

13-Aug-11

Andreas

Demianus

14-Aug-11

14-Aug-11

Demianus - Abdul Manaf

15-Aug-11

16-Aug-11

Formwork removal

Demianus

21-Aug-11

23-Aug-11

Finishing

Demianus

24-Aug-11

26-Aug-11

Andreas

24-Aug-11

31-Aug-11

Installation galvn. Pipe for grounding

Completion GoC

VEHICLE WASH BAY


Construction drawing approval
Material On Site
Survey & marking

Salmon
Wayra
Andreas
Djumadi LM

A Vehicle Wash Bay


Foundation excavation
Formwork & reinforcement installation
Pre pouring inspection
Pouring concrete

PIT FOR RADIO ACTIVE STORAGE


General Lay Out
Steel roof plan dan roof plan
Foundations Plan and Detail
Foundation plan and Detail
fence View
Fence detail
Access Road and Section
Plan , Section and Detail

CLINIC BUILDING
A GENERAL
General Electrical Lay out
General And power socket outlet layout
Lighting & Medical Equipment Panel Load Schedule and single line 1/2
Lighting & Medical Equipment Panel Load Schedule and single line 2/2
Lighting Fixture Layout
HVAC Layout
Fire Alarm System Layout

New Meeting Room, Doctor Room, Medical Room and Admin Office
(Ex. Garden-1)
General Lay Out
Medical Room, Doctor Room and Administration Room (Garden-1)
Coulumn Plan & Detail
Roof Plan
Section
Section & Detail

C New Room (Ex. Garden-2)


New Lay Out Room
Section A-A
Section B-B
Section C-C
Section D-D
Section Det & Section
Steel Roof Plan
Metal Roofing Plan
Door Det.Type 2

D Laboratory & Storage Room for Malaria Control


General Lay Out
Foundations Plan
Section & Detail
Column & Tie Beam Plan
Steel Of Coulum Plan
Steel Roof Frame Plan
Metal Roof Plan
Section A-A
Section and Detail

E Nurse Station
General Lay Out
Nurse room

FIRE STATION BUILDING


A General
General Lay Out
Panel Load Schedule and Single Line Diagram
Lighting System Lay out
Socket Outlet System Lay out
HVAC Power System Lay out
Single Line Diagram For HVAC Power Supply
Fire Alarm System Lay out

B New Breathing Apparatus Storage Room (Ex. Locker Room)


Plan and Section
Spare
Scheme Rack, Front View & Isometric
Cover and Partition Box

C Compressor Room, Drying Room & Workshop


Lay Out
Door Detail
Celling Plan
Foundation and Slab Plan
Detail & Section ( Foundations & Slab )
Steel Roof Frame Plan & Metal Roof Plan
Section
Detail
HVAC Power system Layout
Single Line diagram for HVAC Power Supply
Fire Alarm System Layout
Fire Alarm Layout at Compressor Room, Drying Room & Store Room

Modify existing toilet became pantry cancel, change with new build
pantry
New Pantry Lay Out
Elevation - I & -II
Elevation -III & IV
Section A-A & B-B
Section C-C & D-D

E Training Plat form Cancel change with fence

VII

MARINE BUILDING
A 1 Floor Security
General Electrical Layout
General Power Socket Outlet Layout

B Dark Room Modification


Locations of Dark Room
Layout Detail And Elevation
Water Layout And Elevations

VIII

Issued PO

Andreas

Pouring concrete

VI

14-Aug-11

Demianus

Pre pouring inspection

10-Aug-11

14-Aug-11

Djumadi LM

Survey & marking

10-Aug-11

Excavation

Material On Site

IV

Act. Finish

DJUMADI LM

Construction drawing approval

III

Act. Start

Dody

Cover plate on site

II

Remarks
Supervisor

8
Task Time Record

LOCATION / BUILDING

LABORATORY & MAIN CONTROL BUILDING


A Office & Storage Containner (20 & 40 ft)
General Lay Out (20ft Containner Fix Position)
Office Containner Lay Out
20ft Containner Foundation Lay Out and Detail
General Lay Out (40ft Containner Fix Position)
Storage Containner Lay Out
40ft Containner Foundation Lay Out and Detail
Steel Frame Plan , Section and Detail
Walkway layout, Section and detail
General Electrical Layout
Power Socket-Outlet & Lighting Layout
Cable Feeder Layout
Fire Alarm System Layout
HVAC Lay Out and Elevations
Panel Load Schedule & Single Line
Isometric Perspective Gas Line Pipe

B Bicycle Shelter
Lay Out Bicycle Shelter
Foundation Layout, Section & Detail
Concrete Slab Lay Out, Section & Detail
Steel Roof Frame Lay Out & Metal Roof PLan
Section. E-E, Section F-F, Section G-G, Section H-H

Demianus

DONE

DONE
Wait for Galvn. Pipe for grounding