Professional Documents
Culture Documents
CATEGORY-C
1
25675706
Maintenance of Boeing 737-200 Aircraft including JT8D engines installed
thereon, upto and including "3A" check.
Page 1 of 18
C
6
25674797,
25674798 (Fax)
Maintenance of (a) Cessna Citation 560XLaircraft including PW545A
engines (b) Cessna550 Citation-II aircraft includingPW JT 15D-4engines
(c ) Cessna S550 Citation-SII aircraft including PW JT 15D-4B engines
(d) Battery Shop as per capabilitity list. (e) Maintenance of Agusta A 119
Helicopter including P & W PT6B-37A engines and associated
Instrument, Electrical and Radio system installed upon upto 100 hrs.
Page 2 of 18
ASIA AVIATION
IGI Airport,Palam
asiasus@bol.net.in
PHONE
25675416
(1) Maintenance of the following Aircraft : (a) Cessna Citation II Aircraft
including P&W JT15D-4 engine installed thereon. Inspections upto Phase
5 , 49 & 50 check including minor maintenance (b) Bell 206 BIII
helicopter. (2) Ancillary Shops (a) FTD/ Bench Check of Radio
Equipment (b) Aircraft Batteries- Capacity Testing of Lead Acid Batteries
Re-conditioning /Overhaul and Capacity Testing of Ni-Cd aircraft
Batteries(c) Functional Testof fuel manifold adapter installed on PT6A-21
& PT6A-42 engine.
10
Page 3 of 18
11
12
13
2567576162,25675267
25675380,98183554
30
(1) Maintenance of the following aircraft : (a) HS 748 aircraft including
RR Dart 536-2T and 533-2 engines installed thereon (inspections up to
check B including minor maintenance) (b) Super King Air B-200 aircraft
including PT6A-42 engines installed thereon (inspections up to 800 Hrs /
24 months check including minor maintenance) (c ) Embrear EMB135 BJ
aircraft fitted with RR AE 3007 AI 1E engines and avionics system (upto
800 hrs/12 months inspection) (2) Testing of :-Radio-Navigational
Equipment and Instruments. (3) Servicing of Wheel and brake assembly
as per the approved Capability list .
Page 4 of 18
14
15
16
25673174
(1) Maintenance upto 300 hrs inspection on Bell 206 L3 Helicopter
including its system and Allison 250C 30P engine installed thereon. (2)
Maintenance upto 100 hrs inspection on MBB BK-117C2 (EC145)
Helicopter including its system and Arriel 1E2 engine installed thereon.
(3) Maintenance up to 100 Hrs/6 months Inspection of Agusta A109E
helicopter including P&W 206C engines along with other systems
installed theron.
24618161
9312001417
(1) Maintenance of the following aircraft : (a)Cessana A 152aircraft
including Lycoming O-235 engines installed thereon (b)King AirC-90
Aaircraft including P&W PT6A-21 engines installed thereon. (2)
Ancillary Shops (a) Maintenance of Mechanical and Electrical
Instruments (b) Maintenance of Lycoming O-235 Continental O-200&
Continentaal C-90 series engines (c)Aircraft Batteries as per capability list.
Page 5 of 18
17
18
0522-2437565
0522-2436504
09415541395
(1) Maintenance of , Piper Cub J3C, Beech Baron, Allouette III, Beech
King Air C90A, Cessna 152, Beech Bonanza A-35/A-36, Super King Air
B-200, Super King Air 300 LW, Zenith CH 2000, Bell 230, as per the
approved maintenance schedule. (2) Maintenance of the following engines
and its accessories, Continental A-65, IO-470, IO-550B, E-185, Lycoming
O-235 N2C, P & W PT 6A-21, 6A-42, 6A-60A, Artouste III B, Allision
250. (3) Maintenance and servicing of the following batteries, Nical
Cadmium, Lead Acid as per the capability list. (4) Maintenance including
overhaul of Radio communication, Navigation & Radar equipment
installed on the above mentioned aircrafts as per capability list.
(5)Maintenance of the following aircraft at the Kanpur base, Zenith CH
2000 and its system including Lyco O 235 N 2C engine, Cessna FA 152 A
aircraft including Lyco O 235 N 2C engine.
ERTL
S Block , Okhla Industrial Area, Phase-II , New Delhi 20
PHONE
19
Maintenance up to 300 Hrs. / 06 Months and 12 Months inspection of HS125-700B aircraft including its engine installed thereon , electrical ,
instruments and radio system as per approved inspection schedule.
Page 6 of 18
20
21
0512-2380248
0512-2304627
(1) Maintenance of Cessna 152 aircraft insalled with LYCO-O-235
engine including Electrical,Instrument,Radio systens and associated parts
installed thereon. (2) Maintenance of Cessna 310 aircraft insalled with
its engine including Electrical,Instrument,Radio systens and associated
parts installed thereon. (3) Ancillary Shop, To carry out and certify
Charging and Capacity Test of lead acid battery.
GOVT OF J& K,
Commisioner of Civil AviationDepartment 28 A, Govt House , Gandhi Nagar,
Jammu-180004
PHONE
22
2430301, 2453711
( JAMMU)
(1) Maintenance of Bell 407 helicopter and its engine Allisson 250 C-47B(2) Re conditioning and CT of Ni-Cd Battery Marathon Type Pt
No.31908-001 as per the approved capability list.
GOVT OF RAJASTHAN
Govt.of Rajasthan State, Sanganer Airport,Jaipur, Rajasthan -302011
PHONE
0141-2550543
To carry out and certify the maintinance upto and including phase IV (
800 Hrs/24 months ) inspection of King AirC-90 A aircraft and its engine
PT- 6A 21 ( P& W make ) installed thereon as per the approved capability
list.
Page 7 of 18
23
HAL- LUCKNOW
P.B NO-215, FAIZABAD ROAD ,LUCKNOW -226016
halldrnd@vsnl.net.in
PHONE
24
0522-2351203
(1) Overhaul , Servicing and repairs of system components covered under
Cat "A" approva as per the capability list. (2) The vertical Gyro 208 C of
M/s Jet Electronics (USA) & AH type 851-1 of Badin (France) make. (3)
Maintenance including overhaul of instrument, accessories and equipment
of aircraft upto 5700 Kg AUW as per the approved schedule. (4)
Maintenance including overhaul of instrument, accessories and equipment
of aircraft B 737, HS 748, F 27, F 50 & HS 125 aircraft as per the
approved schedule. (5) Hydrostatic test and charging of aircraft Oxygen
and Nitrogen bottles as per the capability list.
HAL-KANPUR
TRANSPORT AIRCRAFT DIVISION , CHAKERI, KANPUR-208 008
PHONE
0512-2461749 to 58
0512-2403910
(1) Maintenance of following aircraft, including Electrical, Instrument and
Radio Systems and engines thereon a) HS-748 upto period12 inspection.
Excluding O/H of engines and propeller. b) Dornier DO-228 upto4800
hrs. inspection and up to 72 months inspection. Excluding O/H of
engines. c) Maintenance of Dornier 228 a/c
Mechanical/Electrical/instrument/Radio components as per approved
capability list.d) Maintenance of accessories and equipments fitted on F27 aircraft for which facilities and approval are available.e)Gliders
manufactured by HAL. f) Maintenance of HPT-32 a/c upto 1000 Hrs./5
years excluding O/H of engines and propellers.(2) Overhaul of Hartzel
propeller installed on Dornier 228 a/c.(3) Maintenance and servicing
including capacity testing of Nickel cadmium batteries.
(4) Overhaul of Dowty Rotal Propeller installed on AVRO HS -748 A/C
Page 8 of 18
25
INDAMER CO.LTD
IGI AIRPORT,NEW DELHI
PHONE
26
Maintenance of (a) Super king Air B200 aircraft (b)King Air C90A/B
aircraft. ( c) Bell 407 Helicopter (d) Maintenance upto 200 hrs/ Phas II/ 6
months inspection schedule on Cessna Caravan208B aircraft and its
engines, (e) Maintenance upto 150 hrs inspection schedule on Hawker
800 XP aircraft and its engine TFE 731-5BR-1H, (f) Maintenance up to
100 Hrs./3 months inspection schedule on Ecureuil AS-350B3 Helicopter
including its Arriel 2B1 engines, instruments, Electrical & Radio
Navigation systems installed thereon.
INDIA INTERNATIONAL AIRWAYS LTD.
IGI Airport, Palam
iia@nde.vsnl.net.in
PHONE
25675464
(1) Maintenance of the following aircraft : (a) Maintenance of HS-125 3B
a/c including R R Viper 522 engine thereon. Inspectionsup to 4800 Hrs /
48 months check including minor maintenance (b) HS-125-700B A/C
INCLUDING Garrette TFE-731-3R-111engine installed thereon.
Inspection upto 300 Hrs/6 months and 12 months check including minor
maintenance. (c) Bell 222 U Helicopter including Lycoming LTS101750c-1 Turboshaft engine (d) King Air C 90/ C-90A A/C including P&W
PT 6A-21 engine installed thereon.(e) Main & Nose Landing Gear of
King Air C-90 A Aircraft.. (2) Ancillary Shop (a) Aircraft Batteries.
Page 9 of 18
27
28
25653255
(1) Maintenance of the following Aircraft: (a) Airbus A320-231 aircraft
Including IAE V2500-A1 engines installed thereon (b)Boeing 737-200
aircraft includingP&W JT8D engines installed thereon (c)Airbus A300
aircraft including GE CF6 50 engines installed there on.(d) Airbus A
319 aircraft including engines installed thereon up to 300 hrs inspection.
(2) Overhaul, repair and testing of the following: Electrical equipment /
components as installed on Airbus A320 and Boeing 737-200 aircraft.
Instruments as installed on Airbus A320 and Boeing 737-200 aircraft,
Radio and Navigational Instruments as installed on Airbus A320 and
Boeing 737-200 aircraft as per the approved capability.
25675312
FAX 25672767
(1) Maintenance of the following aircraft : (a) Dornier- 228 aircraft
including Garrette TPE 331-5-252 Dengines installed thereon (2)
Ancillary Shops:- (a) Wheel and brake Shop. (b) Instrument Shop (c)
Electrical Shop (e) Radio Shop (f) Fuel Manifold Shop as per capability
list.
Page 10 of 18
29
30
0512-2597729
0512-2596036
(1) Maintenance of the following aircraft including engines, instrument
system,electrical systems and accessories installed thereon but excluding
repair/overhaul of engines,instrument & electrical systems: i) Cessna
182H ii) Piper SuperCub PA-18 iii) Piper Saratoga PA-32R-301
iv)Hansa -3. (2) Maintenance of the following types of Gliders
including instrument systems & associated parts installed thereon but
excluding repair/overhaul of instrument/accessories fitted thereon: i)
Schweizer 2-22,1-26 & 2-33 ii) Rohini Mk-II iii) ITG-3 iv)Kartik Mk-II
v) Primorets Gliders . (3) Capacity Testing of Lead Acid Batteries as per
approved schedules. (4) Maintenance, Bench check, overhaul, annual
Inspection, FTD inspection & repair of radio communication navigation
equipment as per capability list.
0535-2202094,
0535-2202808
(1) Maintenance of aircraft and their system excluding repair /
modification and overhaul - (a) TB 20 Trinidad. (b) Beech King Air C
90A. (c) Robinson R-22 helicopter. (d) Zlin Z 242 L. (2) Maintenance of
engines and their accessories- (a) Lycoming IO-540 C4D5D. (b) P & W
PT6A-21, ( c) Lycoming O-320B2C. (d) Lycoming AEIO-360 A1B6. (3)
Maintenance and servicing of the following batteries, Nical Cadmium,
Lead Acid as per the capability list. (4) Maintenance including overhaul of
Radio communication, Navigation & Radar equipment installed on the
above mentioned aircrafts as per capability list. (5) Instrument ShopBench check, Calibration, and Functional checks of instruments installed
on TB 20 and King Air C 90 A aircraft as per the capability list.
Page 11 of 18
31
32
33
95120-2560120,
95120-2569615
Charging of Oxygen Charging of high altitude oxygen in the small bottles
for aircraft use as per MIL-27210F as amended from time to time.
JAGSON AIRLINES
IGI Airport,Palam
jagson-id@eth.net
PHONE
011-25675927
(1) Maintenance of the following Aircraft : (a) Dornier DO-228 Aircraft
including Garrette TPE-331 engines installed thereon, inspections up to
2400 Hrs / 24 months check including minor maintenance. (b)Chetak
Helicopter including Artouste III B engine installed thereon ( c) To carry
out maintenance up to 100hrs/90days inspection schedule on MI 172
Helicopter fitted with TV3-113 VM engine and avionics system. (2)
Ancillary Shops : a) Aircraft batteries (Capacity testing of Ni-Cd
batteries.) b) Wheel and brake assembly -Overhaul and servicing of DO228 Aircraft wheel assemblies and brakes. c) Instruments Shop.
Page 12 of 18
34
35
25562426,
25652200
Overhaul, repair and testing of the following : I) P&W JT8D Engines
Complete overhaul & testing of the P&W JT8D-1 through 17A engines.
Repairs and servicing of the engine parts/components as per the capability
list. II) IAE V2500 Engines Maintenance including removal and
installation of modules and testing (upto T1 level) of V2500 engines.
Disassembly, assembly and repair of the engines as per the approved
capability list.
MESCO AIRLINES
Shimla Airport, Shimla.
mal@del3.vsnl.net.in
PHONE
36
25652955
To carry out maintenance of (a) P-68 Observer II Aircraft including
Lycoming IO-360 AIB6 engines installed thereon (b) Ecureuil AS-350
BA Helicopter including Arriel 1B engines upto 1000 Hrs / 4Years
inspection including minor maintenance.
Page 13 of 18
37
38
C
39
24615748,
24632285
24690924
(1) Maintenance of (i) Ecureuil AS 355 helicopter including its Allison
250.C20 F engine, Up to and including 5000 Hrs/144 months(G-Insp). (ii)
Bell 206L-4 Helicopter including its Allison 250C-30 P engine,Up to
and1500 Hrs Inspection. (iii) Robinson R-44 helicopter including its
Lyc.0-540F engine Up to and100 Hrs Inspection. and (iv) Chetak
Helicopter including its Artouste IIIB engine. (2) Ancillary Shops: (a)
Aircraft Batteries (Capacity Testing/Charging of Ni-Cd and Lead acid
batteries). (b) Bench checking/Testing of the Radio/Radar Equipments.(i)
VIR 3IH (ii) Radar Antenna AP- 5001 (iii) Radar Indicator D I-5001 (iv)
Radar Transceiver (v) RT-500 ADF DF-60 (vi) VHF-20A (c) A/C
Instruments/Test Equipments of Robinson R44 (i) Altimeter A 613(5934
PM-1).
Page 14 of 18
40
41
0141-2548218
Maintenance of the following aircraft a) Swati LT-II M aircraft including
Lycoming O-235 engine installed thereon b) Pushpak MK-I aircraft
including Continental C90-8F engine installed thereon c) Cessna FA-152
aircraft including Lycoming O-235 N2C engine installed thereon. d )
Maintenance of the Super Blanik L-23 Glider as per the capability list.
42
0522-2396092,
2392953, FAX
0522-2394857
(1) To carry out maintenance excluding overhaul of Radio, Instruments,
Electrical, and Engine accessories of AS 355N Helicoter and AS 365N2
Daupin Helicopter up to 100 hrs inspection. (2) Approved to carry out
Radio inspection schedule up to 180 days.
25675572
To carry out maintenance upto 2500 hrs/72 months of approved
Inspection schedule on Dauphin AS-365 N2 Helicopter & its systems
including Arriel IC2 engine installed thereon.
Page 15 of 18
43
44
25675572
(1) Maintenance of the following aircraft : (a) Boeing 737-400 aircraft
including CFM 56engines installed thereon (b) Boeing 737-700/800
aircraft including CFM 56engines installed thereon (c)Boeing 737-300
aircraft includingCFM56 engines installed thereon (d) Boeing 767-300
aircraft includind P&W 4060 engines installed thereon,upto 2A check &
S1A inspection. (e) CRJ 200 aircraft includind CF 34 engine installed
theron. (2) Anciliary Shops a) Battery shop b) Wheel and brake shop as
per the capability list.
45
25675429
(1) Maintenance of the following aircraft / Engine: (a) Beech Bonanza A35aircraft including Continental E-185 / 225 engine installed thereon (b)
BeechBaron B-58 aircraft including Continental IO-520 engine Installed
thereon (c)Piper Aerostar -600 aircraft as per the approved capability list.
26527051
Maintenance of a) LAMA SA-315 B Helicopter fitted with Artouste III B
engine, b) Bell 206 B III Jet Ranger Helicopter including its RR 250-C20
J engine, c) CHETAK SA-316 B Helicopters fitted with Artouste III
B/B1 engine, and d) Premier 1 Raytheon model 390 including William
Rolls FJ 44 engines along with other systems installed theron, as per the
approved capability list.
Page 16 of 18
46
47
26289201
51603800/1/2/3/4
(1) Maintenance of Chetak helicopter and Artouste III B Engine installed
there on. (2) Maintenance of Cheetah SA-315B Helicopter and ArtousteIII
B Engine installed there on. (At Jaipur : Maintenance up to 800 Hrs./ 4
years. At Jodhpur: Maintenance upto 200 Hrs / 1 Year. At Delhi:
Maintenance up to 200 Hrs / 1 Year. At Srinagar Maintainance upto 400
Hrs./2years).
48
011-25671293
(1) Maintenance of the following aircraft : (a) Beech - 99 aircraft
including PT6A 20 engines installed thereon (b) Bell 206 B III including
Allison250-C20 engine installed thereon. (c) Bell 407 including Allison
250-C47engine installed thereon.(d) Piper Seneca PA-34 Mk IV
including Teledyne Continental LT SIO &TSIO 360 KB engines Installed
thereon.(e) Chetak Helicopter including Artouste III B engine installed
thereon. (2) Ancillary Shops : Aircraft Batteries as per the approved
capability list.
Page 17 of 18
49
95120-5002319
(1) Overhaul, testing and Calibration of a) Pressure Gauges, Gauge fitted
on Oxygen and Nitrogen Cylinder/Bottles b) Aircraft watch fitted on
aircraft below AUW 5700 Kg (2) Calibration of Spring Balance as per
the capability list.
Page 18 of 18