You are on page 1of 5

SAURABH GHOSH

Contact: +968 94147782 / +91 98832 41601 / +91 33 25000718

E-Mail: saurabh3183@gmail.com

Managerial Assignments
MEP - Project Management
CAREER CONSPECTUS
Over 9.5 years of cross-cultural experience in the areas of:
- Project Management

- Strategic Planning

- Site / Construction Management

- Operations Management

- Commissioning

- Design Reviews

- Liaison Work

- Resource Management

- General Administration

A Asst.Manager-Testing and Commissioning; adept in handling multi-discipline contracts involving EPC, Mechanical,
Electrical, Plumbing and Commissioning Jobs.
Presently associated with Bahwan Engineering Co.LLC. Muscat as Asst-Manager-Testing and Commissioning.
Deft in overseeing project activities from conceptualization to execution including technical specifications, stage inspections,
progress monitoring, site management and manpower planning.
Excellent relationship management, analytical and negotiation skills with deftness in swiftly ramping up projects in
coordination with clients, contractors, vendors and consultants.
CAREER CONTOUR

Since Nov12: Bahwan Engineering Co.LLC. Muscat as Asst. Manager-Testing and Commissioning-Electrical
Sep09: Godrej and Boyce Mfg. Co. Ltd., Mumbai as Manager MEP
Dec07 Aug09: Voltas Ltd., Kolkata as Project Engineer - MEP
May06 Nov07: Everest Engineering House Pvt. Ltd., Kolkata as Project Engineer
Please refer the below annexure for major projects handled
Proficiency Forte:

Monitoring and executing projects with respect to budgeted cost, demand forecasts & time over-runs to ensure
timely execution of the projects and conducting cost benefit analysis of the projects including feasibility studies,
assessment of the requirements, interface and commissioning.
Managing on-site activities to ensure completion of project within the time & cost parameters and effective
resource utilization to maximize output as well as reviewing contract drawings and specifications.
Ensuring the implementation of main contractor / consultant review comments in timely manner also placing
purchase orders on approved suppliers as per approved submittals in timely manner.
Anchoring on-site erection & commissioning of plants and ensuring effective resource utilization to maximize
the output and reviewing engineering drawings, technical specifications, cost estimates for installation &
commissioning and reviewing contractor's change order proposals & submittals.
Inspecting field sites to observe & evaluate facilities & structures and to collect field survey data & measurements as
well as procuring project material, coordinating and following up with the vendors for various projects.
Planning material and developing vendors for obtaining timely procurement of materials & equipments at cost
effective prices to ensure smooth execution of projects.
Directing, leading and motivating workforce; imparting continuous on job training for accomplishing greater
operational efficiency.
Working on succession planning of the workforce, shift management activities, appraising the members
performance & providing feedback.
Notable Credits:

Successfully tested and commissioned Main Contract-1 Project of Development of Muscat International Airport.
Received appreciations for managing minimum working capital with 5 turns in Infrastructure Project worth 500 Cr.
Bagged awards for giving maximum no. of kaizen Ideas from various projects.
Successfully executed the Airport Project under Airport Authority of India with maximum profit.
Received appreciation letters from the Electrical Inspector for giving quality electrical works at Airport as
per IS standards.

SCHOLASTICS

B.E. (Electrical & Electronics) from SSIT, Tumkur, Karnataka, Vishveswarya Technological University in 2006.
PGDM in Operations from Welingkar Institute of Management, in 2014
TECHNICAL PURVIEW

Well versed with MS Projects, Primevera, Windows, AutoCAD, MS - Office & Internet Applications.
PERSONAL DOSSIER

Date of Birth:
Nationality:
Passport Status:
Visa Status:
Driving License:
Marital Status:
No. of Dependents:
Languages Known:
Present Address:
Permanent Address:

st

31 October 1983
Indian
th
K7430744 (12 JAN, 2023)
to be applied
Indian Driving Licence and Valid GCC Driving Licence.
Married
4
English, Hindi, Bengali and Assamese
Flat 401, Building 624, way 4143, Al khuwair, Muscat, Sultanate of Oman
Monalisa Apartment, Flat No-A/5, 3, Baguihati Road, Kolkata - 700028

Annexure: 1
Bahwan Engineering Co.LLC., Muscat as Asst. Manager-Testing and Commissioning-Electrical
Project:

Construction and Development of Muscat International Airport at Seeb, Sulatanate of


Oman

Key Deliverables
Stellar in Design & Commissioning various electrical installations inside the airport including LT and HT substations
(11KV/440V),Central Battery System, Dimmer Racks including Low Current Systems like PA, CCTV, Fire Alarm and
Detection System, Flight Information and Display Systems, Building Management Systems, Land Traffic Management
System. Commissioning of LV and HVAC system and its Installation, integrating the same with CPCMS, PMS, BMS,
Airport Scada. Coordination with consultant and contractors for plumbing works. Commissioning of ABB VFD DRIVES
upto 450 KW. Commissioning of Artuk ABB make panels, Schneider Panels. Commissioning of Central Battery
system, ABB and Emerson Make UPS system.
Designing of Various Small power and Lighting drawings. Cable Tray Layout, Cable sizing, preparation of DB schedule.
Coordination with client for Design Drawing Approval and issuing it for Construction.
Stellar in Scheme Checks and interlock checks for LV panels.
Preparation of Relay setting calculation and discrimination study.
Relay Testing for LSIG breakers.
Testing and Commissioning of 2500 Tr Water Cooled Chiller (14 nos), Chilled Water pumps with max 450 KW
motors, Cooling Tower Motors, ABB and Schneider make VFD Drives max 450 KW, Fire Fighting System with
Electrical Driven and Diesel Driven Pumps, 2500 KVA 11 KV DG (12 nos), 500 KVA LV DG at Air Field Lighting
Substations (4 nos), Auto Main Failure Panels, Emerson Make 200 KVA UPS (4 nos), ABB make LV Panels, Central
Battery System, Normal and Emergency Lighting system, Small power System, Fire Alarm System with verification
of Cause and effect Matrix, Inert Gas system and integration of the same with FDAS, Aspiration Smoke Detector
system, 11 KV 125 KVAr Capacitor Bank (28 Nos), ABB make LV Capacitor Bank (75 KVAr) with APFC Relay

Godrej and Boyce Mfg. Co. Ltd.


Project:

MEP works at Godrej-1 Corporate office complex (2 basement and G+11 each of 65000 sq. ft.)
at Vikhroli Mumbai

Accountabilities
Accountable for planning and coordination and overall monitoring of various MEP installations inside the office complex
including LT and HT substations (33KV/440V), Low Current Systems like PA, CCTV, Fire Alarm and Detection System,
Building Management Systems and Access Control.
Responsible for commissioning HVAC system and its Installation, integrating the same with BMS.
Liaising with consultant and contractors for plumbing works.
Interfacing and supporting STP and WTP contractors for electrical installation and pump installation.
Carrying out the commissioning, installing and coordinating of the:
o Fire fighting works and logical operations of fire fighting system as per fire authority norms.
o 2500 KVA ONAN Transformer 3 nos.
o Jackson make 2000 KVA DGs 3 nos.
o APFC, AMF, HT, LT panels.
o 40 Tr AHU 5 nos, 81 nos FCUs each of 1.5 Tr.
o 675 Tr three nos water cooled Chiller from Carrier.
o 700 Tr 3 nos forced draft Cooling towers.
o Denson make VFDs, chilled water pump of 40 HP 4 nos, condenser water pump 4 nos.
Performing the estimation of the actual quantities from the pre-executed approved drawings for ordering out / procurements
of materials / equipments.
Project:

MEP Works at IT PARK, Godrej and Boyce Mfg. Co. Ltd., under Construction division of
Godrej and Boyce Mfg. Co.

Accountabilities
Dexterously involved in the execution of various electrical installations inside the business park including LT and HT
substations (11KV/440V) & Low Current Systems like Fire Alarm and Detection System.
Instrumental in handling SITC of:
o 1450 KVA 8 nos DG set from Mistubishi
o 2.5 MVA X 2 and 1.5 MVA X 3 nos Power Transformer.

Project:
Rural Electrification Works under MSEDCL, RGGVY Scheme at Maharashtra
Accountabilities
Oversaw the costing and estimation of this project, project value worth 1200 Crores.
Worked as a Project Co-ordinator (Design and Planning) in project Co-ordination cell.
Coordinated with the Execution Team and sub contractor for proper execution.
Resolved technical issues at sites regarding designing and Substation works.
Accounted for preparing Milestone Chart.
Pivotal in designing:
o MS Fabrication Drawings as per BOQ and MSEDCL Specs.
o Substation Layout and working plan as per site survey.
Involved in designing & developing:
o Earth mat as per soil resistivity test.
o Cable Schedule and after studying control wiring drawings.
o Civil foundation drawings as per soil bearing capacity.
Performed the collection of:
o Store audit reports before giving requirements for next quarter.
o Joint measurement sheets in co\ordination with site billing engineers.
Formulated bills as per activity and Boq schedule.
Oversaw the collection of bill and system billing
Performed the testing commissioning of 33/11 KV S/S (Augmentation, Additional Power Transformer and New S/S).
Checklist of DTC lines and 33/11 KV S/S prior to commissioning and charging.

Project:
MEP Works at Inorbit Mall, Vashi and Inorbit Malls Pvt. Ltd.
Accountabilities
Executed and commissioned various electrical installations including LT and HT substations (22KV/440V) including:
o Low Current Systems like Fire Alarm and Detection System, BMS, CCTV and PA system.
o ITC of Power Transformer 1.6 MVA-4 nos and 2 MVA-2 nos
o ITC of DG Sets of 2000 KVA - 4 nos.
Formulated the Bar Chart in coordination with Consultants / Clients.
Involved in estimating the actual quantities from the pre-executed approved drawings for ordering out / procurements of
materials / equipments.
Instrumental role in floating enquiries to the suppliers, suppliers quotations along with cost deviations in comparison with
estimated cost, etc. in coordination with Materials / Purchase Department.
Stellar role in assigning the site sub-contractors for Electrical works, BMS, Low current system, etc. based on their
quotations, estimated cost & subsequent negotiations to its highest level.
Oversaw various activities related to installation, testing & commissioning of the project with the proper use of man /
materials in consultation / coordination with Client / Consultant / other contractors / agencies which ensured goal of time for
both, i.e. for execution and collection of payment.
Project:

Electrical Works at National Brain Research Centre, under Directorate of Atomic Energy Govt.
of India, Manesar, Haryana

Accountabilities
Carried out the execution and commissioning of various electrical installations inside the Research Centre including LT and
HT substations (33KV/440V) including Low Current Systems like Fire Alarm and Detection System.

Voltas Ltd.
Project:
Construction of Tata Cancer Hospital, under Tata Medical Centre
Accountabilities
Carried out the execution of various electrical installations inside the Hospital including LT and HT substations (33KV/440V)
including Low Current Systems like PA, CCTV, Fire Alarm and Detection System, Nurse Call System, Bed held units with
Oxygen, Nitrogen and Vaccum Piping.
Performed the Installation Testing and commissioning of:
o 1800 KVA three nos Mitsubushi make DG set.
o 2 MVA two nos and 2.5 MVA two nos ONAN Voltamp make Power transformer.
o Train make screw chiller 450 Tr (3+1).
o AHU 37 nos 5ton to 60ton.
Undertook special care for OTs, for various materials used during execution.
Involved in assigning the site sub-contractors for Electrical works, BMS, Low current system, etc. based on their quotations,
estimated cost & subsequent negotiations to its highest level.

Project:

Construction of New Terminal Building, at Dibrugarh Airport, Dibrugarh Assam,


Under Airport Authority of India

Key Deliverables
Stellar in planning, executing commissioning various electrical installations inside the airport including LT and HT
substations (33KV/440V) including Low Current Systems like PA, CCTV, Fire Alarm and Detection System, Flight
Information and Display Systems, Building Management Systems. Commissioning of HVAC system and its Installation,
integrating the same with BMS. Coordination with consultant and contractors for plumbing works.
Pivotal in commissioning and coordinating the fire fighting works, logical operations of fire fighting system as per fire
authority norms.
Diligently coordinated and supporting STP and WTP contractors for electrical installation and pump installation.
Instrumental role in Installation & commissioning:
o 1000 KVA ONAN Transformer 3 nos.
o Jackson make 1000 KVA DGs 3 nos.
o APFC, AMF, HT, LT panels.
o 40 and 30 Tr AHU 15 nos, 10 nos FCUs.
o 280 Tr three nos Air cooled Chiller from Carrier.
o Danson make VFDs, chilled water pump of 40 HP.

Everest Engineering House Pvt. Ltd.


Project:

Modification in the existing Power Supply System from Noapara to Tollygunj in


connection with Power Supply Arrangement for Tollygunj Garia Section under
Metro Railways, Kolkata

Key Deliverables
Accounted for planning, executing and commissioning various electrical installations at Metro Railways underground 33/11
KV substations.
Dexterously involved the contractors in preparing detail drawings with help of tender drawings documents & specifications.
Instrumental in reviewing the materials specifications as & when it entered into the site and before they are being used.
Organised periodical visits to the ongoing sites to check the development of work and to coordinate with the client and the
contractors for any additions and subtractions as required.
Diligently checked and certified all the equipments, quantity and sub-sequent pricing after receiving the bills from the contractors,
in accordance with the terms & conditions of payment to be forwarded to the client for certified payments to the contractors.
Essayed a stellar role in scrutinizing the snag list and making the client aware about issuing amendments in work order to
the contractors in case of any addition of extra equipments and materials or system used in the project.
Steered efforts in collecting the project handover documents including as built drawings, catalogues, manuals, etc. from the
contractor to deliver it to the client / owner.
Project:

Accelerated Power Development and Re-inforcement Project in Arunachal Pradesh


under Power Department (State Electricity Board) involving Construction of 14 33/11 kV
Substations and 33KV Transmission Line under RGGVY Scheme at Arunachal Pradesh

Key Deliverables
Actively involved in executing and commissioning 14 nos 33/11 kv substations located at different places of Arunachal
Pradesh.
Carried out proper survey of HT line & LT line and submission of the report to design cell.
Formulated cable schedule, after studying control wiring drawings.
Instrumental role in surveying and taking over lands for substation from client and prepared substation layout.
Liaised with the project coordination team for proper follow up of materials and construction drawings.
Ascertained that the site should not cry for shortage of materials and should make proper material planning.
Administered the works done by the Subcontractors as per clients requirement.
Involved in commissioning 33 Kv transmission line with pole mounted DTC under RGGVY scheme at Arunachal Pradesh.
Developed computerized single line / detail layout for the substations and fabrication drawings.
Generated total plant layout including structural drawing & fabrication details and other drawings associates with the project.

You might also like