LOCATION:
OWNER
:
SUBJECT :
ITEM
NO.
SCOPE OF WORKS
1.0 GENERAL REQUIREMENTS
1.1 MOBILIZATION/DEMOBILIZATION
- to include shop drawings, record drawings,
security & cleaning, temporary power & water supply
application & bills, temporary facilities shall be included.
1.2 PERMITS, BONDS & INSURANCE
- Building Permits
(Barangay/Zoning Clearance/Building/SanitaryPlumbing/Electrical/Mechanical/Signage)
- Occupancy Permit & Fire Safety Inspection Certificate
- Performance & Surety Bond/Guarantee Bond
- Contractors Tax
- CARI ( Php 500,000 coverage )
QTY.
UNIT
lot
lot
SUB-TOTAL
2.0
SITEWORK
2.1 DEMOLITION
2.1.a Living room window
2.1.b cabinets at consultation room
2.1.c removal of wooden grills
2.1.d remove closet at GF treatment room
2.2 ELEVATE FLOORING
2.2.a Garage
2.2.b Employees Area
sqm
sqm
SUB-TOTAL
3.0
sqm.
lot
sqm.
sqm.
sqm
3.2 TILEWORKS
- to include surface preparation, mortar setting bed
adhesive, grouting, tile trims, cleaning and polishing.
3.2.a FLOOR
- 600mmx600mm Granite Tiles
( Reception Area )
- 300mm x 600mm Unglazed Tiles ( T&B )
Plain Cement Finish (Employees Area)
sqm
sqm.
sqm.
3.2.b
WALLS
- 300 mm x 600 mm Unglazed Tiles
(Exterior Wall/Reception Wall)
- 400mm x 400mm Ceramic Wall Tiles
( T&B )
SUB-TOTAL
sqm.
sqm.
Page 1 of 3
UNIT
COST
MATERIALS
LABOR
TOTAL
4.0
5.0
STEEL WORKS
to include fixing & accessories
4.1
steel rafters, purlins, shelf angle & sagrods
4.2
steel slats using tubular sections
4.3
transfer fo fire escape doors
SUB-TOTAL
unit
unit
unit
CARPENTRY WORKS
- to include hinges, handles, metal drawers,
rubbers, catches, pegs and others to complete
5.1 CABINETS & SHELVES
5.1.a Lavatory cabinets
5.1.b Counter at Office
5.1.c Overhead Cabinets at Office
5.2 SERVICE COUNTER
- to include supply & fabrication as per shown detail to complete
the works ( Synthetic Granite countertop with laminates in front)
5.3 WALL Band ( Synthetic Granite ) see details
( Perimeter Dining Area walls )
sqm
unit
lm
sqm.
sqm
SUB-TOTAL
6.0
MOISTURE PROTECTION
6.1 ROOFING (employees area)
6.2 WATERPROOFING (2nd floor bathrooms)
SUB-TOTAL
7.0
sqm
sqm
unit
unit
unit
unit
unit
8.0
sqm
sqm
sqm
sqm
sqm
CEILING WORKS
- Supply & installation of unbranded powder coated runners,
hanger rods, clips, nuts, brackets & all fixing accessories to
complete the works.
8.1 10mm thk Gypsum Board ceiling on LSFS
( reception )
sqm
SUB-TOTAL
9.0
PAINTING WORKS
9.1 AUTOMOTIVE LACQUER PAINT FINISH
6.1.a Wooden Door & Door Jamb ( Varnish Finish )
9.2 INTERIOR MASONRY WALLS
9.3 EXTERIOR MASONRY WALLS
9.4 Hardiflex and gypsum board APPLICATIONS
sqm
sqm
sqm
sqm
SUB-TOTAL
Page 2 of 3
10.0
lot
unit
unit
unit
SUB-TOTAL
SIGNATURE:
DATE:
Page 3 of 3