You are on page 1of 3

PROJECT :

LOCATION:
OWNER
:
SUBJECT :

BIDFORM FOR CIVIL/FINISHING & PLUMBING WORKS

ITEM
NO.
SCOPE OF WORKS
1.0 GENERAL REQUIREMENTS
1.1 MOBILIZATION/DEMOBILIZATION
- to include shop drawings, record drawings,
security & cleaning, temporary power & water supply
application & bills, temporary facilities shall be included.
1.2 PERMITS, BONDS & INSURANCE
- Building Permits
(Barangay/Zoning Clearance/Building/SanitaryPlumbing/Electrical/Mechanical/Signage)
- Occupancy Permit & Fire Safety Inspection Certificate
- Performance & Surety Bond/Guarantee Bond
- Contractors Tax
- CARI ( Php 500,000 coverage )

QTY.

UNIT
lot

lot

SUB-TOTAL
2.0

SITEWORK
2.1 DEMOLITION
2.1.a Living room window
2.1.b cabinets at consultation room
2.1.c removal of wooden grills
2.1.d remove closet at GF treatment room
2.2 ELEVATE FLOORING
2.2.a Garage
2.2.b Employees Area

sqm
sqm

SUB-TOTAL
3.0

MASONRY WORKS & DRY WALLS


3.1 WALLS & PARTITION
- to include fixing accessories & reinforcement as shown
on the structural plans
3.1.a 100 mm thk. CHB walls (Property wall, Reception)
3.1.b Stiffener columns, base beam & lintel
beams
3.1.c Plastering Works
3.1.d Plain Cement Plaster Finish
(Interior walls in synthetic adobe finish)
3.1.e 6mm thk fibercement bd on LSFS
(Hallway, Stairs)

sqm.
lot
sqm.
sqm.
sqm

3.2 TILEWORKS
- to include surface preparation, mortar setting bed
adhesive, grouting, tile trims, cleaning and polishing.
3.2.a FLOOR
- 600mmx600mm Granite Tiles
( Reception Area )
- 300mm x 600mm Unglazed Tiles ( T&B )
Plain Cement Finish (Employees Area)

sqm
sqm.
sqm.

3.2.b

WALLS
- 300 mm x 600 mm Unglazed Tiles
(Exterior Wall/Reception Wall)
- 400mm x 400mm Ceramic Wall Tiles
( T&B )
SUB-TOTAL

sqm.
sqm.

Page 1 of 3

UNIT
COST

MATERIALS

LABOR

TOTAL

4.0

5.0

STEEL WORKS
to include fixing & accessories
4.1
steel rafters, purlins, shelf angle & sagrods
4.2
steel slats using tubular sections
4.3
transfer fo fire escape doors
SUB-TOTAL

unit
unit
unit

CARPENTRY WORKS
- to include hinges, handles, metal drawers,
rubbers, catches, pegs and others to complete
5.1 CABINETS & SHELVES
5.1.a Lavatory cabinets
5.1.b Counter at Office
5.1.c Overhead Cabinets at Office
5.2 SERVICE COUNTER
- to include supply & fabrication as per shown detail to complete
the works ( Synthetic Granite countertop with laminates in front)
5.3 WALL Band ( Synthetic Granite ) see details
( Perimeter Dining Area walls )

sqm
unit
lm
sqm.
sqm

SUB-TOTAL
6.0

MOISTURE PROTECTION
6.1 ROOFING (employees area)
6.2 WATERPROOFING (2nd floor bathrooms)
SUB-TOTAL

7.0

sqm
sqm

DOORS / GLASS WINDOWS


- to include hinges, door closer, door stopper, locksets
and others to complete. ( Including Jambs )
7.1 DOORS ( with Jams )
- to include all accessories as per detail on schedule of doors
D-1
Main Entrance Door
D-2
Aluminum Sliding Door
D-3
Kitchen/Hallway
D-4
Shower divider
D-5
Treatment Room/Changing Room
D-6
Bathroom

unit
unit
unit
unit
unit

7.2 Glass Windows


W-1 Picture window
W-2 Steel casement window inside swing
W-3 Steel casement window inside swing
W-4 Built-up plywood, acoustic & gypsum bd panel
W-6 Built-up plywood, acoustic & gypsum bd panel
SUB-TOTAL

8.0

sqm
sqm
sqm
sqm
sqm

CEILING WORKS
- Supply & installation of unbranded powder coated runners,
hanger rods, clips, nuts, brackets & all fixing accessories to
complete the works.
8.1 10mm thk Gypsum Board ceiling on LSFS
( reception )

sqm

SUB-TOTAL

9.0

PAINTING WORKS
9.1 AUTOMOTIVE LACQUER PAINT FINISH
6.1.a Wooden Door & Door Jamb ( Varnish Finish )
9.2 INTERIOR MASONRY WALLS
9.3 EXTERIOR MASONRY WALLS
9.4 Hardiflex and gypsum board APPLICATIONS

sqm
sqm
sqm
sqm

SUB-TOTAL

Page 2 of 3

10.0

PLUMBING AND SANITARY (SUPPLY & INSTALLATION)


to include all installation, fittings, and fixtures, testing
and commissioning & embedding works
10.1 ROUGHING-INS/PIPING SANITARY LINES
10.1.b 25mm PVC Pipe ( Blue ) ACU drain
( with insulation ) & PVC class 150
10.2 Water Heater " Jett Multipoint " 5 KW
10.3 Water storage tank
10.3 Replace bathroom fixtures & fittings

lot
unit
unit
unit

SUB-TOTAL

TOTAL DIRECT COST


MISCELLANEOUS & CONTINGENCIES
OVERHEAD/SUPERVISION/PROFIT
TAXES (Value-Added Tax)
TOTAL BID COST
less: discount
BEST & FINAL OFFER

SUBMITTED BY: name of contractor/authorized representative

SIGNATURE:

DATE:

Page 3 of 3