AA JOYLAND (PVT)LTD
Job: New Bridal Room Construction Work
Civil Works
Description
Unit Quantities
Excavation
Excavation of foundation from the surface ground level up
560
C/ft
to requird depth as per drawings, specification and all
disposal of excess material remove from site job complete in
all respect.
Back Filling Local Sand
Back filling local sand in foundation from the surface soling
level up to requird depth as per drawings, specification and
896
C/ft
all disposal of excess material remove from site job complete
in all respect.
800
C/ft
224
S/ft
1950
S/ft
450
S/ft
4000
Nos
C/ft
150
Nos
Block Masonary
Providing & laying block masonary, using CC blocks as per
drawing set in 1:6 cement sand mortar using Lucky cement o.p.c
block size 6" x 8" x 12" job complete all respet with the satisfaction
of engineer or incharge.
Laying concrete use ratio 1:2:4 3" thick spreading ,leveling &
curing with the satisfaction of site engineer .job complete in all
respect and all disposal material remove at side
Rate
Amount
Nos
S/ft
550
Nos
S/ft
700
R/ft
200
Nos
1 job
1 job
Nos
R/ft
40
R/ft
80
Nos
S/ft
130
Nos
Nos
Nos
Nos
15
Nos
Nos
1job
1job
Nos
Nos
4000
Kg
240
Total
Safety @ Work
For Details See Following Documents.
Appendix A- Safety Procedures for Contaractors.
Appendix B- Guideline for Civil works & Timing Schedule for completion civil works..
All quantities are estimated values, payments shall be based upon actual measurements as verified at site.
No bill will be verified and cleared without the AS-BUILT drawings.
Making of AS-BUILT drawing will be the responsibility of Contractor.
For civil works, shop drawings to be provided by the contractor and approved by the Engineer Incharge before start
All rates must include material & completion of civil work.
Actual dimensions to be measured & verified by the contractor at site.
50 % of advance payment before stating of civil work & 50% payment after completion of civil work.
Incase of any delay of given time schedule of civil work . Then company has rights to dedected 20,00.00/= rupee
12 per day in final bill
13 Contractor to provide all related material's specifications for approval before starting of work.
14 Structural material should be removed from site & to be placed on designated area properly