Substation: KURD SAT 132/33/11 kV 2 x63/50/40 MVA

Contract: KRG-MOE SS6 b / 2011

Site Commissioning Test Record Sheet


DIRECTIONAL O/C and E/F Protection
Protected Unit

Circuit No. and ref.: TRANSFORMER LINE-Main Transformer No.

1.RELAY DATA:
Relay type designation

Serial Number

Rated current (Amp.)

Produced by:

SIEMENS

Rated Frequency (Hz)

50 Hz

Auxiliary DC supply (V)

110

Feeder/Location

Device No.

V.T. Ratio (kV/kV)

132/V3 /0.11V3 / 0.11/V3

C.T. Ratio ( A/A )

300/5/5/5

Polarizing Voltage Vn

110 V AC

2. SETTING RECORD
O/C Setting

Ip=
A, TMS=
Char:NINV
Ip>=
A, t=
sec.
Char:DMT
=
Ip>> NA
RCA +300
Direction: Forward
Plant
132 kV Main Power Transformer Line
Relay Address
E/F Setting

Iep=
A, TMS=
Char:NINV
Iep>=
A, t=
sec.
Char:DMT
=
Iep>> NA
RCA -600
Direction: Forward
Plant
132 kV Main Power Transformer Line
Relay Address
3. GENERAL INSPECTION AND CHECKS:
- Installation and wiring correct to the relevant drawings:
- Test block connections checked: .
- Modules type designation or ratings information is correct:

- Relay case connected to the local earth bar: .


- Output relays contacts are operating properly:
- Operation of digital display, LED indicators, buttons on relay front panel: ..
-Communication
Date:

Tested by:
Zozik Co

Witnessed by:
MOE (Client)

File Name: 44.1 KT Directional_OC_EF_MTR_132 kV.doc

Witnessed by:
PB (Owners Engineer)

KURD SAT 132/33/11 kV 2 x63/50/40 MVA

Substation:

Contract: KRG-MOE SS6 b / 2011

Site Commissioning Test Record Sheet


4. DIRECTIONAL CHARACTERISTICS PRESENTATION:

Reverse Start
Non Operating Area

Reverse Start
Start
Reverse
Non Operating
OperatingArea
Area
Non

RCA=+30

Is

Is

Vp

O/C

E/F

Forward Start
Forward Operation Area

Vp=Quadratue voltage
lagging current 90O

Vp

Forward Start
Forward Operation Area

RCA=-60

Vp=Residual voltage
I=Zero Sequence Current

5. TEST RESULTS :
5.1 Directional Over-current test by secondary current/voltage injection:
Polarizing Voltage(s)
Injected (V)
Angle
=
L1 63V
00
=
L2 63V

-1200

=
L3 63V

+120

=
L1 63V

+1200

=
L2 63V

00
-120

=
L1 63V

-1200

=
L2 63V

+1200

L2

L3

=
L3 63V

=
L1 63V

00

=
L3 63V

L1

Angle Boundaries of operating


area (Current shifted ref. Vp)

=
L3 63V

=
L2 63V

Current injected
Phase(s)
Amps

L1

L2

L3

-120

+120

Date:

Tested by:
Zozik Co

Witnessed by:
MOE (Client)

File Name: 44.1 KT Directional_OC_EF_MTR_132 kV.doc

Witnessed by:
PB (Owners Engineer)

KURD SAT 132/33/11 kV 2 x63/50/40 MVA

Substation:

Contract: KRG-MOE SS6 b / 2011

Site Commissioning Test Record Sheet

5.2 Directional Earth-Fault current test by secondary current/voltage injection:


Polarizing Voltage(s)
Injected (V)
=
U0 63V

Current injected

Angle

Phase(s)

Amps

00

I0(Residual)

Angle Boundaries of operating


area (Current shifted ref. Vp)

Note: Values of injected quantities exceeded threshold values of I>, I0> and Vp
5.3 Sensitivity and timing test by secondary current injection:
5.3.1 Over current and Earth fault: See attached Report
5.3.2 Sensitivity test to Polarizing Voltage:
Min. Polarizing Voltage:

L12=

L13=

L23=

7.4 Other Tests and Checks


Circuit breaker tripping and signaling: ..

On load tests and checks performed: ..

TestEquipment:
Observationoftestingengineer:

Site tests results within factory assigned and PTR values


TESTS PASSED SATISFACTORY.

Date:

Tested by:
Zozik Co

Witnessed by:
MOE (Client)

File Name: 44.1 KT Directional_OC_EF_MTR_132 kV.doc

Witnessed by:
PB (Owners Engineer)