DAILY PROGRESS REPORT

Development of DHAI Phase-II


Infrastructure Work
WORK IN PROGRESS/COMPLETED

Weather:
Sunny

S. No.

Contractor's Manpower at Site

Date

Planned Activities

Achieved

Collector Road

Monday, January 11, 2010

Contractor: M/s Maqbool Associates


Amendments of drawing & specification:

In progress

Project Manager/CM

Cable laying,sand backfilling & brick laying for street lights from Ch: 0+2

In progress

Engineers/Assistant Engineers

Embankment formation for 7th layer frm Ch: 0+980 ~ 1+000.

In progress

* Reasons for non operational equipment

Surveyors/QS

Embankment formation for 19th layer frm Ch: 1+018~ 1+050.

In progress

Assistant Surveyors

Reinforcement & formwork for intermediate segment of top slab of multicell culve

In progress

Foremen/Supervisor

01 No concrete mixer,02 No concrete


vibrator & 01 No Dewatering pump are found
non operational due to contractor's own
reasons.

Equipment Operators

Plant Operators

Excavation for water supply line frm Ch: 0+110 ~ 0+241 ,0+270 ~ 0+300 of M4-02. (

In progress

Drivers

Excavation for street light cable trench from Ch: 0+120 ~ 0+160 of M4-02 (L/S).

In progress

Skilled Labour

45

Formwork for kerb & gutter from Ch: 0+172.5 ~ 0+185,0+190 ~ 0+195 & 0+20

In progress

Unskilled Labour

39

Total

Village M4

Village M7

112

Equipment at Site

Excavation & sand bedding for storm water connection from gully GM-10 to manhole S

Completed

Excavation & sand bedding for water supply Xing at Ch: 128.195 of M7-02.

Completed

SAFETY MEASURES:

Connection of water supply pipe with main line at Ch

Completed

Needs further improvement & implementation.

Type

Operational

*Non
Oper.

Conc. Transit Mixer

Conc.Vibrator

Paver

Tandem Roller/P

Tractor/ Tractr

Dewatering Pum

Dumper

Substation:

Excavator /

No activity observed.

Grader

Utility Ar

Power Generator

Embankment filling for 40th layer frm Ch: 0+020 ~ 0+080 at UT-01.

Loader
Plate
Compactor /
mini roller
Vibrator Roller

Precasting Yard

No activity observed.

Water Bouzer

Crane

Source

Status

Welding Plant

U-PVC pipe

Noor Pipe Industries

Approved

Light Generator

RCC pipes for storm water

Shalimar Pipe Industries

Approved

Bitumen B

HDPE pipe for Water Supply

Noor Pipe Industries

Approved

14

21

PE Pipes for Water Supply

New Tech

Approved

Steel Grade-60

Pak Steel, Fazal

Approved

Concrete Class A-1

IJM

Approved

7
8

Lean concrete Design


Water Stopper

IJM
Decora

Approved
Approved

Transformer, Feed Pillar

Total
Vehicles

Visitors:

B/Down Total

Verbal Instructions to Contractor's staff:


1. Adequate finishing & curing arrangement is

2. The Contractor should commence the work w

coordination to other contractors.


In progress

AER's Instruction:
The Contractor should expedite the work
particularly in Village M7.

BRIEF DESCRIPTION OF MATERIALS APPROVAL


Description

S.No

Siemens

Approved

10

LT Service Boxes

PEL

Approved

11

Consumer Pannel 11 KV

PEL

Approved

12

HT & LT Cables

Newage

Approved

ER's Instruction:

Engineer's Representative:

DAILY PROGRESS REPORT FOR SOD, M1,M3 & M5.

Weather:
Partially Cloudy / Sunny

Development of DHAI Phase-II


Infrastructure Work
WORK IN PROGRESS/COMPLETED
S. No.

Planned Activities

Date
Achieved

Monday, December 01, 2008

Contractor: Habib Rafiq (Pvt.) Ltd.

Village M5:
6

Backfilling 3rd layer for sewer line from manhole FF-3/5 ~ Ch. 0+290 (FF-1/6)

Completed

Precasting Yard:
1

Storm water gully chamber (19 Nos.)

Completed

Sewer house connection (21 Nos.)

Completed

Note:
Contractor is also advised to arrange the temporary covers for manhole

openings in Village M1 (road work area, road # 02) & M3.

ER's Instruction:

Engineer's Representative:

Page 2 of 2

DAILY PROGRESS REPORT FOR SOD, M1,M3 & M


Development of DHAI Phase-II
Infrastructure Work
WORK IS IN PROGRESS/COMPLETED

Weather:
Sunny

S.No

Planned Activities
Village M1:

Contractor's Manpower at Site

Backfilling 12th layer around storm water manhole SA-1/7

Project Manager/CM

Engineers/Assistant Engineers

Surveyors/QS

Assistant Surveyors

Excavation for storm water line from manhole SG-1/4 ~ SG-1/5

Foremen/Supervisor

Excavation for sewer line from manhole FF-2/3 ~ FF-1/4

Equipment Operators

Formwork for 2nd step of walls for storm water manhole SG-1/5

Formwork for top slab of storm water manhole SG-1/2

Plant Operators

Village M5:

Drivers

16

Skilled Labour

17

Lean concrete for sewer manhole FF-1/4

Unskilled Labour

23

Concrete for top slab of sewer manhole FF-2/2

77

Hydro testing of UPVC pipes for sewer line from manhole FF-2/1 ~ FF-2/2

Sand beding for sewer line from manhole FF-2/1 ~ FF-2/2 & FF-2/2 ~ FF-2/3

Backfilling 2nd layer around sewer manholes FF-2/1 & FF-2/2

Total

Reinforcement & formwork for walls of storm water manhole SG-1/3

Equipment at Site
Type

OperationalIdle B/Down Total

Conc. Transit Mixe

Conc.Vibrator

PTR

Tandum Roller

U-PVC pipe for sewerage 150mm & 200mm dia

Dewatering Pu

RCC pipes for storm water (310, 460 & 610mm dia)

Dumper

PE pipe for water supply (DADEX), PE-100, 75mm int dia.

Excavator

Interlocking concrete blocks (Grey & Red)

Grader

Agg. Base course, Sub base.

Power Generato

Cable for street lights (16mm2 4 core - Aluminum)

Loader

Cable (35mm2 4 core - Aluminum)

Plate Compacto

Cable (35mm2 4 core - Aluminum)

Bulldozer

Test on rubber ring for RCC pipes

Vibrator Roller

Water Bouzer

Crane

Welding Plant

Light Generator

Vehicles

11

12

Total

25

13

40

Visitors:

BRIEF DESCRIPTION OF MATERIALS APPROVAL


S.No

Description

OR SOD, M1,M3 & M5.

AI Phase-II
rk
ROGRESS/COMPLETED

Date:Friday, July 11, 2008


Achieved

Contractor:Habib Rafiq (Pvt.) Ltd.


Amendments of drawing & specification:

1/7

Completed

~ SG-1/5

Completed

Completed

e SG-1/5

In progress
Completed

nhole SG-1/3

Completed

SAFETY MEASURES:

Completed

1-Some of the labours were still found


without safety shoes.

Completed

le FF-2/1 ~ FF-2/2

In progress

2/2 & FF-2/2 ~ FF-2/3

Completed

FF-2/2

In progress

2-Improvement & implementation for the


installation of Sign Boards & warning tapes
arrangements are still required.
Verbal Instructions to Contractor's staff:

ERIALS APPROVAL
Source

1. Adequate curing arrangement is required.

Status

2. Site Engineer/Senior Surveyor should ensur

DADEX, ROBIN

Approved

presence in working hours at site so that pro

HRL

Approved

can be handled and solved.

DADEX, POLY PIPE

Approved

AER's Instruction:
The contractor should expedite the work
particularly in village M5.

Primecrete

Approved

DHA phase-II

Approved

Pakistan cable

Approved

Pakistan cable

Approved

Universal

Approved

West Pakistan

Approved

ER's Instruction:

Engineer's Representative:

Daily Progress Report


EMAAR DHA Phase ii Extension
WORK IN PROGRESS/COMPLETED
Description
Team 1 (Mr. MOHSIN)

Villa No

Weather:Sunny

Qty

Cost/unit
Skilled

Un Skilled

Rate/day

Total Cost

Allocated Villas:47~52,195~196,197~200,7~12

Claim/Extra Work/Day Work

Plaster Work
S.O.G

60sft

2900

1.5/sft

250

500

5.75/sft

700

700

750

250

11~12

1928sft

Excavation for plumbing pipe

192

875sft

197
53

Cleaning for plaster

32sft

197

SOG

850

200

Reparing work
Block work
8

Date: 13/8/2012 To 31/8/2012


Labour Used

S.
No.

700

2900

850

500

750

23.44/sft

500

0.71/sft

12

964sft

Plaster work

200

632sft

500

3750

Concet work arch& kitchen pad

199

95sft

500

2950

53

964sft

BRC mash
Reparing work

197

cleaning for plaster

2950

750

197

4.78/sft

450

700

500

700

exavation for plambing pipe


52

Block work
9

Plaster work

25sft
197~200

Block work

47

Exavation for plumbing pipe

192

Reparing work
10

500

500

450

68cft

198

197sft

500

964sft
133sft

250

Cleaning for plster

196~197

276sft

250

Plaster work

197

417sft

Exavation work for plumbing

197
193

73sft

Reparing work

198

Cleaning for plaster

197

683sft

196~195

156sft

Plster work

197

514sft

Exavation for plumbing pipe

193

65sft

47

32sft

Block work

3250
750
500
700

500

53
191~193

Gareg earth lavel

1700

500

3950
750
500

450

700

500

2900

250

500

450

700

250

700

250

250

3150

250

500

750

Earth lavel

195

150sft

250

Cleaning for plaster

197

587sft

250

250

500

1300

Plumbing pipe
13

27sft

650
5

Exavation for plumbingpipe


Reparing work

12

1
3

197

Plaster work
SOG

11

534

192~194

2cu.m

197

389sft

54~191

1928sft

72sft

Plasrer work
PCC work
Block work

47

Earth work

192

250

500

2900

500

2250

500

1500

250

500

Reparing work

450

Block work

253.73sft

500

800

195~196

626.85

500

2100

900sft

700

14
27
28

Plaster work
29
30

Block work
plaster work

117.5

500

1600

195~196

211.84

500

2100

31
Team 2 (Mr.Riaz)
6

Allocated Villas:173~186,187~190

Tile work G.F

181

Plaster work

190

482

52

245

6 Rs/Sft
14.42Rs/Sft

Wood work in progress


7

Tile work

182

Wood work is progress Door fram

187

Es tablis h work s hop

Exavation of wall
8

187

tile work G.foolr & F.floor

11.83/sft

2
182

504

375

325

325

8.73

wood work in progres door frame


exaviton of pipe drain water
9

173~176

Tile Work

85

181~182

5.88
3

11.73

Wood work in progres


cleaning of tile
10

183~184

Tile work
Wood work in progres

door fram fixed

181~190

Roof cleaning

173~176

Tile work

1
1

190

243

182

65

526

Tile fixing

182

105

189

3
1

288

187~1888
189

2.35sft

Tile work

182

83sft

Door frame

187~190

cleaning for rooof


181

182
189

Plaster work

190

Clening for tarecand bath room

181~182

Bath room tile work

Staf bath

Cleaning for virt

187~190

Cleaning for gareg and kitchen

181~186

3200

11.42

624

2
1

812

1
2
2

Wood work in progres

plumbing work
30

9
234

Plaster work
Plaster work

1200

2
3

608

Plaster work

1032

1
9

690sft

Tile fixing

1317
1200

174

Cleaning for garege

29

181~182

Tile fixing

28

627

Back filling

Door frame

27

190
181~184
175~176

Tile work bath room

14

182

door fram fixed


Back filling

Dooor fram fixing


13

173~176

Tile work
Tile work

12

181~184

Cleaning of exivation pipe dran


11

181~182

188~189

Cleaning of roof

187~190

1835

Exavation of garege

184

201

BATH ROOM PLASTER

190

189

Tile fixing

189

216

624

624

Wood work in progres


2200
1500

Wood work in progres


Team 3 (Mr.Abdul Qayum)
6

71

1800Kg

Back filling

63

715Cft

Form work

70,71

800Sft

14

Dewatring

74

300Sft

47

150Sft

70~71

5200sft

Powring of R.c.c pardi


7

Pouring for slab


Back filling

422sft

67~68

1528sft

Cleaning of boundry wall

52~53

400sft

panel of sand villa#

70~71

200sft

174~175

622.50cft

10

72

900sft

14

187~190

100sft

72

2500kg

Pouring of B.wall
Cleaning of b.Wall
Cuting and fixing of steel

6
4
2

Collection of scrab

Pouring of B.wall State


Form work
10

11

70

Form Work of column

Form work of villa #


9

Reasons for idle


equipment/Labour if any

Allocated Villas:63~68,68~74,191~194 Boundry Wall

Cutting of Slab F.Floor

Boundry wall steel pouring

186

50sft

72~73

1400sft

14

186

100

72~73

40

Slab pouring
Slab casing

70~71

Spacing under slab

72~73

Boundry wall bed pouring

52~53

Fixing of slab steel+cutting

73~72

Form work for slab+boundry wall

72~74

Pouring for slab


Cutting and fixing of steel

2
2
1
2

550cft
5Ton

2
4

5
25

72~73

5000sft

73

1800sft

pouring of colum

67~68

Form work of slab

2m

72~74

800sft

Cutting for steel

74

1200kg

Form work

74

800sft

14

14

Curing for slab


12
13
14
27

Cleaning for road

collection of scrap

boudry wall

28

29

58

Block spacing

193~192

Boundry wall

192~193

Back filling

68

1000

Steel fixing

63~68

800sft

Reparing work

71~70

400sft

Foram work

192~193

230sft

Back filling

64

655sft

250

1000

250

500

1000

Spacing slab

192~193

Cleaning

50~51

600sft

187~190
form work

69~70

Water for compackting


30

Back filling

66

680cft

250

Providing spacer

192~193

54cu.M

250

Steel fixing

192~193

1000ton

form work

70~71

Cleaning
31

Back filling

67

Curring

192~193

Cleaning for boundry wall

50+51+186

605cft

3
4
3

72+185+184
70+71

600kg

49

300kg

Form work
form work

1000

Boundry wall reparring


Column steel
Cutting of arapet steel

250

47+48+49

182~183

SCHEDULE WORK FOR NEXT DAY


S.No

Description
Team 1 (Mr. MOHSIN)

Labour Required
Skilled

Unskilled

Remarks
PM's Instruction:

Team 2 (Mr.Riaz)
Direrctors's Instruction:
Team 3 (Mr.Abdul Qayum)

Daily Progress Report


EMAAR DHA Phase ii Extension
WORK IN PROGRESS/COMPLETED
S.
No.

Date:
Labour Used

Description

Villa No

Qty

Cost/unit
Skilled

Un Skilled

Rate/day

Total Cost

Weather:
Claim/Extra Work/Day Work

Reasons for idle


equipment/Labour if any

SCHEDULE WORK FOR NEXT DAY


S.No

Description

Labour Required
Skilled

Unskilled

Remarks
PM's Instruction:

Direrctors's Instruction: