Weather:
Sunny
S. No.
Date
Planned Activities
Achieved
Collector Road
In progress
Project Manager/CM
Cable laying,sand backfilling & brick laying for street lights from Ch: 0+2
In progress
Engineers/Assistant Engineers
In progress
Surveyors/QS
In progress
Assistant Surveyors
Reinforcement & formwork for intermediate segment of top slab of multicell culve
In progress
Foremen/Supervisor
Equipment Operators
Plant Operators
Excavation for water supply line frm Ch: 0+110 ~ 0+241 ,0+270 ~ 0+300 of M4-02. (
In progress
Drivers
Excavation for street light cable trench from Ch: 0+120 ~ 0+160 of M4-02 (L/S).
In progress
Skilled Labour
45
Formwork for kerb & gutter from Ch: 0+172.5 ~ 0+185,0+190 ~ 0+195 & 0+20
In progress
Unskilled Labour
39
Total
Village M4
Village M7
112
Equipment at Site
Excavation & sand bedding for storm water connection from gully GM-10 to manhole S
Completed
Excavation & sand bedding for water supply Xing at Ch: 128.195 of M7-02.
Completed
SAFETY MEASURES:
Completed
Type
Operational
*Non
Oper.
Conc.Vibrator
Paver
Tandem Roller/P
Tractor/ Tractr
Dewatering Pum
Dumper
Substation:
Excavator /
No activity observed.
Grader
Utility Ar
Power Generator
Embankment filling for 40th layer frm Ch: 0+020 ~ 0+080 at UT-01.
Loader
Plate
Compactor /
mini roller
Vibrator Roller
Precasting Yard
No activity observed.
Water Bouzer
Crane
Source
Status
Welding Plant
U-PVC pipe
Approved
Light Generator
Approved
Bitumen B
Approved
14
21
New Tech
Approved
Steel Grade-60
Approved
IJM
Approved
7
8
IJM
Decora
Approved
Approved
Total
Vehicles
Visitors:
B/Down Total
AER's Instruction:
The Contractor should expedite the work
particularly in Village M7.
S.No
Siemens
Approved
10
LT Service Boxes
PEL
Approved
11
Consumer Pannel 11 KV
PEL
Approved
12
HT & LT Cables
Newage
Approved
ER's Instruction:
Engineer's Representative:
Weather:
Partially Cloudy / Sunny
Planned Activities
Date
Achieved
Village M5:
6
Backfilling 3rd layer for sewer line from manhole FF-3/5 ~ Ch. 0+290 (FF-1/6)
Completed
Precasting Yard:
1
Completed
Completed
Note:
Contractor is also advised to arrange the temporary covers for manhole
ER's Instruction:
Engineer's Representative:
Page 2 of 2
Weather:
Sunny
S.No
Planned Activities
Village M1:
Project Manager/CM
Engineers/Assistant Engineers
Surveyors/QS
Assistant Surveyors
Foremen/Supervisor
Equipment Operators
Formwork for 2nd step of walls for storm water manhole SG-1/5
Plant Operators
Village M5:
Drivers
16
Skilled Labour
17
Unskilled Labour
23
77
Hydro testing of UPVC pipes for sewer line from manhole FF-2/1 ~ FF-2/2
Sand beding for sewer line from manhole FF-2/1 ~ FF-2/2 & FF-2/2 ~ FF-2/3
Total
Equipment at Site
Type
Conc.Vibrator
PTR
Tandum Roller
Dewatering Pu
RCC pipes for storm water (310, 460 & 610mm dia)
Dumper
Excavator
Grader
Power Generato
Loader
Plate Compacto
Bulldozer
Vibrator Roller
Water Bouzer
Crane
Welding Plant
Light Generator
Vehicles
11
12
Total
25
13
40
Visitors:
Description
AI Phase-II
rk
ROGRESS/COMPLETED
1/7
Completed
~ SG-1/5
Completed
Completed
e SG-1/5
In progress
Completed
nhole SG-1/3
Completed
SAFETY MEASURES:
Completed
Completed
le FF-2/1 ~ FF-2/2
In progress
Completed
FF-2/2
In progress
ERIALS APPROVAL
Source
Status
DADEX, ROBIN
Approved
HRL
Approved
Approved
AER's Instruction:
The contractor should expedite the work
particularly in village M5.
Primecrete
Approved
DHA phase-II
Approved
Pakistan cable
Approved
Pakistan cable
Approved
Universal
Approved
West Pakistan
Approved
ER's Instruction:
Engineer's Representative:
Villa No
Weather:Sunny
Qty
Cost/unit
Skilled
Un Skilled
Rate/day
Total Cost
Allocated Villas:47~52,195~196,197~200,7~12
Plaster Work
S.O.G
60sft
2900
1.5/sft
250
500
5.75/sft
700
700
750
250
11~12
1928sft
192
875sft
197
53
32sft
197
SOG
850
200
Reparing work
Block work
8
S.
No.
700
2900
850
500
750
23.44/sft
500
0.71/sft
12
964sft
Plaster work
200
632sft
500
3750
199
95sft
500
2950
53
964sft
BRC mash
Reparing work
197
2950
750
197
4.78/sft
450
700
500
700
Block work
9
Plaster work
25sft
197~200
Block work
47
192
Reparing work
10
500
500
450
68cft
198
197sft
500
964sft
133sft
250
196~197
276sft
250
Plaster work
197
417sft
197
193
73sft
Reparing work
198
197
683sft
196~195
156sft
Plster work
197
514sft
193
65sft
47
32sft
Block work
3250
750
500
700
500
53
191~193
1700
500
3950
750
500
450
700
500
2900
250
500
450
700
250
700
250
250
3150
250
500
750
Earth lavel
195
150sft
250
197
587sft
250
250
500
1300
Plumbing pipe
13
27sft
650
5
12
1
3
197
Plaster work
SOG
11
534
192~194
2cu.m
197
389sft
54~191
1928sft
72sft
Plasrer work
PCC work
Block work
47
Earth work
192
250
500
2900
500
2250
500
1500
250
500
Reparing work
450
Block work
253.73sft
500
800
195~196
626.85
500
2100
900sft
700
14
27
28
Plaster work
29
30
Block work
plaster work
117.5
500
1600
195~196
211.84
500
2100
31
Team 2 (Mr.Riaz)
6
Allocated Villas:173~186,187~190
181
Plaster work
190
482
52
245
6 Rs/Sft
14.42Rs/Sft
Tile work
182
187
Exavation of wall
8
187
11.83/sft
2
182
504
375
325
325
8.73
173~176
Tile Work
85
181~182
5.88
3
11.73
183~184
Tile work
Wood work in progres
181~190
Roof cleaning
173~176
Tile work
1
1
190
243
182
65
526
Tile fixing
182
105
189
3
1
288
187~1888
189
2.35sft
Tile work
182
83sft
Door frame
187~190
182
189
Plaster work
190
181~182
Staf bath
187~190
181~186
3200
11.42
624
2
1
812
1
2
2
plumbing work
30
9
234
Plaster work
Plaster work
1200
2
3
608
Plaster work
1032
1
9
690sft
Tile fixing
1317
1200
174
29
181~182
Tile fixing
28
627
Back filling
Door frame
27
190
181~184
175~176
14
182
173~176
Tile work
Tile work
12
181~184
181~182
188~189
Cleaning of roof
187~190
1835
Exavation of garege
184
201
190
189
Tile fixing
189
216
624
624
71
1800Kg
Back filling
63
715Cft
Form work
70,71
800Sft
14
Dewatring
74
300Sft
47
150Sft
70~71
5200sft
422sft
67~68
1528sft
52~53
400sft
70~71
200sft
174~175
622.50cft
10
72
900sft
14
187~190
100sft
72
2500kg
Pouring of B.wall
Cleaning of b.Wall
Cuting and fixing of steel
6
4
2
Collection of scrab
11
70
186
50sft
72~73
1400sft
14
186
100
72~73
40
Slab pouring
Slab casing
70~71
72~73
52~53
73~72
72~74
2
2
1
2
550cft
5Ton
2
4
5
25
72~73
5000sft
73
1800sft
pouring of colum
67~68
2m
72~74
800sft
74
1200kg
Form work
74
800sft
14
14
collection of scrap
boudry wall
28
29
58
Block spacing
193~192
Boundry wall
192~193
Back filling
68
1000
Steel fixing
63~68
800sft
Reparing work
71~70
400sft
Foram work
192~193
230sft
Back filling
64
655sft
250
1000
250
500
1000
Spacing slab
192~193
Cleaning
50~51
600sft
187~190
form work
69~70
Back filling
66
680cft
250
Providing spacer
192~193
54cu.M
250
Steel fixing
192~193
1000ton
form work
70~71
Cleaning
31
Back filling
67
Curring
192~193
50+51+186
605cft
3
4
3
72+185+184
70+71
600kg
49
300kg
Form work
form work
1000
250
47+48+49
182~183
Description
Team 1 (Mr. MOHSIN)
Labour Required
Skilled
Unskilled
Remarks
PM's Instruction:
Team 2 (Mr.Riaz)
Direrctors's Instruction:
Team 3 (Mr.Abdul Qayum)
Date:
Labour Used
Description
Villa No
Qty
Cost/unit
Skilled
Un Skilled
Rate/day
Total Cost
Weather:
Claim/Extra Work/Day Work
Description
Labour Required
Skilled
Unskilled
Remarks
PM's Instruction:
Direrctors's Instruction: