Checklist for Nozzle Orientation


4 Comments

PipelinePigging
AskforourEngineeringExpertsTeamsEverywhereintheWorld.

Further to my post related to requirements for preparation and issue of nozzle


orientation, here is a checklist for the nozzle orientation.
Project Name:

Job No:

Equipment type:

HORIZONTAL/ VERTICAL

Equipment Tag No.:

SL

DESCRIPTION

NO.

Piping engineering

Check Points

Follow

Common for Horizontal or Vertical Vessel

+1

+ 536

Vessel modelling is completed and nozzle orientation is extracted from model & checked against
latest vendor drawing.

30% Model review is completed and review tag related to subject vessel are closed.

Plant North is indicated. Nozzle orientation angle shall be w.r.t. north as 0 degree(clock wise).

Any P&ID notes regarding particular nozzle location/ elevation/ orientation are taken into
consideration.

All nozzles are shown as per P&ID and are designated with nozzle tag number, size and rating.
Any mismatches are commented and resolved.

All nozzles are shown as per Mechanical Data Sheet(MDS) and are designated with nozzle
number, size and rating. Any mismatches are commented and resolved.

All level instrument nozzles are shown as per Level Sketches. Any mismatches are commented
and resolved.

Vessel dimensions OD (or ID & thk) and height/ length are shown.

Holds & notes are clearly listed & identified with cloud.

10

All reference drawings (P&ID / MDS / Level Sketches / Vendor GA) including revision number are
listed in reference drawing section .

11

Nozzles projected above platforms have minimum clearance of 150 mm between bottom of
flange and top of grating.

12

Inlet and outlet nozzles shall be located sufficiently away to avoid vortex flow.

13

All nozzle projections are shown with respect to TAN line for all dish end nozzles.

http://www.pipingengineering.com/checklistfornozzleorientation.html

SUBSCRIBE UPDATES. IT'S FREE!


Your email:
Enteremailaddress...

Subscribe

RELATED READING
Offshore Engineering ChecklistNozzle Orientation Check Points
Common for Horizontal or Vertical
Vessel 1Vessel modelling
Nozzle Orientation Drawing The
objective of this post is to describe the
requirements
Check List for Piping Layouts Project
Name: Job No.: Client: Drawing No. :
Date :

1/4

2/24/2016
14

ChecklistforNozzleOrientation
All nozzle projections (exclusive of dish end nozzles) are shown with respect to vessel centre line
for all shell nozzles.

15

Insulation thickness of vessel is considered in determining the nozzle projection.

16

Insulation thickness shall be shown dotted in drawing.

17

Proper access and approach ladder is provided for all Nozzles/ Instruments as per project
specification and all Platform dimensions, location & ladder location are shown.

18

Side entry from ladder has been provided to the top and intermediate platforms.

19

All valves are accessible from ladder for size less than or equal to 3 and from platform for sizes
greater than 3 unless otherwise specified in relevant project specifications/ client operation and
maintenance requirements.

20

Maximum height of ladder, without mid landing is checked with respect to project specifications.

21

Location and orientation of pipe support cleats are clearly shown.

22

For Instrument nozzles that require access, check the possibility of combining the nozzles for
common access and also check for any obstruction in the surrounding.

23

Hand hole location/orientation shall be shown.

24

Nozzle schedule table (showing sl.no, nozzle name, rating, size, nozzle function, nozzle projection
from vessel center line etc.) shall be shown.

25

Manhole location shall be shown. Manhole cover can be opened without any hindrance. Manhole
davit orientation is marked and manhole envelope angle are shown. Sideways location is
preferred manhole location.

26

Manhole height from platform shall be as per project specifications/ client requirements.

27

Orientation of skirt openings are shown

28

Minimum 750 mm clear space is available on all vessel Platforms for ease of access even after
installing all Stand pipe, valves, Instruments.

One plan view with minimum two elevation views (front view & side view) are shown, if nozzles
are on both Dish end, Both views are required, The views are clearly marked with A-A, B-B etc.

Vessel Bottom elevation is as per P&ID(If specified in P&ID)

Height of centre line of equipment with respect to bottom of saddle is shown.

Proper access, clearances are provided for bottom nozzles, boot mounted nozzles and nozzles are
clash free with equipment support.

Slope in Sloped vessels is shown appropriately as per P&ID requirement.

Slope in Sloped vessels is shown appropriately as per Mechanical Data Sheet(MDS) requirement.

Popular

Recent

Comments

Nozzle Orientation Drawing


August 12, 2014

Piping Layout Drawings Abbreviations and


Legends
February 21, 2013

7 Excel Functions You Must


Know to Work Smarter
July 4, 2014

Tank farm: Types, Design Considerations,


Plot Plan Arrangement, Dyke EnclosurePart 1
August 6, 2013

Types of Pipe Flanges Used in Piping


Systems

February 7, 2013

Google+

Vertical Vessel

One elevation view and multiple plan views at every platform elevation are shown.

Vessel Bottom Line elevation is as per P&ID(If specified in P&ID).

Based on Drop zone area, Pipe davit radius is marked. Pipe davit orientation is shown in the plan
view of the top platform. Drop zone area to be accessible from common access.

Platform width, start angle and end angle are shown clearly.

Orientation of pipe supporting cleat of vessel is shown.

When there are two platforms one above the other(typically in columns etc.), ensure adequate
headroom is available and space is not obstructed due to structural bracings.

engineering.com

Horizontal Vessel

Or reach me on aj@piping-

Pig Launcher

Kicker line connection shall be shown on side/ top of major barrel near to end closure.

Balance line connection shall be shown on side/ top of minor barrel near to pig trap valve
location.

Vent connection shall be shown on top of major barrel.

Pig signaler shall be located on top of minor barrel near to reducer.

Pressure transmitter connection shall be located on top of major barrel.

Pressure safety valve location shall be shown on top of major barrel.

Purge connection shall be located on top of major barrel.

http://www.pipingengineering.com/checklistfornozzleorientation.html

2/4

2/24/2016

ChecklistforNozzleOrientation

Pressure indicator connections shall be shown on the top of major barrel near to end closure and
also on minor barrel near to pig trap valve location.

Lifting lug(two nos.) location shall be shown on major barrel .

10

Drain shall be shown on bottom of major barrel near to reducer and also on bottom of minor
barrel near to pig trap valve.

Pig Receiver

Kicker line connection shall be shown on side/ top of major barrel near to reducer.

Balance line connection shall be shown on side/ top of minor barrel near to reducer.

Vent connection shall be shown on top of major barrel near to end closure and also on top of
minor barrel near to pig trap valve.

Pig signaler shall be located on top of minor barrel after near to pig trap valve.

Pressure transmitter connection shall be located on top of major barrel.

Pressure safety valve location shall be shown on top of major barrel.

Purge connection shall be located on top of major barrel.

Pressure indicator connections shall be shown on the top of major barrel near to end closure and
also on minor barrel near to pig trap valve location.

Lifting lug(two nos.) location shall be shown either on major barrel or on major and minor barrel
depending upon the total length of pig receiver.

10

Drain shall be shown on bottom of major barrel near to end closure and also on bottom of minor
barrel near to pig trap valve.

Related Posts:

Offshore Engineering Checklist- Nozzle Orientation Check Points Common for


Horizontal or Vertical Vessel 1Vessel modelling
Nozzle Orientation Drawing The objective of this post is to describe the
requirements
Check List for Piping Layouts Project Name: Job No.: Client: Drawing No. : Date :
Column Piping: Study Layout, Nozzle Orientation & 1.0Sequence of Column Piping
Study 1.1 All available information /
Tower Piping: Center for Equipment Layout Tower Piping: Center for equipment
layout A tower is
SharethisonWhatsApp

MORE READ
Checklist for Piping

Offshore Engineering

Piping Checklist for 90%

Isometrics: P&ID,

Checklist- Nozzle

3D Model Review

Layout, Drafting Related Orientation


May 21, 2015

January 26, 2015

February 22, 2015

4 COMMENTS
silambarasan
April 25, 2015 at 2:18 pm

thanks sir,
kindly explain,
http://www.pipingengineering.com/checklistfornozzleorientation.html

3/4

2/24/2016

ChecklistforNozzleOrientation

kindly explain,
how to checking pipe isometrics in PDMS?
Reply

Piping engineering
May 21, 2015 at 10:59 am

Hi Silambarasan,
This checklist might help you check isometrics.
http://www.piping-engineering.com/checklist-for-piping-isometrics-p-idlayout-drafting-related.html
Cheers
AJ
Reply

shamsher
August 4, 2015 at 8:34 pm

how we consider the angle in nozzle orientation of different kinds.And when we


use different kind of nozzle
Reply

Piping engineering
August 21, 2015 at 7:09 pm

Hi Shamsher,
Which type of equipment are you referring for nozzle orientation, for
example vertical vessels, horizontal vessels of rectangular tanks?
There are different ways to orient the nozzle based on type of the
equipment.
AJ
Reply

LEAVE A REPLY
Your email address will not be published. Required fields are marked *
Name *

Email *

Check here to Subscribe to notifications for new


posts

PostComment

Confirm you are NOT a spammer

copyright Piping-engineering 2016 All Rights Reserved. Privacy Policy | About Us

http://www.pipingengineering.com/checklistfornozzleorientation.html

4/4

You might also like