You are on page 1of 4

Doosan Heavy Industries

Vietnam

Dung Quat Economic Zone,


Binh Thuan, Binh Son, Quang Ngai,
Vietnam
T +84 55 5618 900
F +84 553 618 950

21-May-12

Danny

J.Y.Jeong

K.J.Lim

Rev.

Date

Drawn

Checked

Approved

For Information
Details of Revision

Owner :

AES-VCM MONG DUONG


POWER COMPANY LIMITED
Owner's Engineer :

Contractor :

Project :

PC
MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER PROJECT

Title :

T10206-QE01-POZEN__-040203 INSPECTION
AND TEST PLAN FOR
CABLE TRAYS INSTALLATION

Drawing No. :

T10206-QE01-P0ZEN-040203

Page 1

T10206

UAS :

QE01

Unit :

PO

KKS :

ZEN

Reg. No. 040203


Revision :
Page-No :

A
1 of 4

ITP for Cable Tray Installation

Doc. No.

T10206-QE01-POZEN-040203

Rev. A

Contractor

DOOSAN

2 of 4

AES-VCM

This note is only applicable for AES-VCM Mong Duong

Detailed Legend

Surveillance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong
except for the first or last operation on the basis of each process. AES-VCM Mong Duong
could check the operation, if he is present at the site during the inspection by Doosan.

Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document


attesting to the satisfactory performance of the related test or inspection for review by
AES-VCM Mong Duong.
Duong

Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to
decide whether they will attend such inspection or not.

Hold Point / Downstream construction and other activities shall not proceed
without attendance or any written approval of AES-VCM Mong Duong.

NOTE : The Site ITP and all of the abovementioned reports will be kept available by
DOOSAN at anytime for control and or review by AES-VCM Mong Duong.

Page 2

Inspection & Test Plan for Cable Tray


Installation

Item Name

Oper. No.

T10206-QE01-POZEN-040203

Rev. A

Contractor

DOOSAN

Page 3 of 4

Inspection & Test Activities


Specific Applicable drawing
number, Standard Code number, Subcontractor DOOSAN
AES-VCM
Specification
A
Sign
A
Sign
A
Sign

Inspection Process

A1

Check the condition of cable Supports, Racks, Trays


and Trunking while receiving.

A2

Verification Document

Remarks
(Allowable tolerance)

Packing List

Packing List

N/A

Check size and type of the Supports, Racks, Trays


and Trunking with respect to the requisitions.

Material Technical
Specification

Technical Specification,
T10206-YR02-POZEN14403

N/A

B1

Check the installation is according to the designed


layout drawing & specification.

Approved Construction
Drawing T10206-YD04---

Refer to attached Checklist

N/A

B2

Check the levelling and alignment of tray and rack and


expansion joints if any are specified are in place.

Approved Construction
Drawing T10206-YD04---

Refer to attached Checklist

N/A

B3

No sharp edges cut to be permitted. Cutting edges of


trays/trunkings are touch-up painted.

Approved Construction
Drawing T10206-YD04---

Refer to attached Checklist

N/A

B4

Ensure the gap between parallel runs is quite enough


to accommodate the layer of cables.

Approved Construction
Drawing T10206-YD04---

Refer to attached Checklist

N/A

B5

Ensure there are no sharp 90 degrees bends are


made.

Approved Construction
Drawing T10206-YD04---

Refer to attached Checklist

N/A

B6

Ensure the cable trays numbered according to cable


trays route layout on which KKS nos. are indicated and
explained.

Approved Construction
Drawing T10206-YD04---

Refer to attached Checklist

N/A

B7

Ensure the cable trays numbered according to


cable trays route layout on which KKS nos. are
indicated and explained.

Approved Construction
Drawing T10206-YD04---

Refer to attached Checklist

N/A

A.Material
Receipt

B. Cable
Tray
Installation

Doc. No.

AES-VCM

Abbreviation :

S: Surveillance

R: Report Review

W: Witness Inspection

H: Hold Inspection

Note :

All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications

Inspection Check List


Project

Drawing No.

Specific Location

Cable Tray Installation Works

Ref. No.
Date :

CHECK ITEM
Verification & Approval Observed
Result
Yes
No
N/A / Remarks

No

Inspection elements

Check the condition of cable Supports, Racks, Trays and Trunking while
receiving.

Check size and type of the Supports, Racks, Trays and Trunking with
respect to the requisitions.

Check the installation is according to the designed layout drawing &


specification.

Check the leveling & alignment of tray & rack and expansion joints if
any are specified are in place.

No sharp edges cut to be permitted. Cutting edges of trays/trunkings are


touch-up painted.

Ensure the gap between parallel runs is quite enough to accommodate the
layer of cables.

Ensure there are no sharp 90 degrees bends are made.

Ensure the cable trays numbered according to cable trays route


layout on which KKS nos. are indicated and explained.

Check whether the exclusive earth continuity between the trays /


trunking / racks where the joints are made.

10

Earth jumper cable with crimp type terminals to be fitted to all cable
tray joints.

Checked by : (Subcontractor DOOSAN Electrical Dept.

DOOSAN QA/QC Dept.

AES-VCM

Name & Signature

Name & Signature

Name & Signature

Name & Signature

Position

Position

Position

Position

Date

Date

Date

Date

page 4