Doosan Heavy Industries

Vietnam

Dung Quat Economic Zone,


Binh Thuan, Binh Son, Quang Ngai,
Vietnam
T +84 55 5618 900
F +84 553 618 950

18/10/2012

Rev.

Date

THUY.D.C Y.S.JUNG
Drawn

Checked

K.J.LIM

For Information
Details of Revision

Approved

Owner :

AES-VCM MONG DUONG


POWER COMPANY LIMITED
Owner's Engineer :

Contractor :

Project :

PC
MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER PROJECT

Title :

T10206-QE01-POZEN__-040213 INSPECTION
AND TEST PLAN FOR
COMMUNICATION,PA,TEL,LAN & CLOCK
INSTALLATION

Drawing No. :

T10206-QE01-P0ZEN-040213

Page 1

T10206

UAS :

QE01

Unit :

PO

KKS :

ZEN

Reg. No. 040213


Revision :
Page-No :

A
1 of 5

ITP for Communication,PA,


TEL,LAN & CLOCK Installation

Doc. No.

T10206-QE01-POZEN-040213

Rev. A

Contractor

DOOSAN

2 of 5

AES-VCM

This note is only applicable for AES-VCM Mong Duong

Detailed Legend

Surveillance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong
except for the first or last operation on the basis of each process. AES-VCM Mong Duong
could check the operation, if he is present at the site during the inspection by Doosan.

Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document


attesting to the satisfactory performance of the related test or inspection for review by
AES-VCM Mong Duong.
Duong

Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to
decide whether they will attend such inspection or not.

Hold Point / Downstream construction and other activities shall not proceed
without attendance or any written approval of AES-VCM Mong Duong.

NOTE : The Site ITP and all of the abovementioned reports will be kept available by
DOOSAN at anytime for control and or review by AES-VCM Mong Duong.

Page 2

Inspection & Test Plan for Communication,


PA, TEL, LAN & Clock Installation

Item Name

C. Cable
Laying

T10206-QE01-POZEN-040213

Rev. A

Contractor

DOOSAN

Page 3 of 5

Inspection & Test Activities


Subcon DOOSAN
A Sign A Sign

AES-VCM
A
Sign

Verification Document

Remarks
(Allowable tolerance)

A1

Check the physical condition of the packing case


intactment.

Packing List

Packing List

N/A

A2

Check intactness of instruments and monitoring


devices installed on the panel facial.

Packing List

Packing List

N/A

B1

Check the physical condition and specification of


instrument and each component

T10206-CV03-POC-155042

B2

Check the elevation, position,and location of


installed equipments, cubicles,devices and
component are in accordance with layout drawings.

T10206-CV03-POC-155042

refer to inspection for


communication system
checklist

N/A

B3

Ensure that the wall mounted installation is


anchored properly.

T10206-XW01-POZEN-150001

refer to inspection for


communication system
checklist

N/A

B4

Check the base frame is properly coated, leveled,


aligned, and anchor (if applicable).

T10206-XW01-POZEN-150001

refer to inspection for


communication system
checklist

N/A

B5

Check the installation location of each component


is accessible for the user.

T10206-XW01-POZEN-150001

refer to inspection for


communication system
checklist

N/A

B6

Ensure that the weatherproof is prepared for


external installation in accordance with area
classification.

T10206-XW01-POZEN-150001

refer to inspection for


communication system
checklist

N/A

B7

Ensure cables are laid properly according to cable


route drawing.

T10206-YR02-POZEN-144402

refer to inspection for


communication system
checklist

N/A

B8

Ensure earthing cable armouring, cable screens


and cubicles.

T10206-YR02-POZEN-144402

refer to inspection for


communication system
checklist

N/A

B9

Ensure cable identification markers are provided.

T10206-YR02-POZEN-144402

refer to inspection for


communication system
checklist

N/A

A.Material
Receipt

B.
C
Communic
ation
System,
PA,TEL,
LAN, &
Clock
Installation

Specific Applicable drawing


number, Standard Code number,
Specification

Inspection Process

Oper. No.

Doc. No.

AES-VCM

Abbreviation :

S: Surveillance

R: Report Review

W: Witness Inspection

H: Hold Inspection

Note :

All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications

Page 3

Inspection & Test Plan for Communication,


PA, TEL, LAN & Clock Installation

Item Name

D. Cable
Glanding,
Splicing,La
beling &
Termination

Oper. No.

Specific Applicable drawing


number, Standard Code number,
Specification

Inspection Process

Doc. No.

T10206-QE01-POZEN-040213

Rev. A

Contractor

DOOSAN

Page 4 of 5

AES-VCM
Inspection & Test Activities
Subcon DOOSAN
A Sign A Sign

AES-VCM
A
Sign

Verification Document

Remarks
(Allowable tolerance)

D1

Check the cable & cable lugs are splice &


terminated properly at the respective terminal.

T10206-YR02-POZEN-144402

refer to inspection for


communication system
checklist

N/A

D2

Ensure that the cable entry are sealed, cable are in


correct length and identification provided & in place.

T10206-YR02-POZEN-144402

refer to inspection for


communication system
checklist

N/A

D3

Ensure all field equipment shall have nameplates


with the instrument tag number and descriptor fixed
to mounting plates, mounting brackets and junction
box.

T10206-XW01-POZEN-150001

refer to inspection for


communication system
checklist

N/A

D4

Ensure label
E
l b l material
t i l and
d writing
iti shall
h ll withstand
ith t d the
th
environmental conditions where they are mounted.
Loosely attached nameplates by wires are not
acceptable.

T10206-XW01-POZEN-150001

refer to inspection for


communication system
checklist

N/A

D5

Ensure all equipments inside electronic cabinets


are labeled.

T10206-XW01-POZEN-150001

refer to inspection for


communication system
checklist

N/A

D6

Check elevation, location of


equipments/cubicles/devices

D7

Check base frame for equipments/cubicles/devices

D8

Cable termination and testing check

Abbreviation :

S: Surveillance

Note :

All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications

R: Report Review

W: Witness Inspection

H: Hold Inspection

Page 4

AES-VCM

Inspection Report for Communication System Check List


Project

Drawing No.

Communication, PA,TEL, LAN & Clock Installation Checklist

Ref. No.
Date :

Specific Location :
CHECK ITEM
No

Verification & Approval

Inspection elements

Yes

No

N/A

Observed Result
/ Remarks

Communication system, PA, TEL, LAN & Clock Installation


1

Check the elevation, position,and location of installed


equipments, cubicles,devices and component are in
accordance with layout drawings.

Ensure that the wall mounted installation is anchored


properly.

Check the base frame is properly coated, leveled, aligned,


and anchor (if applicable).

Ensure that the weatherproof is prepared for external


installation in accordance with area classification.

Ensure cables are laid properly according to cable route


drawing.
Ensure earthing cable armouring, cable screens and
cubicles.
Ensure cable identification markers are provided.

6
7
8

Check the cable & cable lugs are splice & terminated
properly at the respective terminal.

Ensure that the cable entry are sealed, cable are in


correct length and identification provided & in place

10

Ensure all field equipment shall have nameplates with the


instrument tag number and descriptor fixed to mounting
plates, mounting brackets and junction box.

11

Ensure label material and writing shall withstand the


environmental conditions where they are mounted.
Loosely attached nameplates by wires are not acceptable.

12

Ensure all equipments inside electronic cabinets are


labeled.

13

Cable test report must be attached

Checked by :
Subcontractor

Verified/Approved By:
DOOSAN Const'n Dept.

DOOSAN QA/QC Dept.

Name & Signature


Position
Date

Page 5

AES-VCM