Owner :
Contractor :
Project :
PC
MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER PROJECT
Title :
T10206-QE01-POZEN__-040213 INSPECTION
AND TEST PLAN FOR
COMMUNICATION,PA,TEL,LAN & CLOCK
INSTALLATION
Drawing No. :
T10206-QE01-P0ZEN-040213
Page 1
T10206
UAS :
QE01
Unit :
PO
KKS :
ZEN
A
1 of 5
Doc. No.
T10206-QE01-POZEN-040213
Rev. A
Contractor
DOOSAN
2 of 5
AES-VCM
Detailed Legend
Surveillance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong
except for the first or last operation on the basis of each process. AES-VCM Mong Duong
could check the operation, if he is present at the site during the inspection by Doosan.
Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to
decide whether they will attend such inspection or not.
Hold Point / Downstream construction and other activities shall not proceed
without attendance or any written approval of AES-VCM Mong Duong.
NOTE : The Site ITP and all of the abovementioned reports will be kept available by
DOOSAN at anytime for control and or review by AES-VCM Mong Duong.
Page 2
Item Name
C. Cable
Laying
T10206-QE01-POZEN-040213
Rev. A
Contractor
DOOSAN
Page 3 of 5
AES-VCM
A
Sign
Verification Document
Remarks
(Allowable tolerance)
A1
Packing List
Packing List
N/A
A2
Packing List
Packing List
N/A
B1
T10206-CV03-POC-155042
B2
T10206-CV03-POC-155042
N/A
B3
T10206-XW01-POZEN-150001
N/A
B4
T10206-XW01-POZEN-150001
N/A
B5
T10206-XW01-POZEN-150001
N/A
B6
T10206-XW01-POZEN-150001
N/A
B7
T10206-YR02-POZEN-144402
N/A
B8
T10206-YR02-POZEN-144402
N/A
B9
T10206-YR02-POZEN-144402
N/A
A.Material
Receipt
B.
C
Communic
ation
System,
PA,TEL,
LAN, &
Clock
Installation
Inspection Process
Oper. No.
Doc. No.
AES-VCM
Abbreviation :
S: Surveillance
R: Report Review
W: Witness Inspection
H: Hold Inspection
Note :
All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications
Page 3
Item Name
D. Cable
Glanding,
Splicing,La
beling &
Termination
Oper. No.
Inspection Process
Doc. No.
T10206-QE01-POZEN-040213
Rev. A
Contractor
DOOSAN
Page 4 of 5
AES-VCM
Inspection & Test Activities
Subcon DOOSAN
A Sign A Sign
AES-VCM
A
Sign
Verification Document
Remarks
(Allowable tolerance)
D1
T10206-YR02-POZEN-144402
N/A
D2
T10206-YR02-POZEN-144402
N/A
D3
T10206-XW01-POZEN-150001
N/A
D4
Ensure label
E
l b l material
t i l and
d writing
iti shall
h ll withstand
ith t d the
th
environmental conditions where they are mounted.
Loosely attached nameplates by wires are not
acceptable.
T10206-XW01-POZEN-150001
N/A
D5
T10206-XW01-POZEN-150001
N/A
D6
D7
D8
Abbreviation :
S: Surveillance
Note :
All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications
R: Report Review
W: Witness Inspection
H: Hold Inspection
Page 4
AES-VCM
Drawing No.
Ref. No.
Date :
Specific Location :
CHECK ITEM
No
Inspection elements
Yes
No
N/A
Observed Result
/ Remarks
6
7
8
Check the cable & cable lugs are splice & terminated
properly at the respective terminal.
10
11
12
13
Checked by :
Subcontractor
Verified/Approved By:
DOOSAN Const'n Dept.
Page 5