PEAKER JAWA BALI 3 - GAS FIRED POWER PLANT (500 MW) IPP PROJECT

Consortium of xxxxxxxxxxxxx and PT Tenaga Listrik Cilegon (TLC); c/o xxxxxxxxxxxxx xxxxxxxxxxx xxxxxxxxxxx
xxxxxxxxxxxxxxxxxxxxxxxxx, Jakarta xxxxxx; Telp : 62-21-xxxxxxx , Fax : 62-21-xxxxxxx, Email: xxxx@xxxxxxxx,
xxxxx@xxxxx

ADMINISTRATIVE & TECHNICAL PROPOSAL


FORM E1-3: Nominated Site

[Please detail the nominated Site information for the Project in Bidders own format that at
least contains information on the land location, land area (sqm) and current land use]
1. Site Location
This section describes the location of the plant site and location of LNG Regasification
terminal location for sitting of Jawa Bali-3 Gas Fired Power Plant IPP Project with capacity of
500 MW. As indicated on PLNs document of Request For Proposal, the site and LNG
Regasification Terminal must be located in West Java and the electricity generated by this
Power Plant shall be evacuated via existing 150 kV transmission line between Cikande
Substation and Balaraja Substation using double phi connection.
The location of plant site and LNG Regasification terminal are separated due to the LNG
Regasification terminal must be located onshore while the plant site must be located
offshore. Besides that, the LNG Regasification terminal is located in fish pond area due to not
required of deep foundation.
For the Peaker Jawa Bali 3- Gas Fired Power Plant ( 500 MW) IPP Project, the plant site is
located at Alang-alang vilage, Tertiyasa District and Serang Regency with center coordinate
of 505942.70 S and 10601743.73E while the LNG Regasification terminal is located at
Lontar Village,Tertiyasa District and Serang Regency with the center of coordinate of
505842.70 S and 10601743.73E.

Figure 1 : Location of Site and LNG Gas Terminal

2. Availability of Land
There is large area relatively flat for sitting of the plant with coverage of rice field at Alangalang village and it is sufficient area to be built Gas Turbine Power Plant with approximately
area of 6 Ha.
Besides that, LNG Regasification Terminal is proposed to be placed in the shoreline area at
Lontar village with area of approximately 20 ha that will be constructed 3 km from the Power
Plant.

PEAKER JAWA BALI 3 - GAS FIRED POWER PLANT (500 MW) IPP PROJECT
Consortium of xxxxxxxxxxxxx and PT Tenaga Listrik Cilegon (TLC); c/o xxxxxxxxxxxxx xxxxxxxxxxx xxxxxxxxxxx
xxxxxxxxxxxxxxxxxxxxxxxxx, Jakarta xxxxxx; Telp : 62-21-xxxxxxx , Fax : 62-21-xxxxxxx, Email: xxxx@xxxxxxxx,
xxxxx@xxxxx

ADMINISTRATIVE & TECHNICAL PROPOSAL


FORM E1-3: Nominated Site

3. Accessibility
The plant site and LNG Regasification Terminal can be reached from Jakarta via toll road
Jakarta-Tangerang exit to Toll gate Cikande then directs to the site via Kubang Puji public
road.The main entrance road for Plant site and LNG Regasification Terminal shall be built
approximately 4 km at the junction point of 6 0013.13S and 10601742.86 E.The present
condition of the access road is mainly asphalt with the width of the pavement is
approximately 5 metre.
4. Topography Condition
Topographic condition shows the plant site and Terminal Regasification Gas are relatively flat
with natural ground level within the range +1 m to +3 m for plant site and +1 m to +2 m for
Terminal Regasification Gas. (measured by Google Earth)
The condition of the plant site is covered by rice field, while the condition of the Terminal
Regasification Gas is covered by fish pond.
5. Meteorology Condition
The data of climate condition has been obtained from the Badan Meteorologi Klimatologi dan
Geofisika (BMKG), Stasiun Meteorologi Serang, at coordinate of longitude of 0607N and
10608E. The following meteorology data measured and were recorded from year 2011 to
2015 except wind speed and its direction from year 2006 to 2015 and it is summarized in the
following table :
Table 1 : Parameter of Meteorology Data

No
1
2
3

Paramete
r
Maximum
Average
Minimum

Rainfall
(mm)
424.0
127.2
0

Humidity
(%)
98.0
80.8
78.25

Air Temp.
(0C)
34.1
27.1
21.9

Air Pressure
(mbar)
1,011.0
1,007.8
1,004.0

Wind Speed
(knot)
4.4
2.2
1.3

6. Sea Condition
Based on the navigational map issued by Hydro Oceanography of Indonesian Navy Army, the
elevation of seabed in front of the LNG Gas Terminal is approximately 0.5 m to 2.5 m below
mean sea level (MSL) within the radius of 2 km. Thus, the condition of seabed in front of LNG
Gas Terminal is relatively classified as shallow-water zone. However, the jetty should be put
in the depth of 12 m below the mean sea level (MSL). Hence, it will require the longer jetty
with approximate length of 6 km.
As the result of visual observation on coastal zone, there is no coral reef and mangrove tree
encountered along the shoreline.

PEAKER JAWA BALI 3 - GAS FIRED POWER PLANT (500 MW) IPP PROJECT
Consortium of xxxxxxxxxxxxx and PT Tenaga Listrik Cilegon (TLC); c/o xxxxxxxxxxxxx xxxxxxxxxxx xxxxxxxxxxx
xxxxxxxxxxxxxxxxxxxxxxxxx, Jakarta xxxxxx; Telp : 62-21-xxxxxxx , Fax : 62-21-xxxxxxx, Email: xxxx@xxxxxxxx,
xxxxx@xxxxx

ADMINISTRATIVE & TECHNICAL PROPOSAL


FORM E1-3: Nominated Site

7. Geology and Seismic Condition


Geology Map issued by Geological Research and Development Centre, Directorate General
of Geology and Mineral Resources, Department of Mines and Energy shows that geology of
study area where the plant site and LNG Regasification Terminal to be located is formed and
dominated by geology formation of Coralline Limestone (Ql), while at northern coastal zone
is formed by geology formation of Alluvium (Qa).
Coralline Limestone formation consists of coral colonies and mollusk shell fragments while
Alluvium formation consists of gravel, pebbles, sand, silt, clay and swamp deposits. The
Geology Map indicates that there are not any geology faults encountered in both studied
area.
The seismic load should be calculated based on the Indonesian Seismic Code SNI-17262012.