Project: Dhapakhel Plotting

ABSTRACT OF COST
Item
Item Description
Unit Quantity
No.
A.1 Pavement Works
1 Sub-grade
Subgrade construction and preparation of
cu.m 513.48
formationin subgrade in fill areas.
2 Sub-base and Base
Supply, place and compact granular subcu.m 427.90
base material sub-base, all complete.
Supply, place and compact with crusher-run
cu.m 305.64
base material, all complete.
3 Premix Carpet
Providing and spraying bituminious prime
coat MC30/MC70 including cleaning the
Lit
1806.04
road surface using wire, brushes, broom
etc. before applying prime coat.
Providing, mixing, laying and compaction of
cu.m
60.15
25mm thick premixed carpet
A.2 Side Drain
1 Earth work excavation in soft soil.
Brick soling all complete work as per drawing
2
and specification.
3 Brickwork in 1:6 C/S mortar
Plain cement Concrete (PCC) M10/20 for
4
drain base lining

Rate

Amount

Remarks
1620 Ft

114.00

58,536.17

2,993.00

1,280,692.73

3,072.00

938,926.08

207.00

373,849.63

17,458.00

1,050,097.86

Sub-Total I:

3,702,102.47
1620 Ft.

cu.m

12.66

497.49

6,296.43

sq.m

161.34

2,910.13

469,509.70

cu.m

5.52

29,106.24

160,622.79

cu.m

9.02

54,578.36

492,116.40

cu.m
sq.m
cu.m
m
cu.m

0.10
6.19
0.47
30.48
5.61

Providing and laying 200 mm RCC pipes with


or without collars, jointed with stiff mixture of
5
cement mortar in the proportion of 1:2
(1cement : 2 fine sand), lead upto 100m.
Earth work excavation in soft soil
Brick Soling
Bed Concrete (1:4:8)
Pipe Laying and jointing
Backfilling and compaction
Construction of Manhole, Inner side
450x450mm,height 450mm , Wall thick
thickness 230mm with brick work with 1:6
A.3 cement sand mortar, inner side plaster
finished smooth with a coat of neat cement
,base 1:2:4 Pcc , Brick soling all complete
work as per drawing and specification.
Earth work excavation in soft soil
Brick Soling
Bed Concrete (1:3:6)
Brickwork in 1:6 C/S mortar

497.49
2,910.13
54,578.36
1,829.00
346.57
Sub-Total II:

49.28
18,023.41
25,742.79
55,747.92
1,942.90
1,230,051.61

25 Nos.
cu.m
sq.m
cu.m
cu.m

44.99
36.92
2.81
20.43

497.49
2,910.13
54,578.36
28,750.89

22,380.28
107,439.21
153,455.20
587,353.73

Plastering (1:3) inside with cement mortar


1:3 ( 1 cement: 3 coarse sand ) and
sq.m
finished smooth with a coat of neat
cement.

69.09

1,659.89

114,689.06

Cement concrete collar 1:1.5:3


MD-10 450 mm dia CI cover

1.46
25.00

cu.m
nos.

137,712.01
8,300.00
Sub-Total III:

200,951.95
207,500.00
1,393,769.43

Item
No.

Item Description

Unit Quantity

Rate

Amount

Fixing /laying 300 mm dia NP2 RCC Hume


A.4 pipe with collar including 1:4 cement sand
mortar all complete.
Earth work excavation in soft soil
Brick Soling
Bed Concrete (1:4:8)
Pipe Laying and jointing
Backfilling and compaction

cu.m
sq.m
cu.m
m
cu.m

0.10
130.74
4.98
321.72
115.95

497.49
2,910.13
54,578.36
3,381.00
346.57
Sub-Total IV:

49.28
380,474.08
271,715.18
1,087,723.15
40,184.07
1,780,145.75

Fixing /laying 400 mm dia NP2 RCC Hume


A.5 pipe with collar including 1:4 cement sand
mortar all complete.
Earth work excavation in soft soil
Flat Brick Soling
Bed Concrete (1:4:8)
Pipe Laying and jointing
Backfilling and compaction

cu.m
sq.m
cu.m
m
m

0.10
82.13
2.52
162.99
66.87

497.49
2,910.13
54,578.36
4,186.00
346.57
Sub-Total V:

49.28
239,022.79
137,659.59
682,283.67
23,176.12
1,082,191.45

Fixing or laying 50 mm dia GI pipe with


necessary hardware all complete.
Earth work excavation in soft soil
cu.m
Pipe laying and Jointing
m
Backfilling earth
cu.m

75.73
543.76
75.73

497.49
400.00
346.57
Sub-Total V:
Total Estimated Cost:

37,675.32
217,505.28
26,246.02
281,426.62
9,469,687.32

A.6

Remarks

1056 Ft

535 Ft

1784 Ft