You are on page 1of 4

Project :

Title :

Pile Type
Number of Piles
Pile Size
Pile Working Load
Column Load
Column Load + Pilecap Weight
Reaction per Pile
Column Type
Column Length, B
Column Width, D
Column Perimeter
Concrete Grade, fcu

Designed by :
Checked by :

Date :
Page :

1 of 4

=
=
=
=
=
=
=
=
=
=
=
=

RC
6
300
1100
5000
5082
847
SC
600
600
2400
35

(SP for Spun Pile and RC for RC Square Pile)

=
Concrete Cover, c
=
Distance from Pile Center to Pilecap Edge =
Pile Spacing
=
Factor of Safety, FoS
=

460
75
363
2.5
1.50

N/mm2

Pilecap Width, b
Pilecap Length, l
Pilecap Thickness, h
Lever arm, Lxa
Lever arm, Lxb
Lever arm, Lxc
Lever arm, Lxd
Lever arm, Lya
Lever arm, Lyb
Lever arm, Lyc
Lever arm, Lyd

=
=
=
=
=
=
=
=
=
=
=

1476
2326
1000
0
0
0
0
0
0
0
0

mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm

Steel Reinforcement Bars Design


(A) My-y (Bars Lay Parallel with X-axis)
Effective Depth, d
Design Moment
K
As required, As req

=
=
=
=

917
0
0.000
0

mm
kNm

Steel Strength, fy

As minimum
As maximum
Design As
To Provide Bottom Reinforcement
(B) Mx-x (Bars Lay Parallel with Y-axis)
Effective Depth, d
Design Moment
K
As required, As req
As minimum
As maximum
Design As
To Provide Bottom Reinforcement

Template 4 section (IN PROGRESS).xls

=
=
=
10

=
=
=
=
=
=
=
10

mm
kN
kN
kN
kN, < Pile Working Load, OK.
(SC for Square Column and CC for Circular Column)
mm
y
mm
My-y
mm
N/mm2
x

mm
mm
x Pile Size

Mx-x

750

mm

(Including 75mm deviation)


(Including 75mm deviation)
(Including 75mm deviation)
(Including 75mm deviation)
(Including 75mm deviation)
(Including 75mm deviation)
(Including 75mm deviation)
(Including 75mm deviation)

871

mm

mm2 > As required


1919
mm2 > As required
59040
mm2
1919
T 16 mm diameter, Bar c/c spacing =

147

899
0
0.000
0

=====> z =
mm2

mm

mm
kNm
=====> z =

854

mm

mm2 > As required


3024
mm2 > As required
93040
mm2
3024
T 20 mm diameter, Bar c/c spacing =

242

mm2

mm

Project :
Title :

Template 4 section (IN PROGRESS).xls

Designed by :
Checked by :

Date :
Page :

2 of 4

Project :
Title :

Designed by :
Checked by :

Date :
Page :

3 of 4

Shear Check
Shear at column face

3.44

N/mm2

<

4.73

N/mm2

(A) X-axis
b
Shear force
Shear stress
100 x As, prov / bd

=
=
=
=
=
400 / d =
=
fcu / 25 =
av =

1476
3300
2.44
0.15
0.15
0.44
1
1.40

mm
kN
N/mm2
< 3,

75

vc =

0.37

mm
N/mm2

< 1,

Shear resistance =
>

4.73
2.44

N/mm
N/mm2

b
Shear force
Shear stress
100 x As, prov / bd

=
=
=
=
=
400 / d =
=
fcu / 25 =
av =

1476
3300
2.44
0.15
0.15
0.44
1
1.40

mm
kN
N/mm2
< 3,

75

vc =

0.37

mm
N/mm2

Shear resistance =
>

4.73
2.44

N/mm2
N/mm2

=
=
=
=
=
400 / d =
=
fcu / 25 =
av =

2326
3300
1.58
0.15
0.15
0.44
1
1.40

mm
kN
N/mm2
< 3,

75

vc =
Shear resistance =
>
b =
Shear force =
Shear stress =

=
=
=
=
=
=
=
=

1476
3300
2.44
0.15
0.15
0.44
1
1.40

mm
kN
N/mm2
< 3,

75

0.37

mm
N/mm2

=
>

4.73
2.44

< 1,

N/mm
N/mm2

=
=
=
=
=
=
=
=

1476
3300
2.44
0.15
0.15
0.44
1
1.40

mm
kN
N/mm2
< 3,

75

0.37

mm
N/mm2

=
>

4.73
2.44

N/mm2
N/mm2

< 1,

< 1,

OK

(B) Y-axis
b
Shear force
Shear stress
100 x As, prov / bd

=
=
=
=
=
=
=
=

2326
3300
1.58
0.15
0.15
0.44
1
1.40

mm
kN
N/mm2
< 3,

75

0.38

mm
N/mm2

4.73
1.58

N/mm2
N/mm2

=
>

2326
3300
1.58

mm
kN
N/mm2

Template 4 section (IN PROGRESS).xls

< 1,

=
=
=
=
=
=
=
=

2326
3300
1.58
0.15
0.15
0.44
1
1.40

mm
kN
N/mm2
< 3,

75

0.38

mm
N/mm2

0.38

mm
N/mm2

4.73
1.58

N/mm2
N/mm2

=
>

4.73
1.58

N/mm2
N/mm2

< 1,

< 1,

Project :
Title :

Designed by :
Checked by :

100 x As, prov / bd =


=
400 / d =
=
fcu / 25 =
av =

0.15
0.15
0.44
1
1.40

vc =

0.38

mm
N/mm2

Shear resistance =
>

4.73
1.58

N/mm2
N/mm2

75

Date :
Page :

< 3,
< 1,

OK

Provide T12 - 250mm c/c as binder;


Provide Binder
3
T 12

center line
y

center line
x

Legend:
- Pile Point

Template 4 section (IN PROGRESS).xls