XXXX
School Name
Job Number:
XXXX
Address Line 1
[Insert Primary or
Secondary]
Address Line 2
Level:
Cost Plan Date:
Stage [2a,2b,3]
(delete as appropriate)
0/0/0
Client:
Project Details [Brief details i.e. New 35 Classroom National School and 390m GP Room with
Ancillary Accommodation on greenfield site]
Architect:
[Architect]
Civil/Structural Engineer
M&E Engineer
Quantity Surveyor:
[Quantity Surveyor]
PSDP:
0m
0 m2
[specify]
[specify]
0 m2
Wall Area
Wall/ Floor Ratio
Total
Nr of Storeys
0 m2
XXXX per m2
0.00
% Glazing to
Enclosing Wall
0%
Roof Area
0 m2
[insert published cost limit at the date of this cost plan/ Tender Analysis]
COST SUMMARY
New Build
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
/m
0 m2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0 m2
applicable)
/m
0.00
CPS/1
0.00
0.00
/m2 based
on total floor
area
revision 0
CPS/1
revision 0
STAGE [2a,2b,3]
(delete as appropriate)
XXXX
School Name
Job Number:
XXXX
Address Line 1
[Insert Primary or
Secondary]
Address Line 2
Level:
Client:
Project Details:
[Brief details i.e. New 35 Classroom National School and 390m GP Room with Ancillary
Accommodation on greenfield site]
m2
0%
of Total
Ancillary
m2
0%
of Total
Circulation
m2
0%
of Total
Internal Division
m2
0%
of Total
m2
0%
Total
(Comlete section 3.1 for Primary Schools or Extensions to Primary Schools Only)
3.1 New Build Primary Schools or New Build Classroom Extensions to Existing Primary Schools
0.00
0.00
(Comlete section 3.2 for New Build Secondary Schools Only. Do Not Complete for Extensions to Secondary Schools)
Nr of Pupils
n/a
CPS/2
revision 0
TENDER ANALYSIS
STAGE
(Only include this page T/1 for Stage 3 Tender Analysis submissions)
Tender Details
1.0 Project Details:
Roll
Number:
XXXX
School Name
Job
Number:
Level:
XXXX
Address Line 1
[Insert Primary or
Secondary]
Address Line 2
Client:
[ Building description sufficient for Cost Analysis purposes should be included here]
Site:
[ Site description sufficient for Cost Analysis purposes should be included here]
Competition Method:
[Restricted/ Open]
[delete as appropriate]
Tender Date:
0/0/0
Exclusive
Index %
MEAT
Lowest
1,250,000.00
0.00%
1,270,000.00
1st
2nd
1,255,000.00
0.40%
1,265,000.00
2nd- Recommended
3rd
1,280,000.00
2.40%
1,295,000.00
3rd
4th
1,290,000.00
3.20%
1,305,000.00
4th
5th
1,300,000.00
4.00%
1,315,000.00
5h
6th
1,350,000.00
8.00%
1,370,000.00
6th
7th
1,375,000.00
10.00%
1,395,000.00
7th
8th
1,400,000.00
12.00%
1,415,000.00
8th
9th
1,425,000.00
14.00%
1,450,000.00
9th
10th
1,450,000.00
16.00%
1,485,000.00
10th
T/1
revision 0
T/1
revision 0
School Name
[Detailed Cost Plan/ Tender Analysis]
1.0
BBC
New Build -
Stage [2a,2b,3]
BBC Summary
Group
Floor Area
Element
0 m2
/ m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
13.5%
Notes
BBCS/1
revision 0
New Build -
Group
Element
Floor Area
0 m2
/ m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(27) Roofs
0.00
0.00
0.00
(28) Frame
0.00
0.00
0.00
0.00
0.00
0.00
Carried Forward
Specification
revision 0
revision 0
Element
Brought Forward
0.00
-
/ m
0.00
-
%
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Carried Forward
Specification
revision 0
revision 0
Element
Brought Forward
0.00
-
/ m
0.00
-
%
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(- -) Builders Work
0.00
0.00
0.00
0.00
0.00
0.00
Carried Forward
Specification
revision 0
revision 0
Element
Brought Forward
0.00
/ m
0.00
%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(63) Lighting
0.00
0.00
0.00
(64) Communications
0.00
0.00
0.00
0.00
0.00
0.00
(66) Transport
0.00
0.00
0.00
0.00
0.00
0.00
(- -) Builders Work
0.00
0.00
0.00
0.00
0.00
0.00
Carried Forward
Specification
BBC/ 4
revision 0
Element
Brought Forward
0.00
-
/ m
0.00
-
%
0.00
Specification
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
13.5%
BBC/ 5
revision 0
School Name
[Detailed Cost Plan/ Tender Analysis]
2.0
Stage [2a,2b,3]
Floor Area
EXTERNAL WORKS
Group
Element
0 m2
/ m
Specification
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
13.5%
EW/1
revision 0
School Name
[Detailed Cost Plan/ Tender Analysis]
3.0
Stage [2a,2b,3]
Floor Area
Group
Element
0 m2
/ m
Specification
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.5%
FF/1
revision 0
School Name
[Detailed Cost Plan/ Tender Analysis]
2.0
Stage [2a,2b,3]
Floor Area
Group
Element
0 m2
/ m
Notes
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#DIV/0!
13.5%
EBS/1
revision 0
Group
Element
Floor Area
0 m2
/ m
0.00
-
0.00
-
Specification
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(27) Roofs
0.00
0.00
0.00
(28) Frame
0.00
0.00
0.00
0.00
0.00
0.00
Carried Forward
EBC/ 1
revision 0
Element
Brought Forward
0.00
-
/ m
0.00
-
Specification
%
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Carried Forward
EBC/ 2
revision 0
Element
Brought Forward
0.00
-
/ m
0.00
-
%
0.00
-
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(- -) Builders Work
0.00
0.00
0.00
0.00
0.00
0.00
Carried Forward
Specification
EBC/ 3
revision 0
Element
Brought Forward
0.00
/ m
0.00
Specification
%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
(63) Lighting
0.00
0.00
0.00
(64) Communications
0.00
0.00
0.00
0.00
0.00
0.00
(66) Transport
0.00
0.00
0.00
0.00
0.00
0.00
(- -) Builders Work
0.00
0.00
0.00
0.00
0.00
0.00
Carried Forward
EBC/ 4
revision 0
Element
Specification
0.00
/ m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Brought Forward
0.00%
13.5%
%
0.00
EBC/ 5
revision 0
School Name
[Detailed Cost Plan/ Tender Analysis]
4.1
Group
Element
Stage [2a,2b,3]
Floor Area
0 m2
/ m
Specification
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
FFE/1
revision 0
School Name
[Detailed Cost Plan/ Tender Analysis]
5.0
Stage [2a,2b,3]
Floor Area
BBC Total
Abnormal Costs
Group
Element
0 m2
0
/ m
% of BBC
Specification/ Notes
0.00
0.00
0.00
2 *****************
0.00
0.00
0.00
3 *****************
0.00
0.00
0.00
4 *****************
0.00
0.00
0.00
5 *****************
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
13.5%
revision 0
revision 0
Guidance Notes To Design Teams on Completing the Detailed Cost Plan/ Tender Analysis
Template
General
This Detailed Cost Plan Template applies to Stages 2a, 2b Detailed Cost Plans and Stage 3 Tender
Analysis Submissions. Sheet T/1 should only be completed and included when this template is used
for Stage 3 Tender Analysis Submissions.
These guidance notes should be read in conjunction with the Department of Education and Skills 2007 Design
Team Procedures, Practice Notes and Cost Limit Circulars available at www.education.ie.
Costs should be entered against all relevent elements and sub elements. The grouping/ lumping of sub
element costs will not be accepted. In particular all relevent Mechanical and Electrical sub-elements must be
individualy costed.
This Template contains basic formulae for demonstration purposes only and it is the responsibility of the
Design Team Quantity Surveyor completing the Cost Plan to ensure correct calculation of all figures included.
On completion the cost plan must be signed and dated by the Design Team QS.
All fields in blue font in the cost plan template must be completed. Where sections do not apply zero should be
entered in the appropriate fields, e.g. 'Existing Area', etc.
VAT
The cost plan should include VAT at the current 'Building Rate' however it is brought to the Design Teams
attention that the Department requires that Stage 3 Tenders are sought on a VAT exclusive basis. Where this
template is applied for Stage 3 Submission VAT must be included.
Note 1
In accordance with the current DoES Published Cost Limit circular for Second Level Schools any applicable
additional PE Hall allowance should be included on the summary page (CPS/1) where indicated and the
applicable floor area should also be entered under 'New Build Areas/Ratios'.
Note 2
Fixed Furniture & Fittings:- For DoES Cost Data purposes Sanitary Installation element 74 should be included
under the BBC however where built in sink units integral to laboratory benching occur then they should be
included under Fixed Furniture & Fittings and not the BBC. Reference should also be made to the Cost Limit
Circulars when completing the Fixed Furniture and Fittings sections of the cost plan.
Note 3
In-order that the Department obtain realistic cost/m2 of floor area for 'Work to Existing Building' the following
guidelines should be applied:a) Where Work to the existing building is required the gross floor area should be given as that relative to
refurbishment work i.e. if only isolated areas/ rooms are being refurbished then only total floor area of isolated
areas/rooms should be applied.
b) Where any element(s) of work applies to the whole building area (e.g. envelope repairs/ re-roof/ rewire/
heating and plumbing etc.) then the total gross floor area of the existing building should be applied.
On most projects involving extension and refurbishment work 'b' will most likely apply. 'a' should only be
applied where work to areas/rooms are clearly isolated and may be clearly demarcated for accuracy in cost
planning. In either case the design team should clearly state which area has been applied.
Note 4
Where it is necessary to replace fixed furniture & fittings to existing building area then section 4.1 of the
template should be completed and included in cost plan.
CP/GN/28
revision 0
Where Abnormal Costs arise refer to the Department's Design Team Procedures. Any abnormal costs included
for consideration by the Department apart from being identified also require full justification by the
appropriate desciplines within the Design Team and must be fully cost justified with concise cost breakdowns
sufficient to demonstrate the extent and nature of the work i.e. basic areas/quantities and all in rates. Outline
specifications/ drawings should be provided where appropriate to indicate the extent and nature of the work.
Justification for each individual Abnormal included must be appended to the cost plan and clearly cross
referenced to each abnormal listed in the Abnormals section of the cost plan. The percentage for Abnormal
Costs on pages AC/ 1 and CPS/1 must be calculated relative to the New Build Basic Building Cost (BBC) only.
CP/GN/29
revision 0